    PRE-QUALIFICATION FOR SHORT LISTING OF DETAILED DESIGN

    CONSULTANTS

    PRE-QUALIFICATION ENQUIRY DOCUMENT

    QUESTIONNAIRE & EVALUATION CRITERIA

    FOR

    Structural Design of Various Types of Railway Bridges

    Steel & Concrete

    PRE-QUALIFICATION DOCUMENTS FOR SHORT-LISTING DETAILED DESIGN

    CONSULTANTS

  • 2

    Instructions to Applicants

    Applicants are required to read carefully the contents of this document and to provide required

    information in sufficient detail so that the capabilities of the applicant can be fully appreciated

    and assessed.

    DDC (Detailed Design Consultants) may be individuals, consultancy firms or joint ventures well

    experienced in the respective categories. Applicants must read carefully the directions

    concerning the requirements for groups. All members of a group will have their submittals

    evaluated.

    This document consist of pre-qualification Enquiry document, pre-qualification

    questionnaire and Evaluation criteria.

    Applicants are to complete the Questionnaire and to provide the required information in separate

    Sections as described in the Contents of Sections. These documents may be submitted in sets

    of one original and two copies, and marked so. The use of sections is to separate the information

    provided so that there is no doubt as to the intention of the applicant, and to considerably

    simplify the process of assessment of the applicants capability and suitability.

    Submittal will be assessed to demonstrate convincingly that the applicant possesses the

    experience, technical, administrative and financial capability to perform the contract for which

    application is made, and has good performance record in the relevant area.

    Applicants will not be considered if they have a poor performance record such as: abandoning of

    works; not properly completing contracts, inordinate delays in completing contracts; litigation

    history, financial failure etc.

    All documents are to be in English Language.

    Successful applicants will be advised of the result of their application, however, it should be

    noted that RDSO will not discuss any aspect of the evaluation process and the result of the

    evaluation.

  • 3

    Applicants should note clearly the date and time of submittal of applications. No Document

    will be received after the stipulated Date and Time. Applicants are reminded that no

    supplementary material will be entertained by RDSO, and that evaluation will be carried

    out only on the basis of documents received by the closing time for receiving submittals.

    In the event of a conflict between documents submitted by the applicant, the material contained

    in the original set only will prevail.

    Applicants will not be considered if they make misleading or false representations in statements,

    attachments and pre-qualification questionnaire submitted in proof of the qualification

    requirements.

  • 4

    PRE-QUALIFICATION OF DETAILED DESIGN CONSULTANTS (DDCs)

    RESEARCH DESIGNS & STANDARDS ORGANISATIONS

    LUCKNOW

    1. INTRODUCTION

    1.1 RDSO intends to shortlist Detailed Design Consultants (DDCs) for preparing a standard

    panel of approved consultant of repute to engage them for specialized design job on need

    basis. Zonal Railways may also make use of this panel for works at railway level.

    1.2 DDCs will be short-listed for following categories of works:

    Structural design of railway bridges, FOBs/ROBs and other railway structures of :

    (i) Steel/Composite (Steel+Concrete) Super structure

    (ii) PSC/RCC Super Structure

    (iii) Substructure/Foundation of Any type

    1.3 The panel of respective category shall remain valid for 3 year from the date of

    empanelment. Addition/deletion in the list will be done once in a year. Expression of interest

    shall be notified for fresh applications once a year or as decided by RDSO.

    1.4 Deletion of consultant from panel shall be on the basis of bad performance report from

    the client.

    1.5 All DDCs shortlisted for pre-qualification are not necessarily be hired by RDSO.

    1.6 RDSO intends to invite application from only suitable and highly experienced Indian and

    International individuals, consultancy firm or joint ventures who must be having an

    established office in India. Tenders for awarding any work for detailed designing will only

    be invited from those who have been pre-qualified by RDSO through this PQ tender. It is

    mandatory for the International applicants to have Indian partners in the joint venture, who

    have experience in the appropriate disciplines.

    1.7 Interested consultants may apply for pre-qualification individually or as joint ventures,

    partnerships or consortia (groups). However, they will not be permitted to tender for the

    same contract as an individual or individual firm and at the same time as part of a joint

  • 5

    venture, partnership or consortium. Also any firm can participate or become member of

    only one consortium/joint venture/partnership or group.

    1.8 Applicants for pre-qualification should note that this Pre-Qualification Enquiry and

    Questionnaire is intended to provide consultants with preliminary information. The

    information contained herein shall not in anyway be constructed as binding on RDSO.

    1.9 Applicants are advised that selection of consultants shall be entirely at the discretion of

    RDSO. Applicants will be deemed to have understood and agreed that no explanation or

    justification of any aspect of the pre-qualification process will be given and that RDSOs

    pre-qualification decisions are without any right of appeal whatsoever.

    1.10 All costs incurred by an applicant for pre-qualification shall be borne by the applicant,

    RDSO, or any railways office are entirely without liability for such costs on other parties.

    1.11 RDSO reserves the right not to proceed with the pre-qualification procedure at any time

    without notice or liability.

    1.12 All documents and other information supplied by RDSO or submitted by an applicant

    shall remain or become the property of RDSO. Applicants are to treat all information as

    strictly confidential. RDSO will not return any pre-qualification submission except the

    original documents, if any.

    1.13 RDSO will notify successful applicants of the result of pre-qualification for the contract.

    However, pre-qualification of applicant does not make binding on RDSO that they must

    be taken as a part of DDC.

    1.14 Applicants are advised that RDSO is not bound to respond to any enquiries or into

    communication concerning or relating to selection process or the pre-qualification

    procedure.

  • 6

    1.15 RDSO/Zonal Railway will scrutinize the designs/drawing presented by DDC and will

    give the final approval.

    SCOPE OF WORK

    The Scope of Work for the Design Consultants :

    Conduct Design Alternatives on the conceptual design provided in the contract package

    using principles for cost-effective designs.

    Prepare a design basis note prior to start the actual design as per prevailing IR Codes. In

    absence of provision in IR other codes in the order of preference as given in the design

    contract document shall be used.

    Wherever codal provisions are not available DDC shall use sound engineering practices

    and provide the complete logic for using the practice.

    Perform detailed designs of structures (Superstructure, substructure, foundation,

    expansion joints, bearing & Seismic restrainers).

    Prepare the detailed design document which can be easily understood by the approving

    authority i.e. RDSO.

    Incorporate changes in design resulting from RDSOs design reviews.

    Plan, design, detail, control, co-ordinate, and execute the design phase of the Works for

    production of drawings, documents and reports to meet the key schedule date included in

    the Agreement and as directed by RDSO/Zonal Railways.

    Prepare and submit a Design Quality Control Plan to RDSO for approval;

    Maintain a Quality Control activity and an effective internal procedure for checking the

    accuracy of Work and assuring compliance with contract requirements;

    Attend all meetings and prepare, distribute and maintain all meeting minutes, reports,

    notes, correspondence and other documents of whatever nature required during the course

    of the work;

    Proof checking of designs and drawings shall be done by RDSO/Zonal Railway. In case

    of very special type of work like steel/PSC arch bridge, Road cum rail bridge, proof

    checking shall have to be arranged through expert agency in that field as mutually

    agreed..

    Maintain a qualified design team for engineering services during the construction

    contract: to review contractors bar bending schedules, shop and working drawings for

    the Works for compliance with the design requirements and contract documents; to

  • 7

    prepare supplemental reports, calculations, recommendations, etc. or modify existing

    drawings as necessary to incorporate system wide requirements and unforeseen

    conditions;

    Providing solutions to the various problems during construction raised by the field

    engineers;

    2. PROJECT ORGANISATIONS

    2.1 The RDSO/Zonal Railway will be Employer under the terms of any contacts to be

    awarded.

    3. CONTRACTUAL MATTERS

    3.1 The execution of the works will be through public tender from pre-qualified tenderers.

    3.2 DDCs will be required to develop the conceptual designs and Outline Specifications as

    per Employers Requirements into detailed designs and full specifications complete with

    all necessary drawings to proceed to tender for construction. As part of the design effort

    the DDC will make progress submittals of designs, specifications. RDSO/Zonal Railway

    will carry out proof checking of the DDCs work but the DDC will be required to operate

    an internal Quality Assurance Programme to ensure that all work is checked before

    submittal to RDSO. The DDC will prepare design reports, as well as reports on

    Constructability and Maintainability of their designs. In case of very special type of work

    like steel/PSC arch bridge, Road cum rail bridge etc., proof checking shall have to be

    awarded through expert agency in that field as mutually agreed.

    3.3 If a contract is awarded to a group, each member thereof will be severally and jointly

    liable for the whole performance of the contract obligations. A single performance

    guarantee from the lead member will be required for a group of tenderers.

    4. PREQUALIFICATION APPLICATION

    4.1 Applicants for pre-qualification are required to submit the Pre-qualification

    Questionnaire and associated information as herein requested.

    4.2 Applicants shall submit the requisite information in the sectional arrangements as

    indicated in the Table Contents of Sections in the pre-qualification questionnaire.

  • 8

    4.3 Applicants should attach clearly marked and referenced continuation sheets in the event

    that the space provided in the Questionnaire is in sufficient. Alternatively, Applicants

    may format the questionnaire making due provision for incorporation of the

    requested information.

    4.4 Applications for pre-qualification must be submitted by hand or by registered post so as

    to reach the office of the RDSO by . hrs. on ...The onus of ensuring

    this is with prospective applicant. Late or delayed applications will not be received

    or considered.

    4.5 Submissions shall be made in two sets of documents comprising one original set and one

    copy set and addressed to the ED/B&S/RDSO at the address shown below :

    Office of the Director General,

    B&S Directorate,

    2nd

    Floor, Annexe-2,

    Manak Bhawan,

    R.D.S.O., Manak Nagar,

    Lucknow 226 011.

    All envelopes shall be titled PRE-QUALIFICATION SUBMISSION FOR

    STRUCTURAL DESIGN EMPANELMENT OF DETAILING DESIGN

    CONSULTANTS FOR RAILWAY BRIDGES and clearly marked in English as :

    Name of Applicant

    Contract Number

    Copy Number (i.e. Original, or Copy No.1)

    4.6 Information supplied by a applicant (or other constituent member if the applicant is a

    joint venture) must be relevant to the applicant or constituent member named in the

    application and not, unless specifically requested, to other associated companies or firms.

    Unless otherwise approved by RDSO, invitation to tender documents will only be issued

    to consultants or groups whose identity and/or constitution is identical to that at pre-

    qualification.

  • 9

    4.7 A Group comprising a joint venture, partnership or consortium may apply for pre-

    qualification. Applicants attention is drawn to paragraphs 1.6 & 3.3 above. In the case

    of applications from groups, a statement or participation for each constituent member

    shall be submitted to the effect that they are bona fide members of the joint venture

    applying for pre-qualification and that, in the event of pre-qualification, they agree to be

    jointly and severally liable to RDSO under any contract which may be subsequently

    awarded to the joint venture. Details of the existing or proposed joint venture, partnership

    or consortium agreement in the form of a Memorandum of Understanding (MOU) signed

    by all participants will be required.

    4.8 RDSO will review and evaluate the information submitted by applicants and select the

    applicants to whom invitations to Tender will be issued.

    4.9 In responding to the pre-qualification submission, applicants should demonstrate their

    capabilities, by providing material based on their experience, past performance, their

    personnel, equipment and financial resources, including:

    Capability to design to the requisite standard and to monitor and control design

    development.

    Capability to programme and re-programme the design work, monitor progress against

    programme and to utilize computer programming and monitoring techniques.

    Capability pro-actively to undertake and manage contract interfaces or co-ordination.

    Capability to execute the work in time by having adequate resources.

    Operate a design quality control programme.

    In the case the application is from Joint Venture, or consortium, each member of the

    group should substantially satisfy the pre-qualification requirements.

    4.10 Applicants will not be requested to provide additional information or material

    subsequent to the date of submission, and such material if submitted can be

    disregarded.

    4.11 All documents submitted by applicants shall be in the English Language. Submitted

    documents will not be returned except the original documents.

  • 10

    PRE-QUALIFICATION FOR SHORT LISTIG OF DETAILED DESIGN

    CONSULTANTS (DDCs)

    PRE-QUALIFICATION QUESTIONNAIRE

    FOR

    Structural Design of Various Types of Railway Bridges

    Steel & Concrete

  • 11

    PRE-QUALIFICATION QUESTIONNAIRE

    This document contains pro-forma letters and the Pre-qualification Questionnaire. These

    are to be reproduced and completed as appropriate and submitted as part of the

    Applicants pre-qualification submission.

    TABLE OF CONTENTS

    Description Page

    Application for Pre-Qualification 13

    Pre-Qualification Questionnaire

    Verification Statement

    Contents of Each Section

  • 12

    PRE-QUALIICATION QUESTIONNAIRE

    PRO-FORMA LETTERS

    PRO-FORMA LETTER OF APPLICATION (on Firms Letter Head)

    The Director General,

    Research Designs & Standards Organisation,

    Manak Nagar,

    Lucknow 226 011,

    India.

    (Applicant to provide date and reference)

    APPLICATION FOR PRE-QUALIFICATION

    Detailed Design Consultants

    Dear Sir,

    We hereby make application for pre-qualification as Structural Consultants for the Structural Design of

    various types of railway bridges. In support of the application we submit herewith one original and two copies of

    the required documents.

    (In the case of other than a sole proprietorship firm add this following paragraph)

    A Power of Attorney to sign and submit this letter is attached.

    (In the case of a joint venture/partnership/consortium add this paragraph)

    This application is submitted on behalf of a joint venture/partnership/consortium (applicant to delete as

    appropriate) comprising..(applicant to state the names of each member).and of

    which..(applicant to insert name of leading member of joint venture/partnership/consortium) has

    agreed to act as leader. Each member has prepared a statement of participation in relation to this application and

    these are contained in Section 2 herewith.

    Yours faithfully

    (Signature)

    Name of Signatory..

    Capacity of Signatory.

    Name and address of applicant (or of leader if applicant is a group)

  • 13

    PRO-FORMA LETTER OF PARTICIPATION FORM EACH MEMBER OF A GROUP

    (On each Firms letter Head)

    The Director General, Research Designs & Standards Organisation,

    Manak Nagar,

    Lucknow 226 011, India.

    (Applicant to provide date and reference)

    Dear Sir,

    APPLICATION FOR PRE-QUALIFICATION

    We wish to confirm that our company/firm (delete as appropriate) has formed/intends (delete as

    appropriate) to form a group with. (member to insert names of all other members of the group) for

    purposes associated with Contract Number.

    (Members who are not the lead member of the group should add the following paragraph)

    The group is led by (member to insert name of lead member) whom we hereby authorize to act on our

    behalf for the purposes of applying for pre-qualification.

    (members being the lead member of the group should add the following paragraph)

    In this group we act as leader and for the purposes of applying for pre-qualification, represent the group in the event

    of our group being invited to tender for Contract Numberwe agree to be jointly (with other members of

    our group) and severally liable to Research Designs & Standards Organization (RDSO), its successors and assigns

    for all obligations, duties and responsibilities arising from or imposed by ay contract subsequently entered into

    between RDSO and our group.

    Yours faithfully

    Signature

    (Name of Signatory).

    (Capacity of Signatory).

    Notes: 1. Each page of the questionnaire an contents of Sections shall be signed by the Applicant

    2. This entire Questionnaire Pro-forma, when completed shall be included in Section 1

    3. Questionnaire pro-forma relating to the various sections shall be incorporated in the respective

    sections (i.e. Pro-forma section 2 (replies to questions 9 to 14) will be included in the contents of

    Section 2)

    4 In the box Y denotes Yes and N denotes No. Put a tick _/ against whatever is

    applicable or explicitly indicate Yes or No as the case may be

    Y N

  • 14

    PRO-FORMA-GENERAL

    1. Title of contract for which pre-qualification is sought

    Detailed design consultancy for various types of railway bridges

    2. State the structure of the applicants organization (applicants to complete/delete as appropriate)

    Individual company or firm

    Joint Venture

    Partnership

    Consortium

    Other (Please specify)

    2. For applicants who are individual companies or firms, state the following

    Name of Company or firm..

    Legal status : (e.g. incorporated private company, unincorporated business, etc.)

    Registered address.

    Principal place of business.

    Country of incorporation or domicile...

    Contact person..

    Contact persons title

    Address, telephone and facsimile number of contact person

    ..

    ..

    4. For applicants who are in joint venture, partnership, consortium or other association, State the following:

    Names of members Legal Status Registered address Country of incorporation

    (lead member first) and principal place of or domicile

    Business

    (1) .. ..

    (2) ... . ..

    (3) .. ...

    (etc)

    Contact person (from lead member)

    Contact persons title

    Address, telephone, and facsimile number of contact person:

  • 15

    5. Applicants and each member of a group are to present the following information in Section 1 on additional

    sheets which are to be clearly referenced as being in response to this Question 6.

    For the applicant, (in case of a group, for each constituent member); state the following information

    Date of incorporation or forming of organization.

    Names and titles of Directors or partners.

    Has the company or firm ever failed to complete any work awarded to it?

    If yes give details.

    Is the firm or company involved or financially interested in any other business

    not directly associated with the area of work for which pre-qualification is

    sought? If yes give details.

    Does the company of firm have an office or branch office in India?

    If so, provide address(es).

    Y N

    Y N

    Y N

    6. In the case of international applicants, is an Indian Partner, experienced the appropriate

    discipline, a member of the Group?

    If yes, provide list of disciplines

    If not, give reasons for selecting the Indian partner

    ..

    Y N

  • 16

    Proforma Sec-2

    7. Does Section 2 contain the Power of Attorney which empowers the person or persons to

    sign the Letter of Application?

    If yes, have you enclosed the statements of participation on behalf of all the constituent

    members of the group?

    If not, give reasons

    .

    Y N

    Y N

    8. In the case of an incorporated applicant (or constituent member who are incorporated) does

    Section 2 contain copies( in English) of the Memorandum and Articles of Association or

    equivalent expression of corporate capacity?

    If not, give reasons

    ..

    Y N

    9. In the case of applications from groups does Section 2 contain statements of participation in

    the form appearing in the Pre-qualification Brochure for each member?

    In the case of groups have you enclosed an MOU signed by each member that they

    will be jointly and severally responsible for the entire work?

    If not, give reasons

    Y N

    Y N

    10. In the case of applications from a groups, does Section 2 contain copies of the MOU, group

    agreements or other documents establishing or intending to establish the formation of such

    a group?

    If not, give reasons.

    ..

    Y N

    11. In the case of application from groups, does Section 2 contains details of:

    Proposed equity participation by each member for the proposed work?

    Areas of specialization or responsibility of each member for the proposed work?

    Extent of participation (including deployment of key personnel) by each member for the

    proposed work

    If not, give reasons:

    .

    Y N

    Y N

    Y N

  • 17

    PRO-FORMA SECTION 3

    12. State the number of years the applicant (or each constituent member) has been undertaking work similar in

    scope and nature to the works for which pre-qualification is sought.

    Name No. of years

    (1)

    (2)

    (3)

    Etc.

    13a. Performance Record. Applicants should scrutinize the catagory description contained in this Pre-

    qualification Brochure and compile a list showing their previous experience of Relevant Railway work i.e.

    (1) Design of railway bridge in the specific category like steel/composite super structure or PSC/RCC

    Super/Substructure.

    (2) Transit experience i.e. Design of railway bridge other than special category and highway bridge.

    during the last five years. Design work that is similar in nature to the works for which pre-qualification is

    sought should also be included

    Do you authorize RDSO to make enquiries with any of the Clients listed by the

    Applicant ?

    Have you and each constituent member of the Group provided details of each

    project required on Annexure 1 and 1A together with summary of Contracts completed

    in the last five years?

    (Using a separate sheet for each contract)

    Y N

    Y N

    13b. Work in Hand. Applicants or each constituent member should indicate, in the form below, details for each

    contract/commitment which is in hand on ... (Applicants are to present this information in the

    format shown below but on sheets which are to be inserted in the Questionnaire).

    Name of Contract Value of outstanding

    design* work on date

    in Rupees

    Estimated completion

    date

    1. .

    2.

    3.

    Total

    Have you provided details for each contract listed in Annexure 2

    (Using a separate sheet for each Contract)

    Y N

    Only design work cost to be included and not construction cost (Assume 6% inflation per year for rupee portion as

    2% for foreign currency portion)

  • 18

    ANNEXURE 1 PREVIOUS EXPERIENCE

    Design work completed in the last five years (2005-2010), relating to Railway Bridges/Highway bridges.

    Applicants Name:

    (Each member, in case of a group)

    Project Title :

    Location:

    Client:

    Clients Address:

    Clients Representative

    Telephone/Fax No.

    Type of Contract : Detail Design only

    Was the work carried out alone?

    Y N

    Was the work carried out as a member of a Group?

    If the answer is Yes, give your percentage share and

    area/s of participation

    Y N

    Date, work commenced: Date, work was completed

    Was the date of completion given in the original

    Contract extended?

    If so, how much and why?

    Y N

    Were any penalties

    Imposed for delay ?

    Y N

    Were any penalties imposed for reasons other than delay? If yes, give details

    Y N

    Contract value (in Rupees on 31.3.2010 prices,

    assuming 6% inflation for Indian Rupees and 2% for

    foreign currency portion)

    N.B. Give cost only for the design portion and NOT for

    the construction portion. Only that cost of design should

    be included which is done by the applicant/member

    himself in his own name. Where an applicant/member

    has done design work as part of a group only the design

    portion undertaken by applicant/member himself should

    be included and the design work undertaken by the

    remaining member of the group excluded.

    Details of work undertaken :

    What Quality Assurance obligations

    were required in the Contract?

    Has the Applicant or any member of the Group been

  • 19

    Blacklisted by any Client ?

    If yes, why?

    Y N

    Project Description:

  • 20

    ANNEXURE 1A

    Design work completed in the last five years (2005-2010 till date of opening), relating to special railway bridges

    (0.5 km or above of bridge will fall in the category) like Segmental Prestressed Superstructure/ Steel composite of

    value more than Rs.10.0 lakh.

    Applicants Name:

    (Each member, in case of a group)

    Project Title :

    Location:

    Client:

    Clients Address:

    Clients Representative

    Telephone/Fax No.

    Type of Contract : Detail Design only

    Was the work carried out alone?

    Y N

    Was the work carried out as a member of a Group?

    If the answer is Yes, give your percentage share and

    area/s of participation

    Y N

    Date, work commenced: Date, work was completed

    Was the date of completion given in the original

    Contract extended?

    If so, how much and why?

    Y N

    Were any penalties

    Imposed for delay ?

    Y N

    Were any penalties imposed for reasons other than delay? If yes, give details

    Y N

    Contract value (in Rupees on 31.3.2010 prices,

    assuming 6% inflation for Indian Rupees and 2% for

    foreign currency portion)

    N.B. Give cost only for the design portion and NOT for

    the construction portion. Only that cost of design should

    be included which is done by the applicant/member

    himself in his own name. Where an applicant/member

    has done design work as part of a group only the design

    portion undertaken by applicant/member himself should

    be included and the design work undertaken by the

    remaining member of the group excluded.

    Details of work undertaken :

    What Quality Assurance obligations

    were required in the Contract?

  • 21

    Has the Applicant or any member of the Group been

    blacklisted by any Client ?

    If yes, why?

    Y N

    Project Description:

  • 22

    SUMMARY OF ANNEXURE 1

    Name of Applicant (Member in case of a Group):

    S.No. Cost of design portion* done by the above

    applicant/Member only (Not Construction

    Cost)

    RANGE

    Number of Works Total cost of only

    Design portion done by

    the above applicant/

    member only

    1. More than Rs. 5 lacs and less than Rs.10 lac.

    2. Rs. 10 lacs and above but upto Rs. 20 lacs

    3. More than Rs. 20 lacs

    For considering the application the applicant should have completed at least 5 works

    more than Rs.5.0 lac and 2 works more than Rs.10.0 lacs in preceeding 3 years and up to

    the date of opening of offers.

    This should at 31.03.2010 prices, assuming escalation

    at the rate indicated in Annexure 1.

  • 23

    SUMMARY OF ANNEXURE 1A

    Name of Applicant (Member in case of a Group):

    S.No. Cost of design portion* done by the above

    applicant/Member only (Not Construction

    Cost)

    RANGE

    Number of Works Total cost of only

    Design portion done by

    the above applicant/

    member only

    This should at 31.03.2010 prices, assuming inflation

    at the rate indicated in Annexure 1.

  • 24

    ANNEXURE 2 WORK IN HAND (ALL TYPES OF DESIGN WORK ONLY)

    Project Title: Location:

    Client: Clients Address:

    Clients Representative: Telephone/Fax No.

    Type of Contract. Detail Design only/Design & Construct/Design and Supervise

    (Please circle type of Contract)

    Date of commencement of work of proposed date

    for commitments already entered into:

    Anticipated date of Completion:

    Contract Value of work in Rupees: (Only the

    Design portion of cost to be indicated

    Anticipated value of on-going design, work or

    commitment in Rupees as on 31.03.2010. Only

    design work cost ( and not construction cost) to be

    indicated. Assume inflation of 6% per year on

    rupee portion and 2% on foreign currency portion)

    Project Description:

  • 25

    PRO-FORMA SECTIION 4

    14 Staff, Applicants or each constituent member thereof should indicate the number of staff employed (total and

    at specified offices). Only regular employees who have been with the applicant or constituent member of the

    Group for at least 6 months should be included. Information should be given separately for each member.

    15 Location (Specify)

    Members Name

    ..

    ..

    .

    .

    .

    .

    Engineers

    (Graduates,

    equivalents

    and above)

    Subordinate

    Design/Drawing

    Staff (Diploma

    holders or

    equivalent)

    Others Total

    Applicants or each constituent member thereof should provide the numbers that would be made available for

    the proposed work of their current-in-house design resources below. (Only those who have been with the

    Applicant for at least 6 months should be included).

    Number that would be made available for the

    proposed work

    Applicants Name:

    (Members Name

    in case of Group)

    Discipline

    Postgraduates

    And Above

    Graduates And

    Equivalent

    Others Total

    Structural Engineer

    CADD Operator

    Others

    Which member of the Group will provide the project leader for this work?

    Provide the academic qualifications and experience of the proposed Project Leader.

    16.

    Provide in Section 4 the following:

    Have you (each member in case of group) indicated the number of

    personnel who will be made available for the proposed work together with

    their disciplines as indicated in Q. 19(a)?

    Have you (each member in case of group) provided CVs of their key

    personnel who will be made available for the proposed work, indicating

    their Academic and Professional Qualifications, work experience along

    with duration, field of specification, length of service with applicant (with

    member in case of a group)

  • 26

    PRO-FORMA SECTION 5

    17. Include in Section 5 details of ownership and control of applicant, or if a group of each constituent

    member.

    18. Have you or each member of a Group, included in Section 5 documents, including Banking References,

    which demonstrate that you have access to, or have available liquid assets, lines of credit and other

    financial means sufficient to meet cash flow for Rs.10 Lakhs after meeting your commitments for other

    contracts ?

    Do You authorize RDSO to make enquiries with any of the Banks you listed in this application?

    Y N

    Y N

  • 27

    PRO-FORMA SECTION 6

    19a. Have you and each member of a Group, provided in Section 6 information about the

    availability of major item of design facilities.

    Full particulars of computing facilities employed hardware and software should

    be indicated

    Have you, and each member of the Group indicated the design facilities in terms

    of the number of plotters, and work stations which are available in (India) or that

    will be set up in (India) in the event of award of contract?

    Y N

    Y N

    19b. Qualify Assurance Programme:

    Do you currently maintain an in-house Quality Assurance Programme?

    If yes, give the details.

    Have you or any of your recent projects been ISO 9000 certified?

    If yes, give details.

    Y N

    Y N

    VERIFICATION STATEMENT

    Applicants are to verify that the information contained in the completed Questionnaire, any annex thereto

    and all supporting and explanatory information is to their best knowledge and belief, truthful and exact.

    By virtue of my signature below, I confirm to my best knowledge and belief the information contained in

    this questionnaire and sections, any annex thereto and all supporting and explanatory information is

    truthful and exact.

    Signed

    (Same signatory as on letter of application)

    Date:

  • 28

    CONTENTS OF EACH SECTION

    SECTION

    NUMBER

    CONTENTS REMARKS

    1. Pro-Forma General

    Letter of Application

    Pro-forma letter will be found on page of this

    document.

    Completed Pre-qualification

    Questionnaire

    The Pre-qualification Questionnaire is found from

    pages 11-32 inclusive in the document

    2. Pro-forma Section 2

    Memorandum and Articles of Association or

    Partnership Deeds

    A copy in English of the Memorandum and

    Articles of Association (or equivalent) for an

    incorporated applicant (or, in the case of a group

    for each corporation forming a part of the

    applicant)/partnership Deeds.

    Documents relating to a joint venture

    partnership or consortium

    (a) Statement of participation from

    constituent members

    (b) Details of previous collaborations

    (c) Specimen Joint Venture, partnership,

    or consortium agreement and/or other

    documents establishing or intending

    to establish the formation of such

    group

    (d) Details of proposed equity/other

    participations and areas of

    specialization.

    Applicants attention is drawn to paragraph 5.7 of

    the Enquiry Document. A pro-forma statement of

    participation to be completed by each member on

    relevant page of the questionnaire.

    Particulars of the authority which empowers

    the person or persons signing the letter of

    application, (and if appropriate, the statement

    of Participation from constituent members of

    groups) or represent t he applicant.

    RDSO wishes to ensure that applications are

    submitted under the signature(s) of persons who

    properly represent the applicant. Accordingly,

    copies (at this stage unattested) of such documents

    as powers of attorney, signed minutes of board

    meetings confirming board resolutions, current

    published lists of executive directors, etc. should be

    submitted.

  • 29

    SECTION

    NUMBER

    CONTENTS REMARKS

    3. Pro-forma - Section 3

    Documents relating to performance, current

    contracts, relevant experience

    The applicant shall submit details in support of

    statements in the Questionnaire or annexes thereto,

    which relate to performance, current contracts and

    relevant experience.

    4. Pro-forma Section 4

    Documents relating to Staff

    The applicant shall submit details in support of

    statements in the Questionnaire or annexes thereto

    which relate to its management organization

    (existing or, in the case of new groups proposed),

    and of principals or key members of staff as

    provided in the Questionnaire.

    5. Pro-forma Section 5

    Documents relating to ownership and control

    of an applicant (or, in the case of a group, each

    constituent member)

    Details shall be submitted giving full details of the

    ownership and control of the applicant (or in the

    case of a group, each constituent member)

    Documents relating to the financial condition

    of an applicant (or, in the case of a group, each

    constituent member)

    The following documents should be submitted in

    respect of each consultant, whether applying

    individually or as part of a group:

    1. Audited accounts for each of the last three full

    accounting periods together with their Auditors

    Certificate. Such accounts shall include the Profit

    and Loss statement and the Balance Sheet.

    2.A financial statement covering the period

    between the end of the last full accounting period

    and the date of issue of expression of interest.This

    statement should indicate all significant financial

    matters subsequent to the end of the last full

    accounting period. Additionally, the financial

    statement should indicate any significant balance

    sheet liabilities, including contingent liabilities.

    The financial statement should be signed by the

    Managing Director or company secretary of the

    respective company.

  • 30

    SECTIOIN

    NUMBER

    CONTENTS REMARKS

    5(Contd.) Documents relating to the ultimate holding or

    parent company or an applicant (or, in the

    case of a group, each constituent member)

    If an applicant (or member of a group) is wholly or

    significantly owned by a holding or parent

    company, the information relating to audited

    accounts and financial statement (as described

    above) shall be provided for such intermediate or

    ultimate holding or parent companies. This

    information shall be provided in respect of all

    applicants, whether applying individually or as a

    group together with Auditors certification.

    Documents including Banking reference to

    demonstrate adequate liquidity

    In respect of all applicants (whether applying

    individually or as part of a group) and all holding

    or parent companies thereof, a bankers reference

    (in English) should be provided from the

    applicants or companys principal bank in its

    country of incorporation or registration. Such

    reference should indicate the financial standing of

    the applicant and access to lines of credit of other

    financial resources.

    6. Pro-forma Section 6

    Documents relating to availability of design

    and computing facilities, and quality

    assurance.

    The applicant shall submit details in support of

    statements in the Questionnaire or annexes thereto,

    which relate to questions 26a and 26b.

  • 31

    PRE-QUALIFICATION EVALUATION CRITERIA

  • 32

    EVALUATION CRITERIA

    1. Introduction

    The Evaluation Criteria is prepared for use in evaluating the Applicants for their suitability to perform the

    Detailed Design Consultancy for structural design of railway bridges, ROBs/FOBs etc.

    2. Evaluation Factors

    The Enquiry Document required applicants to demonstrate their capabilities to the RDSO by providing

    material based on their experience, past performance, their personnel, equipment and financial resources,

    including :

    Capability to design to the requisite standard and to monitor and control design development.

    Capability to programme and re-programme the design work, monitor progress against

    programme and to utilize computer programming and monitoring techniques.

    Capability to execute the design works in time by having adequate resources.

    Operate a design quality control programme.

    In the case the application is from Joint Venture, or consortium, each member of the group should

    substantially satisfy the pre-qualification requirements.

    3. Evaluation Criteria

    3.1 Assessment Topics

    The Technical and Organizational capabilities, together with Experience and Contract records are of greater

    significance. The qualities of the design team are of the greatest importance. Accordingly, the number of

    topics to be assessed are shown in Table 1.

    Table 1 : Assessment Topics

    Topic No. Assessment Topic

    Financial Standing

    T1 Liquidity and Banking Reference

    T2 Profitability

    Technical and Organizational Capability

    T3 Academic Qualifications

    T4 Technical Staff Numbers

    T5 Experience of Key Staff

    T6 Design Facilities

  • 33

    T7 Quality Assurance

    Experience Record

    T8 Length of time in Business

    T9 Relevant Design Experience

    T10 Specific Transit Experience

    3.2 Change in Assessment Topics

    The assessment topics have been designed to meet the requirements of the contract

    T1. Liquidity and Bankers References : These are important to indicate the financial

    standing of the applicant and access to credit facilities.

    T2. Profitability: Will be obtained from the Balance Sheets that each applicant must provide.

    T3. The Applicant must have well qualified staff to undertake the design work.

    T4. The applicant must be able to field a complete team for each station of the contract.

    T5. This support T3. The staff is the most visible asset of an Applicant.

    T6. The Applicant must show that he has adequate design facilities.

    T7. Quality of the consultants output is essential for the RDSO to achieve its goals. The consultant

    must possess and practice a QC programme.

    T8. Length of Time in Business: A new firm will not have adequate experience, a long established

    firm will be anxious to protect its reputation. This is an important consideration.

    T9. The team must show that it has experience in designing structures for Railway/Metro bridges with

    respective category of superstructure i.e. A steel structure B.PSC/RCC super structure.

    T10. The Team must show experience in designing of railway bridges other than the specific category

    or similar bridges of highway.

    3.3 Assessment Score

    This is based on the weighting to be given to each Topic relative to the whole of the pre-qualification

    topics, and the points scored by the Applicant against each topic.

  • 34

    Table 3 A : ASSESSMENT SCORING

    Indicating weightage to different assessment items. For Cat-A steel composite

    structures.

    Topic

    No.

    ASSESSMENT TOPIC MAX.

    POIN-

    TS

    WEIGHTAGE MAX.

    SCORE

    FINANCIAL STANDING

    T1 Liquidity and Banking

    Reference

    3 8 24

    T2 Profitability 3 4 12

    Technical & Organizational

    Capability

    WEIGHTAGE

    Structural

    design of

    welded/rive-

    ted type steel

    railway

    bridge/ROBs

    Structural

    Designs of

    special spans

    like steel

    composite

    girders

    Total

    T3 Academic Qualifications 3 - - 16 48

    T4 Technical Staff Numbers 3 4 2 6 18

    T5 Experience of Key Staff 3 16 6 22 66

    T6 Design Facilities 3 6 4 10 30

    T7 Quality Assurance 3 3 3 6 18

    Total 180

    Experience Record

    T8 Length of time in Business 3 4 2 6 18

    T9 Relevant Design Experience 3 10 6 16 48

    T10 Specific Transit Experience 3 4 2 6 18

    Total 84

    Total Max. Possible Score 300

  • 35

    Table 3B: ASSESSMENT SCORING

    Indicating weightage to different assessment items. For Cat-B PSC/RCC structures.

    Topic

    No.

    ASSESSMENT TOPIC MAX.

    POIN-

    TS

    WEIGHTAGE MAX.

    SCORE

    FINANCIAL STANDING

    T1 Liquidity and Banking

    Reference

    3 8 24

    T2 Profitability 3 4 12

    Technical & Organizational

    Capability

    WEIGHTAGE

    Structural

    design of

    PSC/RCC

    railway girder

    bridges/ROBs

    Structural

    Designs of

    special spans

    like segmental

    girders/compos

    ite girders

    Total

    T3 Academic Qualifications 3 - - 16 48

    T4 Technical Staff Numbers 3 4 2 6 18

    T5 Experience of Key Staff 3 16 6 22 66

    T6 Design Facilities 3 6 4 10 30

    T7 Quality Assurance 3 3 3 6 18

    Total 180

    Experience Record

    T8 Length of time in Business 3 4 2 6 18

    T9 Relevant Design Experience 3 8 4 12 36

    T10 Specific Transit Experience 3 8 2 10 30

    Total 84

    Total Max. Possible Score 300

    The Points Scored will be based on :

    Poor = 0 Average = 1 Good = 2 Excellent = 3

    It is also proposed that a minimum of 50% score is necessary in each of the three divisions,

    (Financial Standing, Technical and Organizational Capability and Experience Record) and 60%

    of the aggregate for the Pass or Acceptable score for Pre-Qualification.

  • 36

    Table 3C: ASSESSMENT SCORING

    Indicating weightage to different assessment items. For Cat-C Sub

    structures/Foundation of any type.

    Topic

    No.

    ASSESSMENT TOPIC MAX.

    POIN-

    TS

    WEIGHTAGE MAX. SCORE

    FINANCIAL STANDING

    T1 Liquidity and Banking

    Reference

    3 24

    T2 Profitability 3 12

    WEIGHTAGE

    Technical & organizational

    capacity

    Structural/

    Geo-tech design of

    sub structure and

    Foundations

    T3 Academic Qualifications 3 16 48

    T4 Technical Staff Numbers 3 6 18

    T5 Experience of Key Staff 3 22 66

    T6 Design Facilities 3 10 30

    T7 Quality Assurance 3 6 18

    Total 180

    Experience Record

    T8 Length of time in Business 3 6 18

    T9 Relevant Design Experience 3 16 48

    T10 Specific Transit Experience 3 6 18

    Total 84

    Total Max. Possible Score 300

    The Points Scored will be based on :

    Poor = 0 Average = 1 Good = 2 Excellent = 3

    It is also proposed that a minimum of 50% score is necessary in each of the three divisions,

    (Financial Standing, Technical and Organizational Capability and Experience Record) and 60%

    of the aggregate for the Pass or Acceptable score for Pre-Qualification.

  • 37

    3.4 Basis for Weightage

    The weighting has been determined by the importance of the Topic. The weighting is

    graded between 4 and 22, depending on the relative importance of the assessment topic.

    3.5 Basis for Awarding Points

    The purpose of the points system is to be able to put the Applicants into a pecking

    order of capability. Therefore whilst there may be some subjective consideration as to

    what constitutes the award of points, as much as possible criteria for awarding points has

    been laid down based the response of the Applicant to the Questionnaire. It must be

    appreciated that the answer to some Topics are a Yes or No answer, with only 3 points or

    0 points awarded is :

    T1 It is necessary that the firm can withstand the Cash Flow that the contract will

    require until payment received from RDSO. Liquidity, therefore, becomes an

    important consideration. This can be seen from the balance sheets of last three

    year and from the banking reference Current Assets > 2,usually has adequate

    liquidity. If this ratio is Current Liabilities

    less than 2 but there is an adequate banking reference in the form of solvency

    certificate of min amount 25 lachs, one can say that the liquidity is adequate

    Adequate Liquidity = 3 points

    Inadequate Liquidity = 0 points

    T2 The same condition applies as in T1, therefore, from the balance sheets:

    Earnings before tax but after interest, positive in all three years = 3 points

    Ditto, but only from 2 years out of three = 1 point

    Otherwise = 0 point

    T3 Academic Qualifications of key staff limited to 7 in number in various

    disciplines available for this work :

    25%/PG/PHDs and 75% Graduates = 3 points

    >75% of key staff graduates = 2 points

    50% to 70% of key staff graduates = 1 point

  • 38

    No.

    Project Leader = 1

    Structural Engineer = 4

    CADD Operator = 2

    T4 Number of Technical Staff(excluding support staff) will determine how many

    bridges that the Applicant can design simultaneously

    Staff>7 = 3 points

    410 years = 2 points

    5>7 years = 1 point

    3 = 3 points

    work station < 3 = 2 points

    Work stations=2 = 1point

    Work Station < 2 = 0 point

    T7. Quality Assurance Programme in place. This is a major requirement and can only

    be assessed as existing or non-existing.

    Possesses QA Programme certified by ISO = 3 pooints

    Follows internal QA Programme = 2 points

    Does not have QA Programme = 0 points

    T8. The length of existence of the Firm in business is an indication of its stability.

    >10 years = 3 points

    7>10 years = 2 points

  • 39

    5>7 years = 1 point

  • 40

    Evaluation of Pre-Qualification Applications

    Pro-forma Evaluation Sheet

    Name of Applicant: ..

    TOPIC

    NO.

    ASSESSMENT TOPIC POINTS WEIGHTAGE SCORE

    Financial Standing

    T1 Liquidity 8

    T2 Profitability 4

    TOTAL

    Technical and Organizational Capability

    T3 Academic Qualifications 16

    T4 Technical Staff Numbers 6

    T5 Experience of key staff 22

    T6 Design Facilities 10

    T7 Quality Assurance 6

    Experience Record

    T8 Length of time in Business 6

    T9 Relevant Design Experience 16

    T10 Specific Transit Experience 6

    TOTAL 100

    TOTAL

    COMMENT ON EVALUATION:

    1. Has the Applicant scored 50% in each division of the Criteria? YES/NO

    2. Has the Applicant scored 60% or more in the aggregate? YES/NO

    3. Only if the Applicant has a YES to Questions 1 and 2 will his name be added to