rtf management update jennifer anziano regional technical forum july 21, 2015
DESCRIPTION
Delivery Verification Guidance May 2015: RTF approved the delivery verification guidance for the first batch of measures – RTF established a 30 day review period for the three “complex” measures July 2015 (today): Report out on that feedback September 2015: Batch 2 November 2015: Batch 3 3 – Delivery VerificationTRANSCRIPT
RTF Management Update
Jennifer AnzianoRegional Technical Forum
July 21, 2015
2
Overview
Topics for today:• Report out on feedback from delivery verification• MH DHP New Measure Proposal• Annual report• New member solicitation• Upcoming meeting topics• Advanced power strips subcommittee
Delivery Verification Guidance
• May 2015: RTF approved the delivery verification guidance for the first batch of measures– RTF established a 30 day review period for the
three “complex” measures• July 2015 (today): Report out on that feedback• September 2015: Batch 2• November 2015: Batch 3
3 – Delivery Verification
Feedback on Complex Measures
• RTF recommendation to include materials requirements for performance based duct sealing
• Bonneville submitted comments on all three documents– Weatherization and Performance Based Duct Sealing:
• Clarifications to the specification and guidance• Staff accepted all comments
– Commissioning Controls and Sizing• Proposed four clarifications to the specification and guidance• Staff addressed 1 (clarified the intention of the spec)• Staff did not address 3 (2 covered by existing text; 1 change to the spec
itself)
4 – Delivery Verification
New Measure Proposal: DHP for MF
• Measure Name: DHP for MF• Measure Category: Planning UES• Measure Sector: Residential• End-Use: Existing MF• Proposing Party: Puget Sound Energy• Interested Party: PSE, SCL, ETO• Regional Potential: Med (~50-100+ aMW)
5 – New Measure Proposal
New Measure Proposal: DHP for MF
• Measure Specification: Install a ductless heat pump in the main living area of a multifamily unit
• Savings Estimated Procedure: Billing analysis estimate (planning); calibrated engineering (proven)
• Data to Leverage:– PSE has data from custom, whole building retrofits– SCL may also have some data– ETO is in process of completing a billing analysis and may have cost
data– BPA/Ecotope have data and a report from 2012 looking at a small
sample of DHP for MF retrofits
6 – New Measure Proposal
Proposed Motion
“I _________ move that the RTF allocate staff resources towards developing a Residential Ductless Heat Pump for Multifamily UES Measure.”
7 – New Measure Proposal
Annual Report8 – Annual Report
New Member Solicitation
• Current membership terms are coming to a close at the end of 2015
• Seeking solicitation of new members for 2016-2018• Applications due by August 31
– Submit letter of interest, resume, and areas of expertise form– Current members are welcome to apply– Individuals may also indicate interest in being corresponding members
• Seeking Council decision at October meeting• For more information:
http://rtf.nwcouncil.org/newmembers.htm
9 – New Member Solicitation
Upcoming Meeting TopicsAnticipated in August• Residential Lighting
• Residential Advanced Power Strips Call for subcommittee• MH HVAC Measures (includes upgrades, conversion, duct sealing, CC&S)
– Will require Research Strategy to address HP calibration curve
• Multifamily Calibration (seeking RTF direction on whether we need it)
Anticipated in September• Refrigerator/Freezer Decommissioning (need time to convene the subcommittee)• MH New Construction Measures• Res Heat Pump Upgrades SF (New Construction)• Depending on MF calibration direction
– MF Weatherization– New Construction ENERGY STAR Homes MF
• Delivery Verification Batch 2
10 – Upcoming Meeting Topics
Upcoming Meeting Topics
Other Topics on Radar• Behavior Standard Protocol• Non-Residential Lighting Standard Protocols
– Retrofits (Provisional)– Code-Compliant (new – not yet started)
• New Homes Standard Protocol (new measure)• Several UES for New Construction (4 sunset in December)• Guidelines Updates • Delivery Verification Batch 3• Rolling out ProCost v3
11 – Upcoming Meeting Topics