rex miller e-rate update fall/winter 2013. introduction e-rate requires ongoing attention todays...

22
Rex Miller E-Rate Update Fall/Winter 2013

Upload: abby-tandy

Post on 30-Mar-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Rex Miller

E-Rate UpdateFall/Winter 2013

Page 2: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Introduction

E-Rate requires ongoing attention• Today’s session is focused on the E-Rate filing window and

approval process• Seek out experienced assistance

• Some errors are still difficult to correct• Contradiction leads to denial• Get it right the first time

Filing season is near – key items to note:• Deadline – just set this week – March 26, 2014

Q & A• At the end of the presentation• ENA is available at your convenience

Page 3: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

ENA Background

Customer service and education focus• K-12 customized service• E-Rate expertise

• E-Rate Program Service Provider since Year 1 (1998)• Experienced E-Rate team

• Rex Miller, April Scott, Kris Vivrette, Madeline Dusenberry, Ward Chaffin

E-Rate Service Provider Leader • A Top-10 E-Rate Service Provider• Over $500M in E-Rate funded• $130M+ in 2013 E-Rate filings

Page 4: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate in a Slide

$2.3 Billion Technology Matching Program• Run by FCC and its “agent” SLD• Paid for by Universal Service Fees – not by Congress• Administered differently than other education programs – more like IRS

audit

Eligible service to eligible sites for eligible users• Priority 1 – Telephone and Internet• Priority 2 – Internal Connections/Basic Maintenance• Schools, Libraries and Admin Sites can be eligible• Typically K-12 students, teachers and admin

Annual application process• Technology Plan may be required as starting point if P2 funds requested• Open procurement run by state/local• Annual funding form (471) listing amount, vendor and matching %

• Matching % based on Free/Reduced Lunch info• Detailed forms and deadlines required every step of the way

Funds Flow – reimbursement (BEAR) or vendor discount (SPI)

Documentation – if not kept, funds can be denied or revoked/recovered

Page 5: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Annual Timeline - Recurring

Fall• Update Technology Plan (if needed)• Do procurements for new services if needed (form 470)• FCC updates Eligible Services List• FCC sets application deadline

Winter• Complete Funding Application (471) by deadline – March 2014• Begin responding to Application questions (PIA)

Spring• Get Tech Plan Approval Letter (if needed)• Receive Funding Commitment (FCDL)• File Service Start and CIPA Compliance Form (486)

• Required before vendor can bill SLD

Summer• Complete installation of new services• Begin receiving bills for services – continuing

• Begin filing reimbursement forms (BEAR 472) if applicable

Page 6: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate News

Window dates have been set

• Opening January 9, 2014

• Closing March 26, 2014

• Similar to last year

Growth in Priority 1 funding requests

• Rising above funding cap

• Funding reforms/ConnectED/E-Rate 2.0/NPRM Lots of ideas – unlikely to impact ’14-15

• Still enough funds for P1 – but getting tight

• P2 funding unlikely to be available – or only 90%

Eligible Services List issued for ’14-15• Very little change from ’13-14

• Web hosting – eligibility of ancillary components

• Dark vs. lit fiber – construction charge eligibility

Page 7: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

SLD Training Topics

FCC Appeal Order related to RFPs: • Relates to 470s that do not have an RFP (box not checked)

• If any additional information is made available only to entities that contact the applicant, the FCC may deem that to be an “RFP”

• If you have an “RFP” and do not check the RFP box on the 470, you will be denied funding

• This is a difficult area for many districts as “RFP” typically has a very specific meaning in local/state procurement law

• Best practice: consider the term “RFP” on the 470 to mean any written information describing services to be procured that is not included on the 470

If you are providing interested vendors with additional information – via your website or a written document – check the RFP box to protect yourself

If you only have conversations with those that call or e-mail, you are likely OK

Use of multiple providers – application of cost-effective rule• Applicants cannot award an RFP to multiple providers for the same service at

different costs

• SLD has indicated that using multiple providers for services such as web hosting or cell phone service might be considered ineligible

Page 8: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Tips and Notes

E-Rate requires ongoing attention

• Consider the cost/benefit of how your district does E-Rate filings• Do you have an internal expert on E-Rate? Is it the right

person?• E-Rate is only as good as the foundation

• Must follow rules for tech plan and 470/procurement to get funding

• If a procurement is canceled, cannot reuse original 470• Need a new one!

• Don’t let your district be an island• Seek out experienced assistance

• Some errors are still difficult to correct• Contradiction leads to denial• Get it right the first time

Page 9: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Tips 2014

Open eligibility items

• Free devices with purchase of eligible service Cell phone is eligible if offered for free to public VoIP phone, laptop, handheld device, etc. – not currently

eligible Separate NPRM issued – FCC intends to close this loophole

beginning ’14-15

• Wireless access points On-premise managed wireless access points currently

ineligible• Under further FCC review• Mentioned heavily in NPRM

• Use of different technologies for same purpose creating E-Rate inconsistency

Page 10: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Tips 2014

Form 470• New FCC guidance – applicants will no longer be penalized for choosing the

wrong Priority 1 category on their 470 470 Form is changing Still need to select the right category on the 471 – Telecom or Internet

Access• Flexibility is valuable – consider both P1 categories• If you want a multi-year contract, consistency is key

Make sure your 470, RFP or other bid documents and contract are consistent

Cannot add renewal options after initial 470/contract process• FCC Order – “and equivalents”

Cannot list a brand name but can list “brand name and equivalents”

PIA review• Remember to answer their specific questions

Providing extra information creates more work for all parties The SLD must review everything you send them

• Communicate in writing with PIA Phone calls have no record and can result in misunderstandings with

SLD

Page 11: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Rulebook Break

Page 12: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

NPRM – Modernizing E-Rate

FCC issued very extensive NPRM with hundreds of topics about modernizing the program

• Newly appointed FCC Chairman Wheeler is a new element to this process

Topics included: • Broadband goals and measurement• How to lower cost of service – with a presumption perhaps that schools

can’t• Potential reset of priority system• Potential development of separate fund to promote fiber ownership• Consideration of eliminating E-Rate for voice service or traditional

voice service• How to get more funding for internal connectivity to devices used at

schools – wireless access points, switches, etc.• Program funding levels• Discount matrix• Streamlining program administration• And many more minute details

Page 13: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

NPRM – Modernizing E-Rate

FCC received over 1,000 different sets of comments and reply comments

• Many were one-pagers supporting increased funding or web hosting

Differing opinions on many levels in the comments

Some comments seemed to have universal support including:• Delivery of BEAR payments direct to applicant• Moving more E-Rate forms and information online• Consideration of multi-year contract 471• Streamline E-Rate processes to issue funding decisions quicker• Retain flexibility of the applicant to select their provider

Given that the FCC has released the ESL for ’14-15, we do not expect the NPRM to impact ’14-15

• Be alert for potentially dramatic changes for ’15-16

Page 14: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

New Forms – 470 & 471

Changes to 470 and 471 are pending review by OMB

Form 470 – Combines Telecom and IA into one category

Form 471 – Block 2 data moved to Block 5 and focuses on broadband

• Information consistent with Item 21 Attachment• Work with your service provider as needed to fill that information

out correctly• Likely to be used like Item 21 Attachment in testing invoices

Form 471 – formally establishing that Item 21 Attachment is due by filing deadline

Page 15: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

FCC

Page 16: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Streamlining and Simplifying

Technology Plans

• New requirements apply for FY 2011 and beyond

• No longer required for:– Priority 1 (Telecom and Internet Access)

• Still required for:– Priority 2 services (Internal Connections and Basic Maintenance of Internal

Connections)

• ENA comment: make sure you keep your Tech Plan and Approval Letters from prior years in case you are audited

Page 17: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Tips to Eliminate E-Rate Surprises

Make sure you have a solid E-Rate team – internal/external• Staffing changes are key

Make sure documentation is transferred• Consider an E-Rate update report with deadlines and plans – perhaps quarterly

E-Rate information requests – PIA, audits and other – develop consistent process to evaluate, understand and reply with the district’s best answer

• Recognize that SLD role is to prevent ANY inappropriate release of E-Rate funding

• Their role is not to help you get or use the E-Rate funds – different than other programs

Gift rules tracking and compliance

Stay updated on approval status each year• Don’t get surprised by a funding denial after the start of the service year

Procurement – make sure you are comfortable that the process is simple and compliant and be ready for an audit

Documentation – make sure the files are complete and up to date

E-Rate rule updates need to be tracked and implemented in a timely manner

Page 18: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

471 Timing

Page 19: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

E-Rate Timing Soapbox

E-Rate continues the trend of the later closing of filing window in March

Strongly encourage applicants who want to get approved before July 1 to file their 471s as soon as possible

• Target mid-February at the latest

PIA will likely start for you before the 471 filing window is closed, so be ready

Advantages• Earlier approval• No last-minute rush to file• If you have an error, you can file another 471 before filing

deadline and cancel initial incorrect filing – probably easier than using RAL process

Page 20: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Resources

Contact ENA• Rex Miller – [email protected]• April Scott – [email protected]• Kris Vivrette – [email protected]• Ward Chaffin – [email protected]• Madeline Dusenberry – [email protected]

SLD News Brief – make sure your are signed up for these e-mails

• Go to the SLD website’s training section to sign up• Key info provided during E-Rate window and throughout the year

Websites • SLD – main E-Rate rule site – training/WebEx • 2013 fall training materials are available and valuable

http://www.universalservice.org/about/tools/TrainingArchive/Default.aspx?div=3

• www.universalservice.org/sl/

Page 21: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

Happy Holidays & Happy E-Rate Season!

Page 22: Rex Miller E-Rate Update Fall/Winter 2013. Introduction E-Rate requires ongoing attention Todays session is focused on the E-Rate filing window and approval

www.ena.com@ENAconnects ⎜ facebook.com/ENAconnects

Contact ENA TodayRex Miller

[email protected] - 615.312.6000