Department of Transportation Office of Project Development 700 E Broadway Avenue Pierre, South Dakota 57501-2586 605/773-3268 FAX: 605/773-2614
October 28, 2016 ADDENDUM NO. 1
RE: Item #2, November 16, 2016 Letting - IM 0904(50)189, PCN 00GL, Jones County - PCC Overlay, PCC Surfacing, Asphalt Concrete Surfacing, Culvert Repair, & Edge Drains
TO WHOM IT MAY CONCERN: The following addenda to the plans shall be inserted and made a part of your proposal for the referenced project. SPECIAL PROVISIONS: NO CHANGE
BID ITEM FILE: NO CHANGE PLANS: Section L was added. Sincerely, Sam Weisgram Engineering Supervisor SW/cj CC: John Forman, Pierre Region Engineer Doug Sherman, Winner Area Engineer
Connecting South Dakota and the Nation
S.D.
R.
A.
252627
33 34
28
252630
31 32 35 36
2829
234
1415
2 13
910 11 12
1314151617
MURDO
POP. 612
FAS
FA
SFAS
FA
S
FAS
FAS
9083
90
83
Loop
35
Murdo
Dam
BEGIN IM 0904(50)189
END IM 0904(50)189
Exit 191 Exit 192
9083
MRM 191.15 (I-90E)
Str. # 38-166-196
West
Fork
Hay Creek
Hay
Creek
Johnny
Creek
Bull Creek
0+00
52
+70.6
105
+76.9
158
+78.1
209
+80.7
274
+74.5
340
+75.6
397
+20.5
450
+03.9
MRM 192.65 (I-90E)
Str. # 38-180-198
1456
Sta. b 227+77.37
Equation: Sta. a 227+31.49 =
Sta. c 381+36.61
Equation: Sta. b 380+91.82 =
M.R.M.= 198.00 + 0.049
Station c 445+70.00
Median Crossover, In Place
Station c 445+70.00
MRM 194.81 (I-90E)
Str. # 38-200-191/Approach Slabs
Sta. b 272+64 to Sta. b 273+84
Surfacing Exception
Sta. a 38+19.06
Equation: Sta. 38+18.00 =
Median Crossover, In Place
Sta. 0+00.00
MRM = 189.00 +0.634
Station 0+00.00
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
U:\rd\prj\jons00
GL\Title
L.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:7
920
Plotted Fro
m -
trpr1
4341
SECTION L: LIGHTING PLANS
INDEX OF SHEETS
Standard Plates
Wire Diagrams
Conduit Layouts
Estimate with General Notes and Tables
General Layout with Index
L10 to L12
L8 to L9
L4 to L7
L2 to L3
L1
L1 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
...\prj\jons00
GL\N
otesSectionL.d
gn
File -
Plotting Date: 08/10/2016
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4341
L2 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
...\prj\jons00
GL\T
able
Conduit.d
gn
File -
Plotting Date: 08/10/2016
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4341
CONDUIT AND CABLE QUANTITIES L3 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
6+007+00
8+00
9+00
10+00
11+00
a 62+00 a 63+00 a 64+00 a 65+00 a 66+00 a 67+00 a 68+00
I-90 EASTBOUND EXIT 191
CONDUIT LAYOUT
EA1
REA1 a 62+69-42’ R
REA2 a 64+68-51’ R
EA2
RAMP D
EA3
JL1
1-90 EASTBOUND
EJB2
EST UNITQUANTKEY ITEM
2" RIGID CONDUIT, SCHEDULE 40 FT
FT1/C #6 AWG COPPER WIRE
40SCH2"
#6
FT
2 EACH(EA1,EA2)REMOVE LUMINAIRE POLE FOOTING
(REA1,REA2)2’ DIAMETER FOOTING
14
2(REA1,REA2)REMOVE AND RESET LUMINAIRE POLE
ESTIMATE OF QUANTITIES
420
1,300
EACH
1 EACH(JL1)TYPE 1 ELECTRICAL JUNCTION BOX
U:\rd\prj\jons00
GL\a
062c.d
gn
File -
Plotting Date: 08/10/2016
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4341
1" = 40’SCALE
3#6
3#6
#63 40
SCH2"
#63 40
SCH2"
2"RGSC
L4 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
18+00
19+00
20+00
21+00
22+0023+00
a 93+00 a 94+00 a 95+00 a 96+00 a 97+00 a 98+00 a 99+00
24+00
P
I-90 EASTBOUND EXIT 191
CONDUIT LAYOUT
EA6
EA7
REA7 a 96+23-46’ R
REA8 a 98+08-40’ R
EA8
EJB5
RAMP C
1-90 EASTBOUND
LUMINAIR
E EA4
TO EXIS
TING
EST UNITQUANTKEY ITEM
2" RIGID CONDUIT, SCHEDULE 40 FT
FT1/C #6 AWG COPPER WIRE
40SCH2"
#6
FT
2 EACH(EA7,EA8)REMOVE LUMINAIRE POLE FOOTING
(REA7,REA8)2’ DIAMETER FOOTING
14
2(REA7,REA8)REMOVE AND RESET LUMINAIRE POLE
ESTIMATE OF QUANTITIES
390
1,210
EACH
U:\rd\prj\jons00
GL\a
093c.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4341
1" = 40’SCALE
3#6
3#6
#63 40
SCH2"
#63 40
SCH2"
2"RGSC
L5 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
6+007+00
8+00
9+00
10+00
a 146+00 a 147+00 a 148+00 a 149+00 a 150+00
P
P
P
1+002+00
a 141+00
CONDUIT LAYOUTI-90 EASTBOUND EXIT 192
1-90 EASTBOUND
ESG9
EC3
EC2
EC1
REC2 a 147+25-47’ R
REC1 a 145+30-37’ R
EXISTING POWER SOURCE
By West Central Electric1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,
EJC12
EJC13
EJB8
RAMP D
ECE3
RECE3
EJC14JL2
EST UNITQUANTKEY ITEM
2" RIGID CONDUIT, SCHEDULE 40 FT
FT1/C #6 AWG COPPER WIRE
40SCH2"
#6
FT
2 EACH
FT#10 1/C #10 AWG COPPER WIRE
(EC1,EC2)REMOVE LUMINAIRE POLE FOOTING
(REC1,REC2)2’ DIAMETER FOOTING
14
2(REC1,REC2)REMOVE AND RESET LUMINAIRE POLE
50
450
1,395
ESTIMATE OF QUANTITIES
EACH
FTSCRG1.5"
1.5" RIGID GALVANIZED STEEL CONDUIT 15
EC6TO
#63 40
SCH2"
U:\rd\prj\jons00
GL\a
141c.d
gn
File -
Plotting Date: 08/10/2016
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4341
1" = 40’SCALE
3#6
3#6
#63 40
SCH2"
2"SCH403
#10
2"SCH403
#10
2"SCH40 3
#10
2"SCH403
#10
3#62"
SCH40
2"SCH803
#10
#103
3#62"
SCH80
2"RGSC
SCRG1.5"
(JL2)TYPE 1 ELECTRICAL JUNCTION BOX
1 EACH
L6 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
10+00
11+00
12+00
13+0014+00 15+00
a 168+00 a 169+00 a 170+00 a 171+00 a 172+00 a 173+00 a 174+00
P
CONDUIT LAYOUTI-90 EASTBOUND EXIT 192
RED1 a 172+28-36’ R
ED1
RED2 a 170+27-46’ R
ED2EJB11
1-90 EASTBOUND
ED3
EXISTING POWER SOURCE
By West Central Electric1 Phase, 3 Wire Service120/240 v.a.c., 60 hz.,
RAMP C
ED6TO
TO EJB10
3#6
#6340
SCH2"
3#6
2"SCH80
3#6
#6340
SCH2"
U:\rd\prj\jons00
GL\a
168c.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:4
0Plotted Fro
m -
trpr1
4341
1" = 40’SCALE
3#62"
SCH80
EST UNITQUANTKEY ITEM
2" RIGID CONDUIT, SCHEDULE 40 FT
FT1/C #6 AWG COPPER WIRE
40SCH2"
#6
FT
2 EACH(ED1,ED2)REMOVE LUMINAIRE POLE FOOTING
(RED1,RED2)2’ DIAMETER FOOTING
14
2(RED1,RED2)REMOVE AND RESET LUMINAIRE POLE
ESTIMATE OF QUANTITIES
775
250
EACH
L7 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
WT
LU
MIN
AIR
EB
K
WT
BK
}
WT
LU
MIN
AIR
EB
K
WT
BK
included in these plans.Quantities for bonding conductors are notwith the NATIONAL ELECTRICAL CODE.All circuits shall be bonded in accordanceNOTE:
PHOTOCELL
REA1 REA2
EA3
#6 #6
#6
PHOTOCELL
EA6
#6
#6
#6
REA7 REA8
EJB5
#6
#6
#6
WIRING DIAGRAMI-90 EASTBOUND EXIT 191
RAMP DEASTBOUND
EJB2
(EJB1)JUNCTION BOX
EXISTINGTO
(EA4)LUMINAIREEXISTING
TO
RAMP CEASTBOUND
U:\rd\prj\jons00
GL\0
62099
w.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:8
0Plotted Fro
m -
trpr1
4341
2 amp. Dual Element
Sodium Lamp
LEGEND:
FUSE: 4 amp. Non-Time Delayor
LUMINAIRE: 250 watt High Pressure
BK
WT
LU
MIN
AIR
EB
K
BK
BK
WT
LU
MIN
AIR
EB
K
BK
BK
WT
BK
WTLUMINAIRE
BK
WT
BK
WTLUMINAIRE
BK
WT
BK
WTLUMINAIRE
BK
WT
BK
WTLUMINAIRE
L8 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189WIRING DIAGRAM
I-90 EASTBOUND EXIT 192
included in these plans.Quantities for bonding conductors are notwith the NATIONAL ELECTRICAL CODE.All circuits shall be bonded in accordanceNOTE:
U:\rd\prj\jons00
GL\1
45172
w.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:8
0Plotted Fro
m -
trpr1
4341
Sodium Lamp
LEGEND:
FUSE: 4 amp. Non-Time Delayor
2 amp. Dual Element
LUMINAIRE: 250 watt High Pressure
WTLUMINAIRE
BK
WT
BK
#6
WTLUMINAIRE
BK
WT
BK
REC2
REC1
EJB8
#6 #6 #6
#6
RAMP DEASTBOUND
(EC6)LUMINAIREEXISTING
TO
}(WEST CENTRAL ELECTRIC)EXISTING POWER SOURCE
TO
(ESG9)ROAD CLOSURE GATEEXISTING DROP ARM
TO
BK
WT
BK
WT
LU
MIN
AIR
EB
K
WT
BK
WT
LU
MIN
AIR
E
EC3
PHOTOCELL
#6
WTLUMINAIRE
BK
WT
BK
#6
WTLUMINAIRE
BK
WT
BKED3
RED2
RED1
EJB11
#6 #6#6
#6
}
RAMP CEASTBOUND
(WEST CENTRAL ELECTRIC)EXISTING POWER SOURCE
TO
PHOTOCELL
(ED6)LUMINAIREEXISTING
TO
}(EJB10)
JUNCTION BOXEXISTING
TO
BK
WT
BK
WT
LU
MIN
AIR
EB
K
WT
BK
WT
LU
MIN
AIR
E
141+00 - 55’ R
RECE3
SIG
N
TO W
AR
NIN
G
RSC
REJC14
BOX
JUNCTION
DISCONNECT SWITCH
WIRING
SIGNING
ADVANCED
RESET
SOURCE
POWER
L9 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
...\prj\jons00
GL\s
63501s63521.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4341
L10 L12
DAKOTA
SOUTH
STATE OFPROJECT
SHEETSHEETS
TOTAL
IM 0904(50)189
...\prj\jons00
GL\s
63555s63565.d
gn
File -
Plotting Date: 08/05/2016
Plot Scale -
1:2
00
Plotted Fro
m -
trpr1
4341
L11 L12