s n 0 0 2 hsg c 1s, 2s, 3s, 4s, 5s 0.000 hsg d 5.534 other 1s, 2s, 3s, 4s, 5s 8.818 total area morse...

71
SN 002

Upload: dangtram

Post on 24-Apr-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

SN 002

Page 2: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PreDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 1HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Predevelopment - Mini Storage

[49] Hint: Tc<2dt may require smaller dt

Runoff = 2.18 cfs @ 11.98 hrs, Volume= 0.152 af, Depth= 0.21"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

1.900 39 Pasture/grassland/range, Good, HSG A6.980 74 Pasture/grassland/range, Good, HSG C

8.880 67 Weighted Average8.880 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

3.6 300 0.0400 1.40 Shallow Concentrated Flow, Shallow FlowShort Grass Pasture Kv= 7.0 fps

Subcatchment 1S: Predevelopment - Mini Storage

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

2

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=8.880 ac

Runoff Volume=0.152 af

Runoff Depth=0.21"

Flow Length=300'

Slope=0.0400 '/'

Tc=3.6 min

CN=67

2.18 cfs

Page 3: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PreDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 2HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Predevelopment - Mini Storage

[49] Hint: Tc<2dt may require smaller dt

Runoff = 10.03 cfs @ 11.95 hrs, Volume= 0.470 af, Depth= 0.64"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

1.900 39 Pasture/grassland/range, Good, HSG A6.980 74 Pasture/grassland/range, Good, HSG C

8.880 67 Weighted Average8.880 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

3.6 300 0.0400 1.40 Shallow Concentrated Flow, Shallow FlowShort Grass Pasture Kv= 7.0 fps

Subcatchment 1S: Predevelopment - Mini Storage

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

11

10

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=8.880 ac

Runoff Volume=0.470 af

Runoff Depth=0.64"

Flow Length=300'

Slope=0.0400 '/'

Tc=3.6 min

CN=67

10.03 cfs

Page 4: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 100 Year Rainfall=5.20"Morse Lot 6 PreDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 3HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Predevelopment - Mini Storage

[49] Hint: Tc<2dt may require smaller dt

Runoff = 33.02 cfs @ 11.95 hrs, Volume= 1.438 af, Depth= 1.94"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 100 Year Rainfall=5.20"

Area (ac) CN Description

1.900 39 Pasture/grassland/range, Good, HSG A6.980 74 Pasture/grassland/range, Good, HSG C

8.880 67 Weighted Average8.880 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

3.6 300 0.0400 1.40 Shallow Concentrated Flow, Shallow FlowShort Grass Pasture Kv= 7.0 fps

Subcatchment 1S: Predevelopment - Mini Storage

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Type II 24-hr 100 Year

Rainfall=5.20"

Runoff Area=8.880 ac

Runoff Volume=1.438 af

Runoff Depth=1.94"

Flow Length=300'

Slope=0.0400 '/'

Tc=3.6 min

CN=67

33.02 cfs

Page 5: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PreDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 4HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Predevelopment - Mini Storage

[49] Hint: Tc<2dt may require smaller dt[45] Hint: Runoff=Zero

Runoff = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Depth= 0.00"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

1.900 39 Pasture/grassland/range, Good, HSG A6.980 74 Pasture/grassland/range, Good, HSG C

8.880 67 Weighted Average8.880 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

3.6 300 0.0400 1.40 Shallow Concentrated Flow, Shallow FlowShort Grass Pasture Kv= 7.0 fps

Subcatchment 1S: Predevelopment - Mini Storage

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=8.880 ac

Runoff Volume=0.000 af

Runoff Depth=0.00"

Flow Length=300'

Slope=0.0400 '/'

Tc=3.6 min

CN=67

0.00 cfs

Page 6: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

1S

Lower Area

2S

Upper Section

3S

Drains off site

4S

New Building (2015)

5S

New Buildings (2016)

1R

Grass Swale

2R

S/N 001

1P

Upper Pond

2P

Lower Pond

Drainage Diagram for Morse Lot 6 PostDev 070716Prepared by Ruggiano Engineering, Printed 7/12/2016

HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcat Reach Pond Link

S/N 002.1

Dereck Woolridge
Page 7: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 2HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Area Listing (all nodes)

Area

(acres)

CN Description

(subcatchment-numbers)

0.344 39 >75% Grass cover, Good, HSG A (5S)

0.030 61 >75% Grass cover, Good, HSG B (4S)

2.910 74 >75% Grass cover, Good, HSG C (1S,2S,3S,4S,5S)

5.534 98 Paved parking & roofs (1S,2S,3S,4S,5S)

8.818 TOTAL AREA

Page 8: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 3HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Soil Listing (all nodes)

Area

(acres)

Soil

Goup

Subcatchment

Numbers

0.344 HSG A 5S

0.030 HSG B 4S

2.910 HSG C 1S, 2S, 3S, 4S, 5S

0.000 HSG D

5.534 Other 1S, 2S, 3S, 4S, 5S

8.818 TOTAL AREA

Page 9: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 4HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Time span=5.00-100.00 hrs, dt=0.05 hrs, 1901 pointsRunoff by SCS TR-20 method, UH=SCS

Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method

Runoff Area=1.770 ac 69.49% Impervious Runoff Depth=1.25"Subcatchment 1S: Lower Area Flow Length=522' Tc=4.7 min CN=91 Runoff=3.98 cfs 0.185 af

Runoff Area=2.100 ac 69.52% Impervious Runoff Depth=1.25"Subcatchment 2S: Upper Section Flow Length=440' Tc=3.7 min CN=91 Runoff=4.90 cfs 0.219 af

Runoff Area=1.520 ac 50.66% Impervious Runoff Depth=0.93"Subcatchment 3S: Drains off site Flow Length=202' Tc=2.8 min CN=86 Runoff=2.74 cfs 0.117 af

Runoff Area=1.100 ac 35.45% Impervious Runoff Depth=0.72"Subcatchment 4S: New Building (2015) Tc=0.0 min CN=82 Runoff=1.62 cfs 0.066 af

Runoff Area=2.328 ac 72.34% Impervious Runoff Depth=0.93"Subcatchment 5S: New Buildings (2016) Flow Length=440' Tc=3.7 min CN=86 Runoff=4.11 cfs 0.180 af

Avg. Depth=0.52' Max Vel=0.39 fps Inflow=1.62 cfs 0.066 afReach 1R: Grass Swalen=0.150 L=310.0' S=0.0065 '/' Capacity=8.47 cfs Outflow=0.80 cfs 0.066 af

Inflow=0.21 cfs 0.640 afReach 2R: S/N 001 Outflow=0.21 cfs 0.640 af

Peak Elev=420.04' Storage=27,699 cf Inflow=9.10 cfs 0.464 afPond 1P: Upper Pond Outflow=0.13 cfs 0.458 af

Peak Elev=414.72' Storage=8,786 cf Inflow=4.06 cfs 0.643 afPond 2P: Lower Pond Outflow=0.21 cfs 0.640 af

Total Runoff Area = 8.818 ac Runoff Volume = 0.766 af Average Runoff Depth = 1.04"37.24% Pervious = 3.284 ac 62.76% Impervious = 5.534 ac

S/N 002.1

Dereck Woolridge
Page 10: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 5HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Lower Area

[49] Hint: Tc<2dt may require smaller dt

Runoff = 3.98 cfs @ 11.95 hrs, Volume= 0.185 af, Depth= 1.25"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

1.230 98 Paved parking & roofs0.540 74 >75% Grass cover, Good, HSG C

1.770 91 Weighted Average0.540 Pervious Area1.230 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet (imp)Smooth surfaces n= 0.011 P2= 2.10"

1.0 90 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcPaved Kv= 20.3 fps

3.1 400 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

4.7 522 Total

Subcatchment 1S: Lower Area

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

4

3

2

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=1.770 ac

Runoff Volume=0.185 af

Runoff Depth=1.25"

Flow Length=522'

Tc=4.7 min

CN=91

3.98 cfs

Page 11: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 6HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 2S: Upper Section

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 4.90 cfs @ 11.94 hrs, Volume= 0.219 af, Depth= 1.25"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

1.460 98 Paved parking & roofs0.640 74 >75% Grass cover, Good, HSG C

2.100 91 Weighted Average0.640 Pervious Area1.460 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 12: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 7HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 2S: Upper Section

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

5

4

3

2

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=2.100 ac

Runoff Volume=0.219 af

Runoff Depth=1.25"

Flow Length=440'

Tc=3.7 min

CN=91

4.90 cfs

Page 13: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 8HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: Drains off site

[49] Hint: Tc<2dt may require smaller dt

Runoff = 2.74 cfs @ 11.94 hrs, Volume= 0.117 af, Depth= 0.93"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

0.770 98 Paved parking & roofs0.750 74 >75% Grass cover, Good, HSG C

1.520 86 Weighted Average0.750 Pervious Area0.770 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet flowSmooth surfaces n= 0.011 P2= 2.10"

1.4 120 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

0.8 50 0.0200 0.99 Shallow Concentrated Flow, Shallow Conc-grassShort Grass Pasture Kv= 7.0 fps

2.8 202 Total

Subcatchment 3S: Drains off site

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

3

2

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=1.520 ac

Runoff Volume=0.117 af

Runoff Depth=0.93"

Flow Length=202'

Tc=2.8 min

CN=86

2.74 cfs

Page 14: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 9HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 4S: New Building (2015)

[46] Hint: Tc=0 (Instant runoff peak depends on dt)

Runoff = 1.62 cfs @ 11.90 hrs, Volume= 0.066 af, Depth= 0.72"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

0.390 98 Paved parking & roofs0.680 74 >75% Grass cover, Good, HSG C0.030 61 >75% Grass cover, Good, HSG B

1.100 82 Weighted Average0.710 Pervious Area0.390 Impervious Area

Subcatchment 4S: New Building (2015)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=1.100 ac

Runoff Volume=0.066 af

Runoff Depth=0.72"

Tc=0.0 min

CN=82

1.62 cfs

Page 15: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 10HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 5S: New Buildings (2016)

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 4.11 cfs @ 11.95 hrs, Volume= 0.180 af, Depth= 0.93"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 1 Year Rainfall=2.10"

Area (ac) CN Description

1.684 98 Paved parking & roofs0.300 74 >75% Grass cover, Good, HSG C0.344 39 >75% Grass cover, Good, HSG A

2.328 86 Weighted Average0.644 Pervious Area1.684 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 16: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 11HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 5S: New Buildings (2016)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

4

3

2

1

0

Type II 24-hr 1 Year

Rainfall=2.10"

Runoff Area=2.328 ac

Runoff Volume=0.180 af

Runoff Depth=0.93"

Flow Length=440'

Tc=3.7 min

CN=86

4.11 cfs

Page 17: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 12HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 1R: Grass Swale

Inflow Area = 1.100 ac, 35.45% Impervious, Inflow Depth = 0.72" for 1 Year eventInflow = 1.62 cfs @ 11.90 hrs, Volume= 0.066 afOutflow = 0.80 cfs @ 12.20 hrs, Volume= 0.066 af, Atten= 51%, Lag= 18.1 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsMax. Velocity= 0.39 fps, Min. Travel Time= 13.4 minAvg. Velocity = 0.10 fps, Avg. Travel Time= 49.6 min

Peak Storage= 666 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.52'Bank-Full Depth= 1.50', Capacity at Bank-Full= 8.47 cfs

2.00' x 1.50' deep channel, n= 0.150 Sheet flow over Short GrassSide Slope Z-value= 4.0 '/' Top Width= 14.00'Length= 310.0' Slope= 0.0065 '/'Inlet Invert= 423.00', Outlet Invert= 421.00'

Reach 1R: Grass Swale

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Inflow Area=1.100 ac

Avg. Depth=0.52'

Max Vel=0.39 fps

n=0.150

L=310.0'

S=0.0065 '/'

Capacity=8.47 cfs

1.62 cfs

0.80 cfs

Page 18: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 13HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 2R: S/N 001

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 1.05" for 1 Year eventInflow = 0.21 cfs @ 15.34 hrs, Volume= 0.640 afOutflow = 0.21 cfs @ 15.34 hrs, Volume= 0.640 af, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrs

Reach 2R: S/N 001

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.230.22

0.21

0.20.19

0.18

0.170.16

0.15

0.140.13

0.12

0.110.1

0.09

0.080.07

0.06

0.050.04

0.03

0.020.01

0

Inflow Area=7.298 ac0.21 cfs

0.21 cfs

002.1

002.1

Page 19: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 14HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 1P: Upper Pond

Inflow Area = 5.528 ac, 63.93% Impervious, Inflow Depth = 1.01" for 1 Year eventInflow = 9.10 cfs @ 11.94 hrs, Volume= 0.464 afOutflow = 0.13 cfs @ 19.81 hrs, Volume= 0.458 af, Atten= 99%, Lag= 471.8 minPrimary = 0.13 cfs @ 19.81 hrs, Volume= 0.458 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 418.50' Surf.Area= 0 sf Storage= 12,807 cfPeak Elev= 420.04' @ 19.81 hrs Surf.Area= 0 sf Storage= 27,699 cf (14,892 cf above start)

Plug-Flow detention time= 2,777.8 min calculated for 0.164 af (35% of inflow)Center-of-Mass det. time= 1,433.9 min ( 2,267.4 - 833.5 )

Volume Invert Avail.Storage Storage Description

#1 415.00' 73,395 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

415.00 0 0416.00 307 307417.00 2,631 2,938418.00 5,848 8,786419.00 8,042 16,828420.00 10,401 27,229421.00 12,679 39,908422.00 16,351 56,259422.50 17,136 73,395

Device Routing Invert Outlet Devices

#1 Primary 418.50' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 420.50' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 421.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=0.13 cfs @ 19.81 hrs HW=420.04' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.13 cfs @ 5.81 fps)2=Orifice/Grate ( Controls 0.00 cfs)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 20: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 15HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 1P: Upper Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

10

9

8

7

6

5

4

3

2

1

0

Inflow Area=5.528 ac

Peak Elev=420.04'

Storage=27,699 cf

9.10 cfs

0.13 cfs

Page 21: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 16HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 2P: Lower Pond

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 1.06" for 1 Year eventInflow = 4.06 cfs @ 11.95 hrs, Volume= 0.643 afOutflow = 0.21 cfs @ 15.34 hrs, Volume= 0.640 af, Atten= 95%, Lag= 203.2 minPrimary = 0.21 cfs @ 15.34 hrs, Volume= 0.640 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 413.00' Surf.Area= 0 sf Storage= 2,771 cfPeak Elev= 414.72' @ 15.34 hrs Surf.Area= 0 sf Storage= 8,786 cf (6,015 cf above start)

Plug-Flow detention time= 989.7 min calculated for 0.576 af (90% of inflow)Center-of-Mass det. time= 551.8 min ( 2,402.2 - 1,850.4 )

Volume Invert Avail.Storage Storage Description

#1 411.00' 15,572 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

411.00 0 0412.00 935 935413.00 1,836 2,771414.00 2,971 5,742415.00 4,244 9,986416.00 5,586 15,572

Device Routing Invert Outlet Devices

#1 Primary 413.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 414.70' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 415.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=0.18 cfs @ 15.34 hrs HW=414.72' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.13 cfs @ 6.15 fps)2=Orifice/Grate (Weir Controls 0.05 cfs @ 0.43 fps)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 22: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1 Year Rainfall=2.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 17HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 2P: Lower Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

4

3

2

1

0

Inflow Area=7.298 ac

Peak Elev=414.72'

Storage=8,786 cf

4.06 cfs

0.21 cfs

Page 23: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 18HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Time span=5.00-100.00 hrs, dt=0.05 hrs, 1901 pointsRunoff by SCS TR-20 method, UH=SCS

Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method

Runoff Area=1.770 ac 69.49% Impervious Runoff Depth=2.16"Subcatchment 1S: Lower Area Flow Length=522' Tc=4.7 min CN=91 Runoff=6.71 cfs 0.319 af

Runoff Area=2.100 ac 69.52% Impervious Runoff Depth=2.16"Subcatchment 2S: Upper Section Flow Length=440' Tc=3.7 min CN=91 Runoff=8.23 cfs 0.379 af

Runoff Area=1.520 ac 50.66% Impervious Runoff Depth=1.75"Subcatchment 3S: Drains off site Flow Length=202' Tc=2.8 min CN=86 Runoff=5.08 cfs 0.221 af

Runoff Area=1.100 ac 35.45% Impervious Runoff Depth=1.46"Subcatchment 4S: New Building (2015) Tc=0.0 min CN=82 Runoff=3.30 cfs 0.134 af

Runoff Area=2.328 ac 72.34% Impervious Runoff Depth=1.75"Subcatchment 5S: New Buildings (2016) Flow Length=440' Tc=3.7 min CN=86 Runoff=7.64 cfs 0.339 af

Avg. Depth=0.79' Max Vel=0.49 fps Inflow=3.30 cfs 0.134 afReach 1R: Grass Swalen=0.150 L=310.0' S=0.0065 '/' Capacity=8.47 cfs Outflow=1.91 cfs 0.134 af

Inflow=2.56 cfs 1.156 afReach 2R: S/N 001 Outflow=2.56 cfs 1.156 af

Peak Elev=420.62' Storage=35,053 cf Inflow=16.42 cfs 0.852 afPond 1P: Upper Pond Outflow=0.99 cfs 0.842 af

Peak Elev=414.94' Storage=9,737 cf Inflow=6.82 cfs 1.161 afPond 2P: Lower Pond Outflow=2.56 cfs 1.156 af

Total Runoff Area = 8.818 ac Runoff Volume = 1.392 af Average Runoff Depth = 1.89"37.24% Pervious = 3.284 ac 62.76% Impervious = 5.534 ac

S/N 002.1

Dereck Woolridge
Page 24: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 19HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Lower Area

[49] Hint: Tc<2dt may require smaller dt

Runoff = 6.71 cfs @ 11.95 hrs, Volume= 0.319 af, Depth= 2.16"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

1.230 98 Paved parking & roofs0.540 74 >75% Grass cover, Good, HSG C

1.770 91 Weighted Average0.540 Pervious Area1.230 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet (imp)Smooth surfaces n= 0.011 P2= 2.10"

1.0 90 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcPaved Kv= 20.3 fps

3.1 400 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

4.7 522 Total

Subcatchment 1S: Lower Area

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

7

6

5

4

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=1.770 ac

Runoff Volume=0.319 af

Runoff Depth=2.16"

Flow Length=522'

Tc=4.7 min

CN=91

6.71 cfs

Page 25: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 20HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 2S: Upper Section

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 8.23 cfs @ 11.94 hrs, Volume= 0.379 af, Depth= 2.16"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

1.460 98 Paved parking & roofs0.640 74 >75% Grass cover, Good, HSG C

2.100 91 Weighted Average0.640 Pervious Area1.460 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 26: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 21HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 2S: Upper Section

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=2.100 ac

Runoff Volume=0.379 af

Runoff Depth=2.16"

Flow Length=440'

Tc=3.7 min

CN=91

8.23 cfs

Page 27: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 22HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: Drains off site

[49] Hint: Tc<2dt may require smaller dt

Runoff = 5.08 cfs @ 11.93 hrs, Volume= 0.221 af, Depth= 1.75"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

0.770 98 Paved parking & roofs0.750 74 >75% Grass cover, Good, HSG C

1.520 86 Weighted Average0.750 Pervious Area0.770 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet flowSmooth surfaces n= 0.011 P2= 2.10"

1.4 120 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

0.8 50 0.0200 0.99 Shallow Concentrated Flow, Shallow Conc-grassShort Grass Pasture Kv= 7.0 fps

2.8 202 Total

Subcatchment 3S: Drains off site

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

5

4

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=1.520 ac

Runoff Volume=0.221 af

Runoff Depth=1.75"

Flow Length=202'

Tc=2.8 min

CN=86

5.08 cfs

Page 28: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 23HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 4S: New Building (2015)

[46] Hint: Tc=0 (Instant runoff peak depends on dt)

Runoff = 3.30 cfs @ 11.89 hrs, Volume= 0.134 af, Depth= 1.46"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

0.390 98 Paved parking & roofs0.680 74 >75% Grass cover, Good, HSG C0.030 61 >75% Grass cover, Good, HSG B

1.100 82 Weighted Average0.710 Pervious Area0.390 Impervious Area

Subcatchment 4S: New Building (2015)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=1.100 ac

Runoff Volume=0.134 af

Runoff Depth=1.46"

Tc=0.0 min

CN=82

3.30 cfs

Page 29: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 24HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 5S: New Buildings (2016)

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 7.64 cfs @ 11.94 hrs, Volume= 0.339 af, Depth= 1.75"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 10 Year Rainfall=3.10"

Area (ac) CN Description

1.684 98 Paved parking & roofs0.300 74 >75% Grass cover, Good, HSG C0.344 39 >75% Grass cover, Good, HSG A

2.328 86 Weighted Average0.644 Pervious Area1.684 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 30: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 25HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 5S: New Buildings (2016)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

8

7

6

5

4

3

2

1

0

Type II 24-hr 10 Year

Rainfall=3.10"

Runoff Area=2.328 ac

Runoff Volume=0.339 af

Runoff Depth=1.75"

Flow Length=440'

Tc=3.7 min

CN=86

7.64 cfs

Page 31: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 26HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 1R: Grass Swale

Inflow Area = 1.100 ac, 35.45% Impervious, Inflow Depth = 1.46" for 10 Year eventInflow = 3.30 cfs @ 11.89 hrs, Volume= 0.134 afOutflow = 1.91 cfs @ 12.14 hrs, Volume= 0.134 af, Atten= 42%, Lag= 14.6 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsMax. Velocity= 0.49 fps, Min. Travel Time= 10.6 minAvg. Velocity = 0.12 fps, Avg. Travel Time= 42.8 min

Peak Storage= 1,267 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.79'Bank-Full Depth= 1.50', Capacity at Bank-Full= 8.47 cfs

2.00' x 1.50' deep channel, n= 0.150 Sheet flow over Short GrassSide Slope Z-value= 4.0 '/' Top Width= 14.00'Length= 310.0' Slope= 0.0065 '/'Inlet Invert= 423.00', Outlet Invert= 421.00'

Reach 1R: Grass Swale

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

3

2

1

0

Inflow Area=1.100 ac

Avg. Depth=0.79'

Max Vel=0.49 fps

n=0.150

L=310.0'

S=0.0065 '/'

Capacity=8.47 cfs

3.30 cfs

1.91 cfs

Page 32: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 27HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 2R: S/N 001

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 1.90" for 10 Year eventInflow = 2.56 cfs @ 12.07 hrs, Volume= 1.156 afOutflow = 2.56 cfs @ 12.07 hrs, Volume= 1.156 af, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrs

Reach 2R: S/N 001

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

2

1

0

Inflow Area=7.298 ac2.56 cfs

2.56 cfs

002.1

002.1

Page 33: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 28HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 1P: Upper Pond

Inflow Area = 5.528 ac, 63.93% Impervious, Inflow Depth = 1.85" for 10 Year eventInflow = 16.42 cfs @ 11.94 hrs, Volume= 0.852 afOutflow = 0.99 cfs @ 13.00 hrs, Volume= 0.842 af, Atten= 94%, Lag= 63.2 minPrimary = 0.99 cfs @ 13.00 hrs, Volume= 0.842 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 418.50' Surf.Area= 0 sf Storage= 12,807 cfPeak Elev= 420.62' @ 13.00 hrs Surf.Area= 0 sf Storage= 35,053 cf (22,246 cf above start)

Plug-Flow detention time= 2,007.0 min calculated for 0.548 af (64% of inflow)Center-of-Mass det. time= 1,262.6 min ( 2,078.8 - 816.2 )

Volume Invert Avail.Storage Storage Description

#1 415.00' 73,395 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

415.00 0 0416.00 307 307417.00 2,631 2,938418.00 5,848 8,786419.00 8,042 16,828420.00 10,401 27,229421.00 12,679 39,908422.00 16,351 56,259422.50 17,136 73,395

Device Routing Invert Outlet Devices

#1 Primary 418.50' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 420.50' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 421.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=0.97 cfs @ 13.00 hrs HW=420.62' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.15 cfs @ 6.87 fps)2=Orifice/Grate (Weir Controls 0.82 cfs @ 1.12 fps)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 34: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 29HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 1P: Upper Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

0

Inflow Area=5.528 ac

Peak Elev=420.62'

Storage=35,053 cf

16.42 cfs

0.99 cfs

Page 35: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 30HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 2P: Lower Pond

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 1.91" for 10 Year eventInflow = 6.82 cfs @ 11.95 hrs, Volume= 1.161 afOutflow = 2.56 cfs @ 12.07 hrs, Volume= 1.156 af, Atten= 62%, Lag= 7.3 minPrimary = 2.56 cfs @ 12.07 hrs, Volume= 1.156 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 413.00' Surf.Area= 0 sf Storage= 2,771 cfPeak Elev= 414.94' @ 12.07 hrs Surf.Area= 0 sf Storage= 9,737 cf (6,966 cf above start)

Plug-Flow detention time= 663.8 min calculated for 1.092 af (94% of inflow)Center-of-Mass det. time= 390.2 min ( 2,117.2 - 1,727.0 )

Volume Invert Avail.Storage Storage Description

#1 411.00' 15,572 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

411.00 0 0412.00 935 935413.00 1,836 2,771414.00 2,971 5,742415.00 4,244 9,986416.00 5,586 15,572

Device Routing Invert Outlet Devices

#1 Primary 413.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 414.70' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 415.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=2.37 cfs @ 12.07 hrs HW=414.93' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.54 fps)2=Orifice/Grate (Weir Controls 2.22 cfs @ 1.56 fps)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 36: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10 Year Rainfall=3.10"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 31HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 2P: Lower Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

7

6

5

4

3

2

1

0

Inflow Area=7.298 ac

Peak Elev=414.94'

Storage=9,737 cf

6.82 cfs

2.56 cfs

Page 37: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 32HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Time span=5.00-100.00 hrs, dt=0.05 hrs, 1901 pointsRunoff by SCS TR-20 method, UH=SCS

Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method

Runoff Area=1.770 ac 69.49% Impervious Runoff Depth=0.29"Subcatchment 1S: Lower Area Flow Length=522' Tc=4.7 min CN=91 Runoff=0.93 cfs 0.043 af

Runoff Area=2.100 ac 69.52% Impervious Runoff Depth=0.29"Subcatchment 2S: Upper Section Flow Length=440' Tc=3.7 min CN=91 Runoff=1.16 cfs 0.051 af

Runoff Area=1.520 ac 50.66% Impervious Runoff Depth=0.15"Subcatchment 3S: Drains off site Flow Length=202' Tc=2.8 min CN=86 Runoff=0.40 cfs 0.019 af

Runoff Area=1.100 ac 35.45% Impervious Runoff Depth=0.08"Subcatchment 4S: New Building (2015) Tc=0.0 min CN=82 Runoff=0.11 cfs 0.007 af

Runoff Area=2.328 ac 72.34% Impervious Runoff Depth=0.15"Subcatchment 5S: New Buildings (2016) Flow Length=440' Tc=3.7 min CN=86 Runoff=0.58 cfs 0.029 af

Avg. Depth=0.07' Max Vel=0.12 fps Inflow=0.11 cfs 0.007 afReach 1R: Grass Swalen=0.150 L=310.0' S=0.0065 '/' Capacity=8.47 cfs Outflow=0.02 cfs 0.007 af

Inflow=0.06 cfs 0.127 afReach 2R: S/N 001 Outflow=0.06 cfs 0.127 af

Peak Elev=418.77' Storage=14,972 cf Inflow=1.73 cfs 0.087 afPond 1P: Upper Pond Outflow=0.05 cfs 0.085 af

Peak Elev=413.42' Storage=4,021 cf Inflow=0.95 cfs 0.128 afPond 2P: Lower Pond Outflow=0.06 cfs 0.127 af

Total Runoff Area = 8.818 ac Runoff Volume = 0.149 af Average Runoff Depth = 0.20"37.24% Pervious = 3.284 ac 62.76% Impervious = 5.534 ac

S/N 002.1

Dereck Woolridge
Page 38: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 33HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 1S: Lower Area

[49] Hint: Tc<2dt may require smaller dt

Runoff = 0.93 cfs @ 11.96 hrs, Volume= 0.043 af, Depth= 0.29"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

1.230 98 Paved parking & roofs0.540 74 >75% Grass cover, Good, HSG C

1.770 91 Weighted Average0.540 Pervious Area1.230 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet (imp)Smooth surfaces n= 0.011 P2= 2.10"

1.0 90 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcPaved Kv= 20.3 fps

3.1 400 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

4.7 522 Total

Subcatchment 1S: Lower Area

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=1.770 ac

Runoff Volume=0.043 af

Runoff Depth=0.29"

Flow Length=522'

Tc=4.7 min

CN=91

0.93 cfs

Page 39: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 34HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 2S: Upper Section

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 1.16 cfs @ 11.95 hrs, Volume= 0.051 af, Depth= 0.29"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

1.460 98 Paved parking & roofs0.640 74 >75% Grass cover, Good, HSG C

2.100 91 Weighted Average0.640 Pervious Area1.460 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 40: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 35HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 2S: Upper Section

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=2.100 ac

Runoff Volume=0.051 af

Runoff Depth=0.29"

Flow Length=440'

Tc=3.7 min

CN=91

1.16 cfs

Page 41: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 36HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: Drains off site

[49] Hint: Tc<2dt may require smaller dt

Runoff = 0.40 cfs @ 11.95 hrs, Volume= 0.019 af, Depth= 0.15"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

0.770 98 Paved parking & roofs0.750 74 >75% Grass cover, Good, HSG C

1.520 86 Weighted Average0.750 Pervious Area0.770 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet flowSmooth surfaces n= 0.011 P2= 2.10"

1.4 120 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

0.8 50 0.0200 0.99 Shallow Concentrated Flow, Shallow Conc-grassShort Grass Pasture Kv= 7.0 fps

2.8 202 Total

Subcatchment 3S: Drains off site

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.44

0.42

0.4

0.38

0.36

0.34

0.32

0.3

0.28

0.26

0.24

0.22

0.2

0.18

0.16

0.14

0.12

0.1

0.08

0.06

0.04

0.02

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=1.520 ac

Runoff Volume=0.019 af

Runoff Depth=0.15"

Flow Length=202'

Tc=2.8 min

CN=86

0.40 cfs

Page 42: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 37HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 4S: New Building (2015)

[46] Hint: Tc=0 (Instant runoff peak depends on dt)

Runoff = 0.11 cfs @ 11.93 hrs, Volume= 0.007 af, Depth= 0.08"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

0.390 98 Paved parking & roofs0.680 74 >75% Grass cover, Good, HSG C0.030 61 >75% Grass cover, Good, HSG B

1.100 82 Weighted Average0.710 Pervious Area0.390 Impervious Area

Subcatchment 4S: New Building (2015)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.12

0.115

0.11

0.105

0.1

0.095

0.09

0.085

0.08

0.075

0.07

0.065

0.06

0.055

0.05

0.045

0.04

0.035

0.03

0.025

0.02

0.015

0.01

0.005

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=1.100 ac

Runoff Volume=0.007 af

Runoff Depth=0.08"

Tc=0.0 min

CN=82

0.11 cfs

Page 43: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 38HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 5S: New Buildings (2016)

Tc Path:- From ROW along driveway entrance over grass to pavement- Over pavement into catch basin (CB-9)- CB-9 to Pond

[49] Hint: Tc<2dt may require smaller dt

Runoff = 0.58 cfs @ 11.96 hrs, Volume= 0.029 af, Depth= 0.15"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr WQv Rainfall=0.90"

Area (ac) CN Description

1.684 98 Paved parking & roofs0.300 74 >75% Grass cover, Good, HSG C0.344 39 >75% Grass cover, Good, HSG A

2.328 86 Weighted Average0.644 Pervious Area1.684 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.7 60 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

3.0 380 0.0022 2.13 1.67 Circular Channel (pipe), 12" pipe flowDiam= 12.0" Area= 0.8 sf Perim= 3.1' r= 0.25'n= 0.013 Corrugated PE, smooth interior

3.7 440 Total

Page 44: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 39HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcatchment 5S: New Buildings (2016)

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.6

0.55

0.5

0.45

0.4

0.35

0.3

0.25

0.2

0.15

0.1

0.05

0

Type II 24-hr WQv

Rainfall=0.90"

Runoff Area=2.328 ac

Runoff Volume=0.029 af

Runoff Depth=0.15"

Flow Length=440'

Tc=3.7 min

CN=86

0.58 cfs

Page 45: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 40HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 1R: Grass Swale

Inflow Area = 1.100 ac, 35.45% Impervious, Inflow Depth = 0.08" for WQv eventInflow = 0.11 cfs @ 11.93 hrs, Volume= 0.007 afOutflow = 0.02 cfs @ 13.09 hrs, Volume= 0.007 af, Atten= 82%, Lag= 69.6 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsMax. Velocity= 0.12 fps, Min. Travel Time= 42.0 minAvg. Velocity = 0.07 fps, Avg. Travel Time= 77.7 min

Peak Storage= 48 cf @ 12.39 hrs, Average Depth at Peak Storage= 0.07'Bank-Full Depth= 1.50', Capacity at Bank-Full= 8.47 cfs

2.00' x 1.50' deep channel, n= 0.150 Sheet flow over Short GrassSide Slope Z-value= 4.0 '/' Top Width= 14.00'Length= 310.0' Slope= 0.0065 '/'Inlet Invert= 423.00', Outlet Invert= 421.00'

Reach 1R: Grass Swale

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.12

0.1150.11

0.1050.1

0.095

0.090.085

0.080.075

0.070.065

0.06

0.0550.05

0.0450.04

0.035

0.030.025

0.020.015

0.010.005

0

Inflow Area=1.100 ac

Avg. Depth=0.07'

Max Vel=0.12 fps

n=0.150

L=310.0'

S=0.0065 '/'

Capacity=8.47 cfs

0.11 cfs

0.02 cfs

Page 46: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 41HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Reach 2R: S/N 001

[40] Hint: Not Described (Outflow=Inflow)

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 0.21" for WQv eventInflow = 0.06 cfs @ 18.96 hrs, Volume= 0.127 afOutflow = 0.06 cfs @ 18.96 hrs, Volume= 0.127 af, Atten= 0%, Lag= 0.0 min

Routing by Stor-Ind+Trans method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrs

Reach 2R: S/N 001

InflowOutflow

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

0.065

0.06

0.055

0.05

0.045

0.04

0.035

0.03

0.025

0.02

0.015

0.01

0.005

0

Inflow Area=7.298 ac0.06 cfs

0.06 cfs

002.1

002.1

Page 47: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 42HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 1P: Upper Pond

Inflow Area = 5.528 ac, 63.93% Impervious, Inflow Depth = 0.19" for WQv eventInflow = 1.73 cfs @ 11.95 hrs, Volume= 0.087 afOutflow = 0.05 cfs @ 17.66 hrs, Volume= 0.085 af, Atten= 97%, Lag= 342.1 minPrimary = 0.05 cfs @ 17.66 hrs, Volume= 0.085 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 418.50' Surf.Area= 0 sf Storage= 12,807 cfPeak Elev= 418.77' @ 17.66 hrs Surf.Area= 0 sf Storage= 14,972 cf (2,165 cf above start)

Plug-Flow detention time= (not calculated: initial storage excedes outflow)Center-of-Mass det. time= 768.0 min ( 1,654.3 - 886.3 )

Volume Invert Avail.Storage Storage Description

#1 415.00' 73,395 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

415.00 0 0416.00 307 307417.00 2,631 2,938418.00 5,848 8,786419.00 8,042 16,828420.00 10,401 27,229421.00 12,679 39,908422.00 16,351 56,259422.50 17,136 73,395

Device Routing Invert Outlet Devices

#1 Primary 418.50' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 420.50' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 421.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=0.05 cfs @ 17.66 hrs HW=418.77' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.05 cfs @ 2.08 fps)2=Orifice/Grate ( Controls 0.00 cfs)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 48: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 43HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 1P: Upper Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Inflow Area=5.528 ac

Peak Elev=418.77'

Storage=14,972 cf

1.73 cfs

0.05 cfs

Page 49: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 44HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 2P: Lower Pond

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 0.21" for WQv eventInflow = 0.95 cfs @ 11.96 hrs, Volume= 0.128 afOutflow = 0.06 cfs @ 18.96 hrs, Volume= 0.127 af, Atten= 94%, Lag= 419.7 minPrimary = 0.06 cfs @ 18.96 hrs, Volume= 0.127 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 413.00' Surf.Area= 0 sf Storage= 2,771 cfPeak Elev= 413.42' @ 18.96 hrs Surf.Area= 0 sf Storage= 4,021 cf (1,250 cf above start)

Plug-Flow detention time= 1,429.2 min calculated for 0.064 af (50% of inflow)Center-of-Mass det. time= 318.3 min ( 1,704.9 - 1,386.6 )

Volume Invert Avail.Storage Storage Description

#1 411.00' 15,572 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

411.00 0 0412.00 935 935413.00 1,836 2,771414.00 2,971 5,742415.00 4,244 9,986416.00 5,586 15,572

Device Routing Invert Outlet Devices

#1 Primary 413.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 414.70' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 415.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=0.06 cfs @ 18.96 hrs HW=413.42' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.06 cfs @ 2.80 fps)2=Orifice/Grate ( Controls 0.00 cfs)3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs)

Page 50: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr WQv Rainfall=0.90"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 45HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 2P: Lower Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

1

0

Inflow Area=7.298 ac

Peak Elev=413.42'

Storage=4,021 cf

0.95 cfs

0.06 cfs

Page 51: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

3S

Drains off site

2P

Lower Pond

Drainage Diagram for Morse Lot 6 PostDev 070716Prepared by Ruggiano Engineering, Printed 7/12/2016

HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Subcat Reach Pond Link

Page 52: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 2HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Area Listing (selected nodes)

Area

(acres)

CN Description

(subcatchment-numbers)

0.750 74 >75% Grass cover, Good, HSG C (3S)

0.770 98 Paved parking & roofs (3S)

1.520 TOTAL AREA

Page 53: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 3HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Soil Listing (selected nodes)

Area

(acres)

Soil

Goup

Subcatchment

Numbers

0.000 HSG A

0.000 HSG B

0.750 HSG C 3S

0.000 HSG D

0.770 Other 3S

1.520 TOTAL AREA

Page 54: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 100 Year Rainfall=5.20"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 4HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Time span=5.00-100.00 hrs, dt=0.05 hrs, 1901 pointsRunoff by SCS TR-20 method, UH=SCS

Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method

Runoff Area=1.520 ac 50.66% Impervious Runoff Depth>3.65"Subcatchment 3S: Drains off site Flow Length=202' Tc=2.8 min CN=86 Runoff=10.20 cfs 0.463 af

Peak Elev=415.63' Storage=13,481 cf Inflow=24.62 cfs 2.340 afPond 2P: Lower Pond Outflow=21.35 cfs 2.335 af

Total Runoff Area = 1.520 ac Runoff Volume = 0.463 af Average Runoff Depth = 3.65"49.34% Pervious = 0.750 ac 50.66% Impervious = 0.770 ac

Page 55: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 100 Year Rainfall=5.20"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 5HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: Drains off site

[49] Hint: Tc<2dt may require smaller dt

Runoff = 10.20 cfs @ 11.93 hrs, Volume= 0.463 af, Depth> 3.65"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsType II 24-hr 100 Year Rainfall=5.20"

Area (ac) CN Description

0.770 98 Paved parking & roofs0.750 74 >75% Grass cover, Good, HSG C

1.520 86 Weighted Average0.750 Pervious Area0.770 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

0.6 32 0.0200 0.89 Sheet Flow, Sheet flowSmooth surfaces n= 0.011 P2= 2.10"

1.4 120 0.0050 1.44 Shallow Concentrated Flow, Shallow ConcentratedPaved Kv= 20.3 fps

0.8 50 0.0200 0.99 Shallow Concentrated Flow, Shallow Conc-grassShort Grass Pasture Kv= 7.0 fps

2.8 202 Total

Subcatchment 3S: Drains off site

Runoff

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

11

10

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 100 Year

Rainfall=5.20"

Runoff Area=1.520 ac

Runoff Volume=0.463 af

Runoff Depth>3.65"

Flow Length=202'

Tc=2.8 min

CN=86

10.20 cfs

Page 56: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 100 Year Rainfall=5.20"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 6HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 2P: Lower Pond

[82] Warning: Early inflow requires earlier time span

Inflow Area = 7.298 ac, 65.28% Impervious, Inflow Depth > 3.85" for 100 Year eventInflow = 24.62 cfs @ 12.00 hrs, Volume= 2.340 afOutflow = 21.35 cfs @ 12.05 hrs, Volume= 2.335 af, Atten= 13%, Lag= 3.2 minPrimary = 21.35 cfs @ 12.05 hrs, Volume= 2.335 af

Routing by Stor-Ind method, Time Span= 5.00-100.00 hrs, dt= 0.05 hrsStarting Elev= 413.00' Surf.Area= 0 sf Storage= 2,771 cfPeak Elev= 415.63' @ 12.05 hrs Surf.Area= 0 sf Storage= 13,481 cf (10,710 cf above start)

Plug-Flow detention time= 329.6 min calculated for 2.271 af (97% of inflow)Center-of-Mass det. time= 199.6 min ( 1,467.6 - 1,268.0 )

Volume Invert Avail.Storage Storage Description

#1 411.00' 15,572 cf Custom Stage Data Listed below

Elevation Inc.Store Cum.Store(feet) (cubic-feet) (cubic-feet)

411.00 0 0412.00 935 935413.00 1,836 2,771414.00 2,971 5,742415.00 4,244 9,986416.00 5,586 15,572

Device Routing Invert Outlet Devices

#1 Primary 413.00' 2.0" Vert. Orifice/Grate C= 0.600 #2 Primary 414.70' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #3 Primary 415.00' 5.0' long x 3.0' breadth Broad-Crested Rectangular Weir

Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 Coef. (English) 2.44 2.58 2.68 2.67 2.65 2.64 2.64 2.68 2.68 2.72 2.81 2.92 2.97 3.07 3.32

Primary OutFlow Max=21.30 cfs @ 12.05 hrs HW=415.62' (Free Discharge)1=Orifice/Grate (Orifice Controls 0.17 cfs @ 7.67 fps)2=Orifice/Grate (Orifice Controls 14.54 cfs @ 4.63 fps)3=Broad-Crested Rectangular Weir (Weir Controls 6.60 cfs @ 2.12 fps)

Page 57: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 100 Year Rainfall=5.20"Morse Lot 6 PostDev 070716 Printed 7/12/2016Prepared by Ruggiano Engineering

Page 7HydroCAD® 8.50 s/n 003343 © 2007 HydroCAD Software Solutions LLC

Pond 2P: Lower Pond

InflowPrimary

Hydrograph

Time (hours)1009590858075706560555045403530252015105

Flo

w

(cfs

)

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Inflow Area=7.298 ac

Peak Elev=415.63'

Storage=13,481 cf

24.62 cfs

21.35 cfs

Page 58: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

SN 003

Page 59: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

3S

SN003_Pre-dev

9S

FPW to SN003

10S

Lots 15, 29, 30

12P

Lot 14 Pond (As

Surveyed)

13L

SN 003

Drainage Diagram for 14122.1_StormwaterPrepared by Cross Consulting Engineers, P.C., Printed 8/10/2016HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Subcat Reach Pond Link

C

Page 60: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 2HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: SN003_Pre-dev

Runoff = 9.03 cfs @ 12.36 hrs, Volume= 1.397 af, Depth= 0.31"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 1-Year Rainfall=2.10"

Area (ac) CN Description

3.450 58 Meadow, non-grazed, HSG B42.640 71 Meadow, non-grazed, HSG C8.520 78 Meadow, non-grazed, HSG D0.030 78 Meadow, non-grazed, HSG D

54.640 71 Weighted Average54.640 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

7.2 100 0.0490 0.23 Sheet Flow, SheetRange n= 0.130 P2= 2.30"

2.6 200 0.0330 1.27 Shallow Concentrated Flow, ShallowShort Grass Pasture Kv= 7.0 fps

3.1 370 0.0160 1.98 0.99 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.50' Z= 2.0 '/' Top.W=2.00'n= 0.035 Earth, dense weeds

3.6 310 0.0050 1.45 1.63 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.75' Z= 2.0 '/' Top.W=3.00'n= 0.035 Earth, dense weeds

16.1 1,580 0.0060 1.64 8.19 Trap/Vee/Rect Channel Flow, ChannelBot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00'n= 0.050 Mountain streams w/large boulders

32.6 2,560 Total

Subcatchment 3S: SN003_Pre-dev

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

10

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 1-Year

Rainfall=2.10"

Runoff Area=54.640 ac

Runoff Volume=1.397 af

Runoff Depth=0.31"

Flow Length=2,560'

Tc=32.6 min

CN=71

9.03 cfs

Page 61: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 3HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 9S: FPW to SN003

Runoff = 11.17 cfs @ 12.34 hrs, Volume= 1.492 af, Depth= 0.40"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 1-Year Rainfall=2.10"

Area (ac) CN Description

3.400 61 >75% Grass cover, Good, HSG B32.840 74 >75% Grass cover, Good, HSG C8.192 80 >75% Grass cover, Good, HSG D0.600 98 Paved parking & roofs

45.032 74 Weighted Average44.432 Pervious Area0.600 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

7.2 100 0.0490 0.23 Sheet Flow, SheetRange n= 0.130 P2= 2.30"

2.6 200 0.0330 1.27 Shallow Concentrated Flow, ShallowShort Grass Pasture Kv= 7.0 fps

3.1 370 0.0160 1.98 0.99 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.50' Z= 2.0 '/' Top.W=2.00'n= 0.035 Earth, dense weeds

3.6 310 0.0050 1.45 1.63 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.75' Z= 2.0 '/' Top.W=3.00'n= 0.035 Earth, dense weeds

16.1 1,580 0.0060 1.64 8.19 Trap/Vee/Rect Channel Flow, ChannelBot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00'n= 0.050 Mountain streams w/large boulders

32.6 2,560 Total

Subcatchment 9S: FPW to SN003

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

12

11

10

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 1-Year

Rainfall=2.10"

Runoff Area=45.032 ac

Runoff Volume=1.492 af

Runoff Depth=0.40"

Flow Length=2,560'

Tc=32.6 min

CN=74

11.17 cfs

Page 62: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 4HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 10S: Lots 15, 29, 30

Runoff = 3.76 cfs @ 12.25 hrs, Volume= 0.402 af, Depth= 0.50"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 1-Year Rainfall=2.10"

Area (ac) CN Description

8.169 74 >75% Grass cover, Good, HSG C0.118 80 >75% Grass cover, Good, HSG D1.315 98 Paved parking & roofs

9.602 77 Weighted Average8.287 Pervious Area1.315 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

20.6 100 0.0120 0.08 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.30"

2.5 170 0.0050 1.14 Shallow Concentrated Flow, ShallowUnpaved Kv= 16.1 fps

4.7 1,050 0.0040 3.76 6.64 Circular Channel (pipe), PipeDiam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38'n= 0.013 Corrugated PE, smooth interior

27.8 1,320 Total

Subcatchment 10S: Lots 15, 29, 30

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

4

3

2

1

0

Type II 24-hr 1-Year

Rainfall=2.10"

Runoff Area=9.602 ac

Runoff Volume=0.402 af

Runoff Depth=0.50"

Flow Length=1,320'

Tc=27.8 min

CN=77

3.76 cfs

Page 63: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 5HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 12P: Lot 14 Pond (As Surveyed)

Inflow Area = 9.602 ac, 13.70% Impervious, Inflow Depth = 0.50" for 1-Year eventInflow = 3.76 cfs @ 12.25 hrs, Volume= 0.402 afOutflow = 0.18 cfs @ 19.03 hrs, Volume= 0.402 af, Atten= 95%, Lag= 406.5 minPrimary = 0.18 cfs @ 19.03 hrs, Volume= 0.402 af

Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsStarting Elev= 427.92' Surf.Area= 1,303 sf Storage= 1,846 cfPeak Elev= 430.67' @ 19.03 hrs Surf.Area= 6,339 sf Storage= 12,541 cf (10,695 cf above start)

Plug-Flow detention time= 926.7 min calculated for 0.360 af (89% of inflow)Center-of-Mass det. time= 775.1 min ( 1,672.7 - 897.6 )

Volume Invert Avail.Storage Storage Description

#1 428.00' 24,580 cf Basin (Surveyed) (Prismatic) Listed below (Recalc)#2 424.00' 976 cf 2.00'W x 2.00'L x 4.00'H Forebay Z=3.0#3 424.00' 976 cf 2.00'W x 2.00'L x 4.00'H Micropool Z=3.0

26,532 cf Total Available Storage

Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)

428.00 3,020 0 0429.00 3,706 3,363 3,363430.00 4,450 4,078 7,441431.00 5,255 4,853 12,294432.00 6,118 5,687 17,980433.00 7,081 6,600 24,580

Device Routing Invert Outlet Devices

#1 Primary 427.92' 24.0" x 232.9' long Outlet Pipe CPP, square edge headwall, Ke= 0.500 Outlet Invert= 427.92' S= -0.0001 '/' Cc= 0.900 n= 0.010

#2 Device 1 427.56' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 430.66' 12.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 432.31' 2.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #5 Primary 432.65' 5.0' long (Profile 3) Spillway

Head (feet) 0.49 0.98 1.48 Coef. (English) 2.86 3.17 3.24

Primary OutFlow Max=0.17 cfs @ 19.03 hrs HW=430.67' (Free Discharge)1=Outlet Pipe (Passes 0.17 cfs of 12.31 cfs potential flow)

2=Orifice/Grate (Orifice Controls 0.17 cfs @ 7.98 fps)3=Orifice/Grate (Orifice Controls 0.00 cfs @ 0.29 fps)4=Orifice/Grate ( Controls 0.00 cfs)

5=Spillway ( Controls 0.00 cfs)

C

Page 64: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 6HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Pond 12P: Lot 14 Pond (As Surveyed)

InflowPrimary

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

4

3

2

1

0

Inflow Area=9.602 ac

Peak Elev=430.67'

Storage=12,541 cf

3.76 cfs

0.18 cfs

C

Page 65: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 1-Year Rainfall=2.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 7HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Link 13L: SN 003

Inflow Area = 54.634 ac, 3.51% Impervious, Inflow Depth = 0.42" for 1-Year eventInflow = 11.29 cfs @ 12.34 hrs, Volume= 1.894 afPrimary = 11.29 cfs @ 12.34 hrs, Volume= 1.894 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 5.00-96.00 hrs, dt= 0.02 hrs

Link 13L: SN 003

InflowPrimary

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

12

11

10

9

8

7

6

5

4

3

2

1

0

Inflow Area=54.634 ac

11.29 cfs11.29 cfs

Page 66: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 8HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 3S: SN003_Pre-dev

Runoff = 32.07 cfs @ 12.31 hrs, Volume= 3.727 af, Depth= 0.82"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 10-Year Rainfall=3.10"

Area (ac) CN Description

3.450 58 Meadow, non-grazed, HSG B42.640 71 Meadow, non-grazed, HSG C8.520 78 Meadow, non-grazed, HSG D0.030 78 Meadow, non-grazed, HSG D

54.640 71 Weighted Average54.640 Pervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

7.2 100 0.0490 0.23 Sheet Flow, SheetRange n= 0.130 P2= 2.30"

2.6 200 0.0330 1.27 Shallow Concentrated Flow, ShallowShort Grass Pasture Kv= 7.0 fps

3.1 370 0.0160 1.98 0.99 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.50' Z= 2.0 '/' Top.W=2.00'n= 0.035 Earth, dense weeds

3.6 310 0.0050 1.45 1.63 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.75' Z= 2.0 '/' Top.W=3.00'n= 0.035 Earth, dense weeds

16.1 1,580 0.0060 1.64 8.19 Trap/Vee/Rect Channel Flow, ChannelBot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00'n= 0.050 Mountain streams w/large boulders

32.6 2,560 Total

Subcatchment 3S: SN003_Pre-dev

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Type II 24-hr 10-Year

Rainfall=3.10"

Runoff Area=54.640 ac

Runoff Volume=3.727 af

Runoff Depth=0.82"

Flow Length=2,560'

Tc=32.6 min

CN=71

32.07 cfs

Page 67: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 9HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 9S: FPW to SN003

Runoff = 33.04 cfs @ 12.29 hrs, Volume= 3.649 af, Depth= 0.97"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 10-Year Rainfall=3.10"

Area (ac) CN Description

3.400 61 >75% Grass cover, Good, HSG B32.840 74 >75% Grass cover, Good, HSG C8.192 80 >75% Grass cover, Good, HSG D0.600 98 Paved parking & roofs

45.032 74 Weighted Average44.432 Pervious Area0.600 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

7.2 100 0.0490 0.23 Sheet Flow, SheetRange n= 0.130 P2= 2.30"

2.6 200 0.0330 1.27 Shallow Concentrated Flow, ShallowShort Grass Pasture Kv= 7.0 fps

3.1 370 0.0160 1.98 0.99 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.50' Z= 2.0 '/' Top.W=2.00'n= 0.035 Earth, dense weeds

3.6 310 0.0050 1.45 1.63 Trap/Vee/Rect Channel Flow, DitchBot.W=0.00' D=0.75' Z= 2.0 '/' Top.W=3.00'n= 0.035 Earth, dense weeds

16.1 1,580 0.0060 1.64 8.19 Trap/Vee/Rect Channel Flow, ChannelBot.W=2.00' D=1.00' Z= 3.0 '/' Top.W=8.00'n= 0.050 Mountain streams w/large boulders

32.6 2,560 Total

Subcatchment 9S: FPW to SN003

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Type II 24-hr 10-Year

Rainfall=3.10"

Runoff Area=45.032 ac

Runoff Volume=3.649 af

Runoff Depth=0.97"

Flow Length=2,560'

Tc=32.6 min

CN=74

33.04 cfs

Page 68: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 10HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Subcatchment 10S: Lots 15, 29, 30

Runoff = 9.56 cfs @ 12.23 hrs, Volume= 0.913 af, Depth= 1.14"

Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsType II 24-hr 10-Year Rainfall=3.10"

Area (ac) CN Description

8.169 74 >75% Grass cover, Good, HSG C0.118 80 >75% Grass cover, Good, HSG D1.315 98 Paved parking & roofs

9.602 77 Weighted Average8.287 Pervious Area1.315 Impervious Area

Tc Length Slope Velocity Capacity Description(min) (feet) (ft/ft) (ft/sec) (cfs)

20.6 100 0.0120 0.08 Sheet Flow, SheetGrass: Dense n= 0.240 P2= 2.30"

2.5 170 0.0050 1.14 Shallow Concentrated Flow, ShallowUnpaved Kv= 16.1 fps

4.7 1,050 0.0040 3.76 6.64 Circular Channel (pipe), PipeDiam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38'n= 0.013 Corrugated PE, smooth interior

27.8 1,320 Total

Subcatchment 10S: Lots 15, 29, 30

Runoff

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

10

9

8

7

6

5

4

3

2

1

0

Type II 24-hr 10-Year

Rainfall=3.10"

Runoff Area=9.602 ac

Runoff Volume=0.913 af

Runoff Depth=1.14"

Flow Length=1,320'

Tc=27.8 min

CN=77

9.56 cfs

Page 69: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 11HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Pond 12P: Lot 14 Pond (As Surveyed)

Inflow Area = 9.602 ac, 13.70% Impervious, Inflow Depth = 1.14" for 10-Year eventInflow = 9.56 cfs @ 12.23 hrs, Volume= 0.913 afOutflow = 2.79 cfs @ 12.75 hrs, Volume= 0.913 af, Atten= 71%, Lag= 31.4 minPrimary = 2.79 cfs @ 12.75 hrs, Volume= 0.913 af

Routing by Stor-Ind method, Time Span= 5.00-96.00 hrs, dt= 0.02 hrsStarting Elev= 427.92' Surf.Area= 1,303 sf Storage= 1,846 cfPeak Elev= 431.63' @ 12.75 hrs Surf.Area= 7,147 sf Storage= 17,702 cf (15,856 cf above start)

Plug-Flow detention time= 466.3 min calculated for 0.871 af (95% of inflow)Center-of-Mass det. time= 414.1 min ( 1,285.1 - 871.0 )

Volume Invert Avail.Storage Storage Description

#1 428.00' 24,580 cf Basin (Surveyed) (Prismatic) Listed below (Recalc)#2 424.00' 976 cf 2.00'W x 2.00'L x 4.00'H Forebay Z=3.0#3 424.00' 976 cf 2.00'W x 2.00'L x 4.00'H Micropool Z=3.0

26,532 cf Total Available Storage

Elevation Surf.Area Inc.Store Cum.Store(feet) (sq-ft) (cubic-feet) (cubic-feet)

428.00 3,020 0 0429.00 3,706 3,363 3,363430.00 4,450 4,078 7,441431.00 5,255 4,853 12,294432.00 6,118 5,687 17,980433.00 7,081 6,600 24,580

Device Routing Invert Outlet Devices

#1 Primary 427.92' 24.0" x 232.9' long Outlet Pipe CPP, square edge headwall, Ke= 0.500 Outlet Invert= 427.92' S= -0.0001 '/' Cc= 0.900 n= 0.010

#2 Device 1 427.56' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 430.66' 12.0" Vert. Orifice/Grate C= 0.600 #4 Device 1 432.31' 2.00' x 2.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #5 Primary 432.65' 5.0' long (Profile 3) Spillway

Head (feet) 0.49 0.98 1.48 Coef. (English) 2.86 3.17 3.24

Primary OutFlow Max=2.80 cfs @ 12.75 hrs HW=431.63' (Free Discharge)1=Outlet Pipe (Passes 2.80 cfs of 18.46 cfs potential flow)

2=Orifice/Grate (Orifice Controls 0.20 cfs @ 9.27 fps)3=Orifice/Grate (Orifice Controls 2.60 cfs @ 3.35 fps)4=Orifice/Grate ( Controls 0.00 cfs)

5=Spillway ( Controls 0.00 cfs)

C

Page 70: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 12HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Pond 12P: Lot 14 Pond (As Surveyed)

InflowPrimary

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

10

9

8

7

6

5

4

3

2

1

0

Inflow Area=9.602 ac

Peak Elev=431.63'

Storage=17,702 cf

9.56 cfs

2.79 cfs

C

Page 71: S N 0 0 2 HSG C 1S, 2S, 3S, 4S, 5S 0.000 HSG D 5.534 Other 1S, 2S, 3S, 4S, 5S 8.818 TOTAL AREA Morse Lot 6 PostDev 070716 Type II 24-hr 1 Year Rainfall=2.10" Prepared by Ruggiano Engineering

Type II 24-hr 10-Year Rainfall=3.10"14122.1_Stormwater Printed 8/10/2016Prepared by Cross Consulting Engineers, P.C.

Page 13HydroCAD® 8.50 s/n 001911 © 2007 HydroCAD Software Solutions LLC

Summary for Link 13L: SN 003

Inflow Area = 54.634 ac, 3.51% Impervious, Inflow Depth = 1.00" for 10-Year eventInflow = 33.21 cfs @ 12.29 hrs, Volume= 4.562 afPrimary = 33.21 cfs @ 12.29 hrs, Volume= 4.562 af, Atten= 0%, Lag= 0.0 min

Primary outflow = Inflow, Time Span= 5.00-96.00 hrs, dt= 0.02 hrs

Link 13L: SN 003

InflowPrimary

Hydrograph

Time (hours)9590858075706560555045403530252015105

Flow (cfs)

36

34

32

30

28

26

24

22

20

18

16

14

12

10

8

6

4

2

0

Inflow Area=54.634 ac

33.21 cfs33.21 cfs