sarah lippai spring 2005 senior thesis construction management penn state university
DESCRIPTION
JetBlue Training Facility Orlando International Airport, Florida. JetBlue Training Facility Orlando International Airport, Florida. Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University. JetBlue Training Facility - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/1.jpg)
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
JetBlue Training FacilityOrlando International Airport, Florida
![Page 2: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/2.jpg)
JetBlue Training FacilityOrlando International Airport, Florida
Presentation Outline
Project Introduction
4D CAD Analysis
Exterior Skin Redesign to Tilt-up Panels
Redesign of Humidification System
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
![Page 3: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/3.jpg)
Project Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Building Information•Occupant: JetBlue Airways Pilots, Flight Crew, &
Maintenance Personnel
•Function: Training Facility with 8 Full Flight Simulators, two cabin trainers, training pool, classrooms,
and administration offices
•Size: 105,475 SF
•Duration: February 2004 – June 2005
•Cost: $15 million
•Delivery Method: Design - Build
![Page 4: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/4.jpg)
Project Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Project Team
OwnerJetBlue Airways
Owner’s Representative
Tishman Construction
Owner’s ArchitectRubin & Rotman
Associates
General ContractorSuitt Construction
Co.
Architects-EngineersBRPH Architects –
Engineers, Inc.
![Page 5: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/5.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
4D CAD Analysis
![Page 6: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/6.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Why 4D CAD Modeling?
• JetBlue is an inexperienced builder
• Very broad schedule given to the owner
• Construction sequence not explained
Lack of confidence in the GC’s ability to construct the facility on schedule
![Page 7: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/7.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Proposed Solution
• Construct a 3D Model in Autocad
• Combine it with the schedule
• Conduct a survey on the feasibility of 4D modeling early in the project
![Page 8: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/8.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
4D Model
4D Model Simulation
![Page 9: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/9.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
4D Modeling Feasibility
Industry Members Who Have Seen 4D Modeling Industry Members Who
Have Found it Useful
![Page 10: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/10.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Schedule Confidence & Visualization
More Confidence in the Project Schedule
4D Model would Aid in Visualizing Construction
![Page 11: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/11.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
• Unfamiliarity of Software
• Industry members accustomed to 2D drawings
• Cannot provide the level of detail of 2D drawings
• Expensive software and training
• Developing models is time consuming
Drawbacks of 4D Modeling
![Page 12: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/12.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Exterior Skin Redesign
![Page 13: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/13.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Existing Facade• 11” insulated precast concrete panels with exposed
aggregate finish in simulator bay area
• 8” precast panels on north and south facades of administration area
• 4” architectural precast panels on 8” CMU block stair towers
• Aluminum composite panels on west façade incorporated with an aluminum storefront and curtain wall system
![Page 14: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/14.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Tilt-up Concrete Panels
• Given as an option in the RFP documents
• Popular technique in Florida area
• Resistant to weather conditions
• Relatively flat terrain
• Larger panels can be designed
• Quicker erection time
![Page 15: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/15.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Panel Sizes
• Panel Size in simulator bay area can be doubled
• Combination of many precast panels in administration areas
![Page 16: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/16.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Panel Thickness
Simulator Bay Area
• 11” insulated non-composite panel
Administration Area
• 8” solid panel on north and south facades
• 5” spandrel panels on west façade
Insulated Non-Composite Panel
![Page 17: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/17.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Panel Erection4-Point Lift 8-Point Lift
Max Lift
![Page 18: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/18.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Cost and Schedule
Tilt – Up Concrete Existing System
Cost
Material Concrete affordable in Florida areaEqual in cost to Precast material
Masonry for stair towers and elevator shaft is very expensive
Transportation Cast-on-siteNo transportation costs
Transportation from plant to sitePrecast Plant not near siteToll roads in Florida
Crane and Labor On-site less time On-site longer
Schedule
Lead Time Cast-on-siteNo lead time
Long lead timeFast-track project
Erection Time Number of panels decreasedLess erection timeCrane on-site less
Multiple systemsMany smaller panels
![Page 19: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/19.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Humidification System Redesign
![Page 20: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/20.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Existing Humidification System
• Designated by simulator manufacturer
• 10 Armstrong Humidifiers• 59.9 – 229.5 lbs. of water/hour each to the building
Concerns
• Maintain 70 – 75 °F, RH 35 – 55%
• Occupancy of 500 students, faculty, and workers
• Humidity Levels in Orlando, FL
![Page 21: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/21.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Min/Max Relative Humidity for each RTU
Unoccupied
![Page 22: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/22.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Proposed Redesign
• Eliminate Humidification System
• Addition of dehumidification or enthalpy wheel system
Humidity to be Removed by Each Rooftop Unit (lbs of water/hr.)1 2 3 4 5 6 7 8 9 10 11 12
1.288 1.288 1.288 1.288 3.145 3.133 6.227 6.227 19.29 19.76 20.86 20.44
![Page 23: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/23.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Cost and Schedule SavingsProject Costs:• Material cost for 12 Armstrong Dehumidifier Units• Material cost for humidity controls and supply piping• Labor to install units and piping• Lower training and maintenance costsSchedule:• No lead time on equipment• Mechanical system installation time decrease• Elimination of testing of equipmentTraining and Commissioning• Humidification system is difficult to maintain – eliminates
training• No testing of system• No calibration
![Page 24: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/24.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Conclusions
![Page 25: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/25.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Conclusions4D Analysis
• Useful for visualization and building the owner’s confidence in the schedule
• Not cost and time effective
• Difficult learning curve
Exterior Skin Redesign
• Tilt-up is a feasible option
• Faster erection time and cheaper transportation costs
Humidification System Redesign
• Eliminates cost and scheduling issues
• Dehumidification or enthalpy wheel system should be investigated
![Page 26: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/26.jpg)
JetBlue Training FacilityOrlando International Airport, Florida
Thanks to...JetBlue Airways Corporation
•Paul Wood
Suitt Construction Company•Randy Winger, Bryan Pickens, & Tom Reilly
PSU Architectural Engineering•Dr. Horman, Dr. Riley, Dr. Messner, & Dr. Freihaut
Tishman Construction•Carrie Macsuga
BRPH Architects – Engineers•Jon Scott
My Family and Friends•Dad, Mom, Luke & Alex•Shawn, Michelle, Luke, Jason, & Jesse
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
![Page 27: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/27.jpg)
The End
![Page 28: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/28.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Laydown Locations
![Page 29: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/29.jpg)
Project Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Architectural Features
Exterior Facade
• Precast concrete panels with exposed aggregate
• Aluminum composite panels in JetBlue corporate blue and grey
• Aluminum curtain walls and storefront system
• Contemporary look with strong design elements
• Project a bright and airy image
![Page 30: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/30.jpg)
Project
Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
4D CAD Modeling
•What is 4D CAD?
•Combines 3D Autocad Elements with the project schedule
•Produces an image that aids in visualizing the schedule
•Discovers:
•Inconsistencies in the construction sequence
•Potential time and accessibility conflicts
![Page 31: Sarah Lippai Spring 2005 Senior Thesis Construction Management Penn State University](https://reader035.vdocuments.site/reader035/viewer/2022062519/5681514f550346895dbf71ae/html5/thumbnails/31.jpg)
Project Background
4D CAD Analysis
Exterior Skin Redesign
Humidification System Redesign
Conclusions
Sarah Lippai Spring 2005 Senior Thesis
Construction Management Penn State University
JetBlue Training FacilityOrlando International Airport, Florida
Project Execution
During Initial Design:
• JetBlue worked with Tishman Construction, and Rubin & Rotman on the original design options
• Rubin & Rotman from Canada
• JetBlue located out of Buffalo, NY
Suitt Construction chosen as the General Contractor:
• Chose BRPH to act as the A/E to finish the design