3
Level 0 - Ground 0 Level 1 - First 4500 1 2 3 4 5 Level 2 - Second 9000 Level 3 - Roof 13500 5000 5000 5000 5000 3 Sheet 3 Level 0 - Ground 0 Level 1 - First 4500 A B C D E Level 2 - Second 9000 Level 3 - Roof 13500 4 Sheet 1 5000 5000 5000 5000 N Level 0 - Ground 0 Level 1 - First 4500 1 2 3 4 5 Level 2 - Second 9000 Level 3 - Roof 13500 6 Sheet 1 5000 5000 5000 5000 3 Sheet 3 Scale Checked by Drawn by Date Project number As indicated 22/04/2016 18:22:59 Elevations, Section, and Site A202CAB Coursework Coventry University 22/04/2016 Elliot Heeley Paul Smith Sheet 1 1 : 100 South 1 1 : 100 East 2 1 : 500 Site - True North 3 1 : 100 Section Cut 4 Stairs 5 1 : 20 Balcony Railing 6

Upload: elliot-heeley

Post on 21-Feb-2017

189 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: Revit buliding

Level 0 - Ground

0

Level 1 - First

4500

1 2 3 4 5

Level 2 - Second

9000

Level 3 - Roof

13500

5000 5000 5000 5000

3

Sheet 3

Level 0 - Ground

0

Level 1 - First

4500

ABCDE

Level 2 - Second

9000

Level 3 - Roof

13500

4

Sheet 1

5000 5000 5000 5000

N

Level 0 - Ground

0

Level 1 - First

4500

1 2 3 4 5

Level 2 - Second

9000

Level 3 - Roof

13500

6Sheet 1

5000 5000 5000 5000

3

Sheet 3

Scale

Checked by

Drawn by

Date

Project number

As indicated

22/0

4/20

16 1

8:22

:59

Elevations,Section, and Site

A202CAB

Coursework

CoventryUniversity

22/04/2016

Elliot Heeley

Paul Smith

Sheet 1

1 : 100South1

1 : 100East2

1 : 500Site - True North3

1 : 100Section Cut4

Stairs5

1 : 20Balcony Railing6

Page 2: Revit buliding

UP DN

UP DN

-

-

Sheet 12

Sheet 1

1

- -

A

B

C

D

E

1 2 3 4 55000 5000 5000 5000

5000

5000

5000

5000

A

B

C

D

E

1 2 3 4 5

A

B

C

D

E

1 2 3 4 5

A

B

C

D

E

1 2 3 4 5

Scale

Checked by

Drawn by

Date

Project number

As indicated

22/0

4/20

16 1

8:20

:09

Plans, and 3DViews

A202CAB

Coursework

CoventryUniversity

22/04/2016

Elliot Heeley

Paul Smith

Sheet 2

1 : 200Level 0 - Ground1 1 : 200

Level 1 - First2 1 : 200Level 2 - Second3

Reception Desk With Hole For Column7

1 : 200Level 3 - Roof4

1 : 13D Render6

1 : 1Perspective Render5

Page 3: Revit buliding

Level 0 - Ground

0

Level 1 - First

4500

1 2

Level 2 - Second

9000

Level 3 - Roof

13500

2Sheet 3

3

Sheet 3

1

45mmFiberglassInsultaion

Bricwork

Level 0 - Ground

0

Level 1 - First

4500

A

4Sheet 3

A

90mm RigidThermal Insulator

65mmConcrete

Scale

Checked by

Drawn by

Date

Project number

As indicated

22/0

4/20

16 1

8:20

:39

Details

A202CAB

Coursework

CoventryUniversity

22/04/2016

Elliot Heeley

Paul Smith

Sheet 3 1 : 50Detail 1 Location1

1 : 20Detail 12

BoltedL-Angle

Connection

1815 x 2659mmWindow With

Frame

UC 305x305x97Concrete Column

50mmAir Cavity

100mm ConcreteWall Layer

12.5mmPlaster

UB 457x152x82Steel Beam

30mm OakFloor

65mm Concrete

125mmConcrete

90mm ThermalInsulation

1 : 50Detail 2 Location3

1 : 10Detail 24

Concrete Slab Edge

1500mmHardcore

50mmSand

125mmConcrete

100mmConcrete

Wall

12.5mmPlasterBrickwork

45mmFiberglassInsulation

50mmAir Caverty