    Retrofit Measures

    or

    , ,

  • 8/11/2019 Retrofit Abutments

    2/39

    Pur ose

    To describe typical retrofit measures for:

    Abutments Footings

  • 8/11/2019 Retrofit Abutments

    3/39

    Abutment retrofit measures

    Approach slabs

    Anchor slabs

    Diaphragm walls

    ransverse s ear eys Transverse soil anchors

    Soil and gravity anchors

  • 8/11/2019 Retrofit Abutments

    4/39

    Abutment retrofit measures

    California settlement (approach) slab

    Design as SS 10 min Spans soil to deck

    Connection FD isFD

    F D S a

    DL

    0.6 Friction Coeff

    Sa=Spectrum Acc

    DL=Dead Load

  • 8/11/2019 Retrofit Abutments

    5/39

    Abutment retrofit measures New Zealand settlement slab

    ng e o ers ong u na res s ance

    Still have smooth approach

  • 8/11/2019 Retrofit Abutments

    6/39

    Abutment retrofit measures

    Waffle slab retrofit

    2h

    es s ance=. s

    Resistance 16 pile=40 kips ultimate

  • 8/11/2019 Retrofit Abutments

    7/39

    Abutment retrofit measures

    Anchor slab retrofit

    Vertical capacity is of no concern

    Must be securel connected to su erstructure Use damping ratio of 10%

    Longitudinal forces will reduce 20%

  • 8/11/2019 Retrofit Abutments

    8/39

    Abutment retrofit measures

    Must act composite Utilize dowels to provide

    shear transfer

  • 8/11/2019 Retrofit Abutments

    9/39

    Abutment retrofit measures Concrete transverse shear keys

  • 8/11/2019 Retrofit Abutments

    10/39

    Abutment retrofit measures

    Concrete transverse shear keys

  • 8/11/2019 Retrofit Abutments

    11/39

    Abutment retrofit measures

    Transverse soil anchors

    Lateral resistance methods: Lateral capacity of piles

    Passive pressure on wingwalls

    Friction on bottom of footing Anchor slabs (previously discussed)

    When these are not sufficient, consider soil anchors

  • 8/11/2019 Retrofit Abutments

    12/39

    Abutment retrofit measures

    Wingwall cross-tie

  • 8/11/2019 Retrofit Abutments

    13/39

    Abutment retrofit measures Abutment soil shear keys

    -Pp=.96h ksf

    Design tips

    -To be fully effective:

    clear space=2h

    -Design shear for full passive pressure-Use R=2 for flexure

    -Abutment connection designed

    for overstrength moment

    h

  • 8/11/2019 Retrofit Abutments

    14/39

    Abutment retrofit measures

    Wing overlay

  • 8/11/2019 Retrofit Abutments

    15/39

    Abutment retrofit measures

    Wing overlay

  • 8/11/2019 Retrofit Abutments

    16/39

    Abutment retrofit measures

    CIDH pile shear key

    Designed for lateralcapacity only

    More effective when

    fixed at top

  • 8/11/2019 Retrofit Abutments

    17/39

    Abutment retrofit measures

    Deadman anchor

    Extend anchors to avoid backfill movement Embed tie rods in concrete trench for protection

  • 8/11/2019 Retrofit Abutments

    18/39

    Abutment retrofit measures

    Deadman anchor

  • 8/11/2019 Retrofit Abutments

    19/39

  • 8/11/2019 Retrofit Abutments

    20/39

    Abutment retrofit measures Soil anchors

    Prestress ensures anchor is solid

  • 8/11/2019 Retrofit Abutments

    21/39

    Abutment retrofit measures Abutment friction anchor

    se w granu ar so s w e se emen

    15 degree slope compresses slab as longitudinalmovemen occurs

    Steel piles resist uplift

  • 8/11/2019 Retrofit Abutments

    22/39

    Footin retrofit measures Footing strengthening

    or s a y

    Check moment at top

  • 8/11/2019 Retrofit Abutments

    23/39

  • 8/11/2019 Retrofit Abutments

    24/39

    Footin retrofit measures Footing concrete overlay

    se over ay o ncrease nega ve momen capac y

    Use added depth to check positive moment

  • 8/11/2019 Retrofit Abutments

    25/39

    Footin retrofit measures

    Reinforcing splice detail

  • 8/11/2019 Retrofit Abutments

    26/39

    Footin retrofit measures

    Prestressing

    Use to help positive moment

  • 8/11/2019 Retrofit Abutments

    27/39

    Footin retrofit measures ste 1

    Determine design forces

    Limit to flexural capacity of pier

    Use overstren th moment Material stronger than expected

    Confinement of concrete

    Strain hardening of steel

    Increase axial load from EQ

  • 8/11/2019 Retrofit Abutments

    28/39

    Footin retrofit measures ste 2

    Check OT capacity

    If exceeded-check stability with a rocking analysis This may eliminate retrofit requirements

  • 8/11/2019 Retrofit Abutments

    29/39

    Footin retrofit measures ste 3

    Design for shear

    Difficult to retrofit Increase footing depth with overlay

    Add prestressing bars

    Add vertical bars through drilled holes (must passbottom layer with hooks (anchors) to be effective or

  • 8/11/2019 Retrofit Abutments

    30/39

    Footin retrofit measures ste 4

    Design for flexure

    Top reinforcing lacking very often Add overlay with steel and dowels

    should be within thickness of footing from column

    Extra depth helps positive moment Place prestress as close to column as possible

  • 8/11/2019 Retrofit Abutments

    31/39

    Footin retrofit measures ste 5

    Design dowels to connect to existing concrete

    Should transfer shear stress at interface Use shear friction approach-friction=1.0

    ,

    bottom is required-(difficult to do this)

  • 8/11/2019 Retrofit Abutments

    32/39

    Footin retrofit measures ste 6 Check column-to-footing joint shear

    Overlay capacity

    Yield line theory

    Easier to ust make overla thickerExample 10.1

    retrofit of

    footing

  • 8/11/2019 Retrofit Abutments

    33/39

    Pil t f ti ti

  • 8/11/2019 Retrofit Abutments

    34/39

    Pile to footin connection

    Steel pipe piles filled with conc and rebar

    Good connection to new footing

    Can be drilled in low head room

    Very stiff for lateral loads

    Good connection to new footing

    Pil t f ti ti

  • 8/11/2019 Retrofit Abutments

    35/39

    Pile to footin connection Prestress tie down

    roo oa e own

    Pile capacity limits

    amoun o

    prestress

    ue o oo ng

    rotation, limited useto short columns

    (before fully

    effective-rotation

    S

  • 8/11/2019 Retrofit Abutments

    36/39

    Summar

    To describe typical retrofit measures for:

    Abutments Footings

    Ab t t t fit

  • 8/11/2019 Retrofit Abutments

    37/39

    Abutment retrofit measures

    Approach slabs

    Anchor slabs Diaphragm walls

    ransverse s ear eys Transverse soil anchors

    Soil and gravity anchors