RIAP Welding Service s.r.l.
Company Overview
Page 2
Company Detail
RIAP Welding Service s.r.l. is an Italian private mechanical construction Company, specialized
in prefabrication/erection of piping, steel structures and equipment (rotary and static) erection and
Pipelines.
The strength of having many years of business experience, technical knowledge and Project
Management capabilities to offer a product that can satisfy variety of Client need in all industrial
fields.
In details RIAP performs and completes Projects in the fields of OIL & GAS,
PRETROCHEMICAL, CHEMICAL and POWER PLANT, respecting the Clients schedules, Safety
and Quality requirements.
History
Estabilished in 2007 by 25 years experience Management group, with defined values and objectives,
RIAP Welding Service s.r.l. is a young but very active and enterprising Company, always looking for
new Clients, to demostrate the technial capacity of its Management and Staff to carry out every Project
in the best way.
In 2011 the Company obteined the relevant Certification ISO 9001
In 2015 he Company obteined the relavant Certification SOA OG6 3° Bis (Public Procurement)
Our goal is to pursue the satisfaction of our Customers.
Our main values are:
Health, Safety and Environment
Quality
Reliability
Timing
Clarity and Intregrity
Ethics
Page 3
What we do today (1)
We are specialized in execution of Mechanical Works:
• Green Field
• Brown Field
• Modularization
• Pipelines
Piping Works:
Piping Fabrication (Carbon steel, Alloy steel, Stainless steel)
Pipe Supports Supply & Fabrication
Piping Erection
Pipe Supports Erection
Page 4
What we do today (2)
Page 5
Steel Structures:
Steel Structures Erection (Heavy, Medium, Light)
Metal sheets and Cladding Erection
Steel Structures Modularization (modules & Skids)
What we do today (3)
Page 6
Equipment:
Static Equipment Erection (Vessels, Columns, Exchangers, etc…)
Machines Erection (Pumps, Compressors, etc….)
Equipment Internals (trays)
Page 7
WHAT WE DO TODAY (4)
Pipelines
Topographic Measurements
Excavations
Wrapping Application
Pipe Laying
Backfilling
Hydraulic Test
Cathodic Protection
What we do today (5)
Page 8
We are also able to manage other activities using specialized Subcontractors as listed below:
NDE and PWHT
PAINTING
INSULATION (Hot & Cold)
SCAFFOLDING
HEAVY LIFT
STEEL STRUCTURES FABRICATION
ELECTRICAL and INSTRUMENTATION
Our Vision
Page 9
Competencies Leaderships
Strategies Values
Experiences gained in previous
Project combined with
technological innovation.
Staff able to manage all type of
Project in terms of complexity.
Provide a complete service by
Developping innovative technical
Solutions.
Extraordinary achievements
attained by providing high-level
Performance.
Assuring the maximum
performance in Quality, health,
Safety and Environment
We add our vision to Projects
Facilities
Page 10
SICILY – With two fabrication facilities RIAP Welding Service s.r.l. has the logistical advantage to
serve the needs of Clients. Our Workshops in the East Coast of Sicily, next to the important
Petrochemical area, enable to produce any type and materials of piping fabrication giving the
possibility to contain costs, to performe the works according to project schedules with assuring the
maximum performance in QUALITY and HSE.
Also in the same area there is the possibility of using highly specialized subcontractors to perform
activities related to piping fabrication, as below:
NDE & PWHT activities
PAINTING activities (all type of paint systems incl. TSA)
Workshop dimensions:
1°Workshop: «Covered Area Sqm 3.800» «Open Area Sq 7.500» «Offices Sqm 220»
2°Workshop: «Covered Area Sqm 1.600» «Open Area 10.000» «Offices Sqm 150»
Working Capacity
Page 11
Working Capacity of Piping on yearly basis
FABRICATION
ERECTION
PAINTING (Subcontractor Capacity)
INSULATION (Subcontractor Capacity)
About 1.200 Tons
About 700 Tons
About 45.000 Sqm
About 28.000 Sqm
Page 12
Employees
Head Office:
N°1 - General Manager
N° 4 - Managers
N°3 - Tech. Engineers
N°2 - Administrative
N°1 – Warehouseman
N°1 - Secretary
Management & Staff:
N°2 – Site Managers
N°2 – Workshop Managers
N° 4 - Supervisors
N°6 – Technical Officers
N°6 – QA/QC Officers
N°2 – Welding Inspectors
N°2 – HSE Coordinators
N°2 – Safety Supervisors
Direct Manpower:
N°10 – Foremen
N°30 – Pipe Fitters
N° 30 - Welders
N°10 – Erectors
N°15 Steel Struct. Erectors
N°6 – Crane Operators
N°3 – Truck Drivers
N°2 – Electricians
N°55 – Helpers
RIAP Welding Service s.r.l. is a very flexible company that adapts to the needs of its Clients,
always using highly specialized and experienced personnel.
Page 13
CONSTRUCTION EQUIPMENT
We are able to support from 350.000 to 500.000 construction direct man hours
Our Equipment include:
• Cranes
• Pick-up
• Trucks
• Manitoo/Fork-Lift
• Electrical Welding Machines
• Motor Welding Machine
• Generators
• Compressors
• Motor Pumps
• Buses
• Etc…………
Page 14
Safety
INITIAL
ASSESSMENT
COMPANY
POLICIES
INTEGRATION WITH THE
INDUSTRIAL PROCESSES
(Productivity, Budget, etc…..)
SENSITIZATION
PLANNING
INTERVENTIONS
PLANNING &
ORGANIZATION
RISK
ASSESSMENT
REVIEW &
IMPROVEMENT
MONITORING
Page 15
Safety Company Performance
«SAFETY FIRST» is the Company goal. Safety is our first thought.
DescriptionYear
2018
Year
2017
Year
2016
Lost Workday cases (LWDC - number of events) 0 0 0
Lost Workdays (number of work-days lost) 0 0 0
Lost Time Injuries (LTI) = Fatality + LWDC 0 0 0
Restricted Workday Cases (RWDC - number of events) 0 0 0
Medical Treatment Cases (MTC - number of events) 0 0 0
Total Recordable Injuries (TRI) = LTI + RWDC + MTC 0 0 0
FAC (First Aid Cases) 0 0 0
NM (Near Misses High-Potential) 0 1 1
Page 16
Quality
COMPANY
POLICIES
PROCEDURES
CONTROL PLANS
QUALITY PLANS
QUALITY MANUAL
INSPECTIONS &
CONTROLS
RECORDING &
ARCHIVING
CONTINUOUS
IMPROVEMENT
Page 17
Company Growth
Five years Turnover
Page 18
Project References (1)
ContractorMain Contractor/
EngineeringFinal Client Project Country Year
Value€
DirectMan Hours
N.A.KT-Kinetics
Technology - ItalyENI/PETROBEL
EgyptZOHR Supply SRU
Phase-2Workshop
Italy2018 2.500.000 61.000
SIM S.p.A.KT-Kinetics
Technology - ItalyENI/PETROBEL
EgyptZOHR Supply SRU
Phase-1Workshop
Italy2016/2017 1.300.000 58.000
SIM S.p.A.Heurtey Petrochem
France
TOTAL RefineryNormandy-
France
UGO-2011N°2 Steam
Crackers Furnaces
Workshop Italy
2013/2014 760.000 33.500
SIM S.p.A.KT-Kinetics
Technology - ItalyTOTAL Refinery
Normandy-France
TOTAL RN 2012 «D11 Zone 2»
Workshop Italy
2012 375.000 13.900
SIM S.p.A. Technip GermanyEKB GmbH &
CO KG
VIKING AGF LOT 300
«Gas Storage»
Workshop Italy
2010/2011 520.000 22.700
SIM S.p.A.Foster Wheeler
France
POLIMERI EUROPA
Dunkerque-France
DNK-L51 «Swing LDPE/EVA»
Workshop Italy
2010 850.000 36.500
SIM S.p.A.STF S.p.A.
ItayEDF
CTE-West Burton UK
Workshop Italy
2009/2010 470.000 20.300
Project - «Only Piping Fabrication»
Page 19
Project - «Complete Mechanical Works»
Project References (2)
ContractorMain Contractor/
EngineeringFinal Client Project Country Year
Value€
DirectMan Hours
SIM S.p.A.KT-Kinetics
Technology - ItalyENI/PETROBEL
EgyptZOHR Supply SRU
Phase-1Italy 2016/2017 1.200.000 46.500
MAX StreicherS.p.A.
STOGIT S.p.A. -Italy
STOGIT S.p.A. -Italy
Gas Storage Field –Bordolano
Italy 2014/2015 2.900.000 70.000
N.A.IG O&M S.p.A. -
ItalyRWE S.p.A. -
ItalyBiomass Power Plant
- EnnaItaly 2012/2013 1.800.000 46.500
Page 20
Project - «Pipelines» (1 of 3)
Project References (3)
ContractorMain Contractor/
EngineeringFinal Client Project Country Year
Value€
DirectMan Hours
SALP S.p.A. SAIPEMSNAM
Rete Gas
Pipelines 20’’ & Gas MeasurementSystem – Mazzara
del Vallo
Italy 2014/2015 400.000 9.850
MAX StreicherS.p.A. SAIPEM STOGIT
New Distribution Node of Minerbio
and VariantGA.ME.A.
Italy 2014 100.000 2.500
SALP S.p.A. SGISNAM
Rete Gas
Strenghthening of the Gas Network of the South-Western
Dorsal (Paliano-Reggente)
Italy 2014 200.000 5.500
SALP S.p.A. SAIPEMSNAM
Rete Gas
Pipelines 56’’ Zimella –
Cervignano D’Adda (DP 75 Bars – Lot 1)
Italy 2013/2014 600.000 15.800
N.A.IG O&M S.p.A. -
ItalySNAM Rete Gas - Italy
Esso Italiana Pipelines-Augusta
Italy 2013 300.000 8.500
Page 21
Project References (3)
Project - «Pipelines» (2 of 3)
ContractorMain Contractor/
EngineeringFinal Client Project Country Year
Value€
DirectMan Hours
IMPRESA TRE COLLI S.p.A.
TECHFEMSNAM
Rete Gas
Pipelines 30’’/36’’ Potenziamento
Allacciamento A2A Milano - Triulza
Italy 2017 800.000 20.200
IMPRESA TRE COLLI S.p.A.
SAIPEMSNAM
Rete Gas
Strenghthening of Gas CompressionStation – Poggio
Renatico
Italy 2016/2017 900.000 22.800
IMPRESA TRE COLLI S.p.A.
TECHNIPSNAM
Rete GasGas Pipeline Biccari -
NapoliItaly 2012 600.000 15.300
IMPRESA TRE COLLI S.p.A.
SNAM PROGETTI
SNAMRete Gas
Pipeline Massafra -Biccari
Italy 2010 500.000 12.400
Page 22
Project References (3)
Project - «Pipelines» (3 of 3)
ContractorMain Contractor/
EngineeringFinal Client Project Country Year
Value€
DirectMan Hours
SICIM S.p.A.PLUS
PETROLPLUS
PETROL
Pipeline for Castanha Field
Production FacilitiesProject
Angola 2012 400.000 13.500
SICIM S.p.A. OBC OBCOil Pipeline for OBC
ProjectColombia 2011 100.000 2850
SICIM S.p.A.ODE/DORIS
ENGGINEERING
TOTAL –Shetland Islands
Laggan TormoreProject
Shetland Islands - UK
2011 300.000 6.800
SICIM S.p.A. ENEGAS SA ENEGAS SAGas Pipelines Lorca-
Chinchilla Tramo Norte
Spain 2009 300.000 7.200
Page 23
Major Client List
Page 24
Contacts & Company Informations
Company Contacts
Head Office: Via Crispi N°4, 96010
Melilli (SR) Italy
Tel. N°: +39 0931 95 16 74
Fax N°: +39 0931 55 01 44
E-mail: [email protected]
Web Site: www.riapsrl.it
Company Informations
VAT N°: 01584220899
Tax Code: 01584220899
C.C.I.A.A.: 01584220899 2007
Ins. Pos: INPS 7604235245
Banks: Banca Agricola Popolare di
Ragusa, Melilli Office
Your Mechanical Works Provider