sample site zte

Upload: islam-sabry

Post on 02-Mar-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

  • 7/26/2019 Sample Site Zte

    1/23

    ZTE Proprietary Confidential

    S/N Item Description Unit

    1 Site Survey and Layout Design

    1.1

    Wireless engineering technical site survey Site

    1.2

    Wireless telecom equipment installation design Site

    2 Site Transportation

    2.1 Site transportation from warehouse to site Site

    3 TS!"ode #nstallation

    3.1#ndoor $acro site installation %Su&'ca&inet (ty%1)) Site

    3.2#ndoor $acro site installation %Su&'ca&inet (ty%2)) Site

    3.*Site

    3.+Site

    3.3Site

    3.,Site

    3.-Site

    3.Site

    3./Site

    3.10

    DS site installation% (ty%,'+) on tower) Site

    3.11DS site installation% (ty%-'/) on tower) Site

    3.12DS site installation% (ty%10'12) on tower) Site

    3.13Site

    3.1,Site

    3.1*Site

    , 4ower 5quipment #nstallation

    ItemCode

    3*00000+*12-

    3*00000+*12/

    3*00000+221,

    3*00000+221*

    3*00000+2230

    #ndoor $arco6 site installation% (ty%1'3)on tower)

    3*00000+2231

    #ndoor $arco6 site installation% (ty%,'+)on tower)

    3*00000+2221

    7utdoor $acro site installation%Su&'ca&inet (ty%1'2))

    3*00000+2222

    7utdoor $acro site installation%Su&'ca&inet (ty%3',))

    3*00000+223

    7utdoor $arco6 installation% (ty%1'3) ontowerSu&'ca&inet (ty%1'2))

    3*00000+22,0

    7utdoor $arco6 installation% (ty%,'+) ontowerSu&'ca&inet (ty%1'2))

    3*00000+22,1

    7utdoor $arco6 installation% (ty%,'+) ontowerSu&'ca&inet (ty%3',))

    3*0000

    0+21,-3*00000+3-2

    3*00000+3-3

    3*00000+3/1

    DS installation%outdoor 8a&inet (ty%,'+) ontower )

    3*00000+3/2

    DS installation%outdoor 8a&inet (ty%-'/) ontower )

    3*00000+3/3

    DS installation%outdoor 8a&inet (ty%10'12)on tower )

  • 7/26/2019 Sample Site Zte

    2/23

    ZTE Proprietary Confidential

    ,.1

    D8 4ower system installation %indoor) Site

    ,.2

    D8 4ower system installation%outdoor) Site

    ,.3

    attery installation%129:, 3 groups) Site

    ,.,

    attery installation%29:2, 1 group) Site

    * Site ;cceptance and ;s'&uilt Documents

    *.1

    Wireless site installation acceptance Site

    *.2

    Wireless site as'&uilt document Site

    Optional Items

    + Site 5

  • 7/26/2019 Sample Site Zte

    3/23

    ZTE Proprietary Confidential

    +.1 $acro ase Station Su&'ca&inet e

  • 7/26/2019 Sample Site Zte

    4/23

    ZTE Proprietary Confidential

    -.1 Site

    -.2 Site

    Site Dismantle with 5quipment Transportation

    .1 8omplete site dismantling without s Site

    .2 8omplete site dismantling with s %on tower) Site

    .3 8a&inet dismantling

    / 5quipment Swap

    3*00000+,0/2

    TS!"ode commissioning 6 integration%singlemode commissioning)

    3*00000+,13/

    TS!"ode commissioning 6 integration%dual'mode commissioning)

    3*00000+300+

    3*00000+3000

    8a&inet

  • 7/26/2019 Sample Site Zte

    5/23

    ZTE Proprietary Confidential

    /.1 8a&inet swap

    /.2 swap

    /.3 attery swap Site

    10 = System and ;ntenna #nstallation

    10.1 Set

    10.2 Set

    8a&inet

    3*00000+,1-1

    = ;ntenna and =eeder installation%7n tower(;ntenna (ty%1) =eeder (ty%1'2);

    3*00000+,1-

    = ;ntenna and =eeder installation%7n tower(;ntenna (ty%3) =eeder (ty%-'12;

  • 7/26/2019 Sample Site Zte

    6/23

    ZTE Proprietary Confidential

    10.3 Set

    10., Set

    11 8ivil Wor>

    11.1 m

    11.2 m?

    12 ent 8rane

    12.1 sing crane till ,0 T7" Day

    12.2 sing crane till +0 T7" Day

    13 8ivil 8onsulting

    13.1 Tower!pole structual anlysis Site

    13.2 Tower!pole structual strengthening design Site

    1, DT

    1,.1 Site

    1,.2 Site

    1,.3 Site

    3*00000+,1*/

    = ;ntenna installation%7n tower(;ntenna(ty%1);

    = ;ntenna swap%7n tower(;ntenna (ty%1);

    3*00000+,-*3

    7utdoor ca&le tray installation@Supply ofgalvanised outdoor ca&le tray with cover fittedinlcuding all accessories

    3*00000+,/,0

    Supply and construction of reinforced concrete%.8.8) plinth for equipment

    3*00000+*12*

    3*00000+*12+

    3*00000+-/20

    A%dual mode) DT and 8(T for Single Site%withinstrument)

    3*00000+-/21

    A%dual mode) DT and 8(T ;nalysis of test datafor Single Site%with instrument)

    3*00000+-0

    AS$ DT and 8(T for Single Site%with instrument)

  • 7/26/2019 Sample Site Zte

    7/23

    ZTE Proprietary Confidential

    1,., Site

    1,.* Site

    1,.+ Site

    3*00000+-1

    AS$ DT and 8(T ;nalysis of test data for SingleSite%with instrument)

    3*00000+-/0

    $TS DT and 8(T for Single Site%withinstrument)

    3*00000+-/0/

    $TS DT and 8(T ;nalysis of test data forSingle Site%with instrument)

  • 7/26/2019 Sample Site Zte

    8/23

    ZTE Proprietary Confidential

    Work Description

    Qty

    1

    1

    1

    1

    The scope of wor> includes &ut is not limited toB1. Site &asic information survey and collecting %&oth on tower and on ground)C

    2. 5nvironment survey for swapping the e

  • 7/26/2019 Sample Site Zte

    9/23

    ZTE Proprietary Confidential

    1

    1

    1

    1

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. npac>ing inspectionC3. ac> installationC

    ,. #nstallation of ;8 input ca&le and ma>ing the la&elsC*. #nstallation of protection grounding ca&le and ma>ing the la&elC+. Self'chec>ing after equipment installedC-. 8hec>ing &efore equipment power'on and equipment power'onC. System parameter setting system de&uggingC/.cleaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. npac>ing inspectionC3. ac> installationC,. #nstallation of ;8 input ca&le and ma>ing the la&elsC*. #nstallation of protection grounding ca&le and ma>ing the la&elC+. Self'chec>ing after equipment installedC-. 8hec>ing &efore equipment power'on and equipment power'onC. System parameter setting system de&uggingC/.cleaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. npac>ing inspectionC3. #nstallation of &attery shelfC,. #nstallation of 12 pics 129 &atteryC*. 8onnection of &attery ca&leC+. Self'chec>ing after equipment installedC-.cleaning the sites..

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. npac>ing inspectionC3. #nstallation of &attery shelfC,. #nstallation of 2, pics 29 &atteryC*. 8onnection of &attery ca&leC+. Self'chec>ing after equipment installedC-.cleaning the sites.

    The scope of wor> include &ut not limited toBWor> with the customer to perform the installation acceptance test &ased on theacceptance test specifications required &y FT5C 7utput the acceptance test report.

    The scope of wor> include &ut not limited toB1.7utput of engineering completion material and documents related to engineering asrequired &y the contract includingB collection and transfer of remaining engineeringpro&lems and engineering completion documents2.Gandover of maintenance wor>.

  • 7/26/2019 Sample Site Zte

    10/23

    ZTE Proprietary Confidential

    The scope of wor> include &ut not limited toB1. ase station installation environment inspection. 8hec> whether the installationenvironment of the &ase station meets the requirements for equipment installation.2. Deliver the equipment to site unpac> and inspect the &ase station devices deliveredto the site.

    3. #nstall the su&'ca&inet.,. outing connection and la&eling of the related ca&le.*. 4ower on the su&'ca&inet and chec> the installation quality.+. 8lean up the site.

    The scope of wor> include &ut not limited toB1.ase station installation environment inspection. 8hec> whether the installationenvironment of the &ase station meets the requirements for equipment installation.2.Deliver the equipment to site unpac> and inspect the &ase station devices deliveredto the site.3.#nstall one on tower pole.,.Lay and connect optical fi&er from 1 to the and ma>e and attach la&els on

    the optical fi&er.*.Layout and connection of the power ca&les &etween and the D848 la&elcreation and attachmentC+.8onnect = umpers from the to the antennaC ta>e waterproof measures for thefeeder connectorsC and ma>e and attach la&els on the umper and the feeder.-. 4ower on the &ase station device and other devices and chec> the installationquality.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. Deliver the equipment to site and unpac>ing inspectionC3. ac> installationC

    ,. #nstallation of ;8 input ca&le and ma>ing the la&elsC*. #nstallation of protection grounding ca&le and ma>ing the la&elC+. Self'chec>ing after equipment installedC-. 8hec>ing &efore equipment power'on and equipment power'onC. System parameter setting system de&uggingC/.cleaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. Deliver the equipment and unpac>ing inspectionC3. #nstallation of &attery ca&inet and &atteriesC,. 8onnection of &attery ca&leC

    *. Self'chec>ing after equipment installedC+. 8leaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installationC2. Deliver the equipment and unpac>ing inspectionC3. #nstallation of &atteriesC,. 8onnection of &attery ca&leC*. Self'chec>ing after equipment installedC+. 8leaning the sites.

  • 7/26/2019 Sample Site Zte

    11/23

    ZTE Proprietary Confidential

    1

    1

    The scope of wor> include &ut not limited toB1. Gardware inspection.2. 8onfiguration data processing.3. ase station version and data loading.,. Transmission integration &etween TS!"ode and S8!"8.

    *. Trou&leshooting.+. asic function test after site commissioning %including 8S service test and 4S servicetest).

    The scope of wor> include &ut not limited toB1. Gardware inspection.2. 8onfiguration data processing.3. ase station version and data loading.,. Transmission integration &etween TS!"ode and S8!"8.*. Trou&leshooting.+. asic function test after site commissioning %including 8S service test and 4S servicetest).

    The scope of wor> include &ut not limited toB1. emoval of the main equipment of the original site including power equipment.2. emoval of the power ca&le transmission ca&le and dry contact alarm ca&le of theoriginal site.3. emoval of the = umpers.,. 4ac>ing and deliver the dismantled equipment &ac> to warehouse.*. 8lean up the site."otesB feeder ca&les and antennas are not included.

    The scope of wor> include &ut not limited toB1. Gardware removal of the main equipment of the original site including powerequipment and s.

    2. emoval of the power ca&le transmission ca&le and fi&er ca&le of the original site.3. emoval of the original lightning protection &o< %if necessary).,. emoval of = umper.*. 4ac>ing and deliver the dismantled equipment &ac> to warehouse.+. 8lean up the site."otesB feeder ca&les and antennas are not included.

    The scope of wor> include &ut not limited toB1. emoval of the original ca&inet.2. emoval of the power ca&le transmission ca&le and dry contact alarm ca&le of theoriginal ca&inet if there is.3. emoval of the = umpers if there is.,. 4ac>ing and deliver the dismantled equipment &ac> to warehouse.

    ,. 8lean up the site."otesB feeder ca&les and antennas are not included.

  • 7/26/2019 Sample Site Zte

    12/23

    ZTE Proprietary Confidential

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installation.2. Deliver the equipment to site.3. emove the ca&inet devices %8 !8 !4ower %ectifier 6 attery) ca&inet) powerca&le grounding ca&le etc.,. 4ac>ing the dismantled equipments and transport to warehouse .*. #nstall the new ca&inet and material.+. #nstall the ca&les including the optical fi&ers ethernet ca&les power ca&lesgrounding ca&les DH panel lighting protection alarms ca&les 51 ca&les inter'connection ca&les = umpers as required.-. La&els for sites.. 8leaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installation.2. Deliver the equipment to site.3. emove the original power ca&le grounding ca&le fi&er alarm ca&le and =umpers etc.,. "ew and auing the dismantled equipment and transport to warehouse.+. 8leaning the sites.

    The scope of wor> include &ut not limited toB1. ;cceptance for installation environment of equipment ma>e sure to match therequirement of installation.2. Deliver the equipment to site.3. emove the original &atteries.,. 4ac>ing the dismantled &atteries and transport to warehouse.*. #nstall the new &atteries and ca&les.+. La&els for sites.-. 8leaning the sites.

    The scope of wor> include &ut not limited toB1. 8hec> whether the environment meet the requirements of installation.2. Deliver the equipment to site unpac>ing and inspection of antenna and equipment.3. #nstall the antenna to the pole on tower'top.,. Lay the feeder from antenna to TS!"ode and finish the feeder connector andla&eling*. #nstall and connect the umper and finish the water'proof treatment.+. ;fter the installation adust the antenna pitch angel as per the design requirements.

    -. Testing the 9SW of antenna and feeder. 4erforming installation chec>B to ma>e sure the antenna installation meet the designand inslallation requirements.

    The scope of wor> include &ut not limited toB1. 8hec> whether the environment meet the requirements of installation.2. Deliver the equipment to site unpac>ing and inspection of antenna and equipment.3. #nstall the antennas to the pole on tower'top.,. Lay the feeders from antenna to TS!"ode and finish the feeder connector andla&eling*. #nstall and connect the umper and finish the water'proof treatment.+. ;fter the installation adust the antenna pitch angel as per the design requirements.-. Testing the 9SW of antenna and feeder

    . 4erforming installation chec>B to ma>e sure the antenna installation meet the designand inslallation requirements.

  • 7/26/2019 Sample Site Zte

    13/23

    ZTE Proprietary Confidential

    sing crane till ,0 T7"

    sing crane till +0 T7"

    The scope of wor> include &ut not limited toB1. 8hec> whether the environment meet the requirements of installation.2. Deliver the equipment to site unpac>ing and inspection of antenna and equipment.3. #nstall the antenna %1 piece) to the pole on tower'top.,. ;fter the installation adust the antenna pitch angel as per the design requirements.

    *. Gardware installation chec>B to ma>e sure the antenna installation meet the designand inslallation requirements.

    The scope of wor> include &ut not limited toB1. 8hec> whether the environment meet the requirements of installation.2. Deliver the equipment to site unpac>ing and inspection of antenna and equipment.3. emove the original antenna.3. #nstall the new antenna %1 piece) to the pole on tower'top.,. ;fter the installation adust the antenna pitch angel as per the design requirements.*. Gardware installation chec>B to ma>e sure the antenna installation meet the designand inslallation requirements.+. 4ac>ing and deliver the dismantled antenna &ac> to warehouse.

    This wor> pac>age including &ut not limited to B1. Supply ca&le tray with cover fitted inlcuding all accessories

    This wor> pac>age including &ut not limited to B1. 5filling required for foundation construction2. einforcement%default as 20$4a) supply &endingplacingand &inding3. =ormwor>s supply and fi

  • 7/26/2019 Sample Site Zte

    14/23

    ZTE Proprietary Confidential

    This wor> includes &ut is not limited toB ma>ing statistical analysis of the DT and 8(Tdata and outputting single site verification test %SS9) reports.

    This wor> includes &ut is not limited toB collecting test data of single sites &y DT andchec>ing whether every function of the site is normal and whether every parameter iscorrectly configured. The contents of each test may includeB 1) long voice call 2) shortvoice call3) data uploading or downloading service ,) 4D4 test*) scanner test ifneeded +) 8(T on the voice service if needed.

    This wor> includes &ut is not limited toB ma>ing statistical analysis of the DT and 8(Tdata and outputting single site verification test %SS9) reports.

  • 7/26/2019 Sample Site Zte

    15/23

    ZTE Proprietary Confidential

    3,0

    33

    4@@@

  • 7/26/2019 Sample Site Zte

    16/23

    ZTE Proprietary Confidential

    ?49

    3>4

    33

    884

  • 7/26/2019 Sample Site Zte

    17/23

    ZTE Proprietary Confidential

  • 7/26/2019 Sample Site Zte

    18/23

    ZTE Proprietary Confidential

    >38

    9=8

  • 7/26/2019 Sample Site Zte

    19/23

    ZTE Proprietary Confidential

  • 7/26/2019 Sample Site Zte

    20/23

  • 7/26/2019 Sample Site Zte

    21/23

    ZTE Proprietary Confidential

  • 7/26/2019 Sample Site Zte

    22/23

    Region PR Numer

    Reuest !y "o#ile No$

    P" Name ;hmed 5ldemerdash "o#ile No$ 12/13+*00

    Site ID$

    Su#contractor

    Scope o% WorkCi&il Works

    Installation

    'ime o% Completion Starting Date

    Site ID$ Site Name Region Description

    DEL2931 DEL2931 Delta

    Reuirements I% su#contractor can not completed t(ese sites #e%ore))$* +', reser&e

    -ppro&ed !y P"

    urchase Order Request

    -pplicationDate

    ,mail-ddress

    ,mail-ddress

    CompletionDate

  • 7/26/2019 Sample Site Zte

    23/23

    t(e rig(t to take #ack t(is PO$

    t

    aABedDaleAEFteGoBGn

    'imePeriod

    mailto:[email protected]:[email protected]