Sharing of Plan Audit Findings
Scope
- Introduction
- Audit Process
- Common issues found during plan audit
- Conclusion
Introduction
- Importance of submitting plans:
- Compliance with Fire Code
- Complete with all details
- Plans with non-compliant issues/incomplete plans
- Clarification with QP, resulting in delay to obtain
TFP/FSC
- Checklists for the necessary and useful details to be
shown on the fire safety plans for submission to SCDF
- FSSD Circular (5 May 09): Checklists For
Submissions of New and Addition/Alteration Fire
Safety Works
Audit Check Process
No
Yes
No
START
•Audit cases randomly selected by computer
•Audit cases manually converted to audit
ACC (Audit Check
Committee)
Any non-compliant
item?
PO
Updae case status
to “CHK”
PO
Inform QP to :
• clarify/explain in writing
• attend ACC hearing
ACC
Clarification/explanation
accepted?
PO
•Present the case to AIC
•Inform the QP to submit amendment plans
1
Yes
PO
Inform the QP to
submit amendment
plans
AUDIT CHECK PROCESS
Yes
END
PO: processing officer
ACC: Audit Check Committee
AIC: Audit Inquiry Committee
CHK: status update to “checked”
Note: 1. Audit will continue regardless
whether the plans are withdrawn.
2. Audit is on the plans/documents approved by SCDF
- subsequent plans/documents sent via CORENET are not valid after plans are approved
Yes
PO
Inform the QP about the AIC’s decision
AIC (Audit Inquiry Committee)
Determine the severity of the non-
compliance and determine the action to
be taken
- Letter of Warning
- Fine
PO
Inform the QP to submit amendment plans
1
END
PO
Update case status to “CLD”
ACC
Amendment plans
accepted?
NoAudit Process
• Audit is only on the changes highlighted In the amendment plans
• Amendment plans will be audited if main plan is selected for audit check
CLD: case status update to
“closed”
Audit Process Reply to Audit Clarification Letter
- Submission of explanation letter via email- Explanation letter with QP signature and company letter head
Audit Check Committee (ACC) Meet once a week Go through replies by QPs Hear explanation from QPs for major non-compliant projects Committee comprises:
Assistant Director, Fire Safety Plans Compliance Branch Audit Team Leader Processing Officer
Audit Inquiry Committee (AIC)- Hear explanation from QPs with major non-compliant projects- Committee comprises:
- Dir FSSD- Deputy Dir FSSD- Assistant Dir FSSD- Rep from SIA, IES, ACES
- Report to Comr for approval
Information to show on plans
- QP endorsement
- SCDF endorsement (BP/MAA)
- Year of Fire Code
- Project title to tally with plans, e.g. unit no.
- Space of 150 mm x 100mm on top right hand corner
shall be kept blank
- To provide
- Location plan – A/A & new erection
- Whole floor layout plans
- Detail unit layout plans
- Sectional /elevation view
- Site plan – new erection
* Plans to be in scale
QPEndorsement
Miscellaneous
Project Title
• Means of access to site
• Distances between buildings
• Location of existing and proposed internal fire hydrant
10Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Common issues found during plans audit:
• Wrong submission
• Missing endorsements
• Missing information
• Non-compliances
11Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Description Mistake made by QP Remarks
Minor A/A lodgementscheme.
Wrong lodgement by QP for - new erections- A/A works not carried out in
office or shop
- New erections cannot be lodged under the MAA lodgement scheme.
- MAA lodgement is only applicable for approved shop/office with valid TFP/FSC.
Wrong Submission
Waiver Ref: WVR/01234/11Issue: To waive the provision of 2 exit staircases for restaurant at 2nd storeyDecision: Granted with condition that the occupant load shall not exceed 40 persons.
To indicate waiver details on plan
½ hr fire rated door
1 hr fire rated wall
Proposed
Restaurant
• Waiver info• On the relevant floor(s)• Ref. no. • Issue• Decision• Condition (if any)
Missing endorsement
13Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Description Mistake made by QP Remarks
Endorsements (e.g. Smoke purging, engineered smoke control, type of fire protection system, etc.) by QP missing from plans
No annotation of fire safety provisions on plans- Smoke purging system- Engineered smoke control system- One and two way emergency voice
comms system- Fire protection system, e.g.
sprinkler, auto alarm, manual alarm
Type of fire safety provisions shall be endorsed on the building plans
Missing endorsement
14Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
3.5 Calculation of setback distance for unprotected openings
Additional plans were not provided to show the detail calculations of setback distance. - Sizes/locations of enclosing
rectangles- Areas with unprotected
openings- Calculation of setback distance
To provide additional plans to clearly defined the enclosing rectangles and unprotected openings. This would reduce the need for further clarification from the audit processing officers.
Missing information
Fire resistance ratings of compartment walls, fire doors, shutters, etc. not indicated on plans
Shutter to indicate with insulation
rating, if required
• To indicate the fire rating on the plans(including protected shafts)
• For new projects, to indicate the ratingof element of structure
Missing information
HR Hose reel
Note:
- Location of landing valve
- 1st priority: firefighting lobby
- other locations not stated in Fire Code not acceptable
- Landing valve:
- not in protected area shall be fire rated (including the landing valve)
- facing external corridor – only walls to be fire rated
- double standby hose only allowed when all exit staircases are provided with
landing valve
- shall not affect path of escape when locate in exit staircase
- Hose reel to locate not more than 5m from exit/exit access door
HRHR
WR/DR landing valve and HR
Missing information
Occupant load (OL) & Exit capacity (EC)
calculations
- To submit OL and EC calculations for all new
projects
- To submit for change of use for unit
- To highlight in the project title that there is
change of use
- To recalculate the occupant load of the
floor involved in change of use
- To ensure new occupant load does not exceed exit capacity
Missing information
18Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
4.2.2 Length of fire engine accessway
No calculation to show the required length of fire engine accessway for the development- Cubical extent (Pg 6 & 8)- Largest AFA (Pg 3,4,5 & & 7)- Perimeter of building
To provide the following information on site plans or 1st
storey plan:- cubicle extent/ largest AFA- Perimeter of building- Required length of fire
engine accessway
Example of information provided for fire engine accessway
Missing information
Other Endorsements
- Hearing impaired provision
- To indicate the evacuation lift (building more than 24m)
- Passenger lifts shall be designed in accordance with cl. 3.1.3 of appendix 21 (Fire Code 2013)/cl. 6.6.5 b(4) (Fire Code 2018) so that they are used as evacuation lift during evacuation
- Detector at lobby if no sprinkler or detector
20Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
9.1.1a(2) Discharge of exit staircase from basement for Pg 1 buildings with four or more levels (including basement and attics)
Staircase serving basement(s) discharge internally into living area at 1st storey.
Need to comply with staircase serving basement to discharge directly to external requirements if there are four or more levels- Levels include basement(s) and attic.
Non-compliances
21Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
9.1.1b(2) Compartmentation of staircase serving basement with four or more levels
- Staircase is not compartmented at 1st
- Fire door is provided at basement
To comply with staircase compartmentation of exit staircase requirements if there are four or more levels- Fire rated door shall be
provided at 1st storey (not basement)
Voids connecting basement and 1st shall be compartmented
Lift serving basement shall be compartmented from 1st
storey
Non-compliances
22Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
6.3.6 Provision of HFAD Provision of HFAD for PG 1 building not indicated on plan
Numbers and location of HFADs to be annotated on the floor plans.
Non-compliances
23Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
4.4.1 Provision of fire hydrant
Locations of fire hydrants were not indicated on the plans
The fire hydrant (as well as the fire engine access road/accessway serving the development) shall be annotated on the 1st storey plans
Non-compliances
24Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
9.6.1(2)(d)
Fire resistance rating of floor and supporting structures of mezzanine in industrial premises
No fire resistance ratings for:- Mezzanine floor- Columns and beams for
mezzanine floor
Mezzanine is considered as a storey, hence the element of structure shall have at least 1-hr fire resistance rating.
Non-compliances
Mezzanine Floor
Fire rated & min 1m width
• Fire rated• Shall only be used for factory, store and/or ancillary office.
Max area
26Public Protection: Pragmatic in Approach. Professional in Service.
FSD
Clause Description Mistake made by QP Remarks
9.3.3e(3) Natural and cross-ventilation for internal corridor at workers’ dormitory
Internal corridor:- is not effectively cross-
ventilated- mechanically
ventilated
Corridors serving dormitory shall be:- Naturally ventilated - Cross ventilated
- Openings for ventilation to comply with Fire Code requirements.
Non-compliances
Type of ventilation system- Exit staircase - Smoke stop lobby- Corridor (e.g. hotel, healthcare)
PG II- Mechanical ventilation for smoke stop/firefighting lobby is not allowed- Mechanical ventilation for exit staircase is not allowed except staircase storey shelter
- Condition: at least 2 exit staircases, one of them must be naturally ventilated
Non-compliances
Size of air-well in accordance with Cl. 1.4.2
Table 1.4.2: Minimum Air-well size
Fire Code 2018
x
93 sqm
<9m
<9m
Cl. 2.2.13: Every part of the smoke stop lobby shall not be more than 9m
from an air-well (at least 6m in width and 93 sqm in area)
Thank You