resume details

21
17-01-2017 RAMACHARY MANIVANNAN CURRICULAM VITAE Ensuring my BEST Services to the Organization

Upload: manivannan-ramachary

Post on 08-Feb-2017

53 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: RESUME DETAILS

17-01-2017

 

RAMACHARY MANIVANNAN CURRICULAM VITAE

Ensuring my BEST Services to the Organization

Page 2: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

[email protected] [email protected] REPORTING DIRECTOR Please find the attached my Resume for the position applied for Manager related to Civil Engineering Constructions and in Project Management. I'm particularly interested in this opening / position, which relates strongly to my 35 years of experience in Project Management, Construction Management in Building, Construction industry.

As a Project Manager I do perform and will function as Senior Team Manager includes Company’s Focussed operations and make assuring on establishing and implementing business procedures, managing budgets, delegating responsibilities, innovating the organization property, hiring and assessing staff, attending meetings, and evaluating organization performance, is objective sense and holding responsibilities.

I am confident on my experience as below and assuring to contribute firmly as I have

Leadership and managerial skills Strong communication and interpersonal abilities Business acumen and problem-solving orientation Decision-making abilities Time management and deadline orientation Being able to delegate tasks Resourcefulness and innovation

Upon discovering your posting for Project Manager, I hastened to submit my resume for your review. As an experienced and motivated manager with exceptional leadership and interpersonal abilities, I am prepared to significantly contribute function with Integrated Management System and process to lead the field execution team groups.

Page 3: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

My background includes directing operations, employees, Constructions, Engineering and building Customer relations for the best service, strategies to drive business development and enhance overall performance. From overseeing variable and fixed operations and cutting operational costs to spearheading staff hiring / coaching and implementing new programs and process improvements, I excel at improving profit margins, developing and evaluating employees, and realizing consistent increases in sales volume.

Directing continuous the day operations, staff recruitment / training functions, and customer relationship management in consecutive and progressively responsible positions with Huxley Industrial Products, culminating in the role of General Manager.

Implementing cost-effective advertising and merchandising initiatives to maximize profits and stimulate a high level of customer satisfaction and referral business.

Effectively leading teams to propel project and product launch success; managing all aspects of project lifecycles to ensure optimal outcomes.

Demonstrating solid time management and organizational skills, along with powerful and effective sales and operations strategies.

My skills in Construction operations includes staff management, sales and financing, and business leadership have been finely honed, and I am confident my additional strengths will readily translate to your environment. The chance to offer more insight into my qualifications would be most welcome. Thank you for your consideration; I look forward to speaking with you soon.

A competent professional with 35 years of cross-cultural experience in

Construction Management in Building, Construction Field/industry. Expertise in executing projects with a flair for adopting modern construction

methodologies in compliance with quality standards. Proficiency in creating designs & plans, layouts, working drawings and managing

resources to ensure execution of projects. Successfully managed multiple projects and milestones while ensuring projects

complied with all cost, design and standard specifications. Well versed with PPM Concepts, MS Projects, Primavera & my Primavera. Well versed with HSE & Quality, QSP & QMS works procedure including Safety

Management. Possesses excellent relationship management, analytical and negotiation skills.

Page 4: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Looking after the entire project operations along with time, cost and quality

parameters, including technical (engineering) and techno-commercial coordination with all stakeholders.

Establishing time span of project execution as per client specifications; monitoring project status during the course of periodic project review meetings.

Inspecting the work as per architectural & structural drawing and maintaining the record of inspection; listing the resource needs for projects, after considering the budgetary parameters set.

Supervising all construction activities; providing technical inputs for methodologies of construction & coordinating with site management activities.

Executing commercial building works as per design and specification. Networking with Architects / Consultants / Clients / Contractors to ascertain

technical specifications, construction related essentials, based on the prevalent rules.

Maintaining excellent relations with Statutory Authorities for availing mandatory sanctions.

Eternia & Enigma Project for OBEROI Realty, Mumbai, India ( Rs 1600 Crs) Residential Tower & Town ship Building, Qatar ( USD 3.5 Bln) College of Pharmacy in Qatar University, Qatar ( QR 385 Mln) QPD Commercial Towers Includes Hotel Suits ,Qatar,(QR 10 Bln) Ministry of External Affairs, Ashgabat, Turkmenistan ( EURO 133 Mln) Sports F1 Theme Park , International Sports City, Dubai ( USD 250 Mln) Ritz Carlton Hotel , 5 Star with Apartments , Dubai(USD 275 Mln) Concourse and Terminal Extension for International Air Port ,Dubai ( USD 5.2 Bln) 220 Kva Substation Construction , Oman (USD 150 Mln) Prestigious IIMK-Management Faculty Buildings. India ( Rs.20 Crs) Mufti Office Complex Building, Brunei ( USD 5.5 Mln) HPCL Petrochemical Tanks/Pipeline/Control Buildings, Vizag, India SSWSSP Major Water Supply System Project, Andhra Pradesh, India TTPS Circulating Cooling Water System, Tamil Nadu, India Environmental Aerobic/Anaerobic Treatment Plants, Tamil Nadu, India Effluent Treatment Plant, New Delhi, India DCL Polyester Factory Building, Nagpur, India. VSP External/International Major Water/Sewerage Services for CPWD, AP, India VSP Piling Projects, Vizag, AP, India. Roads/Sanitary /Infra Projects (India) General Multi Level Tower Building Projects (India) Construction of Elevated water tanks Projects (India)

Page 5: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Project Management Professional Course with PMI ( Management Institution),progress. Master Diploma in PPM Project Expert from CADD Centre, Chennai in June 2009. Diploma in Civil Engineering by Directorate of Technical Education, Tamil Nadu from

The Seshasayee Institute of Technology, Tiruchirappalli in 1981. Computer Skill –M.S Office/datas/programmes/charts/Documents/submissions

PERIOD YRS COMPANIES COUNTRIES POSITION 2016 2016 1 BOUYGUES CONSTRUCTION INDIA SR PROD. MANAGER 2016 2015 1 SHAPOORJI PALLONJI W.L.L QATAR CONST. MANAGER 2015 2006 8 BOUYGUES BATIMENT INTERN QAT, TKM, UAE SECTION MANAGER 2006 2003 3 LAING O ROURKE DUBAI SENIOR ENGINEER 2003 2002 1 MRP TRADING & CONTRNG Oman, MUSCAT PROJECT ENGINEER 2002 2001 2 JMC PROJECTS IINDIA LTD INDIA SENIOR ENGINEER 2001 1998 2 GALFAR BRUNEI PROJECT ENGINEER 1998 1995 3 L& T ECCG INDIA SENIOR ENGINEER 1995 1993 2 INDIA - OWNED CONTRACTS INDIA PROPERITOR 1993 1981 12 THE COROMANDEL ENGG INDIA PROJECT ENGINEER

Overall Construction Execution -17 & 18 years in India & Abroad with Good Health.

Permanent Address : No.66/G2, Shenbaga Apartments, Laxmi Nagar 3 rd Street, Madippakkam, Chennai – 600091, Tamil Nadu, India. Present Address : Mulund Colony. Mulund West, Mumbai.400082 Age : 53 years Languages Known : English, Tamil, Hindi & Telugu. Valid Passport ; Till Aug 2020 Driving Licence ; Gulf Since 2006 I am well versed in Quality Systems Procedure methods techniques and will definitely do the best with you and confident to associate and responsible. I wish your consideration on my credentials & experience and looking forward to a positive response. MANIVANNAN RAMACHARY

Page 6: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

 

ANNEXURE TO CURRICULAM VITAE – RAMACHARY MANIVANNAN

PROJECTS EXECUTED DURING TENURE OF EXPEREINCE

Project Senior Production Manager Lead Engg Manager

The two upmarket complexes, named Eternia and Enigma, have been designed by architects of HB Design in Singapore, with whom Bouygues Bâtiment International has already worked on two projects (The River and Northpoint Pattaya) in Bangkok. Located at Mulund on two adjacent sites along Lal Bahadur Shastri Road, the two complexes will include four towers, providing 1,840 apartments and 4,977 car parking spaces, representing a total floor area of 605,000 m2. The 59-storey Enigma will stand 201 metres high while the 56-storey Eternia will stand 192 metres high. Situated in one

of the most dynamic suburbs of Mumbai, the condominiums have been designed with bespoke fittings and quality standards, which are on a par with the most prestigious residential developments. A diverse array of facilities will be included: landscaped gardens, swimming pools, a hammam, a yoga room, squash courts, children’s play areas, et

Construction Features (Structure)

Excavation 355,000 Cum

Concrete 300,000 Cum

Reinforcement 26,000 ton

Form works 620,000 Sqmt

Structural Consultant- LERA

Task Assignments and involved as Team Leader

Heading for Enigma Project as Team Production Head performed team Leading.

PERIOD COMPANY COUNTRY PROJECT VALUE

2016

2016 BOUYGUES

CONSTRUCTION INDIA INDIA OBEROIREALTY PROJECT-MULUND

RS.1600 CRORES

Page 7: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Excavation works Sub con is from JAS, Oberoi and the Execution is monitored during. Since March 2016.Leading with team Engineers, Supervisors and foremen. One Tower Raft casting is on progress towards completion of Rebar Form works and towards Casting. Another Tower is on WPF works status is on follow up.

---------------------------------------------------------------------------------------------------

Project Senior Construction Manager Lead Engg Manager

ABRAQUARTIER 3, 4, 5 & 6, THE PEARL QATAR

The project is located in the Pearl, Qatar with a total plot area of 57,186 m2. Development included four towers, each with one basement and forty storeys. The Project is comprised of installation of contiguous wall and CSM wall (with steel profiles as earth retention system followed by excavation from existing ground level to an average bulk excavation depth of approximately 7.0mand associated dewatering works in addition to installation of 364 nos. bored cast in-situ working piles with diameter of 1500mm.Owner is Qatar union Development company.

The Abraj Quartier, or “Neighbourhood of Towers,” is a major component of a major and ambitious mixed-use development in Doha known as “The Pearl”. The design language is essentially a contemporary interpretation of traditional styles and themes, which inturn have been informed by the regional climate and culture. The site plan organizes a series of residential towers and low-rise townhouses along a roadway and boardwalk that front on the Gulf. The boardwalk not only provides a pleasant pedestrian amenity but also serves as access to the adjacent beach. Two beacon-like office towers flank the main access road and serve as the gateway to the overall Pearl development. The Abraj Quartier will include 30 villas and -130 town houses with 3 level podium parking for 2488 cars.

PERIOD COMPANY COUNTRY PROJECT VALUE

2016

2016 SHAPOORJI PALLONJI

QATAR WLL QATAR RESIDENTITAL TOWERS-ABRAJ

USD

3.5 BLN

Page 8: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

The project comprises an Eight (3) level Parking Podium of approximate total built-up area of 38,976m2; Forty three (41) levels High Rise Office Towers of approximate total built-up area of 75,763m2 of which office space is approximately 51,730m2 on ground to 41st floors to be constructed as core and shell. The Scope of Works includes the construction of substructure, superstructure and external works. Also has 200 water Front Town houses.

Height of Towers -151.0 mtr each

Construction Features (Structure)

Concrete 285,000 Cum

Reinforcement 18,000 ton

Form works 720,000 Sqm

---------------------------------------------------------------------------------------------------------

Project Senior Construction Manager Lead Engg Manager

The College of Pharmacy is the project established in Qatar University campus is applied for consideration for provisional accreditation by the Canadian Council for Accreditation of Pharmacy Programs (CCAPP). CCAPP (Canada) is the sole pharmacy program accreditation agency in Canada. Provisional accreditation status is the highest level of recognition that this agency can award to new programs in the formative stage of development. CCAPP informed Qatar University that the institution had been awarded the status of Provisional Accreditation.

The program sought Full Accreditation status for the following the graduation of the first BSc (Pharm) in the First Class and the enrolment of the first students in the final year of the 6-year Doctor of Pharmacy program.

PERIOD COMPANY COUNTRY PROJECT VALUE

2016

2015 SHAPOORJI PALLONJI

QATAR WLL QATAR COLLEGE OF PHARMACY QATAR UNIVERSITY

QAR 385 MLN

Page 9: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Qatar University College of Pharmacy has been awarded the status of Full Accreditation for its Bachelor of Science program in Pharmacy & Doctor of Pharmacy programme for the six year term 2012 - 2018, international program to be awarded full accreditation status by CCAPP- Canada.

College of Pharmacy Facility,-3 levels Building for the area covered to 18000 sqmtr overall.

Pharmacy Building

Research Lab and Research Stations

Professional Practice lab, teaching wet Lab & Patient Access room

General Students Class rooms, meeting, Conference and 3D Auditorium

Analytical instrument rooms & molecular Characterization room

Quality Assurance and Quality Control Systems & Certification’s to the Products.

Construction Features (Structure) Finishing Features

Area 22200 m2 Fire proof Block works

Excavation 50000 m3 Sky Lights

Framed Structure Concrete 18500 m3 External Islamic Finishes

Reinforcements 3000 ton Decorated Landscaping

Form works 42500 m2 Water Features & Décor lightings

I was holding Independent responsible as Leading Senior Construction Manager was heading for the full Project Execution from beginning till the External works includes the internal and external finishes activities includes related MEP Services of Project. I was coordinating directly with Consultant and Client. Consultant is KHATIF & ALAMI.

Project was estimated to finish Dec 2016.

Page 10: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

                  

 

                          

   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐    

 

 

Project Senior Project Engineer Execution Team Leader

High Rise Buildings for QP District Head Quarters consisting 10 Towers includes a HOTEL SUIT. The project involves the construction of nine office towers ranging from 17 to 47 storeys, a 29 storeys five-star 409-key hotel, parking building, power substation and energy centre buildings, as well as a podium that will house public spaces such as restaurants, auditorium .

Total Built up area 700,000 m2 Offices 345,000 m2 Common area 9,250 m2 Hotel 65,300 m2 Auditorium 8,000 m2

PERIOD COMPANY COUNTRY PROJECT VALUE

2015 2010

BOUYGUES BATIMENT INTERNATIONAL QATAR QPD COMMERCIAL

BUILDING QAR 10 BILLIONS

Page 11: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Utilizing its growing spectrum of services to manage one of the largest real estate projects currently under construction in Qatar, QPM provides the QP District project with the following services: Project Management, Design Management, Construction Management, Cost Management and Programme Management

With the nine towers mainly consisting of office space, there will be some room for a number of restaurants and shops located on the ground floor, which will be of benefit to the occupants who will be keen to avoid the sky high temperatures during the summer months.

The hotel, whose brand identity remains nameless, will be located at the southern-most point of the site, ensuring that international guests can be located nearby to what will be a centre for Doha’s financial sector.

Concrete volume 4,500,000 m3 Reinforcement 66,000 ton Form works 25,000,000 m2

I was one among 4000 staffs working during the constructions and I have been in Hotel Tower constructions was having huge volume of concrete in Hotel alone 180000 m3 includes the Hotel Tower and Podium connected together was maintaining 6 days once Slab Casting Includes Post tensioning activities. And additionally worked for External Travertine Stone Cladding activities from GFL to Podium Level

Complete Consulting Design have been under KEO Internationals Team, approval for all

I was having 800 workers with day & Night team of Engineers and foremen and was leading the execution with coordination of KEO, Structural Consultant. Dealing with a small army of 5,000 workers on a daily basis, working in two 11-hour shifts, six days a week, Despite these numbers, the QPD project has an exceptionally high safety record, operating without incident for a 12 million man hours in total.

BMC is responsible for waterproofing and painting, while precast concrete elements are the remit of Redco International, with LEO Steel and CCL overseeing metal works and post-tensioning of concrete slabs respectively.

Page 12: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

 

  

Page 13: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

PERIOD COMPANY COUNTRY PROJECT VALUE

2010 2009

BOUYGUES TURKMEN TURKMENISTAN MINISTRY OF

AFFAIRS EURO133

MLN

 

     

Project Senior Site Manager Execution Team Leader

This Project established by Government of Turkmenistan and located in the Capital Ashgabat. It has the Original Architecture, the 16-story skyscraper surmounted by a giant globe, which houses rooms for press conferences. In the building 118 workers offices and meeting rooms, auditorium, conference room, lounge for international conferences. On the 11th floor there is a viewing terrace with panoramic views of Ashgabat. The building was erected in Archabil avenue, which also has offices other Turkmenistan ministries and departments.  There was a Unique 26 mtr Spherical Doom was designed by Gurit, Composite Specialist Steel Structural Doom Consultant, erected above the Roof of Auditorium on top. The Building was covered around by international standard glazed Façade system throughout full height.

Page 14: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

The Country Islamic pattern finishes involved internally with fascinate decorated in all the premises of Offices includes library, faculty and Prayer Rooms.

Excavation - 40000 cum Externals – Terracotta & Granites

Structure conc - 7000 cum Internals – Granites & Glazed

Reinforcement - 900 tons Roof – Turkmen pattern Tiled Doom

Form work - 8000 Sqmtr Fittings- International Standards

Assigned for Complete Structure Concrete activities includes the team working in

Excavation , Substructure WPF works, Rebar ,form works and Casting .Headed to keep 6 Site Engineers , 6 Foremen and had 258 workers includes for all the activities includes Subcontractor workforce .On Completion took charge for the external finishing includes on

the Building Elevations and around the Buildings for Services. It covers all the floor levels utility

Services installation co coordinating with MEP Team

.

-------------------------------------------------------------------------------------------------------

  

Page 15: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Project Senior Project Engineer Execution Team Leader

Ritz Carlton Hotel (Dubai, United Arab Emirates) - 2005/2008 In a joint venture with local Abu Dhabi contractor Target Engineering Construction, Bouygues Bâtiment International built a 5-star Ritz-Carlton hotel. The complex is at the centre of the International Financial Centre, in a tax-free zone. It includes 340 rooms and suites, 124 serviced apartments, 323 luxury apartments, 3 restaurants, several conference halls, ballrooms, sports facilities, etc. The amenities combine modern & traditional Mediterranean design under a turnkey design and build contract, the 15-storey luxury complex provides guests, residents and customers with 240,000m² of floor space, on a premium site which stretches across 350m of the Arabian Gulf shoreline. Building elevations are clad in granite finishes and opulent interior fittings showcase classical Arab style within an elegant modern design.

Other key facilities include three specialty restaurants, a grand function suite, a sports club and a state-of-the-art spa. Outside, two vast patios form a spectacular focal point for the complex, with a 40-metre high waterfall cascading down a curtain wall.

       

 PERIOD COMPANY COUNTRY PROJECT VALUE

2009

2006 BOUYGUES BATIMENT

INTERNATIONAL DUBAI RITZ CARTLON PROJECT

USD 275 MLN

Page 16: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Owner - Union Properties Architects- Gensler International and Associates

Construction Features ( Structure) Finishes

Excavation - 165000 cum Externals – Terracotta & Granites

Structure conc - 65000 cum Internals – Granites & Glazed

Reinforcement - 7800 tons Roof – Gulf pattern Roofing Systems

Form work - 38000 Sqmtr Fittings- International Standards

Assigned for Completing the Structure Concrete activities includes the team working in Excavation , Substructure WPF works, Rebar ,form works and Casting .Headed to keep 6 Site Engineers , 12 Foremen and had 315 workers includes for all the activities includes Subcontractor workforce ( Post Tensioning Team ).And continued working for External Façade including coordination with MEP& Utiliy services for full project area around.

----------------------------------------------------------------------------------------------

PERIOD COMPANY COUNTRY PROJECT VALUE

2006

2003 AL NABOODAH LAING

O ROURKE DUBAI DUBAI INTERRNATIONAL AIRPORT

USD 5.2 BILLION

Project Senior Project Engineer Lead Senior Engineer

Terminal 3 includes a multi-level underground structure, first and business class lounges, restaurants, 180 check-in counters and 2,600 car-parking spaces. The terminal offers more than double the previous retail area of concourse C, by adding about 4,800 m2(52,000 sq ft) and Concourse B's 10,700 m2 (115,000 sq ft) of shopping facilities.

This is one among the largest building in the world by floor 1,713,000 m2 (18,440,000 sq ft) of space, capable of handling 43 million passengers in a year. A large part is located under the taxiway area and is directly connected to Concourse B: the departure and arrival halls in the new structure are 10 m (33 ft) beneath the airport's apron.

Page 17: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

Owner- Department of Civil Aviation

Structural Consultant- Dar al Hadassah

Finishing works- Al Habtoor & Murray Robert

Construction features ( Structures)

Structure Conc - Foundation & Diaphragm wall alone 2,500,000 cum

Reinforcement - For the above Substructure alone 350,000 tons

Form works - Foundation/walls/columns alone 2,800,000 m2.

Assigned for the above area of works in handling all the three activities continuously with group Engineers ( I was one among the Senior ENGINEER in the Team

r Substructure WPF works, Rebar ,form works and Casting .Headed to keep 6 Site Engineers , 10 Foremen and had 800 workers includes for all the activities includes Subcontractor workforce . The responsibility includes all the Logistic activities leading and coordinating.

---------------------------------------------------------------------------------------------

Page 18: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

PERIOD COMPANY COUNTRY PROJECT VALUE

2002

2001 JMC PROJECTS ( I) LTD INDIA IIMK -INFRASTRUCTURE RS.20

CRORES

Project Senior Project Engineer Lead Senior Engineer

Spread over about 111 acres of land, the Indian Institute of Management Kozhikode, is situated on two hillocks in the Kunnamangalam Area of ancient city of Calicut in Kerala. Boasting of one of the most picturesque and oxy-rich campuses in the country, the world class infrastructure includes air-conditioned classrooms, guest care areas and LAN/WAN connectivity which enables every IIMK resident to be exposed to a wholesome experience. Managed by a dedicated regular administrative staff of 66, it is one of the most efficient Institutions in the country, IIMK pioneered the Interactive Distance Learning (IDL) Program for working executives in India, started with 300 class contact hrs in 2001-02.The Two year-long Executive Post Graduate Programme in Management is the most rigorous programme available in the country having around 810 class contact hours with Accreditation of AMBA (Association of MBAs). The also has residential facilities for students, faculty and visitors. The campus houses 13 hostels to house around 800 students who are required to stay on campus. Set up over 100 acres of land, the campus relies on rain water harvesting as its primary source of water

Construction Features.-Structures concrete was 30000 me3 overall and rebar 1115 ton for all the Building. Construction was maximum 3 levels whereas the Finishes to the International Standard digital systems involved inner decorations, facilitated.

My role was the Senior Project execution Leaded was heading to 15 Engineers and team workforce 900 at a peak time execution involved including Finishes , initiated.

Concrete volume 41,500 cum

Reinforcement 9,500 ton

Form works 13,500 m2.

Externals are Tile Cladding and Roofing was Kerala pattern slope roof tiling works internal are finished with Digital mode functions equipment’s fixed for the Course study.

Page 19: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

     

 

---------------------------------------------------------------------------------------------

PERIOD COMPANY COUNTRY PROJECT VALUE

2000

1998

GALFAR PEMBINAN

SDN BHD BRUNEI STATE OF MUFTI

BUILDING USD 5.5

MLN

Project Senior Project Engineer Lead Senior Engineer

This is Islamic religious rulers facilitated infrastructure Building has all the various office ruling instructions are decided and to make use purpose exclusively includes the Prince accommodate for the Country formulations

The Grand Mufti (Arabic): is the highest official of religious law in a Sunni or Ibadi Muslim country. The Grand Mufti issues legal opinions and edicts, fatāwā, on interpretations of Islamic jurisprudence for private clients or to assist judges in deciding cases. The collected opinions of the Grand Mufti serve as a valuable source of information on the practical application of Islamic law as opposed to its abstract formulation. The Grand Mufti's fatāwā (plural of "fatwā") are not binding

Page 20: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

precedents in areas of civil laws regulating marriage, divorce, and inheritance. In criminal courts, the Grand Mufti's recommendations are generally not binding either.

Building has

Office Blocks at four locations – 6 floors-area of each ,built in 12000 m2 Mufti Prayer hall separate 1600 m2 Faculty office areas 2000 m2 Utility services in Basement for the full area of Building -4600 m2 Services for Office Staff include change room facility 2600 m2

Construction features ( Structures )

Concrete 28,000 m3 Reinforcement 1,000 ton Form works 26,000 m2

Building Finishes

Islamic Pattern Arches internally and External sides of Building all-round Suspended Roof on the Top of Building with Islamic Religious MINAR fixed. Wooden works finishes inside walls, Ceiling (Tungon Groove finish) Islamic carved wooden doors and windows inside of full offices area Granite and Marble finished Floor and walls inside and outside Suspended Planter Boxes ( Cast in situ) Islamic decorated ( GRC mould) External Building decorated Landscape includes water features\ Decorated Islamic country style Lighting fixtures in and out side

I was working as Senior Site Engineer had 4 site Engineers along with me includes 8 foremen and 350 workers other than Subcont works team.I have been since Excavation till hand over the Projects includes complete Finish to Mufti, Brunei Governments.

Structural Consultant was from Malay deployed Engineering Team and Architect was from Philippines.

Construction was foundation, Retaining wall ( PERI) Columns and six levels Slab and finally Doom on top ( includes Frame Erections, Site fabricated Curved form works , Cast in situ concreting works and then worked for the full Finishes activities includes external Building services ( MEP) and Landscaping works.

Gained GRC Mould fixed ARCH casting works to the various sizes and designs involved.

Page 21: RESUME DETAILS

RAMACHARY MANIVANNAN CURRICULAM VITAE

 

   

---------------------------------------------------------------------------------------------