1-1 1. Introduction 1.1 Project Overview The Western Highway (A8) in Victoria is the principal road link between Melbourne and Adelaide. The highway serves interstate trade between Victoria and South Australia, and is the key transport corridor through Victoria’s west. It also supports the farming industry, grain production, regional tourism, and a range of manufacturing and service activities in Victoria’s west. Currently, more than 5500 vehicles travel the highway west of Ballarat each day, including 1500 trucks. In terms of freight movements the Western Highway is one of the busiest highways in the country with the traffic expected to double by 2025. VicRoads identified the need to upgrade the Western Highway in order to: Improve road safety at intersections Improve safety of access to adjoining properties Enhance road freight efficiency Reduce travel time Provide better access to local facilities Improve roadside facilities Complement future bypasses of Beaufort and Ararat The Western Highway is part of the National Land Transport Network, the national network of strategically important land transport linkages. As part of the Nation Building Program (which assists national, regional economic and social development by the provision of funding aimed at improving the performance of land transport infrastructure) VicRoads was allocated funding from both the Commonwealth and State Governments to progressively upgrade the Western Highway into a four-lane divided highway. This Project, known as the Western Highway Project, extends for approximately 100 kilometres (km), commencing at the western edge of Ballarat and finishing at the south-eastern edge of Stawell. The Western Highway Project (the Project) has been split into a series of sections for planning and delivery purposes: Ballarat to Beaufort (Section 1) Beaufort to Ararat (Section 2) Ararat to Stawell (Section 3). Works on an initial 8km segment between Ballarat and Burrumbeet (Section 1a) commenced in April 2010 and will be completed in 2012. Works on a 23.5km segment between Burrumbeet and Trawalla (Section 1b) commenced in May 2012 with completion expected in 2014. Construction of a 3km segment from Trawalla to Beaufort commenced in November 2011 and is expected to be completed in 2012. Sections 2 and 3 are still in the planning phase of the Project, and are the subject of separate Environment Effects Statements (EESs). The full length of the duplication is expected to be completed and opened in stages through to 2016, subject to future funding. Town bypasses of Beaufort and Ararat are not included in the current proposals. The Project sections are shown in Figure 1-1. A summary of each Project section and the current status of each section are provided in Table 1-1. The Section 2 Project area is shown in Figure 1-2. Buangor looking east along the Western Highway Table 1-1 Western Highway Project stages Section Location Length (approximate) Status 1a Ballarat to Burrumbeet 8km Construction commenced in April 2010, and is expected to be completed in 2012 1b Burrumbeet to Trawalla 23.5km Construction commenced in 2012 and is expected to be completed in 2014 1c Trawalla to Beaufort 3.2km Construction commenced in late 2011 and be completed in 2012 2 Beaufort to Ararat 38km Planning phase. Programed for construction between 2013 and 2016 3 Ararat to Stawell 24km Planning phase. Programed for construction between 2014 and 2016, subject to future funding.

Upload: others

Post on 03-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-1

1. Introduction

1.1 Project Overview The Western Highway (A8) in Victoria is the principal road link between Melbourne and Adelaide. The highway serves interstate trade between Victoria and South Australia, and is the key transport corridor through Victoria’s west. It also supports the farming industry, grain production, regional tourism, and a range of manufacturing and service activities in Victoria’s west. Currently, more than 5500 vehicles travel the highway west of Ballarat each day, including 1500 trucks. In terms of freight movements the Western Highway is one of the busiest highways in the country with the traffic expected to double by 2025.

VicRoads identified the need to upgrade the Western Highway in order to:

Improve road safety at intersections

Improve safety of access to adjoining properties

Enhance road freight efficiency

Reduce travel time

Provide better access to local facilities

Improve roadside facilities

Complement future bypasses of Beaufort and Ararat

The Western Highway is part of the National Land Transport Network, the national network of strategically important land transport linkages. As part of the Nation Building Program (which assists national, regional economic and social development by the provision of funding aimed at improving the performance of land transport infrastructure) VicRoads was allocated funding from both the Commonwealth and State Governments to progressively upgrade the Western Highway into a four-lane divided highway. This Project, known as the Western Highway Project, extends for approximately 100 kilometres (km), commencing at the western edge of Ballarat and finishing at the south-eastern edge of Stawell.

The Western Highway Project (the Project) has been split into a series of sections for planning and delivery purposes:

Ballarat to Beaufort (Section 1)

Beaufort to Ararat (Section 2)

Ararat to Stawell (Section 3).

Works on an initial 8km segment between Ballarat and Burrumbeet (Section 1a) commenced in April 2010 and will be completed in 2012. Works on a 23.5km segment between Burrumbeet and Trawalla (Section 1b) commenced in May 2012 with completion expected in 2014. Construction of a 3km segment from Trawalla to Beaufort commenced in November 2011 and is expected to be completed in 2012. Sections 2 and 3 are still in the planning phase of the Project, and are the subject of separate Environment Effects Statements (EESs). The full length of the duplication is expected to be completed and opened in stages through to 2016, subject to future funding. Town bypasses of Beaufort and Ararat are not included in the current proposals.

The Project sections are shown in Figure 1-1. A summary of each Project section and the current status of each section are provided in Table 1-1.

The Section 2 Project area is shown in Figure 1-2.

Buangor looking east along the Western Highway

Table 1-1 Western Highway Project stages

Section Location Length (approximate)

Status

1a Ballarat to Burrumbeet 8km Construction commenced in April 2010, and is expected to be completed in

2012

1b Burrumbeet to Trawalla 23.5km Construction commenced in 2012 and is expected to be completed in 2014

1c Trawalla to Beaufort 3.2km Construction commenced in late 2011 and be completed in 2012

2 Beaufort to Ararat 38km Planning phase. Programed for construction between 2013 and 2016

3 Ararat to Stawell 24km Planning phase. Programed for construction between 2014 and 2016, subject to future funding.

Page 2: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-2

Figure 1-1 Western Highway Project Sections

3

1b1a

1c

2

GR

AMPI

ANS

NAT

ION

ALPA

RK

AVO

CA

ME

LTO

N

MA

LD

ON

TE

RA

NG

CR

ES

SY

SK

IPT

ON

SU

NB

UR

Y

KY

NE

TON

KIL

MO

RE

DU

NO

LLY

MO

RT

LA

KE

GIS

BO

RN

E

WE

RR

IBE

E

ING

LE

WO

OD

HE

AT

HC

OT

E

PE

NS

HU

RS

T

DA

YL

ES

FO

RD

BA

CC

HU

S M

AR

SH

AR

AR

AT

BE

AU

FO

RT

ME

LB

OU

RN

E

HO

RS

HA

M

BE

ND

IGO

STA

WE

LL

GE

ELO

NG

BA

LLA

RA

T

ST

AR

NA

UD

CA

MP

ER

DO

WN

MA

RY

BO

RO

UG

HC

AS

TL

EM

AIN

E

G:\

31

\27

55

8\G

IS\M

ap

s\D

eliv

era

ble

s\S

tag

e 2

\EE

S R

EP

OR

T\0

7 P

roje

ct D

esc

rip

tion

\31

27

55

8_

S2

_0

04

_P

roje

ct_

Se

ctio

ns

_A

4L

.mxd

Da

ta s

ou

rce

: G

HD

, 2

01

2;

DS

E, V

icM

ap

, 2

01

2;

Vic

Ro

ad

s, 2

01

2

Map

Pro

ject

ion:

Tra

nsv

erse

Me

rca

tor

Hor

izo

nta

l Da

tum

: G

DA

19

94G

rid: G

DA

199

4 M

GA

Zo

ne 5

4E

ES

co

pyr

igh

t and

dis

clai

me

r a

ppl

ies

010

2030

5

Kilo

met

res

Sec

tion

1 P

roje

ct A

rea

Sec

tion

2 P

roje

ct A

rea

Sec

tion

3 P

roje

ct A

rea

Fre

eway

Hig

hway

Sea

led

roa

d (a

rter

ial &

loca

l)

Tow

nshi

p ar

ea

Par

ks a

nd R

eser

ves

Sta

te F

ores

t

AR

AR

AT

BE

AU

FO

RT

AD

EL

AID

E

ME

LB

OU

RN

E

to a

de

laid

e

Page 3: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-3

Figure 1-2 Western Highway Project – Section 2 Project Area

AR

AR

AT

RA

GL

AN

BU

AN

GO

R

BE

AU

FO

RT

MID

DL

E C

RE

EK

LAN

GI G

HIR

AN S

TATE

PAR

KM

OU

NT

BUAN

GO

R S

TATE

PAR

K

Wes

tern

Hw

y

Pyrenees H

wy

Gee

long

Rd

Tatyoon Rd

War

rak

Rd

Amphith

eatre

R

d

Buangor - Ben Nevis Rd

Skipton Rd

Hel

endo

ite R

d

Challicum R

d

Main Lead Rd

Stockyard Hill

Rd

Eurambeen - Stre

atham Rd

Raglan - Elmhurst R

d

Eur

ambe

en

- Raglan Rd

Tatyoon North Rd

Mo

un

t Co

le R

d

Old

Shi

rley

Rd

Eliz

abet

h S

t

Tatyoon Rd

Raglan - E

lmhurst R

d

BE

AU

FO

RT

RE

SE

RV

OIR

FIE

RY

CR

EE

K

HO

PKIN

S RIVER

MID

DLE C

RE

EK

GO

RR

IN C

R

EEK

SPR

IN

G C

REE

K

JAC

KS

ON

S C

RE

EK

AVOCA RIVER

CA

PT

AIN

S C

REE

K

WIM

ME

RA

RIV

ER

TRAWALLA C

RE

EK

BUCK

ING

HA

M C

REE

K

G:\

31

\27

55

8\G

IS\M

ap

s\D

eliv

era

ble

s\S

tage

2\E

ES

RE

PO

RT

\07

Pro

ject

De

scri

ptio

n\3

12

75

58

_S

2_

00

2_

Pro

jec

t_A

rea

_A

4L

.mxd

Da

ta s

ou

rce

: G

HD

, 2

01

2;

DS

E,

Vic

Ma

p,

20

12

; V

icR

oa

ds,

20

12

Map

Pro

ject

ion:

Tra

nsv

erse

Me

rca

tor

Hor

izo

nta

l Da

tum

: G

DA

19

94G

rid: G

DA

199

4 M

GA

Zo

ne 5

4E

ES

co

pyr

igh

t and

dis

clai

me

r a

ppl

ies

05

2.5

Kilo

met

res

LEG

EN

D Pro

ject

Are

a

Hig

hw

ay

Se

ale

d r

oa

d (

art

eri

al &

loca

l)

Un

sea

led

ro

ad

Ma

jor

wa

ter

are

a

Ma

jor

wa

ter

cou

rse

Ra

il

Page 4: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-4

1.2 EES Project Summary This EES is for Section 2 (Beaufort to Ararat) of the Western Highway Project. This Section commences at the railway crossing near Old Shirley Road west of the Beaufort township, and extends for a distance of approximately 38km west to Heath Street, Ararat.

The objectives of the Project are:

To provide safer conditions for all road users by:

Reducing the incidence of head-on and run-off road crashes

Improving safety at intersections; and Improving safety of access to adjoining

properties To improve the efficiency of freight by designing

for High Productivity Freight Vehicles.

To provide adequate and improved rest areas.

To locate the alignment to allow for possible future bypasses of Beaufort and Ararat.

1.2.1 Scope of Project The Western Highway is currently supporting a large variety of vehicle types ranging from tourist traffic and commuter traffic to large B double trucks and some farm machinery. The numbers of vehicles on the highway is also increasing which means that there is an increasing problem of queuing behind slow moving vehicles.

The current configuration of the Western Highway is a two lane, single carriageway highway. The configuration of the highway has remained unchanged for almost a century in some locations.

In order to achieve the above Project objectives, VicRoads is proposing to duplicate the Western Highway between Beaufort and Ararat.

Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek crossings and a bypass of the township of Buangor.

The town bypass of Buangor is included within the scope of the EES, but the bypasses of Beaufort and Ararat are not.

1.2.2 Requirements for an EES and Controlled Action

On 27 October 2010, the then Victorian Minister for Planning determined that an EES was required to document the likely environmental effects of the Project.

On the 17 December 2010, the delegate for the Commonwealth Minister for Sustainability, Environment, Water, Population and Communities determined the Project to be a controlled action that requires assessment and approval under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). The EES process is to be applied as an accredited process under the

EPBC Act in accordance with the bilateral agreement between the Commonwealth and Victorian governments. This means that the Minister for Sustainability, Environment, Water, Population and Communities will make a decision whether to approve the Project under the EPBC Act, based on the EES and not a separate assessment process.

1.2.3 EES Project Area The Project area defines the area that was considered for alignment options and was studied to assess potential impacts and benefits for the EES. The Project area, for the purposes of the EES, is approximately 1.5km either side of the existing highway but excludes some areas of environmental and social sensitivity, being Langi Ghiran State Park and Green Hill Lake. This allowed for assessment of options where the alignments deviated from the existing highway.

Figure 1-1 shows the Project area boundary and Technical Appendix A contains map books that show the proposed alignment options. Some of the assessments undertaken to inform this EES have adopted larger study areas than the Project area for the purposes of characterising relevant effects. These are described in the assessment reports appended to this EES and the associated chapters.

1.3 Project Proponent The proponent for the Project is the Roads Corporation (VicRoads). VicRoads is a statutory authority whose responsibilities are outlined in the Transport Integration Act 2010. It is one of several State Government agencies that assist the Government to achieve its integrated transport policy objectives. VicRoads also administers a number of other Acts and Regulations including the Road Management Act 2004 and the Road Safety Act 1986. The VicRoads Chief Executive is accountable to the Minister for Roads, reporting through the Secretary of the Department of Transport.

VicRoads supports Victoria’s liveability and economic prosperity by planning, developing and managing the arterial road network and delivering registration and licensing services. VicRoads manages over 52,000km of road lanes and 3,300 bridges, and processes more than 4 million transactions a year for 3.7 million licensed drivers and 4.9 million registered vehicles.

As the statutory authority for arterial roads (including highways and freeways), VicRoads is responsible for the duplication of the Western Highway and is the proponent for this Project.

1.4 Structure of Environment Effects Statement

The draft EES Scoping Requirements were placed on public exhibition in May 2011 and then issued by the Minister for Planning in their final form in September 2011.

Page 5: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-5

The EES Scoping Requirements provide guidance on the range of environmental matters to be investigated and documented in the EES including Commonwealth requirements under the EPBC Act.

This EES is generally structured in accordance with these EES Scoping Requirements. Table 1-2 summarises the structure of the document and the content of each chapter.

Table 1-2 EES Structure

Chapter No. Chapter title Chapter summary

1 Introduction Describes the Project and the proponent, and the objectives of the Project.

2 Project Rationale Describes the rationale and policy context for the Project.

3 Legislation, Policy and Assessment Framework

Describes the approvals framework and the relevant legislation and policies to the Project.

4 Approach to the EES

Describes the methodology used to prepare this EES including selection of a preferred and alternate alignment option, assessment of environmental risks, assessment of potential impacts and development of measures to ameliorate or manage impacts.

5 Project Alternatives Describes alternative proposals which may still allow the objectives of the Project to be met, and details reasons for the selection and rejection of particular options.

6 Project Description Outlines the proposed development and its components for both construction and operation.

7 Stakeholder and Community Engagement

Describes the key stakeholders in the Project, the consultation undertaken by the proponent in relation to the Project, and the major issues identified by stakeholders and the community.

8 Planning and Land Use

Describes the physical, biological, cultural, social and economic environments that the Project would operate within, the potential risks and impacts of the Project upon the existing environment, the mitigation and management measures that would be undertaken to minimise these risks, and the estimated residual environmental effects of the Project.

9 Traffic and Transport

10 Soils and Geology

11 Groundwater

12 Surface Water

13 Biodiversity and Habitat

14 Cultural Heritage

15 Air Quality

16 Noise and Vibration

17 Visual and Landscape

18 Social

19 Economic

20 Matters of National Environmental Significance

Summarises the assessment of matters of national environmental significance that are required to be addressed under the Commonwealth Environment Protection and Biodiversity Conservation Act 1999.

21 Environmental Management Framework

Outlines the VicRoads safety and environmental management process, describes the environmental management plan that would be used in the construction, operation and rehabilitation of the Project. It also outlines the monitoring programs, auditing and reporting that would be carried out for the Project, and any environmental offsets that VicRoads is committed to.

22 Planning Scheme Amendment Describes the process that would be undertaken to achieve planning approvals for the Project.

22 Conclusion Presents the conclusions of the EES.

To characterise the baseline conditions of the environment and assess the potential impacts from the Project, a number of specialist studies were completed. These are outlined in Table 1-3, along with the corresponding EES chapter. These technical reports have been attached as appendices to the EES.

Note that where the conditional tense is used throughout the EES (e.g. the use of the word ‘would’ rather than ‘will’), this is in reference to the possibility that the Project may not be approved and may therefore not proceed.

Page 6: Section 2 Chapter 1 Introduction Final · Section 2 of the Project assessed in this EES involves the construction of dual two-lane carriageways containing one rail crossing, six creek

1-6

Table 1-3 Studies completed for the Western Highway Project EES

Study Organisation Relevant EES Chapter Relevant Technical Appendix

Planning and Land Use GHD Pty Ltd Chapter 8 Technical Appendix C

Traffic and Transport GHD Pty Ltd Chapter 9 Technical Appendix D

Soils and Geology GHD Pty Ltd Chapter 10 Technical Appendix E

Groundwater GHD Pty Ltd Chapter 11 Technical Appendix F

Surface Water GHD Pty Ltd Chapter 12 Technical Appendix G

Biodiversity and Habitat Ecology & Heritage Partners Pty Ltd Chapter 13 Technical Appendix H

Cultural Heritage Andrew Long & Associates Chapter 14 Technical Appendix I

Air Quality GHD Pty Ltd Chapter 15 Technical Appendix L

Noise and Vibration GHD Pty Ltd Chapter 16 Technical Appendix M

Visual and Landscape ASPECT Pty Ltd Chapter 17 Technical Appendix N

Social GHD Pty Ltd Chapter 18 Technical Appendix O

Economic GHD Pty Ltd Chapter 19 Technical Appendix P

Western Highway looking east from the Hopkins River