James Price Point LNG proposalJames Price Point LNG proposal
Gas tankers PilbaraGas tankers Pilbara
LNG near Broome LNG near Broome -- What does it mean?What does it mean?
• 4 gas pipelines, 4 oil pipelines
• 4 export pipelines (4 x monoethylene glycol - anti freeze)
• 8 LNG tanks, 4 LPG storage tanks, 4 oil
tankstanks
• Construction camp 6,000 - 8,000 FIFO’s
• Permanent 600 - 1,000 personnel
•600 – 900 MW of power station
•Desalination plant?LNG industrial complex - Qatar
The proposalThe proposal
� Land = 2,500 hectares
(1200 x Subiaco Oval)(1200 x Subiaco Oval)
�Sea = 1,000 hectares
Proposed Port at James Price Proposed Port at James Price
PointPoint
6km +
Ship movements at proposed portShip movements at proposed port
1,000 1,000 –– 1,500 ships per annum1,500 ships per annum(number of shipping movements (number of shipping movements -- 200200--300 ships per annum per 10 Mtpa proposed 50 Mtpa) 300 ships per annum per 10 Mtpa proposed 50 Mtpa)
Source: Source: Kimberley LNG Precinct Kimberley LNG Precinct Scope of the Strategic Assessment Page 29Scope of the Strategic Assessment Page 29
LNG TankerPhoto: Woodside
Dredging
� Permanent
loss of seabed
�~50km²
WastewaterWastewater
�� Effluent from 6Effluent from 6--8000 8000
worker town worker town (process waste (process waste
water, ancillary equipment such as condensed water, ancillary equipment such as condensed
water, surface runoff from process areas, sewage water, surface runoff from process areas, sewage
and grey water)and grey water)
�� Broome licensed for 8 Broome licensed for 8 �� Broome licensed for 8 Broome licensed for 8
GL/yrGL/yr
�� 30 GL/yr of waste 30 GL/yr of waste
water (30 billion water (30 billion litreslitres))
Figure 8-6: Maximum predicted summer extent of process waste water dilution zone, location 2,
Scenario 3. The precinct boundary is presented by the black line.
BenzeneBenzene
�� “The proposed 50 “The proposed 50 MtpaMtpa LNG precinct LNG precinct
will make a large contribution to will make a large contribution to
emissions”emissions” ((Source:Source: Air assessments Prepared for Air assessments Prepared for
Woodside Energy Ltd Page 32)Woodside Energy Ltd Page 32)
�� KarrathaKarratha -- 198/198/tonnestonnes per annum per annum (source NPI)(source NPI)
�� James Price Point James Price Point -- 1,766/1,766/tonnestonnes
per annum per annum ((Source:Source: Air assessments Prepared for Air assessments Prepared for
Woodside Energy Ltd Page 32)Woodside Energy Ltd Page 32)
Oil spill trajectory modelOil spill trajectory model
Southern pipeline
failure
Red zone =
1-10 days to reach
Roebuck Bay
James Price Point LNG proposalJames Price Point LNG proposal
�� 2,500 hectare site (1,200 times Subiaco oval)2,500 hectare site (1,200 times Subiaco oval)
�� 1,000 hectare port1,000 hectare port
�� 66--8,000 construction workers8,000 construction workers
�� Wastewater dischargeWastewater discharge�� Wastewater dischargeWastewater discharge
�� Air pollutionAir pollution
�� Oil spill riskOil spill risk