riggin down questions final

1
1. When does the rigging down begin? When all the drilling and cementing activities has been finished. 2. What is the rigging down about? It’s about the disassembled and moved of the rig and its parts. 3. What is the equipment that is important to inspect before starting the rigging down process? The hoisting line, slings, chains, hooks and cables. 4. The rigging down ends when all the drilling and cementing activities is starting. TRUE FALSE 5. Stairs should be placed as soon as possible and taken down as late as possible. Once placed he stairs should be secure against movement. TRUE FALSE

Upload: jafet-ismael-aguilar-colodro

Post on 14-Dec-2015

220 views

Category:

Documents


0 download

DESCRIPTION

¿¿¿¿¿a un público mayoritariamente masculino¿uivocó en afirmar que tener una buena relación es un paso crucial hacia la acumulación de riquezas.

TRANSCRIPT

1. When does the rigging down begin?

When all the drilling and cementing activities has been finished.

2. What is the rigging down about?

It’s about the disassembled and moved of the rig and its parts.

3. What is the equipment that is important to inspect before starting the rigging down process?The hoisting line, slings, chains, hooks and cables.

4. The rigging down ends when all the drilling and cementing activities is starting.

TRUE FALSE5. Stairs should be placed as soon as possible and taken down as late as possible. Once

placed he stairs should be secure against movement.TRUE FALSE