FORM-1 M PRE FEASIBILITY REPORT ENVIRONMENTAL MANAGEMENT PLAN & APPROVED MINING PLAN For Road Metal & Building Stone Mine of M/s. SRI LAKSHMI VENKATESWARA STONE CRUSHERS (MINE LEASE AREA: 1.500 Ha.) At Sy.No: 127, G.KOTTALA VILLAGE PAMIDI MANDAL, ANANTAPUR DISTRICT, ANDHRA PRADESH PROPOSED BY Mg.Pt, Sri N. Kambagiri Ramudu D. NO: 1-730, Near Water Tank Tadipatri, Anantapur District, Andhra Pradesh. Mobile:9849030926. SAI GEO SERVICES G.ESWAR REDDY M.Sc.,B L.,Ph D., RQP/Geologist, RQP/DMG/ AP/07 /2014, RQP/HYD/302/2013/ A, D.No.13-2-155-1,Shirdi Nagar, ANANTAPURAMU.AP.STATE 515001

Upload: others

Post on 15-Nov-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

FORM-1 M

PRE FEASIBILITY REPORT

ENVIRONMENTAL MANAGEMENT PLAN

&

APPROVED MINING PLAN

For

Road Metal & Building Stone Mine of

M/s. SRI LAKSHMI VENKATESWARA

STONE CRUSHERS (MINE LEASE AREA: 1.500 Ha.)

At Sy.No: 127,

G.KOTTALA VILLAGE

PAMIDI MANDAL,

ANANTAPUR DISTRICT,

ANDHRA PRADESH

PROPOSED BY

Mg.Pt, Sri N. Kambagiri Ramudu

D. NO: 1-730, Near Water

Tank Tadipatri, Anantapur

District, Andhra Pradesh.

Mobile:9849030926.

SAI GEO SERVICES G.ESWAR

REDDY M.Sc.,B L.,Ph D.,

RQP/Geologist,

RQP/DMG/ AP/07 /2014,

RQP/HYD/302/2013/ A,

D.No.13-2-155-1,Shirdi Nagar,

ANANTAPURAMU.AP.STATE 515001

Page 2: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

Standard template for evaluation of all projects/ activities;

S.no. Information required Information to be furnished by the project proponent.

1. Name of the project or activity Mining of Road Metal & Building Stone.

2. Name of the organization/owner M/s. Sri Lakshmi Venkateswara Stone Crushers. Stone Crushers

3. Address for communication M/s. Sri Lakshmi Venkateswara Stone Crushers, Mg. Pt: Sri N. Kambagiri Ramudu. NO: 1-730, Near Water Tank Tadipatri, Anantapur District, Andhra Pradesh.

4. Telephone numbers 9849030926

5. Email id of the organization or contact person

[email protected]

6. Location of the proposed project or activity Sy.No. 127 of G. Kottala Village , Pamidi Mandal, Anantapur District, Andhra Pradesh.

7. Appraisal category (b2 or b1) B2 8. Nearest habitation and distance from the

project or activity Kottala village is about 0.80 km. - SW

9. Installed capacity / production capacities 24214 Cum/ annum of Road Metal 10. Specify the fuel (coal / CNG /

biomass/others) and quantity required Diesel based machinery will be used during quarry operations. 200 liters of diesel will be used per day

11. Details of land use/land cover Present land use will be changed with commencement of mining activities. This subject area is exposed with granite boulders of grey and light pink road metal and building stone which is locally named with branded rock of “Grey Metal”

12. Occupancy, ownership of the land in which the activity is proposed: (government land / private land / forest land /revenue land /temple land /leased land/ land belongs to other department)

Government land

13. If it is a forest land, the following details shall be furnished: (whether it is a reserved forest / protected forest/demarcated forest/ national parks/ sanctuaries/ any land in possession of forest department.)

Not applicable

Page 3: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

(the village map with sy. No. Indicating nearest forest boundary line from the site shall be enclosed)

14. Total investment of the project/activity. 30.0 lakhs

A. Funds allocated for EMP (capital cost and recurring cost per annum)

2.50 lakhs (capital) 1.30 lakhs (recurring)

15. Brief description of the project with special reference to specific pollution and its control measures.

During mining operations fugitive dust emissions will be generated. Control devices such as water sprinklers and covering drill with cloth will reduce the generation of dust. Noise levels may be increased during operations and these will be controlled with ears protection/use of latest noise controlled equipment. Vibrations level during blasting operations and these will be minimized by using low explosives and low quantities. Garland drains with sedimentation pits will be provided all along the working pit. The mined out pit will be backfilled and afforested. Greenbelt will be developed all along the mining lease area.

16. Compliance report on the following :

A. Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters.

Present proposal is for environmental clearance.

B. Details of the court cases, if any, pending in any court of law against the project as well as any directions passed by the court relating to the project directly or indirectly.

No court case is pending against the proposed project

C. Details of the notices, if any, given to the project under section 5 of the environmental (protection) act, 1986 and section 18 of the air (prevention & control of pollution) act, 1981.

No

17. Whether the project attracts the provisions laid under the om dt.16.11.2010 issued by the moe&f, goi, w.r.t. Violation of eia notification, 2006 and its amendments there of ? (yes / no)

No

18. Present stage and status of the project : Existing mine 19. Name of the consultant: M/s. Sai Geo Services

G.Eswar Reddy RQP, Anantapur.

Page 4: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

FORM -1M

Page 5: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

FORM-1 M Basic Information:

S.No. Item Details

1.

Name of the Mining Lease site: M/s. Sri Lakshmi Venkateswara Stone Crushers, Mg.Pt: Sri N. Kambagiri Ramudu. (Road Metal & Building Stone Mine)

2.

Location / site (GPS Co-ordinates):

Latitude (N) Longitude (E)

a1 14O 59’ 51.7” 77O 35’ 13.8”

b1 14O 59’ 57.4” 77O 35’ 14.0”

c1 14O 59’ 57.2” 77O 35’ 17.6”

d1 14O 59’ 51.7” 77O 35’ 17.5”

3. Size of the Mining Lease (Hectare): 1.50 Hectares

4.

Capacity of Mining Lease 24214 m3/annum (Maximum

Production in five years);

5. Period of Mining Lease: 10 years

6. Expected cost of the Project: 30 Lakhs

7. Contact Information: M/s. Sri Lakshmi Venkateswara Stone Crushers, Mg.Pt: Sri N. Kambagiri Ramudu. D. NO: 1-730, Near Water Tank, Tadipatri, Anantapur District, Andhra Pradesh.

Environmental Sensitivity:

S.No. Areas Distance in kilometer/Details

1.

Distance of project site from nearest rail

or road bridge over the concerned River,

Rivulet, Nallah etc.

Pamidi Railway Station – 2.2 km (SE)

2.

Distance from infrastructural facilities

Railway line

National Highway

State Highway

Major District Road

Any Other Road

Pamidi Railway Station – 2.2 km (SE)

NH-7 (Gooty –Anantapur) – 2.5kms(E)

Page 6: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

Electric transmission line pole or tower

Canal or check dam or reservoirs or lake

or ponds

In-take for drinking water pump house

Intake for Irrigation canal pumps

3.

Areas protected under international

conventions, national or local legislation

for their ecological, landscape, cultural or

other related value

None

4. Areas which are important or sensitive

for ecological reasons - Wetlands,

watercourses or other water bodies,

coastal zone, biospheres, mountains,

forests

Reserved Forest

Katrimala East R.F. -5.5 Kms –W Kanampalle R.F. – 8.80 Kms – SE Nagasamudram South R.F. – 8.50 Kms-NW Water Bodies Penner River – 1.500Kms-S Puli Vanka – 5.70 Kms-NE

5.

Areas used by protected, important or

sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

None Within 15 km

6. Inland, coastal, marine or underground

waters

None

7. State, National boundaries Non within in 15 Kms radius

8.

Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

None

9. Defence installations None

10. Densely populated or built-up area,

distance from nearest human habitation

None

11.

Areas occupied by sensitive man-made

land uses (hospitals, schools, places of

worship, community facilities)

Hospitals, schools and temples are

available in the surrounding villages

& Mandal

12.

Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

None

13.

Areas already subjected to pollution or

environmental damage. (those where

existing legal environmental standards

None

Page 7: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

are exceeded)

14.

Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

None

15.

Is proposed mining site located over or

near fissure / fracture for ground water

recharge

No

16.

Whether the proposal involves approval or clearance under the following Regulations or Acts, namely:- (a) The Forest (Conservation) Act, 1980; (b) The Wildlife (Protection) Act, 1972; (c)The Coastal Regulation Zone Notification,

2011. If yes, details of the same and their status to be given.

No.

17. Forest land involved (Hectares) No forest land is involved

18.

Whether there is any litigation pending

against the project and/or land in which

the project is propose to be set up?

a) Name of the Court b) Case No. c) Orders or directions of the Court, if

any, and its relevance with the proposed project.

No litigation or court case is pending

against the proposed project.

Page 8: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

“I hereby given undertaking that the data and information given in the application and

enclosures are true to the best of my knowledge and belief and I am aware that if any part of

the data and information submitted is found to be false or misleading at any stage, the

project will be rejected and clearance give, if any to the project will be revoked at our risk

and cost.

Date: 25-10-2017.

Place: Anantapuramu.

M/s. Sri Lakshmi Venkateswara Stone Crushers,

Mg.Pt: Sri N. Kambagiri Ramudu, D. NO: 1-730, Near Water Tank Tadipatri(M), Anantapur District,

Andhra Pradesh. .

Page 9: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-I

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

1.0 EXECUTIVE SUMMARY

1.1 Introduction

The mining area of 1 .500 Ha. in survey no. 127 of G.Kottala Village, Pamidi Mandal, Anantapur District has been leased to Sri. Y. Rajkumar for a period of 10 years by Deputy Director of Mines and Geology, Kurnool.

The proposed area is not fit for agriculture and the Department of Mines and

Geology indicate that the subject area has mineral deposits for extraction. The

salient features of the project are given Table 1.1.

Table 1.1

The Salient Features of the Project

Project Name Road Metal & Building Stone

of M/s. Sri Lakshmi Venkateswara Stone Crushers

Mining Lease Area 1.500 Ha

Location of Mine Sy.No. 127, G. Kottala Village, Pamidi Mandal,

Anantapur District, Andhra Pradesh.

Toposheet number 57 F 9

Proposed production of

mine

24214 Cu.m/annum

Method of mining Open cast semi mechanized mining

Drilling/Blasting Controlled Blasting and drilling is proposed.

No. of working days 300 days

Water demand 3.0 KLD

Sources of water Water will be supplied from bore wells of the

nearby area

Man power 34

Nearest railway station Pamidi Railway station- 2.2kms

Nearest airport Kempegowda International Airport –198 kms

Page 10: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-II

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

2.1 Identification of Project and Project Proponent

The Quarrying area for Road Metal & Building Stone has been leased to M/s.

Sri Lakshmi Venkateswara Stone Crushers in Sy.No. 127, G. Kottala

Village, Pamidi Mandal, Anantapur District by the Deputy Director of Mines

& Geology, over an extent of 1.500 Ha. for a period 10 years.

M/s. Sri Lakshmi Venkateswara Stone Crushers has proposed the project

in the above mentioned notified area and has been in this business since the

last 10 years.

2.2 Brief Information about the Project

The mining lease area is about 1.500Ha. is located in Government land. Open

cast semi mechanized mining is followed and it has been proposed to

produce approximately 24214 Cum/annum of building stone material. The

nearest habitation from the proposed project is at a distance of 0.80 km ie.

Kottala village.

2.3 Need for the Project and Its Importance to the Country or Region

The demand for Road Metal & building stone has increased due to rapid

industrialization and growth in infrastructure. So the number of building

stone producing quarries is increasing in India. Building Stone and M-Sand

have to produce as they form the aggregate in the concrete mixture used in

the construction industry. The Indian Railways also requires the material for

the maintaining the existing network and also for the never ending expansion.

As per EIA notification 2006 project proponent is submitting the proposal to

get Clearance for production capacity of 24214 Cum/annum of from District

Level Environmental Appraisal Committee/District level Impact Assessment

Authority of Andhra Pradesh constituted by MoEF&CC, GOI for the purpose

of grant of quarry lease for which Notification is issued.

2.4 Demands-Supply Gap

There is huge demand since the material is used extensively in Construction,

Railways, Roadways and many other sectors. This project will help in

reducing the Demand-Supply gap in the area.

Page 11: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-3

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

2.5 Domestic/ Export Markets

The material is used in the domestic market and in there is no scope for

exporting the material.

2.6 Employment Generation

Proposed mining is semi mechanized method and this project operation will

provide livelihood to the 34 workers. It will provide employment to the people

residing in vicinity.

3.0 PROJECT DESCRIPTION

3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.

The proposed mine area is of 1.500 Ha. area, No interlinked projects are

associated with this project.

3.2 Location of the project

The mining lease area is located in Survey No. 127, G. Kottala Village, Pamidi

Mandal, Anantapur district, Andhra Pradesh. The mine lease area falls in

Survey of India

Toposheet No.: 57 F/9

Google map is given in Figure-1.

Topographical Map of 10km Radius in Figure -2

Page 12: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-4

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

Figure 1 Google Map of the Study Area

Page 13: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-5

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

Figure 2 Topographical Map of 10km Radius

Page 14: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-6

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

3.3 Details of Alternate Sites

No alternate site was considered as the project is mineral specific and site specific.

3.4 Size or magnitude of operation

The proposed mine has lease over an area of and the 1.500Ha., production rate is

24214 Cu.m/annum. The lease follows open cast semi mechanized mining.

3.5 Geology and Reserves

3.5.1 Topography

Topographically the QL applied area is a plain land gently slopes towards all

directions. Generally it is low lying plain land with an average altitude of 328m

above M.S.L. and dendritic to dendritic drainage is observed. The area is elevated

towards Centre & West of the QL applied area and sloping towards North, East &

South directions. The area is devoid of any forest or tree cover. It comprises big size

Boulders and shrubs only. The subject area covers the part of the Pediment

comprising negligible soil cover along the depressions of the big size Boulders &

sheet rock exposed over the subject area. The drainage pattern is dendritic to sub-

dendritic. The applied area belongs to rocky terrain it does not have much

vegetation.

3.5.2 Geology

The subject area is Granitoid gneiss belonging to Peninsular Gneissic Complex of

Archaean age. The outcrop exhibits multiple sets of joints both closely spaced and

widely spaced as such it is most suitable for quarrying Road metal and Building

stone

3.5.3 Exploration

This is an existing mine excavation has been done.

Reserves

Geological reserves are given below in Table 3.1.

Table 3.2-Details of Reserves

Category Reserves @

95% in M³ Rock Wastage@

5 % in M³ Proved 470014 24738

After Buffer Zone 367970 19367

After Bench Slope deduction 356838 18781

Page 15: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-VII

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

Total mineable reserves = 356838-23047= 333791Cum

Life of the Quarry: Mineable reserves/Annual production= 333791/24214 = 14.0

years *(Source: Mining plan)

3.6 PROJECT DESCRIPTION WITH PROCESS DETAILS

3.6.1 Method of Mining

The quarrying in the sanctioned area is of open cast method other than fully

mechanized mining method with drilling and blasting. The ROM will be sized and

sorted in the crusher established outside the quarry lease area loaded on to tippers

and tractors using JCB, Mining will be carried out by formation of benches of height

6 m each. Considering the technical parameters like surface topography, quality

variations, geo-technical aspects are required for production and extraction of

building material in the area. It is proposed to work from the deposit by adopting

benches formations with ultimate pit slope of 45°. The benches height and the width

will be maintained as specified by D.G.M.S. The width of the working benches shall

not be less than the height. The year wise production and development plan

indicates the site for disposal of waste, site for afforestation as shown in map. The

plan showing position of the working pit proposed for extension etc. Due care has to

be taken in designing the benches and advancing the benches for production. The

ground water table is much below the proposed working level.

The machinery used to carry out the mining operations are given Table 3.2

Mining Machinery

Purpose Type of machinery Capacity & No’s Breaking Crawler drill 4.5” 100 mm dia 450 cfm/2 No’s Loading Loader/Excavator 2 No’s Haulage Tippers 25 – tonner, 6 No’s

Water tanker Tractor type 1 No’s

Page 16: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-888

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

Production parameters

The Mineral production target for five years is given in Table 3.3

Table 3.3

Year wise Road metal Production Programme

Year

Bench Height

Volume

m3

Production

m3

Roadmetal Waste

1st year 6+6m 25422 24151 1208

2nd year 6+6m 25554 24276 1214

Total 50576 48427 2421

* Source: Mine plan

3.7 Raw Material Required Along With Estimated Quantity, Likely Source,

Marketing Area of Final Product/S, Mode of Transport of Raw Material and

Finished Product

No raw material will be required in the proposed project. The operation

involves the extraction of material and dumping in stock yard. Loading of the

building stone material will be done mechanically by tippers and transported

from the quarry to the required site. The rejected material will be dumped

separately.

3.7.1 Use of Mineral

The extracted material will be used in Construction, Railways, Road ways and

many other sectors

3.7.2 Processing

No processing at site is involved.

3.8 Resource Optimization/ Recycling and Reuse

Not envisaged.

Page 17: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-9

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

3.9 Availability of Water Its Source, Energy/ Power Requirement and Source

3.9.1 Water Requirement

Water is required only for drinking purposes and dust suppression. The

number of working people is around 34 so the total water requirement will be

around 3.0 KLD. This water will be supplied from bore wells of nearby area.

3.10 Quantity of Wastes to be Generated (Liquid and Solid) And Scheme for

their Management/ Disposal

3.10.1 Solid Waste Generation& its Disposal

In this type of extraction the recovery factor is as high as 95 % so only 5%

comes out as rejects. The ROM will be fed in to crusher established outside

the applied QL area where it will be crushed to desired sizes and utilized for

state highway project from Pamidi to Bangalore. The entire ROM is intended

for captive consumption.

3.10.2 Liquid Effluent

No liquid effluent will be generated at the mine site. The domestic wastewater

generated will be sent to septic tanks followed by soak pits.

4.0 SITE ANALYSIS

4.1 Connectivity

4.1.1 Nearest Railway Station

Pamidi railway station is about 2.2 km distance towards SE from the mine

area.

4.1.2 Nearest Airport

Kempegowda International Airport is about 198 km distance from mine site.

4.2 LANDFORM, LANDUSE AND LAND OWNERSHIP

The notified area is Government land. It is barren with boulders and followed

sheet rock is exposed in the area and also sheet rock is seen in the surface

level with soil cover.

Page 18: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-10

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

4.3 Climatic data from secondary sources

The average annual rainfall is about 346.6 mm. The observed maximum

temperature is 380C in summer season and minimum temperature is 180C in

winter seasons. The rainfall does not disturb the mining activities.

5.0 PLANNING BRIEF

5.1 Planning Concept

The quarrying in the sanctioned area is of open cast method other than fully

mechanized mining method with drilling and blasting. The ROM will be sized and

sorted in the crusher established outside the quarry lease area loaded on to tippers

and tractors using JCB, Mining will be carried out by formation of benches of height

6 m each. Considering the technical parameters like surface topography, quality

variations, geo-technical aspects are required for production and extraction of

building material in the area. It is proposed to work from the deposit by adopting

benches formations with ultimate pit slope of 45°. The benches height and the width

will be maintained as specified by D.G.M.S. The width of the working benches shall

not be less than the height. The year wise production and development plan

indicates the site for disposal of waste, site for afforestation as shown in map. The

plan showing position of the working pit proposed for extension etc. Due care has to

be taken in designing the benches and advancing the benches for production. The

ground water table is much below the proposed working level.

5.2 Population projection

The project will employ mostly workers from nearby villages. There will not

be any increase in population due to the project.

5.3 Land use planning

The project site is Government land. There will be change in land use as the

material is excavated.

5.4 Assessment of Infrastructure Demand (Physical & Social)

Page 19: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-11

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

On the basis of the preliminary site visit, the infrastructure demand in the

villages was assessed on the basis of need and priority. The existing

infrastructure is satisfactory but the approach road has to be maintained

regularly.

5.5 Amenities/Facilities

Site Services like Work shed, First Aid, Drinking water as required will be

provided within the leased area.

6.0 PROPOSED INFRASTRUCTURE

6.1 Industrial Area (Processing Area)

No infrastructure is proposed.

6.2 Residential Area (Non Processing Area)

As the local persons will be given employment, no residential area/ housing

is proposed within the mining lease area.

6.3 Green Belt

Green belt will be developed along the boundaries of mine lease area.

6.4 Water Management

About 1.0 KLD will be required dust suppression and 0.5 KLD for greenbelt

purpose, 0.5 KLD is for processing, 1.0 KLD for Domestic use, therefore total

water requirement is 3.0 KLD. This water will be supplied from bore wells of

the nearby area.

6.5 Sewerage System

The domestic wastewater generated will be sent to septic tanks followed by

soak pits.

6.6 Industrial Waste Management

Not applicable.

Page 20: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

PFR-XII

PROJECT: Road Metal and Building Stone PRE-FEASIBILITY REPORT

APPLICANT: M/s. Sri Lakshmi Venkateswara Stone Crushers,

6.7 Solid Waste management

The waste generated which is about 5% will stacked outside the QL area for

feeding Crushers.

7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN

Not Applicable.

8.0 PROJECT SCHEDULE & COST ESTIMATES

The Total cost of project would be around Rs. 30 lakhs.

9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)

9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the

Local People Including Tribal Population, If Any, In the Area.

The extraction of the material will be done in open cast method other than

fully mechanized mining method with drilling and blasting. so local labour

will be used. Supporting ancillary facilities will help the local people once the

project commences.

***********

Page 21: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

ENVIRONMENT

MANAGEMENT PLAN

Page 22: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

ENVIRONMENT MANAGEMENT PLAN

Environmental Management Measures specific to the above subject mine are detailed

under the following heads

1. Air Environment

2. Noise Environment

3. Water Environment

4. Land Environment

5. Socio Welfare Measures

6. Occupation Safety and Health Measures

7. Budget for Environmental Protection/management Measures

1. AIR ENVIRONMENT

a) Sources of Air Pollution

Main pollution from the subject Mine is Dust/ Particulate Matter/ Fugitive dust.

The following are

activity:

the identified sources of emission of dust during mining

Line Drilling

Block cutting

Excavation

Dressing

Loading and Transportation

Dumping

Production per annum: 24214m3 (Avg annual Production)

Total Waste generation: 2421 m3 for 2 years.

(* Source Mining Plan)

b) Air Pollution Control Measures

The measures proposed for implementation are listed below

1. Water sprinkling will be done for dust suppression using Water Tankers having

provision of sprinkling on dump yards and haul roads will be used.

2. Dust Masks will be provided for the workers based on work area

Page 23: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

NOISE ENVIRONMENT

i) Sources of Noise

Noise produced from Mining operations is not continuous. The levels of noise are different based on the activity workers are exposed to.

Identified sources of noise from the mine are listed below.

Source of Noise

Drilling Operations

Blasting Operations

Dressing Operations

Machinery operation i.e. Excavator, Tipper movement

The mining operations will be carried out for one shift.

ii) Noise Protection Measures

Hearing protection devices (Ear plugs and ear muffs) will be provided to the drill machine operations and dumper drivers.

Development of greenbelt in the periphery of mine and all along the haul roads.

2. WATER ENVIRONMENT

i) Sources of Water Pollution

The area/activity which has potential resulting in water pollution are

identified and listed below:

Sources of Water Pollution

1. Water Consumption

2. Possibility of Siltation from waste dump yard

3. Ground water level

ii) Water Consumption

Water consumption in the mine is mainly in the following areas and is

estimated to be 3.0KLD @ day. Water will be sourced from local villages.

Water balance is given below

Page 24: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

Water Balance (3.0 KLD/day)

Water Requirement

Total Requirement

(KLD) Dust suppression 1.0 Greenbelt Development 0.5 Domestic Usage 1.0 For Processing 0.5

Total Water Requirement(KLD) 3.0

3.1 Water Pollution control Measures

The following water pollution control measures will be implemented to minimize

impacts due to the above listed issues

Waste Water generation

The only wastewater generation from the Mine is from domestic use. Septic tank

followed by soak pit will be provided for treating the domestic wastewater

4. LAND ENVIRONMENT

I) Areas of Considered

The Identified aspects which can cause impact due to mining operations are

listed below

Land Use

Solid waste generation

Transportation

Green belt

Land Use:

The category of the mining lease area is Government land which is covered with

shrubs.

Solid Waste generation:

Solid waste generation from the mine in the next five years and for the lease period of

mine is given below

Page 25: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

Solid Waste generation - m3

Next Two Years

Waste 2421

Transportation

Transportation activity within the mining lease area is mainly for transportation of

overburden by tippers from the mine pit to crusher units. The length of the haulage

road is approximately 90 m and varies with progress/ increase of mine area.

Green belt Development

As per the conservation of Mineral and Mines Act, it is required to leave a barrier of

0.7 m width all along the mining lease area and all along haulage roads.

I) Land management Measures

A) Solid waste management

The ROM will be fed in to crusher established outside the applied QL area where it

will be crushed to desired sizes and utilized for state highway project from Pamidi to

Bangalore road.

5. SOCIAL WELFARE MEASURES

The mine will provide employment to 34 persons and equal number of persons will

be employed indirectly for transportation and other activities. Local persons will be

given preference.

6. OCCUPATIONAL HEALTH MEASURES

Fugitive dust, noise and fines may affect the health of workers. Safety of employee

during operation will be taken care as per mine regulations act 1961. To avoid any

adverse effects on the health of workers due to dust & noise, the following measures

will be implemented:

Provision of rest shelters for mine workers with amenities like drinking

water, fans, toilets etc.

Dust suppression of haul road.

First - Aid facilities within lease area.

Height, slope and width of dump development as per the approved

Mining plan.

Page 26: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –

Regular medical examination for the employees.

7. BUDGET FOR ENVIRONMENT MANAGEMENT PLAN Total cost for the proposed project is 30 lakhs. Budget allocated for EMP is 2.5 Lakhs

(Capital Cost), 1.30 Lakhs (Recurring Cost).

----------- x x x x -----

Sl no

Work name

Total fixed cost Maintenance/ recurringing cost with periodicity

1 Safety shoe - 5,000

2 Helmet - 3,000

3 Hand gloves - 1000

4 Ear plugs - 500

5 Cloth for protection

from dust

-

2,000

6

Dust Masks

-

4,500

7 Water sprinkling 2,30,000 20,000

8 Green belt

establishment

20,000

13,000

9 Medical examination - 1,000

10 Environmental

Monitoring

-

40,000

11 Social welfare

measures

40,000

Total 2,50,000 1,30,000

Page 27: Road Metal & Building Stone Mine of M/s. SRI LAKSHMI ...environmentclearance.nic.in/writereaddata/Online/TOR/01...Pamidi Railway Station –2.2 km (SE) NH-7 (Gooty –Anantapur) –