Injuries Reported

Date Injury Description Cause(s) Prevention

2/1 Knee While excavating in a field an employee stepped backwards into a small hole resulting in hyperextending their knee.

Overexertion Be aware of surroundings

2/17 Head/neck

An employee was plowing snow, stepped out of the truck and slipped off the seat and on the icy pavement. As he fell, he hit his head on the step and forearm on the bed of the truck. He later went to the Chiropractor and was adjusted.

Slip/Fall Use traction device(s) for footwear

2/23 Hip

While rolling an SF6 cylinder out of the rack it caught an edge and tipped over. The bottle grabbed to keep it from hitting the ground, stood the bottle up and continued to roll the bottle to the truck. Then had my work partner help me load it into the back of the truck. We weighed the bottle later and it weighed 276 lbs. it is a one-of-a-kind bottle, none of our other bottles weigh this much.

Overexertion Use hand cart/truck

Monthly and Year to Date

2020 Month YTD

Total Incidents Reported 3 7

Recordable Case(s) 1 2

Restricted Duty Case(s) 1 1

Lost Workday Case(s) 0 0

Vehicle Incidents

Date Vehicle Driver’s Account: Prevention

2/6 Vehicle #224Driver pulled forward from a parked position and hit a piece of ductwork left next to the warehouse entrance puncturing the sidewall of the right front tire.

Perform a 360 walk around.

2/22 Trailer # 242 On 360 walk around noticed rear right marker light on trailer was hit and damaged. N/A

Close Calls

Date Location Description2/1 Royal City This is an example of good work practice. Utilities were found that were not marked, they were identified

and safely removed.

2/2 Wanapum Dam

While conducting Flow & Pressure readings an employee attempted to plug the air compressor into one of the weatherproof GFCI outlets and noticed a piece of metal sticking out from the outlet that looked like a broken plug from an extension cord or power cord. Thankfully, the metal piece was only contacting the inner rubber gasket of the outlet cover and did not pose a direct shock hazard from the cover. We immediately stopped work and discussed the situation. Photos were taken for Dam Safety and another outlet was used to continue work. Information was also sent to operations.

2/8 Wanapum Dam While doing maintenance on lighting transfer switch TS5 it was noticed that a cut bolt was lying on the insulating lug guard of C-phase (foreign material program).

2/11 Quincy A chunk of frozen dirt fell into hole breaking conduit and phone line. No injuries, and the phone company was contacted to make repairs.

Close Calls

Date Location Description

2/17 EHQOpened door to exit building and noticed that the steps from the door to the sidewalk had not been shoveled free of snow. Snow was trampled down from other people exiting the door. Snow should be cleared as this is a dedicated emergency exit.

2/23 George While straightening up a pole the primary underground wire pinched and blew the fuse. Wire was under the dirt and no one was near it.

2/26 Ephrata

Had tension on hoist after bringing up wire, completed work and released latch to come off hoist. Applied pressure to hoist to start coming off when the latch of hoist broke and all tension released. No one was hurt and took hoist out of service.

Contractor Close Calls, Injuries & Incidents

Date Location Description

2/2 MLSC

Contractor: On Tuesday (2/2/2021) at 11:45 a Safety Coordinator received a call stating that a contractor was unloading a large concrete culvert in the laydown yard of MLSC and the Boom and load broke off the Turret. The load and Boom fell to the ground. No injuries occurred. Labor and Industries was called, an investigation is ongoing under their jurisdiction.

2/9 Road 16North Sky Communication employees were proofing on Road 16 and pulling mule tape through the pipe very quickly. As the end of the Rodder exited the pipe it whipped up and hit the employee in the left eye.

2/12 UnknownContractor erecting scaffold platform smashed their finger while moving a gate arm out of the way of the installation. While pushing on the unattached gate arm it moved suddenly smashing the finger.

Level O - Other – Close Call

Level 1 – Serious Close Call

Level 2 – First Aid Case(s)

Level 3 – Recordable Injury Case(s)

Level 4 –Restricted Duty Case(s)

Level 5 – Lost Work Day Case(s)

Level 6 – Fatality or Hospitalization

19

0

2

0

0

0

0

Employee Safety

2021 incidents Year to Date Summary

2021

3Recordable Cases TTL.

202077

13

11

0

7

5

6

13 Recordable Cases TTL.

Level O - Other – Close Call

Level 1 – Serious Close Call

Level 2 – First Aid Case(s)

Level 3 – Recordable Injury Case(s)

Level 4 –Restricted Duty Case(s)

Level 5 – Lost Workday Case(s)

Level 6 – Fatality or Hospitalization

9

0

0

2

1

0

0

Leading & Lagging Indicators

1 02 2

0

4

25

13

18

4

0

5

10

15

20

25

30

May June July August September October November December January February

COVID-19 Positive Cases by Month 2020-Present

Safety Action Item Critical Success FactorsIncident Reporting

(Date of Entry into System vs Date of Distribution Systemwide) • Number of Close Calls in February = 9• Number of Close Calls sent Next day after being entered into the system = 4

Number of Open Action Items over 60 days oldAs of January 2021 As of February 2021Year 2017 = 7 Year 2017 = 8Year 2018 = 10 Year 2018 = 11Year 2019 = 21 Year 2019 = 22Year 2020 = 11 Year 2020 = 11Month Total = 49 Month Total = 52

Net - February 2021: +3

Incident Reporting for February 2021

(Date of Incident vs. Date of Entry into System)

Injuries• Total Number of Injuries = 6

• Total Number of Injuries Which Date of Incident and Date Entered into System Match = 4

Mobile• Total Number of Mobile Incidents = 2

• Total Number of Mobile Incidents that Date of Incident and Date Entered into system match = 1

Powering our way of life.

Thank You!

Powering our way of life.

SHIP Update – Q1 2021

Safety

Today’s GoalProvide insight into the

COVID-19 activities

I would like to share the following:• Contact Tracing Activities• The Number of Cases per Month• Cases per Work Group• COVID Cases – Contractor verses GCPUD

Contact Tracing Activity03/08/2021

1 02 2

0

4

25

13

18

4

0

5

10

15

20

25

30

May June July August September October November December January February

COVID-19 Positive Cases by Month 2020-Present

COVID-19 by Location

GCPUD COVID-19 CASES

Update to the SHIP

• We have made many changes in our Safety Program over the last 4+ years:• Staffing changes• Organizational changes

• Moving training to Organizational Development• The addition of our Operational Excellence Program

• All of the efforts of the CI Teams 1 – 5

Day to Day Safety Activities• Updates to Safety Policies and the Transition to

PolicyTech• Coordinating the PPE committee activities (FR and

Reflective Clothing Programs)• Updates to Arc Flash Labeling Programs• Job Site Reviews• Monthly Safety Meetings• Contractor Safety Programs• Ergonomics at Home and Work• Workers Compensation

Powering our way of life.

Commission meeting 3/23/21

Continuous Improvement Team 5

Definition:Active Work Zone (AWZ)-Any area usually demarcated with visual aids and or barricades that contains potential safety hazards that are identified and recorded on a Job Brief Form and/or a Job Hazard Analysis.All shop areas designated for craft work where continuously evolving hazards may be present shall be considered permanently Active Work Zones and must be treated as such.

Examples of Active Work Zones

The designation of an Active Work Zone is not intended to replace the existing requirements set by governing regulatory agencies.This program is designed to work in conjunction with existing safety measures and code requirements.

Entering an Active Work Zone

Before entering an active work zone the individual/s shall have been part of the job brief and be aware of all hazards associated with the work zone. The individual shall have all required PPE on and follow all safety guidelines while in the active work zone.

Personal Protective Equipment (PPE)

When entering an active work zone ALL individuals will wear all required PPE.

ALL individuals will follow all safety guidelines.

YELLOW - Caution Tape

Caution Tape indicates minor hazards may be present.

Understand the hazards before you enter this work zone.

RED – Danger Tape

Danger Tape indicates an immediate hazard that presents threat of death or serious bodily injury.

DO NOT CROSS WITHOUT PERMISSION FROM THE PERSON IN CHARGE.

Conclusion:Be aware of your surroundings and do

not enter active work zones without identifying and understanding all hazards present.

Powering our way of life.

State of SecurityYTD ending February 28th, 2021.

Details of Q1 Security Review

• Security Contract• Incidents• Security Risk Assessment• Quarterly Business Review• Genetec Project Status• Emergency Management and IMT

Review

Star Protection Agency

• Star Protection Agency began a 6-month contract with Grant PUD beginning January 1st, 2021

• Quarterly Contract Reviews

Q1 we will establish expectations and guidelines for ongoing Quarterly Contract Reviews

• Security Officers to attend Safety Meetings

• Star Protection Team Site Assessments

Updating Post Orders

Training

Patrol Routes

• Preparation for Seasonal Coverage

5

2

6

2

4

3

2

3

2

6

2

1

4

6

10

0 5 10 15 20 25

Burglar Alarm

Facilities/Maintenance Issue

Suspicious Activity

Unsecured Access Point

Unsecured Vehicle

Vandalism

NUMBER OF INCIDENTS

TYPE

OF

INC

IDEN

T

2021 YTD Reportables

Customer Service Power Delivery Power Production Recreation

4

2

1

1

5

2

1

1

1

1

1

2

1

8

4

1

1

4

4

0 2 4 6 8 10 12 14 16

Burglar Alarm

Facilities/Maintenance Issue

ISP Complaint

LE / Fire / EMS Response

Safety Incident

Suspicious Activity

Unsecured Access Point

Vandalism

NUMBER OF INCIDENTS

TYPE

OF

INC

IDEN

T

2020 YTD Reportables

DSOC EHQ Desk HOB Desk Hydro Patrol T&D Patrol

Year-to-Date Reportable Incidents Compared to Previous Year

Physical Security Risk Assessment

SCOPE OF SERVICEDiscovery – Assessment – Findings/Ratings/Recommendations for Improvement – A Written Contingency & Mitigation Plan –Risk Policies –Defined Controls -- Delivered in Formal Review with Leadership

Completion Date: 2/23/21

Completion Date: 3/5/21

Completion Date: 3/12/21

Completion Date: 6/16/21

Genetec Project Update

Planned activities: WD Genetec transition. PRD transition. Migrate EDC and MLBDC pending CIP PACS Policies and

Procedure certification. Upon completion of above:

o Issue new HID cards. o Install new long range card readers on all gates.

Close the project.

Issues: • IT has lost number of employees with organizational

knowledge. Provisioning network is challenging due to gap in knowledge of current environment and configuration. Increase in potential outages and mitigation efforts require additional resources and time.

Risks: • Covid-19 will continue to challenge project coordination

and timeline.• Product and organizational knowledge loss due to both

internal and external resources leaving the organizations.

The IMT continues their response to the Coronavirus pandemic (COVID-19) with no anticipated date of standing down.

We continue to meet collectively every Monday to provide updates to our Situational Report and that information is then shared with the Executives.

Sequestration: Due to multiple identified close contacts with a positive COVID-19 case our mission critical Operations staff at Priest Rapids Dam, we initiated our second sequestration at the plant on December 2nd, 2020 and successfully ended that sequestration on December 17th, 2020.

Throughout this sequestration and through January 13th, 2021 at 5AM we operated the plants at both Priest Rapids and Wanapum in an Incident Criticality Level (ICL) 1 (Critical) restricting access and work to those areas necessary. We remained in ICL 2 (Severe) for the rest of our operations.

The restrictions placed on the Wanapum Dam Powerhouse were a precautionary step to protect the mission critical employees/operations while at the same time providing assets to assist operations at the Priest Rapid Dam if necessary.

We acknowledged the sacrifice these mission critical employees and their families made to keep the powerhouses operating safely.

Our first, and only other sequestration took place at PRD in October 2020.

Antigen Testing: After working closely with and obtaining the support of the IBEW we initiated mandatory twice-weekly antigen testing on January 27th, 2021 for those designated Power Production employees, Power Delivery’s senior system operators and specified contractors to increase probability they are free of the virus as they perform work in Grant PUD control centers, powerhouses and some other facilities. This decision, coordinated and supported by the Mattawa Community Medical Clinic (MCMC) and supported by the Centers for Disease Control (CDC), has resulted in 190 average tests per week (140 employees/50 contractors). To date this process has identified one confirmed positive test result from a contractor; substantiating our need to conduct these tests.

Vaccines: The IMT has established a Vaccine Planning Team (VPT) that includes IMT/Support staff and representatives from the IBEW. This team has a strong and calculated focus in the development of a vaccine plan. Though a lot of work has gone into looking at a plan from all perspectives, to include a white paper and a full SWOT analysis (Strengths, Weakness, Opportunities and Threats) no decision have been made as to the direction we will be recommending. It is anticipated those recommendations will come in late Q1 or early Q2/2021.

Incident Command System (ICS) Status

Emergency Management Development

The work of the Comprehensive Emergency Management Program/Incident Management Team (CEMP/IMT) has slowed due to our COVID response as anticipated. These team members are actively participating in our response and development along with their primary duties and responsibilities.

Though our internal work (team) has slowed we continue to work with our contractors and Grant County Emergency Management authorities in the development of our all-hazards Comprehensive Emergency Management Plan and the buildout of the support annexes to this plan as previously identified.

Incident ManagementField and EOC Operations

Resource and AcquisitionManagement

Environmental

Incident Action Planning Logistics Support Physical Security

Evacuations and Shelters

Information Technology and Communications Cyber Security

Damage Assessment Finance and InsuranceBusiness Continuity Recovery/Response and Restoration

Public InformationCommunications /Media

Human Resources Mitigation

External AffairsCommunity Relations Legal Preparedness

Customer Relations Health and Safety Cultural

Powering our way of life.

Quarterly Business Report

March 2021Leadership & Organizational Development

Agenda

1. Organizational Linkage

2. Progress Toward Objectives

3. Ongoing Performance Metrics

4. The Year Ahead

Organizational LinkageAligning the work of the team with the needs of the organization

Organizational Objective 2

Organizational Objectives

Department Objectives

Individual Objectives

Department Objectives

To reinforce a people-centric culture where employees acknowledge problems, focus on possibilities and share responsibility for their growth.

We exist to support organizational health by creating clarity around how we lead, train and treatpeople at Grant PUD.VI

SIO

N

MIS

SIO

N

Individual Objectives

1. 90% completion rate for Leading@grant and Working@grantyear 1 & Year 2 training content & transition from consultant to in-house trainers

2. Implement Enabling Structures: New LMS (implemented), Implement Performance Management (goal setting, succession planning), Individual Development Plans, and Onboarding Guides

3. Workforce Development: Hire a Workforce Development Manager & set a strategy for long-term workforce planning

Progress Toward Objectives02

Employee Engagement Assessment

Engagement Hierarchy - Continued

Grant PUD’s – Engagement Summary

Investing in our workforce: Educational reimbursement policy outcomes

• More than doubled participation in program.

• 2021 budget of $275,000 budget allocated

• Featured Employees: • Mike Stussy (Operations Technical

Advisor), Completed BA in Business Management.

• Jake Firestone (Hydro Maintenance Assistant @ Wanapum Dam), Summer 2021 Starting at BismarkState College, Power Generation Technology

• Increase program utilization

• Eliminate barriers

• Reinforce learning organization philosophy

• Nudge toward hard-to-fill roles

• Enhance ability to recruit

• Add structure and greater specificity

Objectives Outcomes

Performance Management Development

• What is it? Conversations that align the work of the individual, to the needs of the organization.

• Need a software solution that supports four facets of performance Management: Plan (organizational & individual goal-setting, succession, talent inventories) Monitor (goals are actively tracked, feedback is given & documented, Supervisory notes, Perf.

Improvement Plans) Dialogue (performance is discussed, good performance is recognized/rewarded, 360/180/90

reviews). Develop (performance is addressed, strengths-based potential is developed, LMS pathway

integration--Individual Development plans)

• Primary 2021 focus is on Plan & Monitoring (goal setting and supervisory notes). Reinforced by Gallup Q12 data.

Leading Self

Leading Others

Leading a Function

Leading an Industry

Learning Pathways• Purpose: Create a clear pathway for people to move within the organization. Calls out capacities and

required learning to get there.

• Reflects “Excellence in service and leadership”. Progression builds upon one another and reflects belief that: Leadership is learned, Leadership is available, Leadership is for everyone

Exam

ple Leading Self

Leading Others

Leading a Function

Leading an Industry

L e a r n i n g P a t h w a y s

Excellence in Service &

Leadership

Individual Development Plans (Grow@Grant)What is an Individual Development Plan (IDP)?

A process the employee directs, in partnership with their manager, to enhance professional growth by:

• Identifying and pursuing personal goals for professional development.

• Setting goals to learn or improve an important competency needed now or in the future.

• Identifying strengths, talents and passions and planning ways to use them on the job.

Exam

ple

Ongoing Performance Metrics03

McKinsey, OHI Training Effectiveness

Q12, Employee Engagement

Orientation Satisfaction

422019 Overall Organizational Health Index Benchmark

Top Quartile

Second QuartileThird QuartileBottomQuartile

Top Decile

Training Completion

In-Flight Educational

Reimbursements

22

YTD responses: 611

YTD responses: 5Q1 2020: 10

As of 2019

As of Feb 24, 2021

As of 2020

The Year AheadQ3-Q4 Commitments04

Learning Progression

Pathway in LMS

Individual Development Plan

Rollout

LMS Implementation

Code of Excellence Program

Implementation

Working@Grant & Leading@Grant“live” sessions

McKinsey Organizational Health Survey

Employee Appreciation Day

Performance Development System

The Year Ahead…

Q1 Q2 Q3 Q4

Questions?

Powering our way of life.

Commission Presentation March 23, 2020

PUBLIC POWER / INDUSTRY OUTREACH ACTIVITY REPORT

Andrew Munro, Senior ManagerExternal Affairs & CommunicationsChuck Allen, SupervisorPublic Affairs

Public Power/Industry Outreach Activity Report – Agenda:

I. Vision and Goals

II. Memberships

III. Leadership

IV. Recent Activities

V. All-New Waterpower Tradeshow 2021!

Vision & GoalsTrusted & Reliable Utility Leader

2021 Goals External Affairs & Communications

1. Increase Revenue Opportunities $50M for Fiber by end of 2021 $100M for PP/PD by end of 2021 ≥ 65% Fiber take rate by end of 2021

2. Top 5% Utility in Communications Excellence Develop “Bot” for grantpud.org by Q4 Develop customer engagement comms. plan by Q2 Conduct customer satisfaction survey by Q4

3. Operational & Compliance Excellence Achieve balanced WA carbon policy (CETA) Maintain 100% compliance with PRA Implement Policy Mgt. Tool Districtwide

Operating Unit Goals align/support GCPUD Strategic Plan Objectives.

Industry MembershipsUnified Voice

Industry Memberships (Unified Voice)

Industry LeadershipPowerful Voice

Industry Leadership (Powerful Voice)

Board of Directors – Andrew Munro

President of Board of Directors – Chuck Allen

Environmental Task Force CEO Sponsor – Kevin Nordt

Board of Directors – Tom Flint

Resource Adequacy Steering Committee – Rich Flanagan

Industry Leadership (Powerful Voice)

Board Chair – Kevin Nordt

Executive Committee Vice Chair – Kevin Nordt

Board of Directors – Judy Wilson

Communications Committee – Chuck Allen

Recent ActivitiesIndustry Collaboration & Outreach

Public Power Week CampaignParticipated with APPA in social media campaign in October.

Public Power Week CampaignFor Public Power Week, we gave away fair backpacks and other items at local grocery stores.

FWEE • Collaborated on production of a

student manual titled “Northwest Sources of Electricity” to highlight power generation in the NW.

FWEE • NW Sources of Electricity Publication, is a

part of the curriculum for our elementary-school energy education program and highlights the importance of hydropower in the Northwest. It replaces an outdated national publication.

NWHA Annual Conference

Presentation on Mitigation and Fish Passage by Mid-Columbia Public Utility Districts: Peter Graf, Grant Public Utility District; Tom Kahler, Douglas Public Utility District and Lance Keller, Chelan Public Utility District.

Salmon in the Classroom • Video demonstrates

Grant PUD’s commitment to fish mitigation and education

• Video had a combined online reach of 125,000+ through Facebook, Instagram and streaming services.

https://vimeo.com/463893801/59288adf7d

Hanford Reach Broodstock Derby• Video illustrates how

Grant PUD collaborates to preserve Columbia River salmon run.

• Video to debut this spring through social media and streaming video services.

https://vimeo.com/491446186/13700d02e5

All-New Waterpower TradeshowClean Currents 2021

All-New Waterpower Tradeshow + Conference!

Industry Participants

Powering our way of life.

March 23, 2021

Commission Report

Operational Excellence (OPEX) Quarterly Business Report Senior Manager of Operational Excellence Daniel Blazquez

• Provides oversight, guidance, leadership, and strategicdirection to all program initiatives working to limit risk inoperations while providing safe and predictable outcomes.

• Manages the Corrective Action, Continuous Improvement andHuman Performance Improvement Programs.

• Experienced Program Manager in

• Aerospace

• Agriculture

• Sales & Marketing

• Continuous & Human Performance Improvement

• Manufacturing, Quality, & Safety

About the Presenter

Daniel BlazquezSenior Manager of Operational Excellence

• OPEX Overview

• OPEX Team

• OPEX Program Description/Initiatives

• OPEX Budget versus Actuals

OPEX The Overview

OPEX Vision and Mission A C o m p a r i s o n

Grant PUD Vision Grant PUD OPEX Vision

Excellence in service and leadership Excellence in service and leadership as a high reliability organization (HRO)

Grant PUD Mission Grant PUD OPEX Mission

To safely, efficiently, and reliability generate and delivery energy to our customers.

To make Grant PUD the safest, most reliable, and efficient provider of energy and fiber on earth.

2021 Org ObjectivesF i n a l i ze a n d I m p l e m e nt O P E X F ra m e w o r k

2021 Organizational Objectives Enterprise Wide 2021 Priority Elevating Safety Priorities

Improving Org HealthAdvancing

Compliance Outcomes

Delivering on our financial and

operational targets Status

OrganizationFinalize and implement operational excellence framework (OPEX) COO lead High X X X X In Progress

Roll out Code of Excellence organization wide Yes High X In Progress

Finalize and Implement Enterprise Risk Management Program Yes High X X X In Progress

Refresh and continue delivery of Technology Roadmap Yes High X X In Progress

Adopt and rollout Julie's EPMO (Enterprise Project Mgmt. Org.) governance and framework and execute on John M's EPPM (Enterprise Project Portfolio Mgmt.) V2.0

Yes High X In Progress

Advance large customer focused capital projects - DB2, retail load requests, transmission interconnection requests.

Yes High X In Progress

Meet Fiber buildout and take rate objectives Yes High X In Progress

Finalize and rollout "New Normal" work design, policy and procedures - telecommute

Yes High X X In Progress

Finalize and implement workforce development framework CCO lead Medium X In Progress

Execute on enhanced Financial and Management Reporting CFO lead High X In Progress

COOFinalize and implement foreign material exclusion program (FME) COO High X X In Progress

Perform evaluation and requirements gathering for lock out/tag out program

COO / CFO - Facilities

High X X In Progress

Development and/or revision/updates of operational procedures - checklists…

COO High X In Progress

Advance CMMS focus for Power Delivery to allow increased data collection, planning and execution activities

COO High X X X In Progress

CFODevelop enterprise controls program and complete phase #1 of implementation

CFO lead Medium X In Progress

Institute "top quartile" internal strategic review and implementation plan (People Development/Process and system improvement)

CFO High X X In Progress

CCOFinalize and implement generation acquisition framework (Resource Planning and Resource Acquisition)

CCO High X In Progress

Develop a long term specified source product CCO High X In Progress

Retail Cost of Service / Rate Design Review CCO High X In Progress

• OPEX Policy

• OPEX Charter

• OPEX Roadmap

OPEX FrameworkPo l i c y Ro a d m a p C h a r te r

• OPEX Common Language

• OPEX Education and Training

• OPEX Focused/Directed Sustainable efforts

• OPEX is Part of Grant PUD Culture

• OPEX Program Vision Common Across Grant

OPEXTHE TEAM

Continuous Improvement Human Performance Improvement

Corrective Action

Brad Martinez Sr. Program Spc

Rey Pulido CI Manager

Cindi HarrAdmin. Assistant

Abel SabedraSr. Program Spc

Tyler O’BrionSr. Safety

Coordinator

Robert LougeeCAP Manager

Danny CombsProgram Spc.

Mark BeattieProject Spc. IX

Montague MeadowsLead Program Spc.

Operational Excel lence Team

Daniel BlazquezOPEX Senior Manager

OPEX The Programs (Descriptions and Initiatives)

Corrective Action ProgramProgram Purpose Statement (Mission) – Why it exists

The Corrective Action Program (CAP) is a reactive approach to problem identification and resolution (PI&R) which addresses process and organizational shortcomings once they become consequential.

Program BenefitsCAP implements a methodical approach to problem identification and resolution to provide measured solutions to consequential issues.

Current Program Initiatives

Expectation from the Program in 2021Provide Leadership an enhanced understanding of state of Grant PUD’s performance through an aggregate review process based on trending data. Also, a new approach to the timely and effective resolution of issues with expanded capabilities to track corrective actions to completion and assure sustainability of these actions. Driving a data driven approach.

#1 #2 #3 #4 #5 #6 #7

Support Ongoing Cause Evaluations

Ongoing Development of

Condition Reporting System (CRS)

Prepare the District for the Impact of

CAP Change

Condition Reporting System

Launch

Mentor District Personnel

Deploy KPI’s and Data Intelligence

Align CAP with OPEX Framework

Corrective Action Program (CAP)Init iat ive Highl ight - Condit ion Report ing System (CRS)What it is An application built upon Maximo to serve as common entry point for adverse and off-normal conditions identified through

the performance of daily work at Grant PUD. This tool will allow for conditions reported to be associated within the asset databaseor to be bucketed with like conditions for further analysis.

Why we are doing it To provide consolidated platform to report all issues. This will allow for the tracking and trending of allconditions reported to ensure that each condition is resolved at the appropriate level, based on significance.

How we are doing it Through a set of policies, procedures and protocols in conjunction with the Condition Reporting Systemplatform. The Condition Reporting System, combined with written governance will ensure that all conditions are resolved with themost consistent application of CAP methodologies possible.

2021 Program Outcomes Grant PUD’s improved confidence that all issues are identified and corrected at the appropriate levels.We will also have a complete command of where all conditions are at every point of the process.Through the prudent application of keywords to each condition submitted to the Condition Reporting System, the District will haveimproved capabilities to identify and correct adverse trends prior to those conditions rising to the level of consequence.

Continuous Improvement ProgramP ro g ra m O ve r v i e w

Program Purpose Statement (Mission) – Support employee efforts to enhance work practices and deliver business

excellence to internal and external customers.

Program Benefits- Engage and provide employees with a resource for implementing their ideas for improving their work

practices through the elimination of non-value-added work, utilizing creative and innovative ways to sustainably increase-quality and organizational performance.

Current Program Initiatives

Expectation from the Program in 2021

1. Increase visibility and awareness into CI departments: support, services, skills, capacity, capabilities, and plan. 2. Enterprise-wide Continuous Improvement training modules for Leaders and Staff. 3. Developed and defined improvement model with proficient staff to support improvement work.

#1 #2 #3 #4 #5 #6 #7

PP-Leadership Assessment

PD- Work Order Process Map

PP- Clearance Request Process

PP- Confined Space Project

PD- Outage Reporting Process

PP- Scheduling and Planning

PD-District System Load Map

Continuous Improvement ProgramP ro j e c t H i g h l i g h t - Po w e r P ro d u c t i o n L e a d e rs h i p A s s e s s m e n t

What it is To gain an understanding of the current state of leadership’s priorities and time commitments, and develop a structure to enable them to focus on value added work

Why we are doing it feedback was given to management about the lack of resources and time to allocate towards the plans/objectives that were put together. This analysis will further help understand the barriers that keep us from progressing in our strategy and other initiatives.

How we are doing it By gather information about the day in the life of a leader at Grant. We can use the data collected to help develop an understanding of leader’s priorities and time commitments, which could then help us create countermeasures to support leader’s ability to spend time on the appropriate work.

2021 outcomes Leader Standards for expectations, priorities and time commitments, Identify resource limitations, development of countermeasure

Human Performance Improvement (HPI) ProgramP ro g ra m O ve r v i e w

Program Purpose Statement (Mission) A strategic effort to minimize the frequency and severity of events triggered by

human errors through defining and reinforcing behaviors that support safe, reliable and error free operation and maintenance defined actions.

Program Benefits Safer work environment for employees and reduced financial losses and damage to equipment.

Current Program Initiatives

Expectation from the program in 2021

1. Increase visibility and awareness of HPI through Enterprise-wide HPI training modules for Leadership and Staff.2. Developed and defined HPI Program with a proficient staff to support Human Performance work.

#1 #2 #3 #4

HPI Leadership Training

HPI Champions District Wide HPI Introductions

HPI Integration

Human Performance Improvement (HPI) ProgramI n i t i a t i v e H i g h l i g ht – D i s t r i b u t i o n o f H u m a n Pe r fo r m a n c e To o l s

What it is Four core human performance tools: Situational Awareness, Questioning Attitude, Take-A-Minute, Stop Work. These four corehuman performance tools are critical attributes demonstrated by a properly trained, developed and engaged employees.

Why we are doing it These core tools or cultural attributes are a prerequisite for any high performing and reliable organization. Toenhance human performance, all employees at GCPUD need to be provided training that focuses on these tools.

How we are doing it This is accomplished mostly through internal and external training and through cultural shifts inside theorganization by employee engagement. Leadership support and commitment is critical to success.

2021 outcomes Improved focus, attention and concentration by employees on the proper execution of work tasks.

OPEX The Budget Versus Actuals

View in Power BI

Downloaded at:3/5/2021 8:17:37 AM Pacific Standard Time

Last data refresh:3/5/2021 8:15:30 AM Pacific Standard Time

Thank You

March 23, 2021 Commission Presentation

Customer SolutionsCOVID Impacts

Agenda• Aging

• COVID Relief

• Opportunities Industrialization Center (OIC)

• Share the Warmth

• Low Income

• What are we doing?

• Courtesy Calling and Payment Arrangements

• Irrigation Collection Plan

• After Proclamation Plan

Aging

Aging

$388,274.05

$639,758.75

$28,815.23 $216,865.89

$1,012.90

$286,395.17

$-

$100,000.00

$200,000.00

$300,000.00

$400,000.00

$500,000.00

$600,000.00

$700,000.00

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2020 2021

Residential AgingJanuary 2020 - February 2021

Arrears 31-60 Days Arrears 61-90 Days Arrears Over 90 Days

Aging

$1,012.90

$420,319.76

$286,395.17

39

1,766

1,072

$-

$50,000.00

$100,000.00

$150,000.00

$200,000.00

$250,000.00

$300,000.00

$350,000.00

$400,000.00

$450,000.00

-

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2020 2021

Residential Service Agreements in Arrears over 90 Days

Arrrears Over 90 Days Service Agreement Count

Residential customers owing over $500 / Over 90 daysOperational Area Count Average $ Total AmountMoses Lake 92 $ 845.00 $ 77,757.59 Ephrata 29 $ 860.73 $ 24,931.43 Quincy 22 $ 779.61 $ 17,151.47 Royal City 19 $ 918.45 $ 17,450.68 Grand Coulee 9 $ 711.96 $ 6,407.66

171 $ 143,698.83

Aging

$1,706,022.49

$198,927.59

$2,456,544.19

$1,512,451.85

718

264

$-

$500,000.00

$1,000,000.00

$1,500,000.00

$2,000,000.00

$2,500,000.00

$3,000,000.00

-

100

200

300

400

500

600

700

800

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2020 2021

Irrigation Service Agreements in Arrears Over 90 Days

Arrears Over 90 Days Service Agreements Over 90 Days

Aging

$-

$50,000.00

$100,000.00

$150,000.00

$200,000.00

$250,000.00

$300,000.00

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2020 2021

Small Commercial Service Agreements in Arrears

Arrears 31-60 Days Arrears 61-90 Days Arrears over 90 Days

COVID Relief -OIC

• Opportunities Industrialization Center (OIC) is located at 903 W 3rd Ave in Moses Lake. The organization has many services which include:

• Energy Assistance Program (LIHEAP and CARES)

• The appointments are over the phone, they verify income and obligate funds by calling Grant PUD

• National Farmworker Jobs Program

• The Prosperity Center

• Financial Education, Money Management, Home ownership Counseling

• Rental Obligations Paid to the Landlord

COVID ReliefOpportunities Industrialization Center (OIC)

0

50

100

150

200

250

300

350

$-

$20,000.00

$40,000.00

$60,000.00

$80,000.00

$100,000.00

$120,000.00

Janu

ary

Febr

uary

Mar

ch

April

May

June July

Augu

st

Sept

embe

r

Oct

ober

Nov

embe

r

Dece

mbe

r

Janu

ary

Febr

uary

Mar

ch

April

May

June July

Augu

st

Sept

embe

r

Oct

ober

Nov

embe

r

Dece

mbe

r

Janu

ary

Febr

uary

2019 2020 2021

Monthly Amounts Obligated with Family CountJanuary 2019- February 2021

Obligation Amount Family Count

Year Obligated Family Count2019 $ 354,814.00 9082020 $ 397,007.13 9552021 $ 55,809.00 128

COVID Relief – Share the

Warmth

• Grant PUD Share the Warmth Program:

• Contributions are Posted to the Share the Warmth PUD Account

• Residential Customers Only

• Income Qualification is 150% of Poverty Level

• CSRs and OIC Verify Income

• CSRs Transfer Share the Warmth Funds to the Customer Account

• Up to $300 per Household per Year

• Balance: $145,455

COVID Relief – Share the WarmthCustomer Donations

$0

$10,000

$20,000

$30,000

$40,000

$50,000

$60,000

$70,000

$80,000

$90,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2019 2020 2021

Share the Warmth ContributionsJanuary 2019 - February 2021

Customer Donations

Year Amount2019 $ 216,659.15 2020 $ 158,003.70 2021 $ 23,868.78

COVID Relief – Share the WarmthHelping Households

2629 30

27 27

17

23

1612

27 28

36

72

60

34

22

7 84

74 5

2

14

23

14

$-

$5,000.00

$10,000.00

$15,000.00

$20,000.00

$25,000.00

0

10

20

30

40

50

60

70

80

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb

2019 2020 2021

Share the Warmth January 2019 - February 2021Transfer Amount and Count

Customer Amount Customer Count

Year Amount2019 $ 78,406.57 2020 $ 66,652.58 2021 $ 11,100.00

COVID Relief – Low Income

Discounts

• Grant PUD Low Income Discount Program:

• Residential Customers Only

• Income Qualification is 150% of Poverty Level

• CSRs and OIC Verify Income

• Senior Discount – 62 Years or Above

• Disabled Discount – Signed Form

• 20% Discount on their Bill each Month

COVID Relief – Low IncomeDiscounts Given

Year Amount2019 $ 13,140.00 2020 $ 12,758.00 2021 $ 2,062.00

How we are Helping Customers

Irrigation Collection

Plan

• Calling Campaign begins March 9th and Continues to March 23rd

• CSRs call every irrigation customer to collect past due amounts and 2021 prepay amounts

• CSRs monitor and follow up to confirm payments have been received

• All Arrears (2020 and 2021 prepay) are due March 15th

• Customers Eligible for Disconnects will Begin March 24th

Post Proclamation

Collection Plan

• Proclamation ends

• Start sending auto generated reminder letters 2 months prior to the proclamation ending

• Letters mailed to all customers that include helping agencies, payment arrangements opportunities, late payment charges, begin disconnects by …..

• over 90 days in arrears

• over 60 days in arrears

• Courtesy calling from the collection process instead of severance process

• Late payment charges will begin the following month after proclamation ends

• The initial disconnects for non-payment, disconnect for nonpayment (dnp) collection fee or deposits will be charged

• Designated CSR during this time period manually pushing out disconnects to manage the workload for CSRs and the servicemen

• Start the CCS system severance process

Post Proclamation

- Share the Warmth

Expanded Share the Warmth Offering – Max $25,000

Offer $300 Share the Warmth funds for customers that have been financially impacted by COVID-19

Residential customers only

Current low-income verification using 1-month income verification and/or unemployment paperwork

$300 contribution

Increased Share the Warmth Offering – Max $25,000

Offer $150 additional Share the Warmth funds for customers that have been financially impacted by COVID-19

Residential customers only

Currently on low-income discounts, have received OIC funding or Share the Warmth funding in the last 12 months

Thank You