![Page 1: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/1.jpg)
Is the great uranium
price squeeze
coming to an end?
FINEX
October 18th 2018
Salamanca
poised for
lift off…
![Page 2: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/2.jpg)
GLOBAL Top Ten
![Page 3: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/3.jpg)
Low OPEX & existing infrastructure
EU funded infrastructure and low operating costs make the difference
![Page 4: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/4.jpg)
EXPLORATION programme
Annual exploration expenditure to maintain steady state production
Source:
Berkeley Energia Definitive
Feasibility Study, July 2016
![Page 5: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/5.jpg)
China DOUBLES nuclear capacity
China set to double its nuclear capacity by 2020
and then double again by 2035
Source: BP Energy Outlook, 2017
Edition
![Page 6: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/6.jpg)
US utilities URGENTLY need to start buying
US utilities have a major re-contracting requirement
by 2027 as high priced 2005-2007 contracts run off.
Meanwhile, 58 reactors are currently under construction globally, a 25
year high in nuclear growth
Source: 2016 uranium marketing annual
report by the US EIA
![Page 7: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/7.jpg)
PRODUCTION cuts
Production cuts remove 25% of world production in 2018
![Page 8: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/8.jpg)
TIPPING POINT in uranium price
The Q3 spot market saw more transactions and more volume over the last three
months than any time in history with the U3O8 price closing out September at $27.38.
That is a $0.92 increase on the month and a $4.58 increase over the quarter.
![Page 9: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/9.jpg)
LOW uranium cost
Salamanca has amongst the lowest uranium production costs of all major suppliers
![Page 10: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/10.jpg)
10
REVERSING regional decline
Salamanca project
helps address largest
population decline
in Spain
APPLICANTS
FOR 200 JOBS18,000
OF VILLAVIEJA’S PERMANENT
RESIDENTS HAVE APPLIED FOR
A JOB
25%
![Page 11: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/11.jpg)
JOB creation
Retortillo &
Villavieja de Yeltes-30%
POPULATION DECLINE - CASTILLA Y LEÓN SALAMANCA PROJECT
2,000 €250M 450
Salamanca project hopes to address economic decline and depopulation
+
![Page 12: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/12.jpg)
Historic Mining Region
Mining in the region for over 2,000 years
Mines operated
in Castilla y León400+
![Page 13: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/13.jpg)
NUCLEAR contribution to energy mix
Nuclear power is an important component of electricity supply in Spain
![Page 14: Salamanca poised for lift off - Berkeley Energia Limited · Salamanca poised for lift off ... BP Energy Outlook, 2017 Edition. ... Meanwhile, 58 reactors are currently under construction](https://reader036.vdocuments.site/reader036/viewer/2022070710/5ec4d972ca613742ce2b75d8/html5/thumbnails/14.jpg)
STRONG local support
Residents clearly
want the mine