retail - billingsley company · 4. the sound overview • 1,500,000. population within 20 miles •...
TRANSCRIPT
1
2
09VISION & LOGO PRESENTATION
09VISION & LOGO PRESENTATION
08VISION & LOGO PRESENTATION
LOGO APPLICATIONS
3
RetailIn the heart of the Cypress Waters development:
Embracing the concept of new urbanism creating an atmosphere in which one can truly Work, Live, Play and Explore. Cypress Waters is a remarkably untouched 1,000-acre development on a 362-acre lake within five minutes of DFW airport. Perfectly placed along the crest of growth between Dallas and Fort Worth and fronting LBJ Freeway and Belt Line Road.Immediate freeway access to any submarket in North Texas reaching a population base of 3,525,000 people within a 20-mile radius.
• 20,310 SF of retail• Lakefront amphitheatre• Patios, parks & relaxation lawn• 6-mile hike and bike trail around North Lake• 1,800 units of high-end multi-family• Non-motorized water activities• One-acre park with 40-foot sculpture• Two nearby schools with over 2,000 students
RetailIn the heart of the Cypress Waters development:
Embracing the concept of new urbanism creating an atmosphere in which one can truly Work, Live, Play and Explore. Cypress Waters is a remarkably untouched 1,000-acre development on a 362-acre lake within five minutes of DFW airport. Perfectly placed along the crest of growth between Dallas and Fort Worth and fronting LBJ Freeway and Belt Line Road. Immediate free-way access to any submarket in North Texas reaching a population base of 3,525,000 people within a 20-mile radius.
• 5 Unique Event Spaces• Lakefront amphitheatre• Walk, bike & run around the edge of North Lake for 5k/10k• 1,800 units of high-end multi-family• Family-friendly splash-pad & fishing available• Immersive art throughout The Sound• Located between Dallas & Ft. Worth minutes away from DFW • 700+ parking spaces available during the week• 2,400+ parking spaces available on nights and weekends
4
THE SOUND OVERVIEW
• 1,500,000 POPULATION WITHIN 20 MILES• 2,671 RESIDENTS LAKESIDE• 12,000 COMMERCIAL OFFICE TENANTS• 12 CORPORATE HEADQUARTERS• 10,000 RESIDENTIAL UNITS AT FULL
BUILD-OUT
SURROUNDING COMMUNITY
Distance 1 Mile 3 Miles 5 MilesDaytime Population 13,745 672,358 176,991
Total Businesses 410 3,765 8,619
Residents 1,973 66,638 135,065
People
TrafficIH 635 130,000 VPD
Belt Line Rd. 70,000 VPD
Olympus Rd. 35,000 VPD est.
14,450Daytime population
5
14,450Daytime population
2,671Residents lakeside
13Corporate HQs
12,000commercial office tenants
6
Park
ing
7ParkingTOTAL PARKING: 799 Spaces
Off-street: 139 spacesOn-street: 73 spacesMF garage: 133 spaces
3201 Olympus: 224 spaces3100 Olympus: 230 spaces
8 The Sound
6.5-mile trail
Future campus
Campusopens 2018
Bleecker
The Wharf
LeeElementary
10,000Residental units at full build
$120,000median household income
91,500,000
population within 10 miles
799retail parking spaces
25-32average age of resident
10
Act
ive Z
one
11
12
Bold
Reta
il
13
14
Bold
Reta
il
15
16
THE SOUNDDESIGN PACKAGE
716.11.09
KEY PLAN
04
01
03
02
ELEVATIONS - BUILDING A
01 - West Elevation
02 - East Elevation
03 - North Elevation 04 - South Elevation
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
BUILDING B
BUILDING B
24'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P. 22'-0" a.f.f.
T.O.CANOPY
24'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
37'-0" a.f.f. T.O.P.
12'-6" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O. CANOPY
10'-0" a.f.f. B.O. CANOPY
10'-0" a.f.f. B.O.CANOPY
12'-6" a.f.f. T.O. STOREFRONT
10'-0" a.f.f. T.O.STOREFRONT
11'-6" a.f.f. B.O. CANOPY
CAST STONE COPING
RECLAIMED BRICK
PAINTED BRICK METAL ACCENT PLATES DARK BRONZE MULLIONS
CAST STONE WALL LIGHT SCONCE
CAST STONE TRIM
METAL PANELS WOOD TRELLIS
BRANCH WOOD CLADDING
STUCCO
METAL COPING
STUCCO
METAL COPING
STEEL CANOPY
CANVAS AWNING
CAST STONE BASE
STOREFRONT STOREFRONTSTOREFRONTALT: OVERHEAD ROLL-UP DOOR
GLASS ENTRY STOREFRONT STEEL DOORSRECLAIMED WOOD SIDING
METAL COPING METAL COPING
WOOD DOOR
RECLAIMED WOOD SIDING
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
CAST STONE TRIM
CAST STONE BASE
STOREFRONTSTOREFRONT
STOREFRONTALT: OVERHEAD ROLL-UP DOOR
STEEL DOORRECLAIMED WOOD SIDING
RECLAIMED WOOD SIDING
STOREFRONTSTOREFRONT
ALT: OVERHEAD ROLL-UP DOOR
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN METAL COPING
STUCCO
METAL COPING
CANVAS AWNING BRANCH WOOD CLADDING
STUCCO
METAL COPING
STEEL CANOPY
WOOD TRELLIS
CAST STONE COPING
RECLAIMED BRICK
PAINTED BRICK
METAL ACCENT PLATES DARK BRONZE MULLIONSCAST STONE WALL LIGHT SCONCE
RECLAIMED WOOD SIDING STUCCOSTOREFRONT
STEEL CANOPY
FAN FAN
STEEL DOOR
STEEL CANOPY LIGHT SCONCE
CAST STONE TRIM
CAST STONE BASE
STOREFRONTEXTERNAL STAIR
THE SOUNDDESIGN PACKAGE
916.11.09
KEY PLAN
03
01
04
02
ELEVATIONS - BUILDING B
01 - West Elevation
02 - East Elevation
03 - South Elevation 04 - North Elevation
20'-0" a.f.f. T.O.P.
0'-0" a.f.f.
BUILDING A
BUILDING A
26'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
37'-0" a.f.f. T.O.P.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
26'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
16'-0" a.f.f. 2ND FLOOR
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
16'-0" a.f.f. 2ND FLOOR
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
12'-0" a.f.f. B.O.CANOPY
12'-6" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O.STOREFRONT
11'-0" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O. STOREFRONT
10'-0" a.f.f. T.O.STOREFRONT
METAL COPING
CAST STONE
WOOD TRELLIS
LIGHT SCONCESTEEL DOORS
CAST STONE BASE
METAL COPING
WOOD DOORRECLAIMED WOOD SIDING
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
METAL COPING
WOOD TRELLIS
CAST STONE ACCENTSTOREFRONTCAST STONE
RECLAIMED BRICKRECLAIMED BRICK
RECLAIMED WOOD SIDING
TILE
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
WOOD DOOR
RECLAIMED WOOD SIDING
LIGHT SCONCECAST STONE BASE
CAST STONE ACCENT
STOREFRONTCAST STONE
RECLAIMED BRICK
RECLAIMED BRICK
STEEL DOORS
METAL PANELSRECLAIMED WOOD SIDINGTILE
STEEL CANOPY
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
West ElevationNorth Building
East ElevationNorth Building
East ElevationSouth Building
17
THE SOUNDDESIGN PACKAGE
716.11.09
KEY PLAN
04
01
0302
ELEVATIONS - BUILDING A
01 - West Elevation
02 - East Elevation
03 - North Elevation 04 - South Elevation
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
BUILDING B
BUILDING B
24'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P. 22'-0" a.f.f.
T.O.CANOPY
24'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
37'-0" a.f.f. T.O.P.
12'-6" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O. CANOPY
10'-0" a.f.f. B.O. CANOPY
10'-0" a.f.f. B.O.CANOPY
12'-6" a.f.f. T.O. STOREFRONT
10'-0" a.f.f. T.O.STOREFRONT
11'-6" a.f.f. B.O. CANOPY
CAST STONE COPING
RECLAIMED BRICK
PAINTED BRICK METAL ACCENT PLATES DARK BRONZE MULLIONS
CAST STONE WALL LIGHT SCONCE
CAST STONE TRIM
METAL PANELS WOOD TRELLIS
BRANCH WOOD CLADDING
STUCCO
METAL COPING
STUCCO
METAL COPING
STEEL CANOPY
CANVAS AWNING
CAST STONE BASE
STOREFRONT STOREFRONTSTOREFRONTALT: OVERHEAD ROLL-UP DOOR
GLASS ENTRY STOREFRONT STEEL DOORSRECLAIMED WOOD SIDING
METAL COPING METAL COPING
WOOD DOOR
RECLAIMED WOOD SIDING
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
CAST STONE TRIM
CAST STONE BASE
STOREFRONTSTOREFRONT
STOREFRONTALT: OVERHEAD ROLL-UP DOOR
STEEL DOORRECLAIMED WOOD SIDING
RECLAIMED WOOD SIDING
STOREFRONTSTOREFRONT
ALT: OVERHEAD ROLL-UP DOOR
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN METAL COPING
STUCCO
METAL COPING
CANVAS AWNING BRANCH WOOD CLADDING
STUCCO
METAL COPING
STEEL CANOPY
WOOD TRELLIS
CAST STONE COPING
RECLAIMED BRICK
PAINTED BRICK
METAL ACCENT PLATES DARK BRONZE MULLIONSCAST STONE WALL LIGHT SCONCE
RECLAIMED WOOD SIDING STUCCOSTOREFRONT
STEEL CANOPY
FAN FAN
STEEL DOOR
STEEL CANOPY LIGHT SCONCE
CAST STONE TRIM
CAST STONE BASE
STOREFRONTEXTERNAL STAIR
THE SOUNDDESIGN PACKAGE
916.11.09
KEY PLAN
03
01
04
02
ELEVATIONS - BUILDING B
01 - West Elevation
02 - East Elevation
03 - South Elevation 04 - North Elevation
20'-0" a.f.f. T.O.P.
0'-0" a.f.f.
BUILDING A
BUILDING A
26'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
37'-0" a.f.f. T.O.P.
37'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
37'-0" a.f.f. T.O.P.
26'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
16'-0" a.f.f. 2ND FLOOR
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
16'-0" a.f.f. 2ND FLOOR
37'-0" a.f.f. T.O.P.
0'-0" a.f.f.
16'-0" a.f.f. 2ND FLOOR
20'-0" a.f.f. T.O.P.
20'-0" a.f.f. T.O.P.
22'-0" a.f.f. T.O.CANOPY
12'-0" a.f.f. B.O.CANOPY
12'-6" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O.STOREFRONT
11'-0" a.f.f. T.O. STOREFRONT
12'-6" a.f.f. T.O. STOREFRONT
10'-0" a.f.f. T.O.STOREFRONT
METAL COPING
CAST STONE
WOOD TRELLIS
LIGHT SCONCESTEEL DOORS
CAST STONE BASE
METAL COPING
WOOD DOORRECLAIMED WOOD SIDING
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
METAL INTERNALLY ILLUMINATED SIGN
STEEL CANOPY
FAN
METAL COPING
WOOD TRELLIS
CAST STONE ACCENTSTOREFRONTCAST STONE
RECLAIMED BRICKRECLAIMED BRICK
RECLAIMED WOOD SIDING
TILE
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
WOOD DOOR
RECLAIMED WOOD SIDING
LIGHT SCONCECAST STONE BASE
CAST STONE ACCENT
STOREFRONTCAST STONE
RECLAIMED BRICK
RECLAIMED BRICK
STEEL DOORS
METAL PANELSRECLAIMED WOOD SIDINGTILE
STEEL CANOPY
CAST STONE
RECLAIMED BRICK
CAST STONE
RECLAIMED BRICK
West ElevationSouth Building
18
Bold
Reta
il
19
20Office and Multifamily
Bleecker Street 2018
The Wharf2017
Brinker2017
3100 Cypress Waters2018
Byron Bay2019
3201 Olympus2018
21
015SIGNAGE CONCEPT PACKAGE
Industrial Details . Raw yet Refined . Refreshing . Impactful . Timeless . Classic . High Contrast
TEXAS INDUSTRIAL / BOLD SIMPLICITY
017SIGNAGE CONCEPT PACKAGE
Reclaimed Wood . Concrete . Corten Steel . Brick . Gabion Wall . Painted Wood . Chrome
MATERIALS & COLOR
TEXAS INDUSTRIAL / BOLD SIMPLICITY
09VISION & LOGO PRESENTATION
22
09VISION & LOGO PRESENTATION
23
08VISION & LOGO PRESENTATION
LOGO APPLICATIONS
08VISION & LOGO PRESENTATION
LOGO APPLICATIONS
DELIVERS 2018For leasing information contact:Thomas Glendenning 214.960.4528Jake Sherrington 214.960.4623