Revision of DOE-STD-1189-2008,
Integration of Safety into the Design Process
Pranab Guha, DOE/ AU-31
Office of Nuclear Safety Basis & Facility Design
March 2015
1
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Reason for Revision
2
5-year periodic review required per DOE Order(O) 252.1A,
Technical Standards Program
A critical supporting standard for the following
directives/standards, all of which have been revised since 2008
• DOE O 413.3B, Program and Project Management for the
Acquisition of Capital Assets, 11-29-2010
• O 420.1C, Chg 1, Facility Safety,
• DOE-STD-3009-2014, Preparation of Nonreactor Nuclear
Facility Documented Safety Analysis
Secretarial commitment in DOE Implementation Plan, dated
Sept 26, 2011, in response to DNFSB Recommendation 2010-1
Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Actions Completed
3
Conducted 13 conference calls and meetings with DOE
Program Offices, sites and contractors – collected their
experiences in using STD-1189:
• What’s working
• What’s not working
• What improvements would be helpful
Developed objectives for the revision based on these meetings
Developed Project Justification Statement (PJS)
PJS received concurrence by all organizations
Developed list of team members to support revision
Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Scope of Revision
4Office of Environment, Health, Safety and Security
Provide consistency with DOE O 420.1C.Chg.1, DOE O 413.3B,
STD-1020-2012, and STD-3009-2014
Evaluate Appendices A, B, C, and D for potential relocation to
more appropriate technical standards or handbooks
Update format to be consistent with industry codes and
standards
Clarify requirements for change control of safety design
documents and support of the critical decision milestones
Clarify requirements for identifying ‘major modification’ projects
Streamline format of CSDR and PDSA to be in-line with DSA
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Scope Details
Provide consistency with DOE O 420.1C. Chg 1,
DOE O 413.3B, STD-1020-2012, STD-3009-2014:
• Significant changes were made in above listed directives
since DOE-STD-1189 was issued, such as, requirements
for confinement ventilation systems, Fire Protection,
NPH design, use of industry codes and standards,
hazard analysis, co-located worker safety, chemical
safety, defense-in-depth, and critical decision processes.
5Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Scope Details, cont.
Evaluate Appendices A, B, C, and D for potential
relocation to more appropriate technical
standards or handbooks:
• Intent is not to duplicate requirements; DOE-STD-1189
will focus on ‘design process requirements’, not ‘design
requirements’ or ‘safety analysis requirements’.
• Many of the requirements in Appendices A-D are
addressed in DOE O 420.1C. Chg 1, DOE-STD-1020 and
DOE-STD-3009.
6Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Scope Details, cont.
Update format to be consistent with industry
codes and standards:
• Any revision to DOE standards should follow industry
practices
• Clear requirements statements
• Separate requirements and guidance
7Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189
Scope Details, cont.
Clarify requirements for change control of safety design
documents and support of the critical decision milestones
• Provide flexibility with CD process vs. design status
• Provide guidance for combined CD-2/3
Clarify requirements for identifying ‘major modification’
projects
• Use of graded approach for documentation requirements
and design process
• Evaluate DOE approval process
Streamline format of CSDR and PDSA to be in-line with DSA
• Possible use of DOE-STD-3009 DSA format for CSDR and
PDSA would make the process more efficient
8Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
Writing Team
9Office of Environment, Health, Safety and Security
Name Organization E-mail Telephone Number
Pranab Guha AU-31 [email protected] 301-903-7089
Chris Chaves AU-31 [email protected] 301-903-5999
David Compton PEC [email protected] 202-586-1034
P.K. Niyogi NE-31 [email protected] 301-903-2421
Bob Lowrie URS [email protected] 803-502-9635
Brad Evans PNNL [email protected] 509-371-7386
Kevin Kimball Y-12 [email protected] 865-576-6675
Andrew Vincent SRS [email protected] 803-557-9989
Charles Maggart DOE-ID [email protected] 208-526-1701
William Shields PEC [email protected] 540-692-1590
DOE-STD-3009-2014 Roll-outAU
Review Team
10Office of Environment, Health, Safety and Security
Name Organization E-mail Telephone Number
Ruben Sanchez MA-63 [email protected] 202-586-7581
Roland Frenck NA-APM [email protected] 301-903-2255
Kim Loll NA [email protected] 301-903-6369
Kim Davis-Lebak FMC/LASO [email protected] 505-667-5105
Carol Sohn SC [email protected] 509-375-2320
Chip Lagdon CNS [email protected] 202-586-0799
Bob Nelson EM-41 [email protected] 509-376-8800
Tom Temple SRS [email protected] 803-208-8772
Kelli Markham NE-3 [email protected] 301-903-9252
Chris Honkomp EM Projects [email protected] 202-586-8162
Bob Boston DOE-ID [email protected] 202-526-8932
Jim Goss DOE-NPO [email protected] 865-574-4335
Mark Mitchell EFCOG/LLNL [email protected] 925-422-8600
Robert Miklos INL/NLDC [email protected] 208-533-7760
Jim O’Brien AU-30 james.o'[email protected] 301-903-1408
DOE-STD-3009-2014 Roll-outAU
Responsibility of Review Team
Will play an important role providing guidance and advice
based on their accumulated knowledge to ensure the revised
Standard will be an effective tool for project success
Will review/comment on pre-RevCom versions
Will participate in RevCom review and comment
Will help resolve issues that emerge during DOE-wide
review, as requested
11Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
DOE-STD-1189 Revision
Schedule
Kickoff meeting – October 2014
1st draft to Review Group – April 2015
Pre-RevCom review – September 2015
RevCom release – November 2015
Issue final DOE-STD-1189 – November 2016
(Schedule dates are based on issuance date of DOE-STD-3009-2014
by November, 2014)
12Office of Environment, Health, Safety and Security
DOE-STD-3009-2014 Roll-outAU
Proposed New Format and
Current Status
Proposed new format:
Sec. 1 – Introduction (Scope and Applicability)
Sec.2 – Acronyms and Definitions
Sec.3 – Project Management
Sec.4 – Integration of Safety into the Design Process
Sec.5 – Integration of Safety into Facility Modification
Sec.6 – References
App A – Overview of Project Management and Safety-In-
Design Process
13Office of Environment, Health, Safety and Security