Phoenix Pacific Resume of business-project: INOVATION TECHNOLOGIES INTRODUCTION IN WASTE MANAGEMENT AND SOLUTION OF PROBLEMS OF THEIR UTILIZATION IN SEVASTOPOL CITY Ukraine, Kiev - 2009

Upload: claudia-hendrix

Post on 30-Dec-2015

30 views

Category:

Documents


0 download

DESCRIPTION

Resume of business-project : INOVATION TECHNOLOGIES INTRODUCTION IN WASTE MANAGEMENT AND SOLUTION OF PROBLEMS OF THEIR UTILIZATION IN SEVASTOPOL CITY. Ukraine , Kiev - 2009. Waste management status analysis :. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Resume of business-project :

Phoenix Pacific

Resume of business-project:INOVATION TECHNOLOGIES INTRODUCTION IN WASTE MANAGEMENT AND SOLUTION OF PROBLEMS OF THEIR UTILIZATION IN SEVASTOPOL CITY

Resume of business-project:INOVATION TECHNOLOGIES INTRODUCTION IN WASTE MANAGEMENT AND SOLUTION OF PROBLEMS OF THEIR UTILIZATION IN SEVASTOPOL CITY

Ukraine, Kiev - 2009

Page 2: Resume of business-project :

Phoenix Pacific

Waste management status analysis:

Almost 50 billion cubic meters of solid domestic waste (SDW) annually accumulates in Ukraine which makes up almost 11 million tons of waste buried at 4.5 thousand dumps and landfills with the total area of almost 7.6 thousand hectares

There are 248 overfilled landfills (5%), while 1 133 landfills (25%) do not meet the environmental safety requirements

Two landfills from 100 of most hazardous ecological objects of Ukraine are in Crimea – in Yalta and Sudak

Only 2.5% of SDW is burnt at two out of four existing incineration plants built during the Soviet times (Kiev, Dnepropetrovsk)

Due to the lack of a waste management system, about 16 thousand unauthorized dumps with the total area of 1.1 thousand ha appear in residential areas each year

Page 3: Resume of business-project :

Phoenix Pacific

Waste management services were found to be rendered by 1 172 organizations out of which 281 (23%) are private companies, which is 5% more than in 2006. Most private companies are located in Kherson Oblast (32), Kirovograd Oblast (27) and Kharkov Oblast (23)

The average fee for waste management services is Euro 4,0/m3 which includes Euro 2,5 for collection and transport and Euro1,5 for burial. Such fees are much lower than the international fees; therefore, they do not ensure normal plant operation and make it impossible to introduce modern technologies at the plants

Over Euro 50 million was allocated for development and management of sanitation plants in 2007, which is 79% more than in 2006. Most financing was provided in Kiev (Euro 17 million), Donetsk Oblast (Euro 11,2 million), and Kharkov Oblast (Euro 2,8 million)

The average vehicle wear rate increased from 66% (2006) to 69% (2007). The least wear rate was found in Sevastopol (25%) and Kiev (47%)

Page 4: Resume of business-project :

Phoenix Pacific

As stipulated by the Law of Ukraine “On Local Self-Government in Ukraine” (Article 30), the waste management issues pertain to the competence of local executive bodies which are usually in no haste, and sometimes even too slow in introducing modern waste management techniques and technologies

The key reason of such a situation is noncompliance of the local authorities with the requirements of the Laws of Ukraine “On Housing and Utility Services” and “On Waste” as regards insufficient funding of development and management of facilities in this industry sector, establishment of economically feasible tariffs, and reasonable control over the waste management process (especially the use of dumps and landfills)

Actuality of problem solution of sanitary clearing system improvement in communities, particularly in cities of Crimea South coast and Sevastopol city, which caused current ecological problems, absence of efficient systems collection.

Page 5: Resume of business-project :

Phoenix Pacific

The project goal is to solve a problem of waste utilization with

producing of alternative fuel and power via introduction of innovative waste management technologies in cities and regions AR of Crimea:

Improve sanitary and ecological state of cities and communities of Crimea peninsula and Sevastopol city, in particular,

decrease in the amount of buried household, construction, industrial and hazardous waste on landfills by at least 5-8 times ,

considerable reduction in the pollution of water area of the Black Sea, atmosphere and underground water-bearing formations ,

implementation of an action plan aimed at remediation of unauthorized dumps and existing landfills, thereby considerably increasing the operation life of the existing landfills and the standard volume of waste buried at the said landfills ,

obtaining a considerable volume of waste energy to be reused in industrial production ,

making use of the sorted-out waste residue, as alternative fuel, to obtain electric and thermal energy for production and local community needs.

Page 6: Resume of business-project :

Phoenix Pacific

We propose the following measures to achieve the set goal and improve the waste management system in Sevastopol city:

Creation of transport and technological complexes on introduction of :

separate collection and utilization of waste produced by the network of recreation centers, crowded areas on Black Sea coast, in network of office and administration buildings, entertainment buildings in the city’s areas their agglomerations, using specialized vehicles and 7-35-m3 bulk bins with compactors

collection and utilization of construction waste, formed in process of repair and reconstruction of current and future building objects with production of secondary crushed stone for using in road construction and concrete production.

collection and utilization of medical waste and medicinal preparations collection and utilization of plant-protecting agents, food and other

supplements, products and other goods, with expired date

At present the given market segment are not spread by operators and has an elemental character with using unspecialized equipment and need innovational technologies solution.

Page 7: Resume of business-project :

Phoenix Pacific

Creation of waste sorting and handling complexes at the existing landfills, and also waste transfer station in city regions will allow to optimize using of current park of waste collection equipment belongs to transporter-enterprises. Sorted waste (light combustible fraction) will be using as alternative fuel on energy generating station in Bakhchisaray region, and secondary crushed stone formed in the process of construction waste utilization – in road construction and concrete production

Using as alternative fuel the sorted fraction of solid domestic waste and other waste, formed in region will give and opportunity reduce the volume (till 80 %) of waste due to the dumping on the landfill.

Projecting and construction of energy generating station for producing electric and heat energy from sorted waste (alternative fuel) based on using by specialists of “Ukrspetstechnologii” Corporation, in cooperation with E.O. Paton Electric welding Institute and Gas Institute of National Academy of Ukraine, the steam-plasma installations with producing synthetic gas - alternative to the natural gas.

Creation of regional center on ecological safety utilization of medical waste, medical product, plant-protecting agents, food and other supplements, products and other goods, with expired date

Development and implementation of state-of-the-art technology programs aimed at reclamation of unauthorized dumps and both existing and closed landfills, which will mitigate the environmental impact and will ensure sanitary and epidemiological welfare of the population of Sevastopol city and all region

Page 8: Resume of business-project :

Phoenix Pacific

FINANCING COSTS

Total cost of the Project 2,6 mln. Euro, including: investors’ funds or borrowed funds– 2,6 mln. Euro (100%),

with 6% annual rate drawdown– according schedule of financing interest payment– every month from the beginning of

financing term of financing – four years period of grace –one year

Investment payback period– three years Profitability index– 2,30 Gross profit margins– 89% Operating profit margins– 53% Net profit margins– 21%

Page 9: Resume of business-project :

Phoenix Pacific

Necessary equipment (transport)    

№ NameQuantity, unit

Cost per unit, Euro

Total cost, Euro

Total value excluding VAT, Euro

1 Renault Kerax chassis 2 120 000 240 000 200 000

2 Multilifts ( Ecopress HKS-20 ) 2 31 200 62 400 52 000

3Manipulators PM8522 1 31 200

31 200 26 000

4 Trailers for container 2 31 200 62 400 52 000

5 Mobile compactors EMC МЕGA - 20 5,5 kWt 9 24 000 216 000 180 000

6 Stationary compactor EMC МЕGA - 30 5,5 kWt 10 19 600 196 000 163 333

7 Plug-in container for industrial waste EC 30 , capacity 30 m3 12 11 200 134 400 112 000

8Container for industrial waste HL 16,4 m3 with covered roof 12 5 600

67 200 56 000

9 Container for industrial waste HL 30 m3 with covered roof 16 5 600 89 600 74 667

10 Shredder for solid domestic waste 1 490 000 490 000 408 333

11 Separator for sorting of solid domestic waste 1 259 000 259 000 215 833

12 Shredder 1 630 000 630 000 525 000

  Total cost, Euro     2 598 200 2 165 167

Page 10: Resume of business-project :

Phoenix Pacific

0

200 000

400 000

600 000

800 000

1 000 000

1 200 000

1 400 000

1 2 3 4 5 6 7 8 9 10 11 12 13

Monthly schedule of project investing, Euro

Заемные (кредитные) средства - 100%Borrowed (credit) funds - 100%

Page 11: Resume of business-project :

Phoenix Pacific

Profit and material losses pro forma statement per 1-st years of project realization, Euro Months of the project

1 2 3 4 5 6 7 8 9 10 11 12 1 year

Calendar months of the project 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

Gross income 56 406 118 377 148 541 169 179 189 818 210 456 217 943 225 429 229 172 232 915 236 658 236 658 2 271 552

VAT 9 401 19 730 24 757 28 197 31 636 35 076 36 324 37 571 38 195 38 819 39 443 39 443 378 592

Updated gross income 47 005 98 648 123 784 140 983 158 182 175 380 181 619 187 857 190 977 194 096 197 215 197 215 1 892 960

Operational expenses                          

VARIABLE EXPENSES:                          

Fuel 6 563 6 563 6 563 6 563 6 563 6 563 6 563 6 563 6 563 6 563 6 563 6 563 78 750

Petroleum   131 131 131 131 131 131 131 131 131 131 131 131 1 575

Motor tires   563 563 563 563 563 563 563 563 563 563 563 563 6 750

Accumulator storage battery   33 33 33 33 33 33 33 33 33 33 33 33 394

Electric power   400 480 480 480 480 480 480 480 480 480 480 480 5 680

Wages of main personnel   7 464 21 732 21 732 21 732 21 732 21 732 21 732 21 732 21 732 21 732 21 732 21 732 246 521

Services on utilization (landfill)   2 947 6 174 9 261 12 348 15 435 18 522 18 866 19 211 19 383 19 555 19 727 19 727 181 157

FIXED EXPENSES:                            

Technical service and repair of fixed assets (motor transport and equipment)

  779 779 779 779 779 779 779 779 779 779 779 779 9 352

Administrative-management personnel wages   24 970 27 714 28 675 28 675 28 675 31 556 32 516 32 516 32 516 32 516 32 516 32 516 365 364

Communication and other services   999 1 664 1 710 1 710 1 710 1 755 1 847 1 847 1 847 1 893 1 893 1 893 20 767

Assignments   3 270 5 445 5 595 5 595 5 595 5 745 6 045 6 045 6 045 6 195 6 195 6 195 67 965

Electric power   136 227 233 233 233 239 252 252 252 258 258 258 2 832

Transport   2 271 3 781 3 885 3 885 3 885 3 990 4 198 4 198 4 198 4 302 4 302 4 302 47 198

Consulting services   2 820 5 919 7 427 8 459 9 491 10 523 10 897 11 271 11 459 11 646 11 833 11 833 113 578

Security   908 1 513 1 554 1 554 1 554 1 596 1 679 1 679 1 679 1 721 1 721 1 721 18 879

Clerical and other expenses   8 769 11 095 11 451 11 659 11 866 12 217 12 386 12 266 12 148 12 179 12 065 11 954 140 055

Total operational costs   63 023 93 812 100 072 104 399 108 725 116 424 118 968 119 566 119 808 120 546 120 792 120 681 1 306 816

Amortization   40 944 41 568 42 192 42 814 43 435 44 054 43 208 42 378 41 564 40 766 39 985 39 218 502 126

Credit interest and commissions on the credit   11 599 20 545 12 171 12 171 12 757 13 343 12 991 12 991 12 991 12 991 12 991 12 991 160 530

Profit before-tax income (for period) 0 -68 561

-57 278 -30 650 -18 401 -6 735 1 560 6 452 12 922 16 614 19 793 23 448 24 325 -76 510

Net operating loss carry-back (at rising) 0 0 -68 561 -125 839 -156 489 -174 890 -181 624 -180 065 -173 612 -160 690 -144 076 -124 283 -100 835 -76 510

Assessable incomes/losses 0 -68 561

-125 839 -156 489 -174 890 -181 624 -180 065 -173 612 -160 690 -144 076 -124 283 -100 835 -76 510 -76 510

Income tax   0 0 0 0 0 0 0 0 0 0 0 0 0

Net profit / losses  -68 561

-125 839 -156 489 -174 890 -181 624 -180 065 -173 612 -160 690 -144 076 -124 283 -100 835 -76 510 -76 510

Page 12: Resume of business-project :

Phoenix Pacific

Pro forma statement of movement of funds 1-st year, Euro                         

Months of the project 1 2 3 4 5 6 7 8 9 10 11 12 TOTAL

Sales income 56 406 118 377 148 541

169 179

189 818

210 456

217 943

225 429 229 172 232 915 236 658 236 658 2 271 552

Variable expenses -17 428 -30 314 -34 019 -37 723

-41 428

-45 132

-45 545

-45 959 -46 165 -46 372 -46 579 -46 579 -483 243

Fixed expenses -39 550 -53 829 -57 083 -58 572

-60 058

-63 935

-66 023

-66 328 -66 411 -67 090 -67 179 -67 045 -733 102

Payments into the budget -12 163 -21 826 -29 759 -33 727

-36 301

-39 956

-42 792

-43 723 -44 851 -45 427 -45 903 -46 478 -442 906

Credit VAT 9 401 19 730 24 757 28 197 31 636 35 076 36 324

37 571 38 195 38 819 39 443 39 443 378 592

Debit VAT6 118 8 873 9 933 10 798 11 663 12 627 12

944 13 064 13 112 13 259 13 309 13 286 138 986

VAT reclaimed progressive total   0 3 283 14 140 28 963 46 362 66 334

88 783 112 163 136 671 161 755 187 315 187 315

VAT Payments into the budget 0 3 283 10 856 14 824 17 398 19 973 22 449

23 380 24 508 25 083 25 560 26 134 25 560

Interests and commissions payments (credit)-11 599 -20 545 -12 171 -12

171 -12 757

-13 343

-12 991

-12 991 -12 991 -12 991 -12 991 -12 991 -160 530

The outcome from operational activity -24 333 -8 136 15 509 26 987 39 275 48 090 50 591

56 428 58 753 61 036 64 007 63 566 451 772

Cash flow from investment activity                          

Founders contribution 0 0 0 0 0 0 0 0 0 0 0 0 0

Fixed assets acquisition -2 012 200 -117 200 -117 200

-117 200

-117 200

-117 200

0 0 0 0 0 0 -2 598 200

The outcome from investment activity -2 012 200 -117 200 -117 200

-117 200

-117 200

-117 200

0 0 0 0 0 0 -2 598 200

Cash flow from financial activity                          

Credit entry 1 892 200 1 237 200

117 200

117 200

117 200

117 200

0 0 0 0 0 0 2 598 200

Credit repayment 1 0 0 0 0 0 0 0 0 0 0 0 0 0

The outcome from financial activity 892 200 1 237 200

117 200

117 200

117 200

117 200

0 0 0 0 0 0 2 598 200

Funds                          

At the beginning of period 0 -1 144 333

-32 470 -16 961

10 026 49 301 97 392

147 983 204 411 263 164 324 199 388 206 0

At the end of period -1 144 333 -32 470 -16 961 10 026 49 301 97 392 147 983

204 411 263 164 324 199 388 206 451 772 451 772

Cash flow -1 144 333 1 111 864

15 509 26 987 39 275 48 090 50 591

56 428 58 753 61 036 64 007 63 566 451 772

Page 13: Resume of business-project :

Phoenix Pacific

Profit and material losses pro forma statement per 1-10 years of project realization, Euro Months of the project

1 2 3 4 5 6 7 8 9 10  

Calendar months of the project year year year year year year year year year year TOTAL

Gross income 2 271 552 3 140 680 3 313 840 3 397 637 3 481 435 3 610 150 3 610 150 3 850 630 3 850 630 3 850 630 34 377 336

VAT 378 592 523 447 552 307 566 273 580 239 601 692 601 692 641 772 641 772 641 772 5 729 556

Updated gross income 1 892 960 2 617 233 2 761 533 2 831 364 2 901 196 3 008 459 3 008 458 3 208 857 3 208 856 3 208 855 28 647 770

Operational expenses                      

VARIABLE EXPENSES:                      

Fuel 78 750 78 750 94 500 103 950 114 345 125 780 138 357 152 193 167 413 184 154 1 238 191

Petroleum 1 575 1 575 1 890 2 079 2 287 2 516 2 767 3 044 3 348 3 683 24 764

Motor tires 6 750 6 750 6 750 6 750 6 750 6 750 6 750 6 750 6 750 6 750 67 500

Accumulator storage battery 394 394 473 520 572 629 692 761 837 921 6 191

Electric power 5 680 4 800 4 800 4 800 4 800 4 800 4 800 4 800 4 800 4 800 48 880

Wages of main personnel 246 521 260 790 260 790 260 790 260 790 260 790 260 790 260 790 260 790 260 790 2 593 629

Services on utilization (landfill) 181 157 314 849 395 489 405 115 414 742 426 434 426 434 451 634 451 634 451 634 3 919 124

FIXED EXPENSES:                      

Technical service and repair of fixed assets (motor transport and equipment) 9 352 9 352 11 222 12 344 13 578 14 936 16 430 18 073 19 880 21 868 147 035

Administrative-management personnel wages 365 364 325 164 325 164 325 164 325 164 325 164 325 164 325 164 325 164 325 164 3 291 840

Communication and other services 20 767 22 715 22 715 22 715 22 715 22 715 22 715 22 715 22 715 22 715 225 202

Assignments 67 965 74 340 74 340 74 340 74 340 74 340 74 340 74 340 74 340 74 340 737 025

Electric power 2 832 3 098 3 098 3 098 3 098 3 098 3 098 3 098 3 098 3 098 30 709

Transport 47 198 51 625 51 625 51 625 51 625 51 625 51 625 51 625 51 625 51 625 511 823

Consulting services 113 578 157 034 165 692 169 882 174 072 180 508 180 508 192 532 192 532 192 532 1 718 867

Security 18 879 20 650 20 650 20 650 20 650 20 650 20 650 20 650 20 650 20 650 204 729

Clerical and other expenses 140 055 139 007 139 007 139 007 139 007 139 007 139 007 139 007 139 007 139 007 1 391 120

Total operational costs 1 306 816 1 470 892 1 578 204 1 602 828 1 628 534 1 659 741 1 674 127 1 727 175 1 744 583 1 763 730 16 156 629

Amortization 502 126 416 060 366 334 282 801 218 944 170 024 132 462 103 549 81 234 63 962 2 337 495

Credit interest and commissions on the credit 160 530 127 745 75 781 23 817 0 0 0 0 0 0 387 872

Profit before-tax income (for period) -76 510 602 537 741 214 921 918 1 053 718 1 178 694 1 201 869 1 378 132 1 383 039 1 381 163 9 765 774

Net operating loss carry-back (at rising) -76 510 0 0 0 0 0 0 0 0 0 -76 510

Assessable incomes/losses -76 510 602 537 741 214 921 918 1 053 718 1 178 694 1 201 869 1 378 132 1 383 039 1 381 163 9 765 774

Income tax 0 150 634 185 304 230 480 263 430 294 673 300 467 344 533 345 760 345 291 2 460 571

Net profit / losses -76 510 451 903 555 911 691 439 790 289 884 020 901 402 1 033 599 1 037 280 1 035 872 7 305 203

Page 14: Resume of business-project :

Phoenix Pacific

Pro forma statement of movement of funds, Euro

    2 3 4 5 6 7 8 9 10  

Months of the project 1 год год год год год год год год год год TOTAL

Sales income 2 271 552 3 140 680 3 313 840 3 397 637 3 481 435 3 610 150 3 610 150 3 850 630 3 850 630 3 850 630 34 377 336

Variable expenses -483 243 -651 535 -767 675 -790 850 -815 188 -843 284 -858 755 -906 013 -924 732 -945 324 -7 986 598

Fixed expenses-733 102 -776 612 -789 246 -795 620 -802 129 -811 482 -813 274 -829 675 -831 843 -834 229 -8 017 213

Payments into the budget -442 906 -697 698 -724 224 -767 934 -821 935 -870 098 -898 465 -933 730 -974 316 -971 714 -8 103 020

Interests and commissions payments (credit) -160 530 -127 745 -75 781 -23 817 0 0 0 0 0 0 -387 872

The outcome from operational activity 451 772 887 090 956 914 1 019 416 1 042 182 1 085 287 1 039 656 1 181 213 1 119 739 1 099 363 9 882 633

Cash flow from investment activity 0                    

Founders contribution 0 0 0 0 0 0 0 0 0 0 0

Fixed assets acquisition -2 598 200 0 0 0 0 0 0 0 0 0 -2 598 200

The outcome from investment activity -2 598 200 0 0 0 0 0 0 0 0 0 -2 598 200

Cash flow from financial activity 0                    

Credit entry 2 598 200 0 0 0 0 0         2 598 200

Credit repayment 0 -866 067 -866 067 -866 067 0 0 0 0 0 0 -2 598 200

The outcome from financial activity2 598 200 -866 067 -866 067 -866 067 0 0 0 0 0 0 -0

Funds 0                    

At the beginning of period 0 451 772 472 795 563 643 716 992 1 759 174 2 844 462 3 884 118 5 065 331 6 185 070 0

At the end of period 451 772 472 795 563 643 716 992 1 759 174 2 844 462 3 884 118 5 065 331 6 185 070 7 284 433 7 284 433

Cash flow 451 772 21 023 90 848 153 349 1 042 182 1 085 287 1 039 656 1 181 213 1 119 739 1 099 363 7 284 433

Page 15: Resume of business-project :

Phoenix Pacific

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

1 2 3 4 5

The sructure of income from waste managemnt project realization in Sevastopol city ,

in % to the gross income

ТБО через мобильные компакторы Раздельный сбор ТБО через систему компакторов

Негабаритные отходы,отходы электротехники, автотранспорта Строительные отходы

Просыпь строительных отходов Вторичный щебень, фракция 0-20 мм

Вторичный щебень фракция 20-40 мм Вторичный щебень фракция 40-80 мм

Металлолом Альтернативное топливо из ТБО

Альтернативное топливо из разделного сбора Транспортные услуги

Page 16: Resume of business-project :

Phoenix Pacific

The structure of incomes from realization of waste management project in Sevastopol city, Euro/year

307 800 388 800 466 560 466 560 466 560

307 800 518 400 648 000 648 000 648 000

204 480531 360

738 720 777 600 816 480111 586

180 662180 662 191 290 201 917

60 008

101 171101 171 107 122 113 073

83 345

140 515140 515 148 781 157 046

83 345

140 515140 515 148 781 157 046

66 676

112 412112 412 119 025 125 637

52 388

88 324 88 324 93 519 98 715

226 875

225 000 225 000 225 000 225 000226 875

201 600 252 000 252 000 252 000

542 250511 920 572 400 572 400 572 400

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1 2 3 4 5

ТБО через мобильные компакторы Раздельный сбор ТБО через систему компакторов Негабаритные отходы,отходы электротехники, автотранспорта

Строительные отходы Просыпь строительных отходов Вторичный щебень, фракция 0-20 мм

Вторичный щебень фракция 20-40 мм Вторичный щебень фракция 40-80 мм Металлолом

Альтернативное топливо из ТБО Альтернативное топливо из разделного сбора Транспортные услуги

Page 17: Resume of business-project :

Phoenix Pacific

Calculating of debt service ratio, Euro

  1 2 3 4 5 6  7  8  9  10  11  12  1 year

Amortization 40 944 41 568 42 192 42 814 43 435 44 054 43 208 42 378 41 564 40 766 39 985 39 218 502 126

Net profit for the period -68 561

-125 839

-156 489

-174 890

-181 624

-180 065

-173 612

-160 690

-144 076

-124 283

-100 835

-76 510 -76 510

Credit Interests payments 11 599 20 545 12 171 12 171 12 757 13 343 12 991 12 991 12 991 12 991 12 991 12 991 160 530

Credit repayment 0 0 0 0 0 0 0 0 0 0 0 0 0

All expenses -16 018 -63 726

-102 127

-119 905

-125 433

-122 668

-117 414

-105 321 -89 521 -70 526 -47 860

-24 301

586 145

All repayments for the period 11 599 20 545 12 171 12 171 12 757 13 343 12 991 12 991 12 991 12 991 12 991 12 991 160 530

Debt service ratio                         3,65

Page 18: Resume of business-project :

Phoenix Pacific

Calculating of debt service ratio, Euro

 1

year2

year 3 4 5 6 7 8 9 10 TOTAL

Amortization 502 126 416 060 366 334 282 801 218 944 170 024 132 462 103 549 81 234 63 962 2 337 495

Net profit for the period -76 510 451 903 555 911 691 439 790 289 884 020 901 402 1 033 599 1 037 280 1 035 872 7 305 203

Credit Interests payments 160 530 127 745 75 781 23 817 0 0 0 0 0 0 387 872

Credit repayment 0 866 067 866 067 866 067 0 0 0 0 0 0 2 598 200

All expenses 586 145 995 707 998 026 998 057 1 009 232 1 054 044 1 033 864 1 137 148 1 118 513 1 099 834 10 030 570

All repayments for the period 160 530 993 812 941 848 889 884 0 0 0 0 0 0 2 986 072

Debt service ratio 3,65 1,00 1,06 1,12 3,36

Page 19: Resume of business-project :

Phoenix Pacific

NET PRESENT VALUE (NPV)

YearNet cash flow

Discount factor

Real value of net cash flow 6%

(Initial cost) 2 598 200 1,0000 -2 598 200

1 425 615 0,9434 401 524

2 867 962 0,8900 772 483

3 922 245 0,8396 774 335

4 974 240 0,7921 771 689

5 1 009 232 0,7473 754 157

6 1 054 044 0,7050 743 060

7 1 033 864 0,6651 687 578

8 1 137 148 0,6274 713 461

9 1 118 513 0,5919 662 046

10 1 099 834 0,5584 614 141

Disposal value1 099 834 0,5584 614 141

NPV 4 910 416

Page 20: Resume of business-project :

Phoenix Pacific

INTERNAL RATE OF RETURN (IRR)

YearNet cash flow

IRRReal value of net cash flow

29,8%

(Initial cost) 2 598 200 1,0000 -2 598 200

1 425 615 0,7704 327 908

2 867 962 0,5936 515 194

3 922 245 0,4573 421 746

4 974 240 0,3523 343 246

5 1 009 232 0,2714 273 946

6 1 054 044 0,2091 220 429

7 1 033 864 0,1611 166 574

8 1 137 148 0,1241 141 155

9 1 118 513 0,0956 106 968

10 1 099 834 0,0737 81 035

Disposal value1 099 834 0,0737 81 035

NPV81 035

Page 21: Resume of business-project :

Phoenix Pacific

Payback period, months 20,9

 

Projected period of credit repayment, months 48

 

Net Present Value-NP

4 910 416

 

Profitability index of investment (PI) for discount of 6%

 2,30

 

Rate of gross profit margins 89%

 

Rate of operating profit margins 53%

 

Rate of net profit margins 21%

 

Page 22: Resume of business-project :

Phoenix Pacific

Кумулятивный профиль рисков по проекту

0

200 000

400 000

600 000

800 000

1 000 000

1 200 000

1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000

Рис. 1 - Кумулятивный показатель вероятности наступления событий

Сu

mu

lati

ng

NP

V,

Eu

ro

Cumulative profile of project’s risks

Pic 1. Cumulative index of event probability

Page 23: Resume of business-project :

Phoenix Pacific

Чувствительность проекта к изменению переменных издержек

0

1 000 000

2 000 000

3 000 000

4 000 000

5 000 000

6 000 000

90% 100% 110% 120% 130% 160% 200%

Уровень переменных издержек, % к плановым

NPV

, Eur

o

0,00

0,50

1,00

1,50

2,00

2,50

3,00

3,50

Indi

cato

r PI

Project sensibility to variable expenses changing

Level of variable expenses, % to the planning

Page 24: Resume of business-project :

Phoenix Pacific

Чувствительность проекта к изменению стоимости услуг

-5 000 000

0

5 000 000

10 000 000

15 000 000

70% 80% 90% 100% 110% 120% 130%

Уровень стоимости услуг

NP

V, E

uro

0,00

1,00

2,00

3,00

4,00

5,00

6,00

Ind

icat

or

PI

Project sensibility to product cost changing

Cost service level

Page 25: Resume of business-project :

Phoenix Pacific

Чувствительность проекта к изменению планого объема оказываемых услуг

-2 500 000

-500 000

1 500 000

3 500 000

5 500 000

7 500 000

115% 110% 105% 100% 95% 90% 80% 70% 60%

Объем оказываемых услуг

NP

V, E

uro

0,00

0,50

1,00

1,50

2,00

2,50

3,00

3,50

4,00

Ind

icat

or

PI

Project sensibility to the planning production volume changing

Rendering service volume

Page 26: Resume of business-project :

Phoenix Pacific

System of collection and transportation of sorted domestic waste to be used as alternative fuel

• Creation on existing landfills in Sevastopol city the waste sorting and waste loading complexes with the service in the city and region.

• Fractions selection, which available as alternative fuel

• Preparing of sorted SDW fractions for burning as alternative fuel

• Transportation of prepared for waste fraction burning on special heavy-duty road train with trailer (waste capacity 300-350 cubic meters.)

System of collection and transportation of sorted domestic waste to be used as alternative fuel

• Creation on existing landfills in Sevastopol city the waste sorting and waste loading complexes with the service in the city and region.

• Fractions selection, which available as alternative fuel

• Preparing of sorted SDW fractions for burning as alternative fuel

• Transportation of prepared for waste fraction burning on special heavy-duty road train with trailer (waste capacity 300-350 cubic meters.)

Page 27: Resume of business-project :

Phoenix Pacific

The first link offered by corporation of an effective control system of a

waste in Sevastopol is introduction of separate gathering in places of formation of a waste after city districts with use of press containers in

volume of 20-30 m cubic

Export of not pressed waste by bunkers and usual containers is unfairly expensive, as the enterprises frequently should pay for «air export».

The press container, in comparison with the usual container, is capable,

depending on type of a waste, to contain in tens times more. Such effect is provided with presence of the pressing mechanism which condenses a pressed material in the container with consolidation factor 1:5 or 1: 7,

depending on structure of a waste.

Thus there is no necessity at once to devastate the container, a waste remains in it before container filling on what automatically informs a

sensor control of 100 % population.

The filled container is taken out by the specialized car with system capture, and on its place is established new – empty.

Page 28: Resume of business-project :

Phoenix Pacific

We propose using two variants of press-containers:

Mobile press-containers, where pressure chamber inseparable connected with refuse receptacle

Optimum size– 20 cubic meters.

Forcing compaction 1:5

Page 29: Resume of business-project :

Phoenix Pacific

Page 30: Resume of business-project :

Phoenix Pacific