RPC LAB SETUP RPC Lab became operational in December 2010
Two bay space and fully Air conditioned, Air Curtained
Room temperature and humidity sensors
Data Acquisition System with NIM/CAMAC Modules
Cosmic ray test stand (*New Almost Ready 2mx1.6m)
4-Channel gas mixing system
Freon, Iso-butane, Argon Gas Cylinders
Air Compressor (DST-RPC Research Project)
SY-2527 Universal Multichannel Power Supply
Positive High Voltage Module
Negative High Voltage Module
Assembly Table of Scintillator Paddles
DAQ, Cosmic Stand & Gas Mixing Unit
Cosmic Stand( 2mx1.6m) For testing of 5 assembled RPCs
High Voltage Supply Unit
Present DAQ Status
Procured new Universal Multichannel Power Supply (SY-2527) from CAEN which is integrated to our DAQ system.
A new Ethernet based CAMAC controller is integrated in to the DAQ and made operational. (Sumit’s Talk)
Constantly check for signal formation in Avalanche and Streamer mode as a cross-check for the complete system (prototype glass RPCs)
We are establishing the facility for fabricating prototype Bakelite RPCs (procured raw material)
Continued…….
Prototype Glass RPC (from TIFR)
Stability Monitoring of Telescope Paddles
Continued…….
Continued……..
VI Characteristics of Test RPC
VI Characteristics of 30X30 Cm Glass RPC
0 2000 4000 6000 8000 10000 120000.00
0.05
0.10
0.15
0.20
0.25
0.30
GLASS RPCL
ea
ka
ge
Cu
rre
nt
(in
mic
ro A
mp
s)
High Voltage (volts)
Model ExpGro1
Equation y = A1*exp(x/t1) + y0
Reduced Chi-Sqr
3.7305E-4
Adj. R-Square 0.92442
Value Standard Error
Leakage Current
y0 -2.91669E-5 0.0057
Leakage Current
A1 1.80712E-5 2.41177E-5
Leakage Current
t1 1044.47069 148.01819
FREON 62%; ISOBUTANE 8%; ARGON 30%
TEMP 25.9C 30-05-2011 10:30 A.M
Ongoing Updates
VME Crate with modules (ADC/TDC/Scaler) order placed
Gas cylinders are doubledNitrogen is also procured for pressure/leak tests
Can also be used for flushing of RPCs for moisture control
New RPC storage area would be available in 2 wks (civil work over, cabling etc), 400sq. Ft.
As per the new RPC group’s guidelines, may need to double TDC and the power supply! For testing 5 RPCs in a stack with all read out
channels Will be running the system integration tests with the
bakelite RPCs soon.VME software work will start once VME arrives (with