scale: 1/2=1'-0 11'-0 max. eq

12
2" CROSS PIPE LENGTH CANTILEVER, 40% OF MAX E-W PIER SPACING E-W PIER SPACING CANTILEVER, 40% OF MAX E-W PIER SPACING E-W PIER SPACING 7'-6" TOP CAP RAIL CONNECTOR B EQ. EQ. 11'-0" MAX. 7'-6" 2'-6" MAX. H F D C 2" PIER PIPE 1 ENGINEERED FOUNDATION DIAGONAL BRACING, AS NEEDED 2" CROSS PIPE 1 IRONRIDGE RAIL PV MODULE IRONRIDGE UNIVERSAL FASTENING OBJECT FINAL GRADE FOUNDATION DEPTH PIER EMBEDMENT = 2/3 FNDN DEPTH 2" PIPE 1 CONCRETE FOUNDATION, 2500PSI MIN 2" PIPE 1 FOUNDATION DEPTH *ADDITIONAL ENGINEERING REQUIRED 2" PIPE 1 FOUNDATION DEPTH BY OTHERS, SPECIFICATIONS VARY *ADDITIONAL ENGINEERING REQUIRED 2" PIPE 1 FOUNDATION DEPTH BY OTHERS, SPECIFICATIONS VARY PV MODULE FRAME IRONRIDGE RAIL IRONRIDGE STOPPER SLEEVE IRONRIDGE UNIVERSAL FASTENING OBJECT 1" IRONRIDGE STOPPER SLEEVE PV MODULE FRAME IRONRIDGE RAIL IRONRIDGE UNIVERSAL FASTENING OBJECT 1" PV MODULE FRAME DETAIL, MID CLAMP PLAN 3 8 " IRONRIDGE UNIVERSAL FASTENING OBJECT IRONRIDGE UNIVERSAL FASTENING OBJECT PV MODULE FRAME IRONRIDGE RAIL DETAIL, MID CLAMP FRONT 2" PIPE 1 IRONRIDGE 2" TOP CAP IRONRIDGE XR RAIL PV MODULE, BY OTHERS IRONRIDGE 2" RAIL CONNECTOR PIPE FITTINGS DETAIL 2" PIPE 1 IRONRIDGE 2" TOP CAP IRONRIDGE XR RAIL PV MODULE, BY OTHERS IRONRIDGE 2" RAIL CONNECTOR IRONRIDGE UNIVERSAL FASTENING OBJECT SHEET NAME JOB NO. ISSUE DATE SHEET NO. SHEET SIZE 24X36 1495 ZEPHYR AVE, HAYWARD, CA 94544 800.227.9523 IRONRIDGE.COM NOT FOR CONSTRUCTION REVISION HISTORY APPROVAL STATUS REV DESCRIPTION DATE 2.09 GM PV SYSTEM DETAILS 3-UP 2" (UFO) JUNE 2018 IR 1.0 Scale: 1/2"=1'-0" 3-UP - PV SYSTEM PLAN DETAIL A Scale: 3/4"=1'-0" 3-UP - PV SYSTEM SIDE SECTION B CLIENT NAME PROJECT NAME PROJECT ADDRESS SYSTEM KW DC IRONRIDGE GROUND MOUNT SYSTEM Scale: 1/2"=1'-0" DRILL/POUR FOUNDATION J Scale: 1/2"=1'-0" DRIVEN PIER FOUNDATION L Scale: 1/2"=1'-0" HELICAL PILE FOUNDATION M 6"=1'-0" DETAIL, END CLAMP (UFO) PLAN G 6"=1'-0" DETAIL, END CLAMP (UFO) FRONT H 6"=1'-0" DETAIL, MID CLAMP PLAN E 6"=1'-0" DETAIL, MID CLAMP FRONT F 3"=1'-0" PIPE FITTINGS DETAIL C 3"=1'-0" PIPE FITTINGS DETAIL D SHEET NOTES SNOW LOAD, PSF EXPOSURE CAT MODULE TYPE RISK CAT WIND SPEED, MPH MODULE W DC MODULE QTY - - - - 72-CELL, GENERIC 1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS) Scale: 1/2"=1'-0" EARTH SCREW FOUNDATION K

Upload: others

Post on 09-Nov-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

1

'-

0

"

M

A

X

.

7'-6"

2'-6" MAX.

H

F

D

C

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

IRONRIDGE RAIL

PV MODULE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

DETAIL, MID CLAMP PLAN

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, MID CLAMP FRONT

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

3-UP 2" (UFO)

JUNE 2018

IR 1.0

Scale: 1/2"=1'-0"

3-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

3-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SHEET NOTES

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 2: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) PLAN

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

*ADDITIONAL ENGINEERING REQUIRED

E

Q

.

E

Q

.

1

1

'-

0

"

M

A

X

.

7'-6"

2'-6" MAX.

H

F

D

C

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

IRONRIDGE RAIL

PV MODULE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

FINAL GRADE

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

3-UP 2" (CAMO)

JUNE 2018

IR 1.1

Scale: 1/2"=1'-0"

3-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

3-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SHEET NOTES

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 3: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

4

'-

0

"

M

A

X

.

7'-6"

VARIES

H

F

D

C

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

PV MODULE

IRONRIDGE STOPPER SLEEVE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, MID CLAMP FRONT

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

4-UP 2" (UFO)

JUNE 2018

IR 2.0

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

Scale: 1/2"=1'-0"

4-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

4-UP - PV SYSTEM SIDE SECTION

B

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 4: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

4

'-

0

"

M

A

X

.

7'-6"

VARIES

H

F

D

C

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

PV MODULE

IRONRIDGE STOPPER SLEEVE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) PLAN

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, MID CLAMP FRONT

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

4-UP 2" (CAMO)

JUNE 2018

IR 2.1

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

Scale: 1/2"=1'-0"

4-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

4-UP - PV SYSTEM SIDE SECTION

B

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 5: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

TOP CAP

RAIL CONNECTOR

B

9'-0"

E

Q

.

E

Q

.

1

7

'-

0

"

M

A

X

.

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

9'-0"

VARIES

H

F

D

C

PV MODULE

IRONRIDGE STOPPER SLEEVE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM PLAN DETAIL

A

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM SIDE SECTION

B

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

5-UP 2" (UFO)

JUNE 2018

IR 3.0

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 6: Scale: 1/2=1'-0 11'-0 MAX. EQ

2" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

TOP CAP

RAIL CONNECTOR

B

9'-0"

E

Q

.

E

Q

.

1

7

'-

0

"

M

A

X

.

2" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

2" CROSS PIPE

1

9'-0"

VARIES

H

F

D

C

PV MODULE

IRONRIDGE STOPPER SLEEVE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM PLAN DETAIL

A

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM SIDE SECTION

B

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

5-UP 2" (CAMO)

JUNE 2018

IR 3.1

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (12GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 7: Scale: 1/2=1'-0 11'-0 MAX. EQ

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

1

'-

0

"

M

A

X

.

VARIES

7'-6"

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1'-7

5

8

"

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

3-UP 3" (UFO)

JUNE 2018

IR 4.0

Scale: 1/2"=1'-0"

3-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

3-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 8: Scale: 1/2=1'-0 11'-0 MAX. EQ

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

1

'-

0

"

M

A

X

.

VARIES

7'-6"

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1'-7

5

8

"

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) PLAN

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

3-UP 3" (CAMO)

JUNE 2018

IR 4.1

Scale: 1/2"=1'-0"

3-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

3-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 9: Scale: 1/2=1'-0 11'-0 MAX. EQ

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

4

'-

0

"

M

A

X

.

VARIES

7'-6"

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

4-UP 3" (UFO)

JUNE 2018

IR 5.0

Scale: 1/2"=1'-0"

4-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

4-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 10: Scale: 1/2=1'-0 11'-0 MAX. EQ

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

7'-6"

TOP CAP

RAIL CONNECTOR

B

E

Q

.

E

Q

.

1

4

'-

0

"

M

A

X

.

VARIES

7'-6"

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) PLAN

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

4-UP 3" (CAMO)

JUNE 2018

IR 5.1

Scale: 1/2"=1'-0"

4-UP - PV SYSTEM PLAN DETAIL

A

Scale: 3/4"=1'-0"

4-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 11: Scale: 1/2=1'-0 11'-0 MAX. EQ

TOP CAP

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

RAIL CONNECTOR

9'-0"

B

E

Q

.

E

Q

.

9'-0"

1

7

'-

0

"

M

A

X

.

VARIES

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

IRONRIDGE STOPPER SLEEVE

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

IRONRIDGE STOPPER

SLEEVE

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP PLAN

IRONRIDGE UNIVERSAL

FASTENING OBJECT

1"

PV MODULE FRAME

DETAIL, MID CLAMP PLAN

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, MID CLAMP FRONT

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

5-UP 3" (UFO)

JUNE 2018

IR 6.0

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM PLAN DETAIL

A

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, END CLAMP (UFO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (UFO) FRONT

H

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K

Page 12: Scale: 1/2=1'-0 11'-0 MAX. EQ

TOP CAP

3" CROSS PIPE LENGTH

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

E-W PIER SPACING

CANTILEVER,

≤40% OF MAX E-W

PIER SPACING

RAIL CONNECTOR

9'-0"

B

E

Q

.

E

Q

.

9'-0"

1

7

'-

0

"

M

A

X

.

VARIES

H

F

D

C

3" PIER PIPE

1

ENGINEERED

FOUNDATION

DIAGONAL BRACING,

AS NEEDED

3" CROSS PIPE

1

IRONRIDGE STOPPER SLEEVE

PV MODULE

IRONRIDGE RAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

2'-6" MAX.

FINAL GRADE

FO

UN

DATIO

N D

EPTH

PIER EM

BED

MEN

T =

2/3 FN

DN

D

EPTH

2" PIPE

1

CONCRETE

FOUNDATION,

2500PSI MIN

2" PIPE

1

FO

UN

DATIO

N D

EPTH

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

*ADDITIONAL ENGINEERING REQUIRED

2" PIPE

1

FO

UN

DATIO

N D

EPTH

BY OTHERS,

SPECIFICATIONS

VARY

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) FRONT

IRONRIDGE CAMO

END CLAMP

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, END CLAMP (CAMO) PLAN

IRONRIDGE CAMO

END CLAMP

*MODULE GLASS NOT SHOWN FOR CLARITY

PV MODULE FRAME

DETAIL, MID CLAMP PLAN

3

8

"

IRONRIDGE UNIVERSAL

FASTENING OBJECT

IRONRIDGE UNIVERSAL

FASTENING OBJECT

PV MODULE FRAME

IRONRIDGE RAIL

DETAIL, MID CLAMP FRONT

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

2" PIPE

1

IRONRIDGE

2" TOP CAP

IRONRIDGE

XR RAIL

PV MODULE,

BY OTHERS

IRONRIDGE

2" RAIL

CONNECTOR

PIPE FITTINGS DETAIL

IRONRIDGE UNIVERSAL

FASTENING OBJECT

SHEET NAME

JOB NO.

ISSUE DATE

SHEET NO.

SHEET SIZE

24X36

1495 Z

EP

HY

R A

VE

, H

AY

WA

RD

, C

A 9454

4

80

0.227.95

23 IR

ON

RID

GE

.C

OM

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

REVISION HISTORY

APPROVAL STATUS

REV DESCRIPTION DATE

2.09 GM

PV SYSTEM

DETAILS

5-UP 3" (CAMO)

JUNE 2018

IR 6.1

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM PLAN DETAIL

A

Scale: 1/2"=1'-0"

5-UP - PV SYSTEM SIDE SECTION

B

CL

IE

NT

N

AM

E

PR

OJE

CT

N

AM

E

PR

OJE

CT

AD

DR

ES

S

SY

ST

EM

K

W D

C

IR

ON

RID

GE

GR

OU

ND

M

OU

NT

S

YS

TE

M

3"=1'-0"

PIPE FITTINGS DETAIL

C

3"=1'-0"

PIPE FITTINGS DETAIL

D

SN

OW

L

OA

D, P

SF

EX

PO

SU

RE

C

AT

MO

DU

LE

T

YP

E

RIS

K C

AT

WIN

D S

PE

ED

, M

PH

MO

DU

LE

W

D

C

MO

DU

LE

Q

TY

- - - -

72

-C

EL

L, G

EN

ER

IC

6"=1'-0"

DETAIL, END CLAMP (CAMO) PLAN

G

6"=1'-0"

DETAIL, END CLAMP (CAMO) FRONT

H

6"=1'-0"

DETAIL, MID CLAMP PLAN

E

6"=1'-0"

DETAIL, MID CLAMP FRONT

F

SHEET NOTES

1. SCHEDULE 40 PIPE OR ALLIED MECHANICAL TUBING (8GA WALL THICKNESS)

Scale: 1/2"=1'-0"

DRILL/POUR FOUNDATION

J

Scale: 1/2"=1'-0"

DRIVEN PIER FOUNDATION

L

Scale: 1/2"=1'-0"

HELICAL PILE FOUNDATION

M

Scale: 1/2"=1'-0"

EARTH SCREW FOUNDATION

K