NASHVILLE AREA MPO FY 2014-2017 TIP - ADOPTED DECEMBER 11, 2013
RUTHERFORD
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Operation of Relax & Ride service in the Murfreesboro Urban Area
City of MurfreesboroLocation
Route 5307 Urban Operating for Rover Public Transit - Relax & Ride Service
$940,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 1045-332Regional Plan IDLengthCounty
TIP # 2005-006
Murfreesboro PublicTransit
Lead AgencyTransit OperationsImprovement Type
5307 Urban Operating for Rover PublicTransit - Relax & Ride Service
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$35,000.00$35,000.00$70,000.00$140,000.00FTA 5307-MOPERATIONS2014
$40,000.00$40,000.00$80,000.00$160,000.00FTA 5307-MOPERATIONS2015
$80,000.00$80,000.00$160,000.00$320,000.00FTA 5307-MOPERATIONS2016
$80,000.00$80,000.00$160,000.00$320,000.00FTA 5307-MOPERATIONS2017
REVISION HISTORY
PROJECT NOTES
2011 5307 (2009) - $103,866 federal2011 5307 (2010) -$106,981 federal2011 5307 (2011) - $185,191 federal20125307 (2012)2013 5307 (2013)2014 5307 (2014)
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
100/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Operation of para-transit and demand response service for the Murfreesboro urbanized area that exceedsthe limits of the fixed route service operated by Rover (MCHRA).
Murfreesboro Urban AreaLocation
Route 5307 Urban Operating for Rover Public Transit - MCHRA Contract
$520,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 1045-333Regional Plan IDLengthCounty
TIP # 2005-007
Murfreesboro PublicTransit
Lead AgencyTransit OperationsImprovement Type
5307 Urban Operating for Rover PublicTransit - Mid-Cumberland Human ResourceAgency (MCHRA) Contract
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$25,000.00$25,000.00$50,000.00$100,000.00FTA 5307-MOPERATIONS2014
$30,000.00$30,000.00$60,000.00$120,000.00FTA 5307-MOPERATIONS2015
$35,000.00$35,000.00$70,000.00$140,000.00FTA 5307-MOPERATIONS2016
$40,000.00$40,000.00$80,000.00$160,000.00FTA 5307-MOPERATIONS2017
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
101/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct 12' pedestrian and bikeway from Sharp Springs Natural Area to Jefferson Springs RecreationArea to make connection toward Murfreesboro
Sharp Springs Natural Area to Jefferson SpringsLocation
Route Jefferson Springs Greenway Extension
$2,568,700.00Air Quality Status 108649.00TDOT PINExempt Project Cost
Rutherford County 1.00 1046-295Regional Plan IDLengthCounty
TIP # 2006-304
SmyrnaLead AgencyGreenwayImprovement Type
Jefferson Springs Greenway ExtensionProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$265,617.00$0.00$1,062,467.00$1,328,084.00HPP (TN100)CONSTRUCTION2014
$116,662.00$0.00$466,646.00$583,308.00HPP (TN100)CONSTRUCTION2015
$116,662.00$0.00$466,647.00$583,309.00HPP (TN100)CONSTRUCTION2016
REVISION HISTORY
PROJECT NOTES
DEMO ID#: TN-100. Section 1702-SAFETEA-LU, HPPFederal ID# 339.
12/18/12 - It is anticipated that the engineering andenvironmental stages will be completed in FY 13. Constructionwill begin as directed by TDOT after all clearances areobtained. It is anticipated that this project will not require thefull expenditure of funds that are designated in the current TIPand are being requested to move into the 14-17 TIP, but untilcompletion of the project this cannot be known for certain. Anyfunds that are left unexpended would be moved to one of theother Greenway projects.It should be noted that all of thefederal funds on this and all of the greenway projects are HPPfunds designated directly to Smyrna by Congress. The projectwill be managed by Town staff, including the Town Plannerand the Director of Parks and Recreation in conjunction withTDOT. The Town of Smyrna has constructed approximately9.9 miles of greenways over the past several years, much ofwhich has been constructed as recreation trails within localparks as well as connections between the library, parks, andneighborhoods. Many of these have also been constructed assidewalks in conjunction with road improvement projects,including 3 different phases ofimprovements to Rock SpringsRoad and two phases of improvements to Enon Springs Road.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
102/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Operation of transit services in the Murfreesboro Urbanized Area.
City of MurfreesboroLocation
Route 5307 Urban Operating for Rover Public Transit - Fixed Route Service
$4,040,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 1045-334Regional Plan IDLengthCounty
TIP # 2008-45-089
Murfreesboro PublicTransit
Lead AgencyTransit OperationsImprovement Type
5307 Urban Operating for Rover PublicTransit - Fixed Route Service
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$190,000.00$190,000.00$380,000.00$760,000.00FTA 5307-MOPERATIONS2014
$305,000.00$305,000.00$610,000.00$1,220,000.00FTA 5307-MOPERATIONS2015
$260,000.00$260,000.00$520,000.00$1,040,000.00FTA 5307-MOPERATIONS2016
$255,000.00$255,000.00$510,000.00$1,020,000.00FTA 5307-MOPERATIONS2017
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
103/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description FTA 5307 Urban capital funding for the operation of Rover Public Transit Fixed Route services to includepassenger amenities, bus stop signs, benches, information kiosks, bike racks, maintenance equipment,miscellaneous bus equipment, office equipment, office furniture among others.
City of MurfreesboroLocation
Route 5307 Urban Capital for Rover Public Transit - Equipment
$100,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 1045-335Regional Plan IDLengthCounty
TIP # 2008-45-090
Murfreesboro PublicTransit
Lead AgencyTransit CapitalImprovement Type
5307 Urban Capital for Rover Public Transit- Equipment
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$2,500.00$2,500.00$20,000.00$25,000.00FTA 5307-MCAPITALIZATION2014
$2,500.00$2,500.00$20,000.00$25,000.00FTA 5307-MCAPITALIZATION2015
$2,500.00$2,500.00$20,000.00$25,000.00FTA 5307-MCAPITALIZATION2016
$2,500.00$2,500.00$20,000.00$25,000.00FTA 5307-MCAPITALIZATION2017
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
104/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Rebuild Brinkley Road from Hwy 96 to Manson pike from a 2-lane ditch section street to a 3-lane curb &gutter street complete with sidewalks
Hwy 96 to Manson PikeLocation
Route Brinkley Road Reconstruction
$8,500,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 2.00 1042-286Regional Plan IDLengthCounty
TIP # 2011-410-151
MurfreesboroLead AgencyRoad UpgradesImprovement Type
Brinkley Road ReconstructionProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$1,200,000.00$0.00$0.00$1,200,000.00LOCALROW2014
$7,300,000.00$0.00$0.00$7,300,000.00LOCALCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
12/21/12 - The project is currently in the design phase withROW acquisition anticipated in early 2014. The constructionphase for the roadway improvements, currently projected forlate 2014, will take approximately 18 months and is containedin the City’s 2012-16 Capital Improvement Program (CIP)budget.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
105/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Rebuild Rucker Lane from SR-96 to the new SW Loop Road to a 3-lane roadways with curb & gutter andsidewalk
SR-96 to Veterans PkwyLocation
Route Rucker Lane Reconstruction
$6,200,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 2.40 1042-287Regional Plan IDLengthCounty
TIP # 2011-410-152
MurfreesboroLead AgencyRoad UpgradesImprovement Type
Rucker Lane ReconstructionProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$6,200,000.00$0.00$0.00$6,200,000.00LOCALCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
12/21/12 - The project is currently in the construction phase(utility relocations only) with ROW already acquired. Theconstruction phase for the roadway improvements, currentlyprojected for 2014, will take approximately 18 months and iscontained in the City’s 2012-16 Capital Improvement Program(CIP) budget.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
106/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct new 5 lane facility needed to provide alternative access to and relieve congestion on NW Broad(US-41/70) and Thompson Lane (SR-268)
From Sulphur Springs Road to NW Broad Street and interchange @ SR-840Location
Route Cherry Lane Extension with SR-840 Interchange
$32,028,000.00Air Quality Status 116200.00TDOT PINNon-Exempt Project Cost
Rutherford County 0.00 1041-129Regional Plan IDLengthCounty
TIP # 2011-41-144
MurfreesboroLead AgencyNew RoadImprovement Type
Cherry Lane Extension with SR-840Interchange
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$110,000.00$0.00$440,000.00$550,000.00M-STPPE-D2014
$680,000.00$0.00$2,720,000.00$3,400,000.00M-STPROW2015
$1,250,000.00$0.00$5,000,000.00$6,250,000.00M-RSVCONSTRUCTION2017
REVISION HISTORY
PROJECT NOTES
12/21/12 -Subject to successful negotiations of a designcontract. ROW anticipated for late 2015. This will be a locallymanaged project.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
107/191Page
1/29/13 -**Like the Chaney Boulevard widening project, thisproject was put on hold while the city finished up the massiveWaldron Road/Parthenon Parkway widening and water-linereplacement project, but the city is ready to move forward withthis project in the next few years. Preliminary engineering forboth NEPA and design in 2014, with ROW acquisitionoccurring in 2015, and construction starting in 2015. Finaldeliverables will include the newly widened roadway, full, six-foot concrete sidewalks, benches, handrails, pedestrianlighting, curbs, shoulders, and marked crosswalks. The cityplanner andcity engineer, along with the grants manager, headof finance, and the streets supervisor, will be fully involved inthe day-to- day management of the project and coordinationwith the various parties ranging from TDOT to the contractors.The city has a great deal of similar project managementexperience, and current city staff is well versed in the policiesand procedures of TDOT’s Local Programs.**The city of LaVergne recently completed the Waldron Road/ParthenonParkway five-lane widening project, whichincluded a massivewidening and realignment process, sidewalk installation, theshifting of underground utilities, reroutingof daily trafficcirculation patterns, and the removal and replacement of anold water line. Due to the scale, scope, andgeneral length ofthe project, there were slight modifications made bycontractors, TDOT, and other parties, the city notincluded, butthe project met timeframe and budget constraints. Funds wereobligated in 2009 and construction wascompleted in 2013, alengthy process but representative of the scope and scale ofthe project. Unlike the Waldron Roadproject, this proposedwidening project is much smaller in scale, scope, andprojected timeframe, and therefore it should be an easilymanaged project for the city.
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Widen Jefferson Pike to 3 lanes from Murfreesboro Road to Old Nashville Highway. Intersectionimprovements are included.
From Murfreesboro Road to Old Nashville HighwayLocation
Route Jefferson Pike Widening
$6,000,000.00Air Quality Status TDOT PINNon-Exempt Project Cost
Rutherford County 1.80 1042-122Regional Plan IDLengthCounty
TIP # 2011-42-032
LaVergneLead AgencyRoad WideningImprovement Type
Jefferson Pike WideningProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$100,000.00$0.00$400,000.00$500,000.00M-STPPE-N2014
$76,962.00$0.00$307,849.00$384,811.00M-STPPE-D2014
$200,000.00$0.00$800,000.00$1,000,000.00U-STPROW2015
$800,000.00$0.00$3,200,000.00$4,000,000.00U-RSVCONSTRUCTION2016
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
108/191Page
1/29/13 -**Like the Chaney Boulevard widening project, thisproject was put on hold while the city finished up the massiveWaldron Road/Parthenon Parkway widening and water-linereplacement project, but the city is ready to move forward withthis project in the next few years. Preliminary engineering forboth NEPA and design in 2014, with ROW acquisitionoccurring in 2015, and construction starting in 2015. Finaldeliverables will include the newly widened roadway, full, six-foot concrete sidewalks, benches, handrails, pedestrianlighting, curbs, shoulders, and marked crosswalks. The cityplanner andcity engineer, along with the grants manager, headof finance, and the streets supervisor, will be fully involved inthe day-to- day management of the project and coordinationwith the various parties ranging from TDOT to the contractors.The city has a great deal of similar project managementexperience, and current city staff is well versed in the policiesand procedures of TDOT’s Local Programs.**The city of LaVergne recently completed the Waldron Road/ParthenonParkway five-lane widening project, whichincluded a massivewidening and realignment process, sidewalk installation, theshifting of underground utilities, reroutingof daily trafficcirculation patterns, and the removal and replacement of anold water line. Due to the scale, scope, andgeneral length ofthe project, there were slight modifications made bycontractors, TDOT, and other parties, the city notincluded, butthe project met timeframe and budget constraints. Funds wereobligated in 2009 and construction wascompleted in 2013, alengthy process but representative of the scope and scale ofthe project. Unlike the Waldron Roadproject, this proposedwidening project is much smaller in scale, scope, andprojected timeframe, and therefore it should be an easilymanaged project for the city.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
109/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Intersection improvements including modification of the signalization and the addition of turn lanes.
Weakley Lane @ Swan DriveLocation
Route Weakley Lane
$500,000.00Air Quality Status 117472.00TDOT PINNon-Exempt Project Cost
Rutherford County 0.00 1042-167Regional Plan IDLengthCounty
TIP # 2011-42-061
SmyrnaLead AgencyIntersectionImprovement Type
Weakley Lane/ Swan Drive IntersectionImprovements
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$100,000.00$0.00$400,000.00$500,000.00M-STPCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
12/18/12 -It is anticipated that the engineering for this proposalwill be completed in FY 2013. Implementation would beginwithin 90 days of completion of the engineering. It isnotanticipated that any right-of-way wi ll have to be purchased,so construction would begin soon after completion of theengineering. The project will be managed by Town staff,including the Town Planner, Director of Public Works, andEngineer-of-Record. The Town of Smyrna has managedmultiple road improvement projects that included intersectionimprovements, include 3 phases of Rock Springs Road, twophases of Enon Springs Road, and Old Nashville Highway.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
110/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Widen Thompson Lane from 2 to 5 lanes including sidewalks and bike lanes. Interconnect traffic signalsinto existing fiber optic to provide for coordinated arterial signal system.
From US 41/70(NW Broad St) to SR-10 (Memorial Blvd)Location
Route Thompson Lane (SR-268) Widening
$34,713,000.00Air Quality Status 115906.00TDOT PINNon-Exempt Project Cost
Rutherford County 3.93 1042-127Regional Plan IDLengthCounty
TIP # 2011-42-142
MurfreesboroLead AgencyRoad WideningImprovement Type
Thompson Lane (SR-268) WideningProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$100,000.00$0.00$400,000.00$500,000.00M-STPPE-D2014
$1,200,000.00$0.00$4,800,000.00$6,000,000.00M-STPROW2015
REVISION HISTORY
PROJECT NOTES
1/11/13 -The project is currently in the beginning portion ofthedesign phase with request for Letters of Interest (LOI)advertised by TOOT on December 16, 2012. ROW funding isprojected for FY 2015. The PE and ROW phases are beingfunding primarily with federal STP funds with thelocalgovernment providing the required match. Theconstruction phase, currently projected for 2017, will beprogrammed and funded by TOOT based on the provisions oncontractualcommitments between TOOT and the City ofMurfreesboro. This project will be managed by TDOT.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
111/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Widen from 2 to 3 lanes with sidewalks, bike lanes and transit shelters.
From US-41 (SE Broad St.) to Rutherford BlvdLocation
Route Bradyville Pike (SR-99) Widening
$7,378,400.00Air Quality Status 115906.00TDOT PINNon-Exempt Project Cost
Rutherford County 2.10 1042-131Regional Plan IDLengthCounty
TIP # 2011-42-143
MurfreesboroLead AgencyRoad WideningImprovement Type
Bradyville Pike (SR-99) WideningProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$44,000.00$0.00$176,000.00$220,000.00M-STPPE-D2014
$150,000.00$0.00$600,000.00$750,000.00M-STPROW2014
$0.00$109,120.00$436,480.00$545,600.00STPROW2014
REVISION HISTORY
PROJECT NOTES
12/21/12 -The project is currently in the design phase withROW funding projected for FY 2014. The PE and ROWphases are being funding primarily with federal STP funds withthe local government providing the required match. Theconstruction phase, currently projected for 2015, will beprogrammed and funded by TDOT based on the provisions oncontractual commitments between TDOT and the City ofMurfreesboro. This will be a locally managed project.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
112/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construction of passenger waiting/admin/training facility.
City of MurfreesboroLocation
Route 5307 Urban capital Funding for Rover Public - Passenger Waiting/Admin/Training Facility
$5,000,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 1045-338Regional Plan IDLengthCounty
TIP # 2011-45-114
Murfreesboro PublicTransit
Lead AgencyTransit CapitalImprovement Type
5307 Urban capital Funding for RoverPublic - Construction for PassengerWaiting/Admin/Training Facility
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$500,000.00$500,000.00$4,000,000.00$5,000,000.00FTA 5307-MCONSTRUCTION2017
REVISION HISTORY
PROJECT NOTES
2011 5307 (2008) - $661,379 federal2011 5307 (2009) -$696,297 federal2012 5307 (2009)
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
113/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct 12' pedestrian and bikeway trail from Threet Industrial Boulevard from Sam Ridley Parkway toAviation Pkwy, west of the Town limits.
From Sam Ridley Parkway to the Aviation PkwyLocation
Route Smyrna Greenway
$700,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 1.00 1046-292Regional Plan IDLengthCounty
TIP # 2011-46-056
SmyrnaLead AgencyGreenwayImprovement Type
Smyrna GreenwayProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$2,000.00$0.00$8,000.00$10,000.00HPP (TN100)PE-N2014
$18,000.00$0.00$72,000.00$90,000.00HPP (TN100)PE-D2014
$20,000.00$0.00$80,000.00$100,000.00HPP (TN100)ROW2015
$100,000.00$0.00$400,000.00$500,000.00HPP (TN100)CONSTRUCTION2016
REVISION HISTORY
PROJECT NOTES
DEMO ID#: TN100. Section 1702-SAFETEA-LU, HPP FederalID# 339
12/18/12 -This route will require engineering andenvironmental clearances first, with the possibility of right-of-way and/or a land lease from the airport. Construction willbegin as directed by TDOT after all clearances are obtained. Itshould be noted that all of the federal funds on this and all ofthe greenway projects are HPP funds designated directly toSmyrna by Congress. The project will be managed by Townstaff, including theTown Planner and the Director of Parks andRecreation in conjunction with TDOT. The Town of Smyrnahas constructed approximately 9.9 miles of greenways overthe past several years, much of which has been constructedas recreation trails within local parks as well as connectionsbetween the library, parks, and neighborhoods. Many of thesehave also been constructed as sidewalks in conjunction withroad improvement projects, including 3 different phases ofimprovements to Rock Springs Road and two phases ofimprovements to Enon Springs Road.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
114/191Page
Section 1702-SAFETEA-LU (TN100)
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct 12' pedestrian and bikeway trail along Stewart’s Creek from Old Nashville Highway to north ofLowry St.
From Old Nashville Highway to north of S. Lowry St.Location
Route Smyrna Greenway 2
$756,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 1.60 1046-293Regional Plan IDLengthCounty
TIP # 2011-46-057
SmyrnaLead AgencyGreenwayImprovement Type
Smyrna Greenway 2Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$2,000.00$0.00$8,000.00$10,000.00HPP (TN100)PE-N2014
$18,000.00$0.00$72,000.00$90,000.00HPP (TN100)PE-D2014
$20,000.00$0.00$80,000.00$100,000.00HPP (TN100)ROW2015
$111,200.00$0.00$444,800.00$556,000.00HPP (TN100)CONSTRUCTION2016
REVISION HISTORY
PROJECT NOTES
DEMO ID#: TN100. Section 1702-SAFETEA-LU, HPP FederalID# 339.
12/18/12 -This route will require engineering andenvironmental clearances first, with the possibility of right-of-way and or a land lease from the airport. Construction willbegin as directed by TDOT after all clearances are obtained. Itshould be noted that all of the federal funds on this and all ofthe greenway projects are HPP funds designated directly toSmyrna by Congress. The project will be managed by Townstaff, including theTown Planner and the Director of Parks andRecreation in conjunction with TDOT. The Town of Smyrnahas constructed approximately 9.9 miles of greenways overthe past several years, much of which has been constructedas recreation trails within local parks as well as connectionsbetween the library, parks, and neighborhoods. Many of thesehave also been constructed as sidewalks in conjunction withroad improvementprojects, including 3 different phases ofimprovements to Rock Springs Road and two phases ofimprovements to Enon Springs Road.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
115/191Page
Section 1702-SAFETEA-LU (TN100)
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
116/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Widen Stonecrest Parkway to add a dedicated straight through lane as well as modifications to theexisting signalization and potential modifications to private commercial access points to StonecrestParkway.
Sam Ridley Pkwy (SR-266) @ Stonecrest PkwyLocation
Route
$400,000.00Air Quality Status 117492.00TDOT PINNon-Exempt Project Cost
Rutherford County 0.00 1144-003Regional Plan IDLengthCounty
TIP # 2012-44-172
SmyrnaLead AgencyIntersectionImprovement Type
Sam Ridley Pkwy & Stonecrest PkwyIntersection Improvements
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$20,000.00$0.00$80,000.00$100,000.00M-STPROW2014
$50,000.00$0.00$200,000.00$250,000.00M-STPCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
12/18/12 -It is anticipated that the engineering for this proposalwill be completed in FY 2013. Funding for this is in the FY 11-15 TIP. Implementation would begin within 90 daysofcompletion of the engineering. Right-of-way would bepurchased first, with construction to begin soon aftercompletion of the right-of-way purchase. The projectwill bemanaged by Town staff, including the Town Planner, Directorof Public Works, and Engineer-of-Record. The Town ofSmyrna has managed multiple roadimprovement projects thatincluded intersection improvements, include 3 phases of RockSprings Road, two phases of Enon Springs Road, and OldNashville Highway.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
117/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construct grade-separated interchange at the intersection of SR-1 (Broad Street), SR-10 (US-231/Memorial Blvd), and SR-96(Old Fort Pkwy) in Murfreesboro to improve safety and to managecongestion by building an overpass for thru traffic.
SR-1 and SR-96Location
Route SR-1 and SR-96 Intersection Grade Separation
$16,500,000.00Air Quality Status 101112.00TDOT PINNon-Exempt Project Cost
Rutherford County 0.00 1244-002Regional Plan IDLengthCounty
TIP # 2012-44-201
TDOTLead AgencyIntersectionImprovement Type
SR-1 and SR-96 Intersection GradeSeparation
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$0.00$3,300,000.00$13,200,000.00$16,500,000.00NHPPCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
118/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Signal timing study along state routes within the Town of Smyrna Construction phase includesimplementation of an adaptive signal control system; installation of a master signal controller, wirelesscommunication devices, Closed Circuit Television (CCTV), Dynamic Message Signs (DMS), WeatherCommunication, Adaptive Signal Control.
SR-266/ Sam Ridley Pkwy, SR-41/ US-70/ Lowry Street, SR-102/ Nissan DriveLocation
Route
$900,000.00Air Quality Status 117493.00TDOT PINExempt Project Cost
Rutherford County 13.60 1147-004Regional Plan IDLengthCounty
TIP # 2012-47-173
SmyrnaLead AgencyITSImprovement Type
Smyrna Signal SystemProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$20,000.00$0.00$80,000.00$100,000.00M-STPPE-D2014
$160,000.00$0.00$640,000.00$800,000.00M-RSVCONSTRUCTION2015
REVISION HISTORY
PROJECT NOTES
12/18/12 -It is anticipated that the study will be completed inFY 2014. Implementation would begin within 90 days of studycompletion, after the most cost-effective means ofimplementation are determined. The project will be managedby Town staff, including the Town Planner, Director of PublicWorks, and Engineer-of-Record. The Town of Smyrna hasnever managed a project such as this, but the Town hasextensive experience in signal maintenance and intersectionimprovements.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
119/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construction of restroom facilities along Phase 1 of the Smyrna Greenway
Sharp Springs Area near SR-266Location
Route
$272,000.00Air Quality Status 040860.00TDOT PINExempt Project Cost
Rutherford County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2012-56-190
SmyrnaLead AgencyGreenwayImprovement Type
Smyrna Greenway Phase 1Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$4,400.00$0.00$17,600.00$22,000.00HPP (TN100)PE-D2014
$50,000.00$0.00$200,000.00$250,000.00HPP (TN100)CONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
DEMO ID# TN100. Section 1702-SAFETEA-LU, HPP FederalID# 339.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
120/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Preventive Maintenance Activities for Rover Fixed Route Transit Service
City of MurfreesboroLocation
Route 5307 Urban capital Funding for Rover Public - Capital for Preventive Maintenance Activities
$425,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-45-019
Murfreesboro PublicTransit
Lead AgencyTransit CapitalImprovement Type
5307 Urban capital Funding for RoverPublic - Capital for Preventive MaintenanceActivities
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$10,000.00$10,000.00$80,000.00$100,000.00FTA 5307-MCAPITALIZATION2014
$10,000.00$10,000.00$80,000.00$100,000.00FTA 5307-MCAPITALIZATION2015
$10,000.00$10,000.00$80,000.00$100,000.00FTA 5307-MCAPITALIZATION2016
$12,500.00$12,500.00$100,000.00$125,000.00FTA 5307-MCAPITALIZATION2017
REVISION HISTORY
PROJECT NOTES
Continued maintenance of buses.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
121/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Additional Preliminary Engineering and Design funds for New Transit Facility inMurfreesboro.
City of MurfreesboroLocation
Route 5307 Urban Capital for Rover Public Transit- Additional PE for New Transit Facility
$100,000.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-45-020
Murfreesboro PublicTransit
Lead AgencyTransit CapitalImprovement Type
5307 Urban Capital for Rover Public Transit- Additional PE for New Transit Facility
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$10,000.00$10,000.00$80,000.00$100,000.00FTA 5307-MPE2014
REVISION HISTORY
PROJECT NOTES
PE is scheduled to be complete during early 2015.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
122/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Capital funding to replace, rehabilitate and purchase buses and related equipment and to construct bus-related facilities.
Murfreesboro Urbanized AreaLocation
Route
$146,234.00Air Quality Status TDOT PINExempt Project Cost
Rutherford County 0.00 ConsistentRegional Plan IDLengthCounty
TIP # 2014-45-029
MPOLead AgencyTransit CapitalImprovement Type
Bus & Bus Facilities (Grouping) -Murfreesboro UZA
Project Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$3,591.00$3,591.00$28,725.00$35,907.00FTA 5339IMPLEMENTATION2014
$3,634.00$3,634.00$29,070.00$36,338.00FTA 5339IMPLEMENTATION2015
$3,677.00$3,677.00$29,419.00$36,773.00FTA 5339IMPLEMENTATION2016
$3,722.00$3,722.00$29,772.00$37,216.00FTA 5339IMPLEMENTATION2017
REVISION HISTORY
PROJECT NOTES
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
123/191Page
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Closed Loop Signal Coordination System and related road widening (widen from 4 to 5 lanes), includingbike lanes and reconstruction of sidewalks.
Greenland Drive to Main StreetLocation
Route Middle Tennessee Boulevard
$9,578,569.00Air Quality Status TDOT PINNon-Exempt Project Cost
Rutherford County 1.00 1047-290Regional Plan IDLengthCounty
TIP # 203
MurfreesboroLead AgencyITSImprovement Type
Middle Tennessee BoulevardProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$247,500.00$0.00$990,000.00$1,237,500.00HPP (TN200)ROW2014
$1,008,357.00$0.00$4,033,429.00$5,041,786.00HPP (TN200)CONSTRUCTION2014
$42,500.00$0.00$170,000.00$212,500.00M-STPROW2014
$491,472.00$0.00$1,965,889.00$2,457,361.00M-STPCONSTRUCTION2014
REVISION HISTORY
PROJECT NOTES
DEMO funding available from previous appropriations.SAFETEA-LU HPP funds are distributed annually. Due tofederal budget limitations, the actual amounts may be lessthan the amounts shown above. Section 1702 SAFETEA-LU,HPP Fed ID is 1327 & 4928.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
124/191Page
1/29/13 -**This project is a carryover from the previous TIP.The city has had a small amount of funding for this project forsome time, but a recent amendment shifted a large amount ofHPP funding to the project to allow the city to enhance thescope and scale of the project. The amendment was approvedby TDOT in January 2012. The city held a meeting with thecontractor in January 2013 to discuss the preliminaryengineering design and proposed timeframe for constructionafter the bid process, selection, concurrence, and notices toproceed. Construction is expected to begin approximately oneyear from now in May/June of 2014. The final deliverable willbe 1.7 miles of new greenway with a trailhead, parking area,pavilion, playground equipment, educational signage,benches, and boardwalk-type crossings for low-lying areasalong the greenway.**The city of La Vergne recentlyconstructed its first phase of the city’s overall GreenwayMaster Plan with the completion of the Brookside greenwaypiece. A ribbon-cutting ceremony with the Mayor andAldermen, citizens, staff, and coverage by Larry Flowers onChannel 4 WSMV highlighted the success of the project andthe excitement of the city. After the project opened to thepublic, the city partnered with the Department of Forestry andplanted trees along the stretch of the completed greenway, aswell as added some pedestrian lighting, all of which was doneto further enhance the project and which also shows the city’sdedication to the project as a whole.
NASHVILLE AREA METROPOLITAN PLANNING ORGANIZATION
Transportation Improvement Program for FYs 2014-2017
Project Description Construction of a greenway and bike trail that will connect City Hall with various residentialneighborhoods.
Along Nir Shreibman Blvd and Stones River Rd from SR-41 to La Vergne Ln.Location
Route Hurricane Creek Greenway
$1,935,480.00Air Quality Status 041618.00TDOT PINExempt Project Cost
Rutherford County 1.70 1046-294Regional Plan IDLengthCounty
TIP # AM-006
LaVergneLead AgencyGreenwayImprovement Type
Hurricane Creek GreenwayProject Name
Local fundsState FundsFederal FundsTotal FundsFunding TypeType of WorkFiscal Year
$28,896.00$0.00$115,584.00$144,480.00ENHCONSTRUCTION2014
$358,200.00$0.00$1,432,800.00$1,791,000.00HPP (TN018)PE-D, ROW,CONSTRUCTION
2014
REVISION HISTORY
PROJECT NOTES
DEMO ID: TN018. Section 1602-TEA21.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
125/191Page
1/29/13 -**This project is a carryover from the previous TIP.The city has had a small amount of funding for this project forsome time, but a recent amendment shifted a large amount ofHPP funding to the project to allow the city to enhance thescope and scale of the project. The amendment was approvedby TDOT in January 2012. The city held a meeting with thecontractor in January 2013 to discuss the preliminaryengineering design and proposed timeframe for constructionafter the bid process, selection, concurrence, and notices toproceed. Construction is expected to begin approximately oneyear from now in May/June of 2014. The final deliverable willbe 1.7 miles of new greenway with a trailhead, parking area,pavilion, playground equipment, educational signage,benches, and boardwalk-type crossings for low-lying areasalong the greenway.**The city of La Vergne recentlyconstructed its first phase of the city’s overall GreenwayMaster Plan with the completion of the Brookside greenwaypiece. A ribbon-cutting ceremony with the Mayor andAldermen, citizens, staff, and coverage by Larry Flowers onChannel 4 WSMV highlighted the success of the project andthe excitement of the city. After the project opened to thepublic, the city partnered with the Department of Forestry andplanted trees along the stretch of the completed greenway, aswell as added some pedestrian lighting, all of which was doneto further enhance the project and which also shows the city’sdedication to the project as a whole.
Printed on
Nashville Area Metropolitan Planning Organization
Wednesday, December 11, 2013
Transportation Improvement Program for FYs 2014-2017
126/191Page