sadeer pre qualification document

62
1 Pre-Qualification Document Gypsum Board and Dry Walling Glass Reinforced Gypsum (GRG) Glass Reinforced Cement (GRC) Fibrous Plaster FMG System Wood Works & Wood Flooring Artificial and Special Stones Acoustical Panel System Metal Works Armourcoat & Venetian Plaster Other Finishing Work

Upload: christine-joy

Post on 03-Oct-2014

194 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Sadeer Pre Qualification Document

1

Pre-Qualification Document • Gypsum Board and Dry Walling • Glass Reinforced Gypsum (GRG) • Glass Reinforced Cement (GRC) • Fibrous Plaster FMG System • Wood Works & Wood Flooring • Artificial and Special Stones • Acoustical Panel System • Metal Works • Armourcoat & Venetian Plaster • Other Finishing Work

Page 2: Sadeer Pre Qualification Document

2

Sadeer Trading & Contracting Co. (ISO 9002 CERTIFIED) Block No. 8, Street #83 Building No. 168, South Subhan - Kuwait Tel: 4714325 / 6 / 8, 4714265 Fax: 4714301 E-Mail: [email protected] Website: www.sadeercont.com

Page 3: Sadeer Pre Qualification Document

3

Table Of Contents

Table Of Contents Contents Page No. Cover Page 1-2 Table of Contents 3 Company Profile 4 Company Structure 5-6 Organization Chart 7 Financial Situation 8 Executed Projects (Main Projects) 9 Commercial buildings 10-19 Hospitals 20-25 Offices & Hotels 26-29 Villas & Diwaniyas 30-33 Auditoriums 34-37 Current / On-going Projects 38-42 Suppliers, Resources & Sub-Contractors 43 Reference Companies 44 Commercial Registration Copy 45-46 Testimonials 47-51 List of Staffs 52-54 Project Photographs 55-61

Page 4: Sadeer Pre Qualification Document

4

Company Profile

Sadeer Trading & Con-tracting Com-pany was established in 1973 by MR. TAREQ BADER SALEM AL MUTAWA. The main goal of this establishment was then, to introduce the drywall system to the building industry in Kuwait. Since that year, our experience in the gypsum field, and even-tually, in other related finishing works started to grow bigger with time. Today, we deal on commercial and contracting basis with over 250 finishing items (wall fabrics and coverings, synthetic floorings and carpets, raised floors, ceramic murals, painting, wooden doors and carpentry works ....... etc). With all those items, our strong and solid friendship with the "Gypsum" was always dominating in our works. By combining the Engineering team we have, our Factory in South Subhan, and our unlimited contacts with the best and most advanced gypsum establishments all over the world, we were able to expand and specialize on every aspect of this material: • Gypsum Board and Dry Walling. • Glass Reinforced Gypsum. (G.R.G.) • Glass Reinforced Cement. (G.R.C.) • Fibrous Plaster. • F.M.G. System • Wood Works & Wood Flooring • Artificial and Special Stones • Acoustical Panel System • Metal Works • Armourcoat & Venetian Plaster • Other Finishing Works Finally, we are at a stage where we can say that we are able, to execute any design, no matter, how complicated it is to help Architects achieve their ideas.

Page 5: Sadeer Pre Qualification Document

5

Company Structure (A) MAIN OFFICE PARTNERS MR. TAREQ BADER S. AL MUTAWA MS. FARIDA H.SULTAN AL-ESSA MR. RAKAN T.B.S. AL MUTAWA MR. DHARI T.B.S. AL MUTAWA MS. DANA T.B.S. AL MUTAWA GENERAL MANAGER MR. NABIL AWAD PROJECTS MANAGERS MR. SOUHEIL MARDO MDM. SAHAR CHANE MR. MAHDI MOHD. MUBARAK MR. S. T. PAHATHKUMBURE MR. ASHRAF ADEL HANNA MR. NADER MALAEB MR. KEIZAR SADLIWALA SITE ENGINEERS & ARCHITECTS MR. FLORENTINO TONGSON MS. RANA DIB MS. NADINE N. SAYEGH MR. ADEL YUSEF PHILLIPS MS. RAGINA SURESH MR. RONALDO COLLADO GASMEN MS. THEA KATHERENE TONGSON MS. JYOTHY LAKSHMI DHANARAJ MR. MOH'D. MOHSIN SONI MR. BAIG AZHAR HUSSAIN AKHTAR MR. CHACKO JACOB MR. ROBIN COLLADO GASMEN MR. ZIAD AL-DAKHEEL MR. RANDI B REUNDA MR. YASMINE NEZAH MR. BINU MATHEW MR. LEEJOSH MR. KHAN BHAI ABDE MANAF MS. ROUDAINA SEBAALY

Page 6: Sadeer Pre Qualification Document

6

Company Structure

(B.) Showroom / Commercial Industries:

Manager: Mr. Abdul Karim Al-Abadi Location: Shuwaikh, Canada Dry St. Tel: 483-3819 Activity: Retailing of decoration items.

(C.) Sadeer Industries Factory: Manager (G.R.C.): Mdm. Sahar Chane Manager (G.R.G.): Mr. Sayed Zainul Abdin Location: South Subhan, Block No. 8, Street No. 83 Building No. 168, Tel : 4714325 / 6 / 8 - 4714265 Fax : 4714301 E-Mail : [email protected] Website : www.sadeercont.com Activity : Manufacturing different patterns of ceiling tiles, cornices, etc. for our projects as well as sales in G.R.G. and G.R.C.

(D.) Agencies: Manager: Mr. Abdul Karim Location: Main Office Tel: 4714325 / 6 / 8 - 4714265 Fax: 4714301 E-Mail: [email protected] Website: www.sadeercont.com Activity: Representing a variety of companies In the field of interior finishes:-- Armourcoat Limited (U.K.) Spiver, Italy Armstrong Limited (U.K.) Forton - F.M.G. (U.K.) G.S.P. Ceilings & Mfg. (U.K.) Mihashi Company (Japan) Hafele Gmbh (Architectural Hardware)

Page 7: Sadeer Pre Qualification Document

7

Page 8: Sadeer Pre Qualification Document

8

Financial Situation CAPITAL: KD. 700,000/- (FULLY PAID).

BANKERS (1): GULF BANK KUWAIT, Head Office,

P.O. Box 3200, Safat 13032, Kuwait. (2): NATIONAL BANK OF KUWAIT, Head Office, P.O. Box 95, Safat 13001, Kuwait. SITUATION: Since the liberation, we have not borrowed to finance our projects. Our financial position is kept steady and strong by planning our cash flow very well to enable us to finance our contracting & commercial divisions.

Page 9: Sadeer Pre Qualification Document

9

Executed Projects

• Main Projects

• Hospitals

• Offices & Hotels

• Villas & Diwaniyas

• Auditoriums

Al – Fanar Cinema

Le-Meridien Hotel

Page 10: Sadeer Pre Qualification Document

10

Executed Main Projects Main Projects:

1. Arab Organization Headquarters 2. Bayan Palace Rehabilitations 3. Amiri Diwan 4. Bayan Palace V.I.P. Residential Complex 5. Amiri Diwan - Seif Palace Renovation 6. Equate Project 7. Iranian Embassy V.I.P. Area 8. Subiya Power Station 9. Alghanim Specialities 10. Public Inst. For Social Security Headquarters 11. Kuwait Oil Sector Complex 12. Waterfront - Phase 5 13. Fahaheel Cinema Complex 14. Ministry Of Interior 15. Al-Aseer Tower 16. Extn. To College Of Technological Studies 17. Fahaheel Waterfront Development, Cinema 18. Australian College Of Kuwait 19. Seif Palace 20. Al Manshar Complex 21. Al Salam Hospital New Residential Tower 22. Al Manshar Rotana Suites 23. Burgan Bank Liberation Tower 24. Dome Complex 25. KEO Head Quarters 26. Surra Mosque 27. Hetco Office Building 28. KFH all branches 29. Al Molalla Cinema 30. Kuwait Continental 31. Avenues

Al-Ghanim Show room

Marina Mall

Page 11: Sadeer Pre Qualification Document

11

Main Projects

1. ARAB ORGANIZATION HEADQUARTERS: (KD. 900,000/-) CLIENT: THE ARAB ORGANIZATIONS CONSULTANT: PAN ARAB MAIN CONTRACTOR: AHMADIAH TRDG & CONTG CO., PROJECT MANAGER: MR. ELIE HANI

DESCRIPTION OF WORKS • Glass Reinforced Gypsum (G.R.G) Bulkheads, G.R.G. Vault Ceiling, Cove Lights ….. • False Ceiling, Gypsum Partitions, Claddings, Columns, Bulkheads, Access Doors etc ….. • Syrian Room-Modern, Traditional and Islamic Designs of Syrian Marble, Granite and Wood Work. • Syrian Fountains - 1 Major and Small fountains with Syrian Granite and Marble.

2. BAYAN PALACE REHABILITATIONS: (KD. 530,000/-)

CLIENT: MINISTRY OF PUBLIC WORKS CONSULTAN: PACE/SSH/K.E.O. (CONSORTIUM) MAIN CONTRACTOR: AL KHATEEB HAMMOND J.V. PROJECT MANAGER: MR. KEITH DAY

DESCRIPTION OF WORKS • Auditorium Ceilings, Gypsum Board Partitions and Ceilings, Columns, Cladding, Access Doors,

Flooring, Bulkheads, Spandrel, Cove Lights.. etc. • G.R.G. Ceiling, Cornices .. etc.

Hotel Hilton

Al - Hamra Mall

Page 12: Sadeer Pre Qualification Document

12

Main Projects 3. AMIRI DIWAN: (KD. 60,000/-)

CLIENT: MINISTRY OF PUBLIC WORKS CONSULTANT: PACE/SSH/JQEC (CONSORTIUM) MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO., PROJECT MANAGER: ENGR. AHMED SHAHBAS DESCRIPTION OF WORKS • Gypsum Partitions, Mineral Fibre & Dampa False Ceiling, Cladding, Carpeting, Wall Covering, Raised Floor …. etc.

4. BAYAN PALACE V.I.P RESIDENTIAL COMPLEX: (KD. 130,000/-)

CLIENT: MINISTRY OF PUBLIC WORKS

DESCRIPTION OF WORKS • Al Jahra 1, 2, 3 : G.R.G. Domes, Cornices, Cladding and False Ceiling …… etc. • Bubiyan 1, 2, 3 : G.R.G. Domes, Cornices, Cladding and False Ceiling …… etc.

5. AMIRI DIWAN - SEIF PALACE RENOVATION: (KD. 50,000/-)

CLIENT: MINISTRY OF PUBLIC WORKS CONSULTANT: JASSIM QABAZAD ENG. MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO. PROJECT MANAGER: ENGR. P. K. THUKRAL

DESCRIPTION OF WORKS • Gypsum Board Partition, • Acoustical Ceiling, G.R.G., • Vinyl Wall Covering, Wall Panels, • Linear Metal Ceiling.…. etc.

6. EQUATE PROJECT: (KD. 300,000/-)

CLIENT: EQUATE - P.I.C. MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO. PROJECT MANAGER: ENGR. AMIR RA’AD

DESCRIPTION OF WORKS • Partitions, Ceiling & Flooring Works.

Page 13: Sadeer Pre Qualification Document

13

Main Projects 7. IRANIAN EMBASSY V.I.P. AREA: (KD. 30,000/-)

MAIN CONTRACTOR : MOUSA BAHMAN TRDG. & CONTG. PROJECT MANAGER : MR. RIBHI ASSAD

DESCRIPTION OF WORKS • Glass Reinforced Gypsum (G.R.G.) Works.

8. SUBIYA POWER STATION: (KD. 35,000/-)

CONSULTANT: M.E.W. / MERZ MCLAIN ENGLAND MAIN CONTRACTOR: FRENCH DECORATION CO.

DESCRIPTION OF WORKS • All types of interior decorations.

9. ALGHANIM SPECIALITIES: (KD. 100,000/-)

CLIENT: ALGHANIM CONSULTANT: KUWAIT ENGINEERING OFFICE MAIN CONTRACTOR: ALGHANIM INTERNATIONAL PROJECT MANAGER: MR. AHMAD DESCRIPTION OF WORKS • G.R.G. Works, Gypsum Board Ceiling & Partition • Interior Finishing.

10. PUBLIC INST. FOR SOCIAL SECURITY H.Q.: (KD. 350,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR: AHMADIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • Interior Finishing.

11. KUWAIT OIL SECTOR COMPLEX : (KD. 362,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR : M.A. AL-KHARAFI & SONS COMPANY DESCRIPTION OF WORKS • G.R.G. Suspended Ceiling & G.B. Works.

Page 14: Sadeer Pre Qualification Document

14

Main Projects 12. WATERFRONT - PHASE 5: (KD. 203,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR: AHMADIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • G.R.G. & G.B. Works; Armourcoat

13. FAHAHEEL CINEMA COMPLEX : (KD. 80,000/-)

CONSULTANT: OHA ENGINEERING MAIN CONTRACTOR: AHMADIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • Finishing works; G.R.C. & G.B. Works.

14. MINISTRY OF INTERIOR: (KD. 20,000/-)

CONSULTANT: AL-ZAMAMI CONSULTING ENGINEERS MAIN CONTRACTOR: AHMADIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • G.R.G. Suspended Ceiling

15. AL-ASEER TOWER : (KD. 108,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR: AHMADIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • Suspended Ceiling & Partition Works.

16. EXTN. TO COLL. OF TECHNOLOGICAL STUDIES : (KD. 305,000/-)

CONSULTANT: TURNER INTERNATIONAL - PROJACS MAIN CONTRACTOR: ALGHANIM INT’L. GEN. TRDG & CONTG CO. DESCRIPTION OF WORKS • G.B. Ceiling & Partition; Cladding; MFT Ceilings.

Page 15: Sadeer Pre Qualification Document

15

Main Projects 17. FAHAHEEL WATERFRONT DEV’T., CINEMA : (KD. 162,000/-)

CONSULTANT: GULF CONSULTANTS MAIN CONTRACTOR : TAMDEEN REAL ESTATE COMPANY DESCRIPTION OF WORKS • Interior Finishes

18. AUSTRALIAN COLLEGE OF KUWAIT: (KD. 88,000/-)

CONSULTANT: SALEH AL-QALAAF MAIN CONTRACTOR: KHALID AL-KHARAFI & BROTHERS

DESCRIPTION OF WORKS • CEILINGS & PARTITIONS

19. SEIF PALACE : (KD. 61,600/-)

CONSULTANT: MAIN CONTRACTOR: THE NATIONAL COMPANY

DESCRIPTION OF WORKS • G.R.G. & Gypsum Board Ceiling Works

Marina Mall

Souk Sahrq

Page 16: Sadeer Pre Qualification Document

16

Main Projects

20. AL-MANSHAR COMPLEX: (KD. 104,500/-)

CONSULTANT: GULF CONSULT CONTRACTOR: AHMADIAH TRDG. & CONTG. COMPANY DESCRIPTION OF WORKS • Metal Suspended Ceilings, Fabric Ceilings & G.B. Works

21. AL-SALAM HOSPITAL, NEW RESIDENTIAL TOWER: (KD. 99,700/-)

CONSULTANT: AL-ZAMAMI CONSULTANT CONTRACTOR: BURHAN INTERNATIONAL CONST. CO.

DESCRIPTION OF WORKS • Supply & Installation Of G.B. Partition, • Suspended Ceilings & Painting Works.

22. AL-MANSHAR ROTANA SUITES: (KD. 2,101,786/-)

CONSULTANT: OPTION ONE CONSULTANTS CONTRACTOR: SADEER TRADING & CONTG. CO. DESCRIPTION OF WORKS • Interior Finishes

23. BURGAN BANK LIBERATION TOWER: (KD. 19,970/-)

CONSULTANT : S.S.H. CONTRACTOR / OWNER : BURGAN BANK DESCRIPTION OF WORKS • Civil & Decoration Works

24. DOME COMPLEX: (KD. 27,000/-)

CONSULTANT: KHALID ALI AL – KHARAFI COMPANY CONTRACTOR : KHALID ALI AL-KHARAFI COMPANY

DESCRIPTION OF WORKS • G.R.G. Works

Page 17: Sadeer Pre Qualification Document

17

Main Projects 25. KEO HEADQUARTERS: (KD. 45,174/-)

CONSULTANT : KEO INTERNATIONAL CONTRACTOR : HOT ENGINEERING & CONSTRUCTION CO. DESCRIPTION OF WORKS • Gypsum Package

26. SURRA MOSQUE: (KD. 100,297/-)

CONSULTANT: CONTRACTOR: MARAFI SONS COMPANY DESCRIPTION OF WORKS • G.R.G. & G.R.C. Works

27. HETCO OFFICE BUILDING: (KD. 8,000/-)

CONSULTANT : CONTRACTOR : AL-JAWAD TRADING & CONTRACTING CO. DESCRIPTION OF WORKS • Finishing Works

28. KFH ALL BRANCES: (KD. 15,656/-)

CONSULTANT: OWNER: KUWAIT MANAGER COMPANY DESCRIPTION OF WORKS • Armourcoat Works

29. AL-MOHALLAB CINEMA: (KD. 40,750/-)

CONTRACTOR : SADEER TRADING & CONTG. CO. OWNER : TAMDEEN REAL ESTATE COMPANY DESCRIPTION OF WORKS • Interior Refurbishment

Page 18: Sadeer Pre Qualification Document

18

Main Projects 30. KUWAIT CONTINENTAL: (KD. 3,000/-)

CONSULTANT: OWNER: KUWAIT CONTINENTAL HOTEL DESCRIPTION OF WORKS • Interior Finishing

31. AVENUES: (KD. 175,000/-)

CONSULTANT: PAN ARAB CONSULTING ENGINEERS CONTRACTOR: ALGHANIM INTERNATIONAL DESCRIPTION OF WORKS • Cement Plaster Works

Al-Hamra Mall

Hilton Hotel

Page 19: Sadeer Pre Qualification Document

19

Executed Hospital Projects

1. Amiri Hospital 2. Salmiya Clinic 3. Al-Maidan Dental Clinic 4. Al-Hadi Clinic 5. Telecommunication Hospital (Ent) 6. Al-Mowasat Hospital – Phase II 7. Ahmadi Day Care Centre 9. Al- Sabah Eye Hospital 10. Telecommunication Hospital 11. Children Hospital 12. Al-Salam Hospital 13. Al-Salam Pediatric 14. Ahmadiah Cardiac Hospital 15. Al-Farwania Dental Clinic 16. G.M.S Hospital (Jabriya)

Al-Mowasat Hospital Al-Mowasat Hospital

Page 20: Sadeer Pre Qualification Document

20

Hospital Projects

1. AL BAHAR EYE CENTRE: (KD. 220,000/-)

CLIENT: MINISTRY OF HEALTH. CONSULTANT: KUWAIT TECHNICAL CONS. OFFICE MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO. PROJECT MANAGER: ENGR. FOUAD HELMY DESCRIPTION OF WORKS • Gypsum Partitions, Mineral & Metal False Ceiling, • PVC Flooring, Bulkheads, Raised Floor ….. etc.

2. KUWAIT CLINIC: (KD. 35,000/-)

CLIENT: AL SULTAN GROUP MAIN CONTRACTOR: KUWAIT MEDICAL SERVICES PROJECT MANAGER: ENGR. HAIDER AHMED

DESCRIPTION OF WORKS • False Ceiling, Cladding, Gypsum Board Ceiling, • Access Panels, Gypsum Soffits, Columns … etc

3. EAR, NOSE & THROAT HOSPITAL: (KD. 90,000/-)

CLIENT: MINISTRY OF HEALTH. CONSULTANT: AL BUNYAN MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO., PROJECT MANAGER: ENGR. YOUSEF ATIYAH DESCRIPTION OF WORKS • Gypsum Partitions, Mineral & Metal False Ceiling, • PVC Flooring, Bulkheads, Raised Floor, G.R.G. Ceilings.

Children's Hospital

Page 21: Sadeer Pre Qualification Document

21

Hospital Projects

4. NATIONAL BANK HOSPITAL FOR CHILDREN: (KD. 67,000/-)

CLIENT: NATIONAL BANK OF KUWAIT CONSULTANT: GULF CONSUL MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO., PROJECT MANAGER: ENGR. YOUSEF ATIYAH DESCRIPTION OF WORKS • Gypsum, Mineral & Metal Ceiling, Resilient Flooring • Bulkheads, G.R.G. Ceilings.. etc.

5. AL MOWASAT HOSPITAL - PHASE I: (KD. 290,000/-)

CONSULTANT: GULF CONSULT MAIN CONTRACTOR: BURHAN TRADING & CONTG. CO. PROJECT MANAGER: MR. ALI NAJI DESCRIPTION OF WORKS • Interior Finishing

6. DAY CARE CENTRE IN AHMADI: (KD. 80,000/-)

CLIENT: HANDICAPPED SOCIETY CONSULTANT: K.E.O. MAIN CONTRACTOR: AL GHANIM INTERNATIONAL PROJECT MANAGER: MR. TAREQ AL SHUHABI

DESCRIPTION OF WORKS • Interior Finishing.

7. AL-MOWASAT HOSPITAL - PHASE II: (KD. 130,000/-)

CLIENT: HOSPITAL CONSULTANT: GULF CONSULT MAIN CONTRACTOR: BURHAN KUWAITI TRADING & CONTG. CO. PROJECT MANAGER: MR. ALI NAJI DESCRIPTION OF WORKS • Interior Finishing

Page 22: Sadeer Pre Qualification Document

22

Hospital Projects

8. AL-SALAM INTERNATIONAL HOSPITAL: (KD. 314,600/-)

CONSULTANT: AL-ZAMAMI CONSULTANT CONTRACTOR: BURHAN INTERNATIONAL CONST. CO. DESCRIPTION OF WORK • Supply & Installation of G.B. Partition, • Suspended Ceiling Works.

9. AL-MOWASAT HOSPITAL: (KD. 132,000/-)

CONSULTANT: GULF CONSULT CONTRACTOR: BURHAN INTERNATIONAL DESCRIPTION OF WORK • Ceilings & Partitions

10. GMS HOSPITAL, JABRIYA: (KD. 60,733/-)

CONSULTANT : GULF CONSULT CONTRACTOR : FRENCH DECORATION CENTRE INT’L.

DESCRIPTION OF WORK: • GRG Ceiling & Painting

11. INTERNATIONAL CLINIC: (KD 230,000/-)

CONTRACTOR : KUWAIT DYNAMICS LTD. DESCRIPTION OF WORK • Interior finishing

Al – Hadi Hospital

Page 23: Sadeer Pre Qualification Document

23

Hospital Projects 12. AL SALAM HOSPITAL (KD 314,625/-)

CONSULTANT : AL ZAMAMI CONTRACTOR : BURHAN INTERNATIONAL DESCRIPTION OF WORK • Interior finishing

13. AL SALAM HOSPITAL-PEDIATRIC (KD 5,000/-)

OWNER AL SALAM DESCRIPTION OF WORK • Interior finishing work

14. SPECIALISED CARDIAC HOSPITAL (KD 88,274/-)

CONSULTANT L.W.INTL. KTC CONTRACTOR : AHMADIAH TDG. & CONTG. CO. DESCRIPTION OF WORK • Suspended Ceiling

15. FARWANIA DENTAL CLINIC (KD 2,125/-)

CONSULTANT RAYA AL JANABI DESCRIPTION OF WORK • Armourcoat

16. G.M.S.Hospital (KD 60,732/-)

CONSULTANT GULF CONSULTANT CONTRACTOR : FRENCH DECORTION CENTER DESCRIPTION OF WORK • GRG False Ceiling work

Page 24: Sadeer Pre Qualification Document

24

Executed Offices & Hotels

1. Kuwait Airways 2. Sheraton Hotel 3. Kuwait International Hotel 4. Le Meridien Hotel 5. Al-Shaheed Tower 6. Gulf Investment Corporation Headquarters 7. K.E.O. Renovation 8. Sheraton Hotel Ballroom 9. Al-Sahab Tower 10. Hilton Resort Hotel, At Al-Mangaf 11. Le' Meridien Hotel, Renovation 12. Al-Bahar Headquarters 13. Bank Of Bahrain And Kuwait 14. Al-Arraya Complex 15. Al-Sayer Headquarters 16. Burgan Bank-Chairman's Club 17. Palm Club 18. Mangaf Tower 19. Burgan Bank Headquarters, Banking Hall 20. KUFPEC New Main Office Building 21. IFA Hotels & Resorts

Hotel Le Meridien

Hotel Hilton

Page 25: Sadeer Pre Qualification Document

25

Offices & Hotels

1. KUWAIT AIRWAYS: (KD. 600,000/-)

CLIENT: KUWAIT AIRWAYS CORP. CONSULTANT: KUWAIT ENGINEERING GROUP MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO. PROJECT MANAGER: ENGR. MIDHAT BOSHRA. DESCRIPTION OF WORKS • Gypsum Partition, Cladding, Acoustical Ceilings, • Columns, Bulkheads, Wall Covering...…. etc. in addition to very sophisticated GRG Ceiling.

2. SHERATON HOTEL: (KD. 275,000/-)

CLIENT: KUWAIT SHERATON HOTEL CONSULTANT: TURNER PROJACS MAIN CONTRACTOR: AYALA ABBOTT & BUTTERS PROJECT MANAGER: MR. KEITH DAY DESCRIPTION OF WORKS • GRG Ceiling, Cornices, Gypsum Partitions, Wall • Covering, Columns, Mineral Fiber Ceiling …. etc.

3. KUWAIT INTERNATIONAL HOTEL: (KD. 10,000/-)

CLIENT: KUWAIT INTERNATIONAL HOTEL MAIN CONTRACTOR: AL HADEER GEN. TRDG & CONTG PROJECT MANAGER: ENGR. MOH'D AL AMOUDI

DESCRIPTION OF WORKS • Gypsum Ceiling and Partition, G.R.G. Ceiling, • Columns….etc.

4. LE MERIDIEN HOTEL: (KD. 20,000/-)

CLIENT: KUWAIT MERIDIEN HOTEL MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO PROJECT MANAGER: ENGR. MHAGDY KHALEEL DESCRIPTION OF WORKS • Gypsum Ceilings & Cornices …. etc.

5. AL SHAHEED TOWER: (KD. 125,000/-)

CLIENT: THE UNITED REALTY CO. MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO PROJECT MANAGER: ENGR. KEITH SPENCER DESCRIPTION OF WORKS • Gypsum Partition, Gypsum Board Cladding, • Suspended Ceiling, Special Ceiling (G.R.G). etc.

Page 26: Sadeer Pre Qualification Document

26

Offices & Hotels 6. GULF INVESTMENT CORP. HEADQUARTERS: (KD. 145,000/-)

CONSULTANT: PAN ARAB ENGINEERING MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO PROJECT MANAGER: ENGR. ELIE HANI DESCRIPTION OF WORKS • Gypsum Partition, Gypsum Board Cladding, • Suspended Ceiling, Special Ceiling (G.R.G.), etc.

7. K.E.O. RENOVATION: (KD. 25,000/-)

CONSULTANT & OWNER: K.E.O. DESCRIPTION OF WORKS • Renovation Works.

8. SHERATON HOTEL BALLROOM: (KD. 50,000/-)

CLIENT: SHERATON (AL-SHAYA'A CO.) CONSULTANT: K.E.O. MAIN CONTRACTOR: AL RABIAH TRDG. & CONTG. CO. DESCRIPTION OF WORKS • Decoration Works & Finishing Items.

9. AL SAHAB TOWER: (KD. 130,000/-)

CLIENT: MR. AL NAFFISSI CONSULTANT: P.A.C.E. MAIN CONTRACTOR: AHMADIAH CONTRG. & TRDG. CO. DESCRIPTION OF WORKS • Decorative Works & Finishing Items.

10. HILTON RESORT HOTEL, AT AL-MANGAF: (KD. 350,000/-)

CONSULTANT: P.A.C.E. MAIN CONTRACTOR : AHMADIAH CONTRG. & TRDG. CO. DESCRIPTION OF WORKS • Interior Finishing.

11. LE' MERIDIEN HOTEL, RENOVATION: (KD. 37,000/-)

CONSULTANT: LE' MERIDIEN MANAGEMENT MAIN CONTRACTOR : AL-KHATEEB TRADING GROUP CO. DESCRIPTION OF WORKS • G.R.G. & Paint

Page 27: Sadeer Pre Qualification Document

27

Offices & Hotels

12. AL-BAHAR HEADQUARTERS: (KD. 65,000/-)

CONSULTANT: KUWAIT ENGINEERING OFFICE MAIN CONTRACTOR: M.A. AL-KHARAFI & SONS COMPANY DESCRIPTION OF WORKS • Interior Finishing

13. BANK OF BAHRAIN AND KUWAIT: (KD. 31,000/-)

CONSULTANT: KUWAIT ENGINEERING OFFICE MAIN CONTRACTOR: ALGHANIM INT'L GEN. TRDG. & CONTG. CO. DESCRIPTION OF WORKS • Interior Finishing.

14. AL-ARRAYA COMPLEX: (KD. 70,000/-)

CONSULTANT: PAN ARAB CONSULTING ENGINEERS MAIN CONTRACTOR: AHMADIAH CONTRACTING & TRDG. CO.

DESCRIPTION OF WORKS • Architectural Finishes

15. AL-SAYER HEADQUARTERS: (KD. 361,500/-)

CONSULTANT: KUWAIT TECHNICAL CONS. OFFICE MAIN CONTRACTOR: PROJECT MANAGEMENT INTERNATIONAL DESCRIPTION OF WORKS • Interior Finishes

16. BURGAN BANK-CHAIRMAN'S CLUB: (KD. 51,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR: UNITED REAL ESTATE COMPANY DESCRIPTION OF WORKS • Ceilings & Partitions

17. PALM CLUB: (KD. 30,000/-)

CONSULTANT: AL-KHALID CONSULTANTS MAIN CONTRACTOR: GHASSAN AHMED AL-KHALID CO. DESCRIPTION OF WORKS • G.R.G. Works

Page 28: Sadeer Pre Qualification Document

28

Offices & Hotels 18. MANGAF TOWER: (KD. 17,000/-)

MAIN CONTRACTOR: AL-DALEEL COMPANY DESCRIPTION OF WORKS • G.R.G. Ceilings, including edge details & Gypsum Skim

19. BURGAN BANK HEADQUARTERS, BANKING HALL: (KD. 80,000/-)

CONSULTANT: S.S.H. MAIN CONTRACTOR : UREC DESCRIPTION OF WORKS • Supply & Installations for the completion of Furniture Works.

20. KUFPEC NEW MAIN OFFICE BUILDING: (KD. 95,700/-)

CONSULTANT: AL-JAZEERA CONSULTANTS MAIN CONTRACTOR: SAYED HAMID BEHBEHANI & SONS DESCRIPTION OF WORKS • Gypsum Board Partitions, G.B. Wall Ceilings, PVC Floorings, • Wall Coverings, Access Floorings, Acoustical Wall • Ceiling Panels.

21. IFA HOTELS & RESORTS: (KD. 90,000/-)

OWNER: IFA HOTELS & RESORTS DESCRIPTION OF WORKS • Partitions, Skirting, Ceiling Works & other Finishing Itemss

Hotel Hilton

Hotel Hilton

Page 29: Sadeer Pre Qualification Document

29

Executed Villas & Diwaniyas 1. Villa Al-Sumait 2. Ghassan Saleh Villa 3. Al-Yarmouk Diwaniya 4. Mustafa Sultan Residential Complex 5. Issam Al Bahar Villa 6. Shaheen Al-Ghanim Villa 7. Kharafi Villas 8. Madam Wadha Al-Refai Villa 9. Al-Kharafi Villas 10. Al-Humaidi Villa 11. Dar Salwa 12. Al-Funaitess Villa 13. Anwar Al-Mulla Villa

Private Palace

Private Palace

Page 30: Sadeer Pre Qualification Document

30

Villas & Diwaniyas

1. VILLA AL SUMAIT: (KD. 150,000/-)

CLIENT: MR. ABDULLAH SUMAIT CONSULTANT: KUWAIT TECH. MAIN CONTRACTOR: AL AHLIA CONTRACTING COMPANY PROJECT MANAGER: ENGR. EIMAN SHABARO ACTIVITY: • GRG & all types of Interior Decoration.

2. GHASSAN SALEH VILLA: (KD. 24,000/-)

CLIENT: GHASSAN SALEH CONSULTANT: K.E.O. ACTIVITY: • All types of Interior Decoration.

3. AL YARMOUK DIWANIYA: (KD. 50,000/-)

CONSULTANT: AL JAZEERA ENG. MAIN CONTRACTOR: AHMADIAH CONTG & TRDG CO. ACTIVITY: • All types of Interior Decorations

4. MUSTAFA SULTAN RESIDENTIAL COMPLEX: (KD. 70,000/-)

CONSULTANT: KUWAITI ENGINEERING OFFICE MAIN CONTRACTOR: AL AHLIA CONTRACTING GROUP ACTIVITY: • All Types of Interior Decorations

5. ISSAM AL BAHAR VILLA: (KD. 30,000/-)

OWNER: MOH'D ABDUL RAHMAN AL BAHAR SITE ENGINEER: ENGR. REFAAT RIAD ACTIVITY: • All types of Interior Decorations.

6. SHAHEEN AL-GHANIM VILLA: (KD. 17,500/-)

OWNER: MR. SHAHEEN AL-GHANIM SITE ENGINEER: MR MASSIMO GALLUCI ACTIVITY: • ALL TYPES OF INTERIOR DECORATIONS

Page 31: Sadeer Pre Qualification Document

31

Villas & Diwaniyas 7. KHARAFI VILLAS: (KD. 220,000/-)

OWNER: MR. KHARAFI CONSULTANT: AL BANNAI ENGINEERING ACTIVITY: • All Types of Interior Decorations.

8. MADAM WADHA AL REFAI VILLA: (KD. 17,000/-)

OWNER: MADAM WADHA AL REFAI CONSULTANT: AL BANNAI ENGINEERING ACTIVITY: All types of Interior Decorations

9. AL-KHARAFI VILLAS: (KD. 200,000/-)

CONSULTANT: AL-BANNAI CONSULTANTS CONTRACTOR: AL-BANNAI CONSULTANTS & TRDG. CO. ACTIVITY: • G.R.G. & PAINTS

10. AL-HUMAIDI VILLA: (KD. 25,000/-)

CONSULTANT : AL-BANNAI CONSULTANTS CONTRACTOR: AL-BANNAI CONSULTANTS & TRDG. CO. ACTIVITY: • G.B. WORKS

11. DAR SALWA: (KD. 215,000/-)

CONSULTANT: ABDUL RAZZAK AL-NASSER CONSULTANTS CONTRACTOR: UNITED AMERICAN REAL ESTATE SERVICES ACTIVITY: • G.R.G. & PAINTINGS.

Page 32: Sadeer Pre Qualification Document

32

Villas & Diwaniyas 12. AL-FUNAITESS VILLA: (KD. 132,000/-)

CONSULTANT: AYALA CONSULTANTS CONTRACTOR: AYALA INTERNATIONAL LIMITED ACTIVITY: • G.R.G. CEILINGS & PAINT.

13. MR. ANWAR AL-MULLA VILLA: (KD. 19,000/-)

CONSULTANT: AL-ZAMAMI CONSULTING ENGINEERS CONTRACTOR: AL-AHLIA CONTRACTING COMPANY ACTIVITY: • G.R.G. WORKS, CEILINGS & PARTITIONS.

Private Palace

Page 33: Sadeer Pre Qualification Document

33

Executed Auditoriums 1. Kuwait Oil Sector Complex Auditorium 2. KISR Auditorium 3. College of Social & Legislative Sciences A, B, C, D & E 4. Extn. to The College of Technological Studies 5. Bayan Auditorium 6. Australian College of Kuwait 7. Day Care Center 8. Kuwait Airline Company 9. Al-Fanar Cinema 10. Al-Kout Cinema (Water Front) 11. Fahaheel Cinema 12. Al-Mohallab Cinema 13. Avenues Cinema 14. Gulf University Auditorium (under construction)

Page 34: Sadeer Pre Qualification Document

34

Kuwait Airways Auditorium

Page 35: Sadeer Pre Qualification Document

35

Australian College Auditorium

Page 36: Sadeer Pre Qualification Document

36

KISR Auditorium

Page 37: Sadeer Pre Qualification Document

37

Current On-going Projects

1. AVENUE CINEMA PROJECT 2. MAZAYA / GLOBAL PROJECT 3. MESSILA BEACH HOTEL PROJECT 4. MARINA MALL DECORATION 5. AL-MANSHAR ROTANA SUITES 6. PORSCHE SHOWROOM PROJECT 7. MARINE SCIENCE PROJECT 8. IFA OFFICES PROJECT 9. GULF UNIVERSITY (GUST) PROJCT 10. NADIA RESIDENTIAL TOWER PROJECT 11. AL-AHLI BANK PROJECT 12. JET AIRWAYS PROJECT 13. IBIS HOTEL, SALMIYA 14. FRETTE SHOP 15. AL-KHARAFI BUILDING- QUIBLA 16. AL-SAFAT CENTER PROJECT- QUIBLA 17. AL-BAHAR VILLA PROJECT 18. DASMAN BNEID SUPER MARKET PROJECT 19. SPECIAL TRAINING CENTER PROJECT 20. THE LAKES PROJECT 21. FAHAD AL-OTHMAN VILLA PROJECT 22. VILLA MODA PROJECTS 23. AHMADI PROJECT PART- ( 1-5) 24. KHALID TOWER PROJECT 25. JET AVIATION VIP & CIP 26. MITSUBISHI CAR SHOWROOM

Page 38: Sadeer Pre Qualification Document

38

Current On-Going Projects

1. AVENUES CINEMA PROJECT (KD 760,209/-) Consultant: Pan Arab Consulting Engineers

Owner: Kuwait National Cinema Company Scope of work: Floor finishes, Wall finishes, Ceiling Finishes, Doors & Windows Percentage completed: 35%

2. MAZAYA/GLOBAL PROJECT (KD 627,000/-) Consultant: OHA Engineering Co. Owner: Al Mazaya Real Estate Development Co., Scope of work: Masonry, Plaster & Water Proofing, Painting,

Metal, Mirrors & Bathroom Accessories, Wood work etc. Percentage completed: 50%

3. MESSILA BEACH HOTEL PROJECT (KD 222,000/-) Consultant: Gulf Consultant Contractor: KCPC Scope of work: Ceiling works, Gypsum Board ceilings & Partitions Percentage completed: 30%

4. MARINA MALL DECORATION (KD 35,000/-) Owner United Real Estate Company Scope of work: Ramadhan Decoration Percentage completed: 100%

5. AL MANSHAR ROTANA SUITES (KD 2,101,786/-) Consultant: Option One Consultants Contractor: Sadeer Trading &Contg. Co. Scope of work: Interior Finishes Percentage completed: 100%

6. PORSCHE SHOWROOM PROJECT KD 74,851/-)

Consultant: SSH Contractor: Sadeem Al Kuwait Scope of work: Supply, Installation & Maintenance of Gypsum Works Percentage completed: 50%

7. MARINE SCIENCE PROJECT (KD 151,000/-)

Consultant: SSH Contractor: Burhan International Scope of work: Supply & installation of Acoustical,

Gypsum, Aluminium & Wood works Percentage completed: 30%

Page 39: Sadeer Pre Qualification Document

39

Current On-Going Projects

8. IFA OFFICES PROJECT (KD 81,916/-)

Owner : International Finance Advisors Scope of work: Ceilings & Partition works Percentage completed: 1000%

9. GULF UNIVERSITY (GUST) PROJEST(KD 364,130/-)

Consultant: KEO Contractor: Burhan Internationals Scope of work: Ceilings & Partition works Percentage completed: 50%

10. NADIA RESIDENTIAL TOWER PROJECT (KD 61,000/-)

Consultant: KEO Contractor: Al Ahlia Contracting Group Scope of work: GRG Works Percentage completed: 50%

11. AL AHLI BANK PROJECT (KD 60,492/-)

Owner: Al Ahli Bank of Kuwait Scope of work: Renovation - Interior finishes Percentage completed: 100%

12. JET AVIATION PROJECT (KD 57,283/-)

Consultant: SSH Contractor: Combined Group Scope of work: Supply & Fix - Ceilings & Partition Percentage completed: 30%

13. IBIS HOTEL PROJECT (KD 93,630/-)

Consultant: Al Jazeera Owner: Action Real Estate Co. Scope of work: GRG Ceiling & Access Doors Percentage completed: 80%

14. FRETTE SHOP (KD 49,446/-)

Owner: Hamed Y.Al Essa Scope of work: Interior Finishing works Percentage completed: 90%

15. AL KHARAFI BUILDING QUIBLA (KD 48,000/-)

Consultant: KEO Intl. Contractor: M.A. Kharafi & Sons Scope of work: Supply & Fix Gypsum Board Ceiling,

GB Partition & Painting work Percentage completed: 75%

Page 40: Sadeer Pre Qualification Document

40

Current On-Going Projects

16. AL SAFAT CENTRE (KD 27,378/-) Consultant: Nezar Al Anjari Consulting Bureau Contractor: Al Ahlia Contracting Co. Scope of work: False Ceiling & partition Percentage completed: 35%

17. AL BAHAR VILLA PROJECT

Contractor: Artal Realty Scope of work: Armourcoat Percentage completed: 90%

18. DASMA & BNEID SUPER MARKET PROJECT (KD 69,000/-)

Consultant: Al Mousawi Wng. Consultants Contractor: Kuwait Manager Company Scope of work: Supply & Fix - Ceilings Percentage completed: 20%

19. SPECIAL TRAINING CENTRE (KD 750,000/-)

Consultant: KEO Intl. Contractor: RECAFCO Scope of work: Supply and fix GRG, Gypsum Board and Wood Percentage completed: 10%

20. THE LAKES PROJECT (AVENUES) (KD 179,960/-)

Consultant: NORR Group Contractor: M/s Ritec Trading Company Scope of work: Cement Plaster & Gypsum Plaster Percentage completed: 10%

21. FAHAD AL OTHMAN VILLA PROJECT (KD 33,576/-)

Owner: Fahad Al Othman Scope of work: GRG Ceiling and wall cladding,

Acrylic & Decorative Wood Ceiling Percentage completed: 50%

22. VILLA MODA PROJECT KD. 410,005/-

Owner: Villa Moda Lifestyle Co. Scope of work: Interior finishing work Percentage completed: 95%

Page 41: Sadeer Pre Qualification Document

41

Current On-Going Projects

23. AHMADI CLUB (KOC) (KD 11,000/-) Owner KOC Scope of work: Armourcoat Percentage completed: 95%

24. KHALID RESIDENTIAL TOWER KD 27,860/-

Owner: Al Khalid Residential Tower Contractor: Sayed Hamid Behbehani & Sons. Co. Scope of work: Supply & installation of Gypsum Board Ceiling Percentage completed: 90%

25. JET AVIATION VIP & CIP(KD 49,000/-) Consultant GULF CONSULTANT Contractor: Combined Group Scope of work: Interior finishes Percentage completed: 50%

26. MITSUBISHI CAR SHOWROOM (KD 11,187/-) Contractor: Bader Al Mulla Scope of work: Interior finishes Percentage completed: started

Avenues Mall Fahaheel Cinema

Page 42: Sadeer Pre Qualification Document

42

SUPPLIERS, RESOURCES & SUB-CONTRACTORS

ARMSTRONG WORLD INDUSTRIES - U.K. BRITISH GYPSUM CO. - U.K. B.T.S. INTERIORS - U.K. C.M.C. - BELGIUM DANOGIPS - DENMARK GERLAND SOLE INTERNATIONAL - FRANCE GILLEISPE - U.K. GORDON SIMMONDS PARTNERSHIP - U.K. HARLEQUIN - U.K. INTEC INTERNATIONAL - USA LAFARGE PLASTERBOARD - U.K. LINDNER A.G. - GERMANY MA>AN SABOUNI - SYRIA MAISON BOYER - FRANCE MARKSTYLE - USA MIDAS - U.K. NAKA CORPORATION - JAPAN NASREEN AL KHOULI - SYRIA NATIONAL GYPSUM COMPANY - SAUDI ARABIA OWA - WEST GERMANY PALMYRA - GREECE PETER MULLINS - U.K. POLYFLOOR - U.K. QBE CEILING & BUILDING MATERIALS - MALAYSIA. RAM METAL INDUSTRIES - DUBAI RUBBER GATES - U.K. S.A.S. GROUPS - U.K. SAUDI FACTORY FOR PROFILES - SAUDI ARABIA SHEH FUNG SCREWS - TAIWAN SUNDEK - INDIA UNITED STATES GYPSUM - USA ZOFFANY - U.K. IN ALL OUR PROJECTS IN ADDITION TO OUR STAFFS WE DO FROM TIME TO TIME NEED THE HELP OF SPECIALIZED SUB-CONTRACTORS TO COMPLETE THE WORK AS PER THE NEEDS OF THE PROJECT.

Page 43: Sadeer Pre Qualification Document

43

Reference Companies

AHMADIAH CONTRACTING AND TRADING COMPANY AL AHLIA CONTRACTING GROUP AL BANNAI CONSULTANTS & TRADING COMPANY AL FULAIJ TRADING GROUP AL GHANIM INTERNATIONAL AL GHANIM TRADING & CONTRACTING CO. AL HADEER GENERAL TRADING & CONTRACTING COMPANY AL KHATEEB HAMMOND J.V. AL RIYASH TRADING & CONTRACTING AL SHAYA'A CONTRACTING COMPANY AL ZABIN GROUP ARABIC COMPANY AYALA ABBOTT & BUTTERS AYALA INTERNATIONAL LIMITED BEHBAHANI TRADING & CONTRACTING COMPANY BURHAN COMPANY M.A. AL-KHARAFI & SONS COMPANY NASSAR AL RASHID EST. NATIONAL REAL ESTATE COMPANY UNITED AMERICAN REAL ESTATE SERVICES AL TAMDEEN REAL ESTATE MABANI COMPANY COMBINED GROUP RECAFCO

Page 44: Sadeer Pre Qualification Document

44

Commercial Registration Copy

Page 45: Sadeer Pre Qualification Document

45

Page 46: Sadeer Pre Qualification Document

46

Testimonials

Page 47: Sadeer Pre Qualification Document

47

Page 48: Sadeer Pre Qualification Document

48

Page 49: Sadeer Pre Qualification Document

49

Page 50: Sadeer Pre Qualification Document

50

Page 51: Sadeer Pre Qualification Document

51

List Of Staff CHAIRMAN & MANAGING PARTNERS 1 TAREQ BADER S.AL-MUTAWA Chairman 2 FARIDA H.SULTAN AL-ESSA Managing Partner 3 RAKAN TAREQ BADER SALEM AL MUTAWA Managing Partner 4 DHARI TAREQ BADER SALEM AL MUTAWA Managing Partner 5 DANA TAREQ BADER SALEM AL-MUTAWA Managing Partner GENERAL MANAGER 6 ENGR. NABIL AWAD General Manager ADMINISTRATION & OFFICE SECTION 7 ABDUL KARIM ABADI Commercial & Finance Manager 8 JAMAL ABU SHANAB Asst. Purchase Manager 9 DINESHAN KEEZHANGOTE Agencies - Manager 10 YUNUS ALI ALI KUTBUDDIN SHAKIR Accountant 11 HUSSAIN FAKHRUDDIN CHAKLY Accountant 12 MOHD JAVED ALAM Asst. Accountant 13 AHMAD MOHD. DAHMAN P.R.O 14 OSAMA KASIM P.R.O 15 BIJU JOSEPH Store in-charge 16 PIYADASA KARANNAGODA Store in-charge 17 SHERLY THOMAS Secretary - Chairman’s Office 18 LALI POTTI Secretary - Head Office 19 SHILNA GANESH Secretary -Head Office 20 JEESHMA SIVADAS Commercial Assistant 21 SOBHANA SREENIVASAN Secretary 22 N. FAROOK BASHA Tea Boy ENGINEERS & PROJECT MANAGERS 23 ENGR. S.T. PAHATHKUMBURE Chief Engineer 24 ENGR. ASHRAF YUSEF ADEL Projects Manager 25 ENGR. SOUHEIL Y. MARDO Projects Manager 26 ENGR. NADER MALAEB Project Manager 27 MR. KEZAR ABBAS BHAI SADLIWALA Project Manager 28 ENGR. ADEL YUSEF PHILLIPS Project Manager 29 ENGR. FLORENTINO TONGSON Senior Architect 30 ENGR. MAHDI MOHD. ALMAHDI Architect/ Project Manager

Page 52: Sadeer Pre Qualification Document

52

List Of Staff DESIGNING SECTION 33 MDM. SAHAR CHANE Manager - Interior Designer 34 RANA ELIAS DIB Designer-Project in-charge 35 NADINE GEORGE ABBOUD Interior Designer 36 ROUDAINA SEBAALY Interior Designer 37 RAGHI VINOD KUMAR Secretary-ID section 38 THEA KATHERENE TONGSON AutoCAD operator 39 EDVARDO P. LAJARCA JR. AutoCAD operator 40 RENE D RELOZA AutoCAD operator FACTORY & STORE 41 ANIL KUMAR R. ACHARY Foreman 42 SAYED ABDUL GANI (SARWAT) Foreman 43 SUHESH S. SHYLAJA Foreman 44 SAYED ZAINUL ABDIN Store in-charge 45 PUSHPA Safety Officer 46 KARUNA M. DERANGULA Office Cleaner 47 NIRANJANA Office Cleaner 48 MAHMOOD ASHAMANDI MAHMOOD Driver 49 ABDUL AZIZ AKBAR BASHA Driver 50 AHMED BADSAH (DRIVER) Driver 51 JOSEPH B. CURITANA (DRIVER) Driver 52 MATHEW BABY ZAKARIA -- (DRIVER) Driver 53 MOHD. MUSTAFA Driver 54 NUWAN CHAMARA EKANAYAKE Driver 55 P.A. KULARATNA -- (DRIVER) Driver 56 P.K. SIRIPALA Driver 57 RADI ISHMAIL -- (DRIVER) Driver 58 RAKESH BHOI (DRIVER) Driver 59 RAMA KRISHNA PILLAI -- (DRIVER) Driver 60 MUSTAFA SULAIMAN Casting/Fixer 61 CHINTAKA D.R.P Aluminum Fixer 62 ROLAND CASTRO BAGAY Electrician 63 FAKHRUDDIN A. ALLAHBUX Welder 64 ROGELIO RAMOS Welder 65 BALJINDER SINGH SANTOKH SINGH Carpenter 66 BINESH Carpenter 67 GURMEET SINGH PRITAM SINGH Carpenter 68 JAGDEV SINGH BHAGAT SINGH Carpenter 69 NATWERLAL SUTHAR Carpenter 70 AMERJI PRAJAPAT Painter 71 GIRISH CHANDRA D. PRAJAPAT Painter

Page 53: Sadeer Pre Qualification Document

53

List Of Staff SITE ENGINEERS & STAFFS 72 CHACKO JACOB Site Engineer 73 ENG.YUSEF FARAJ Site Engineer 74 KHAN BHAEEVABDE MANAF Site Engineer 75 RANDY B.REUNADA Site Engineer 76 YASMIN NEZAH Site Engineer 77 ABELARDO BAMBA Foreman 78 ALFREDO ESTAVILLO, (SR.) Foreman 79 AMBASA DOUGLAS HEMANTHA Foreman 80 ANTONY BARIYAWANSA Foreman 81 AZZAM AMIN AHMED Foreman 82 GANESH LAL PRAJAPAT Foreman 83 HANNAN GANGARDI WALA Foreman 84 JASVIR SINGH KEWAL Foreman 85 KAIZER GEORGE RIVERA Foreman 86 MANNAN MOIZ BHAI CHALLAWALA Foreman 87 NARINDER SINGH SOHAN SINGH Foreman 88 NASIR MAKIN Foreman 89 SALVADOR BENITEZ Foreman 90 SANIL C. PUSHPANGATHA Foreman 91 WILLY LAXAMANA Foreman 92 BINU T. MATHEW AutoCAD Operator 93 JAY CRUZ AutoCAD Operator 94 JYOTHY LAKSHMI DHANRAJ AutoCAD Operator 95 LEE JOSH AutoCAD Operator 96 MOHD. MOHSIN SONI AutoCAD Operator 97 RAGINA SURESH AutoCAD Operator 98 ROBIN COLLADO GASMEN AutoCAD Operator 99 RONALDO COLLADO GASMEN AutoCAD Operator 100 BAIG AZHAR HUSSAIN AutoCAD Operator 101 SUBHA SHINE PULLAT SIDHARTHAN AutoCAD Operator 102 SUBIN M.S AutoCAD Operator 103 RAMYA ANIL Secretary-Site 104 SISHIL KRIPAL Secretary-Site 105 SMITHA MURALI Secretary-Site

Page 54: Sadeer Pre Qualification Document

54

Project Photographs

Sultan Center Restaurant

Telecommunication Hospital

Souk Sharq Debenhams

Public Institution for Social Securities Office

Page 55: Sadeer Pre Qualification Document

55

Project Photographs

Hotel Safir International (Armourcoat Work)

Public Institution for Social Securities Office (PIFSS)

Public Institution for Social Securities Office

Mowasat Hospital

Page 56: Sadeer Pre Qualification Document

56

Project Photographs

Munther Complex

Meridian Hotel

Marafie Jewellery

Malaysian Embassy

Page 57: Sadeer Pre Qualification Document

57

Project Photographs

Kuwait Tower

Kuwait Airways

First United Head Office another View

First United Head Office

Page 58: Sadeer Pre Qualification Document

58

Project Photographs

Children Hospital

Bank of Bahrain & Kuwait

Burgan Bank

Al Bahar Building

Page 59: Sadeer Pre Qualification Document

59

Project Photographs

Al – Shaheed Tower

Al – Shaheed Tower

Caesars Restaurant

Hotel Hilton Visitor's Area

Page 60: Sadeer Pre Qualification Document

60

Project Photographs

Messilah Beach Hotel

Rotana Suites Hotel Elevation

Rotana Suites Hotel Elevation

IBIS Hotel

Page 61: Sadeer Pre Qualification Document

61

Project Photographs

Marriot courtyard

Rotana Suites Hotel Interior

Rotana Suites Hotel Interior

Rotana Suites Hotel Interior

Page 62: Sadeer Pre Qualification Document

62

Frette Green wing showroom

Villa Moda Louis vuiton