Repairs, Retrofits & Upgrades – What is TxDOT’s & FHWA’s policy Necessary Information – What information
does a designer need? Examples
![Page 3: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/3.jpg)
Repairs, Retrofits & Upgrades
![Page 4: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/4.jpg)
October 11, 2011 Michelle L. Romage-Chambers, P.E.
TxDOT & FHWA Policy
Project Specific Requirements
![Page 5: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/5.jpg)
Project Types
2R & Maintenance – Non freeway resurfacing or restoration projects that are not on the national system 3R- The scope varies from minor safety
improvements to more complete rehabilitation projects 4R- Reconstruction or New construction
projects
![Page 6: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/6.jpg)
Governing Specifications
MASH – AASHTO Manual for Assessing Safety Hardware NCHRP Report 350 – National Cooperative
Highway Research Program NCHRP Report 230 – National Cooperative
Highway Research Program
![Page 7: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/7.jpg)
Preventative Maintenance & 2R
Replacement with a bridge railing meeting MASH or NCHRP Report 350 is recommended but not required Must meet minimum height requirement
shown in the Bridge Railing Manual Existing railing that does not meet the height
standard or MASH or NCHRP Report 350 must be upgraded
![Page 8: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/8.jpg)
3R, Not Widened & No work affecting Existing Railing
Replacement with a bridge railing meeting MASH or NCHRP Report 350 is recommended but not required Must meet minimum height requirement
shown in the Bridge Railing Manual Existing railing that does not meet the height
standard or MASH or NCHRP Report 350 must be upgraded
![Page 9: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/9.jpg)
3R, Widened and/or Work Affecting Existing Rail
All railing on structure must comply with MASH or NCHRP Report 350 Exceptions Design Exception required if ADT is
greater than 1500 VPD Design Waiver required if ADT is less than
1500 VPD
![Page 10: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/10.jpg)
4R
Bridge railing must comply with MASH or NCHRP Report 350 Exceptions by approval of Design Exception
Request
![Page 11: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/11.jpg)
MBGF & Transitions
MBGF & Transitions must be upgraded if the bridge rail is upgraded MBGF & Transitions may be upgraded
without upgrading bridge railing
![Page 12: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/12.jpg)
Required Design Information
New design requirements Existing Plans Field verification
![Page 13: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/13.jpg)
New Design Requirements
Type of retrofit, repair, or upgrade Roadway design speed Proposed finished depth of overlay Desired transition type Deck drain requirements
![Page 14: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/14.jpg)
Existing Plans
Layouts (Widened Structure & Original) Abutments Joint Information Existing Approach Slab Details Spans Rail
![Page 15: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/15.jpg)
Field Verification
Existing railing type Height of
existing railing
![Page 16: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/16.jpg)
Field Verification
Slab Depth Overhang width &
depth Curb width & depth
![Page 17: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/17.jpg)
Field Verification
Abutment Geometry Wing Geometry
![Page 18: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/18.jpg)
Field Verification
Joint Information Existing overlay
depth
![Page 19: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/19.jpg)
Field Verification
Location of nearby road crossings Existing Approach
Slab Conditions Existing slopes
![Page 20: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/20.jpg)
Photos
Existing Rail Terminal Ht (all corners)
Existing Rail Average Ht (both sides)
Photo with direction info (all corners)
Photo with direction info (all corners)
Photo with direction info (all corners)
Photo of typical overhang
![Page 21: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/21.jpg)
Undocumented Changes
![Page 22: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/22.jpg)
Undocumented Changes
Gas Line
![Page 23: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/23.jpg)
Undocumented Changes
![Page 24: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/24.jpg)
Transition Details
![Page 25: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/25.jpg)
Example Projects
![Page 26: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/26.jpg)
Height Upgrade
![Page 27: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/27.jpg)
Transition Upgrade
![Page 28: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/28.jpg)
Transition Upgrade
![Page 29: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/29.jpg)
Transition Upgrade
![Page 30: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/30.jpg)
T101 RC
![Page 31: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/31.jpg)
T101 RC
![Page 32: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/32.jpg)
C402 Retrofit
![Page 33: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/33.jpg)
C402 Retrofit
![Page 34: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/34.jpg)
C402 Retrofit
![Page 35: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/35.jpg)
C1W Retrofit
![Page 36: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/36.jpg)
C1W Retrofit
![Page 37: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/37.jpg)
C1W Retrofit
![Page 38: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/38.jpg)
C1W Retrofit
![Page 39: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/39.jpg)
RAC-R
![Page 40: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/40.jpg)
RAC-R
![Page 41: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/41.jpg)
Quality Control - Inspection
![Page 42: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/42.jpg)
Summary
Replacement requirements are dependent on the type of project Provide the designer with existing plans,
photos, and new design requirements Inspection of the contractors work is
imperative
![Page 43: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/43.jpg)
Credits
Photos – Miscellaneous districts, Scott Dziekan, Nick Nemec, Bridge Division Field Section Design Details – John Holt, Jim Pitzer & JT
Ries
![Page 44: Retrofitting Bridge Rails · shown in the Bridge Railing Manual Existing railing that does not meet the height standard or MASH or NCHRP Report 350 must be upgraded . 3R, Widened](https://reader030.vdocuments.site/reader030/viewer/2022041113/5f1eb5fc7d1587148c6d5610/html5/thumbnails/44.jpg)
Questions?