resume 2013

5
Fernando Contreras 9257 Raúl Garza, Cd. Juarez, Chih. 32650 Home: 6199629 Movil656 6437407 [email protected] SUMMARY Mold and tool designer / Mold and die maker, Tool room supervisor, EDUCATION / TRAINING Bachelor degree in mathematics CBTIS 1281983Unigraphics mold Wizard PLM Refrigeration, electricity and toolmaker technician1983 Chicago Cd, Juarez Mexico CNC programming (Community College) 1995 GD&T (Community College) 1995 El Paso Tx. Unigraphics post processor (Unix solution) 2003 Mexico DF. Green Belt 2004 Cd. Juarez Mexico PROFESSIONAL EXPERIENCE Tool and mold designer 1/2011 to Present Responsible to all design and fabrication aspects of tools requested to me for a local machine shops That servicers depending of the job, can be design, fabrication, reparation, modification or tooling update drawings only. I use depending of the tools or jobs provide to me: mold wizard of unigraphics, mold flow analysis, another kind of simulator, CNC programming Most of the time I order specialized parts like punches, matrixes, hot runners, heater, core pins, slides, lifters, sleeves, plungers, retainers, cylinders, racks, pinions, sensors, switches, cam actions, relays, die sets, mold sets, ejector, accelerator ,etc. And materials too!! , like edm electrodes, Wire, cooper, aluminum, steels ( mold,die and tool steels) In every job that I accepted I always provide to my customer fabrication support. Latest accomplishments: Repair a large 4 cavity complete damage or destroyed mold (40 tons) Built in a solid block, without any drawings or reference points, this job allowed to tooling die of Mexico recover 50,000 usdwho was detained for almost a year. Repair a welded cavities for a Battery cover , the welded area cannot be texturized properly due to a different materials between steel base and electrode used when was reworked ,after that , they call me to see the problem, then I checked the cavity steel and called to Bholer to request the proper electrode bar , after applied both cavities

Upload: fernando-contreras

Post on 18-Jul-2015

306 views

Category:

Business


0 download

TRANSCRIPT

Page 1: Resume 2013

Fernando Contreras 9257 Raúl Garza, Cd. Juarez, Chih. 32650

Home: 6199629 Movil656 6437407

[email protected]

SUMMARY

Mold and tool designer / Mold and die maker, Tool room supervisor,

EDUCATION / TRAINING

Bachelor degree in mathematics CBTIS 1281983Unigraphics mold Wizard PLM

Refrigeration, electricity and toolmaker technician1983 Chicago

Cd, Juarez Mexico

CNC programming (Community College) 1995 GD&T (Community College) 1995

El Paso Tx.

Unigraphics post processor (Unix solution) 2003 Mexico DF.

Green Belt 2004 Cd. Juarez Mexico

PROFESSIONAL EXPERIENCE Tool and mold designer 1/2011 to Present Responsible to all design and fabrication aspects of tools requested to me for a local machine shops That servicers depending of the job, can be design, fabrication, reparation, modification or tooling update drawings only. I use depending of the tools or jobs provide to me: mold wizard of unigraphics, mold flow analysis, another kind of simulator, CNC programming Most of the time I order specialized parts like punches, matrixes, hot runners, heater, core pins, slides, lifters, sleeves, plungers, retainers, cylinders, racks, pinions, sensors, switches, cam actions, relays, die sets, mold sets, ejector, accelerator ,etc. And materials too!! , like edm electrodes, Wire, cooper, aluminum, steels ( mold,die and tool steels) In every job that I accepted I always provide to my customer fabrication support. Latest accomplishments:

Repair a large 4 cavity complete damage or destroyed mold (40 tons) Built in a solid block, without any drawings or reference points, this job allowed to tooling die of Mexico recover 50,000 usdwho was detained for almost a year.

Repair a welded cavities for a Battery cover , the welded area cannot be texturized properly due to a different materials between steel base and electrode used when was reworked ,after that , they call me to see the problem, then I checked the cavity steel and called to Bholer to request the proper electrode bar , after applied both cavities

Page 2: Resume 2013

was reworked and texturing . allowed to Tooling die recover 24,000 usd who was detained for almost 3 months

Design 7 stamping progressivedies, in a record time tomaquinados HB, this job allowed to the owner to maintain his customer.

Adapt new hot runner system in a stack mold, because the original was damage and cannot be repaired because are obsolete, and the fabrication company was no longer , this job allowed to Century mold achieve his production goals, I was outsourced by GM tools.

Insert broken slide to avoid makingnew one, they save 22,000 dollars, this job was made for century mold and the local shop to fabricate the insert was Plastic and stamping solutions.

Delphi Thermal Systems 10/2007 to1/2011 Cd. Juarez ToolingandMethods Engineer. Responsible of: Molding and stamping presses andher equipment, planning, made and validate any engineering change,validate repaired, modified ornew tools some ones in Mexico, USA.And South Korea, bought mold and die spare parts, components, materials, tool room and maintenance consumables, trained tool room and maintenancepersonal; designed and fabricate any tool required to improve the production rate or safety,generate all documents requiredfor the PCP. Like HVP’s,PFMAS, DFMAS, PPAPS, generate and implement maintenance programs, improve tool room quality, reduce down time and scrap levels,transferred and implemented processes either from development or from another manufacturing facility, reviewed all tool designs with the designers to find any problem or interference before to send to manufactured. Accomplishments:

Refurbish a complete destroyed stamping pressarrived from Donchery France, inhome.

Refurbish a complete stamping press arrived from New York Plant,this machine was sent to Oak Company.

Validate in KDAC (Delphi Korea) 6 progressive stamping dies for 58 mm evaporators for Mexico and Poland in only 15 days, this action allowed to our division tolaunch the product on time.

Validate 16 plastic injection moldsfor GMplatform, in only a month.

Page 3: Resume 2013

Dynamic Plastics 1/2006 to10/2007 Cd. Juarez Tool room Supervisor Responsible of: Supervised all tool room technicians, maintained thetool roomjobs schedule, bought all tool room consumables, and specialized tools and parts , maintained all tool room equipment. Designed and fabricated any tool that the plant needs to improve his production or his safety. Maintained proper inventory of many specialized parts for plastic injection molds and his hot runners Maintained all plastic injection molds, made all engineering changes, validated and implemented according with his quality systems, Validated abroad some new plastic injection molds like China, and Portugal, Supervised all hot runner repaired in house Generated tooling inspection report, check list, Process Control Plan, Papp’s and all involved documents Requested by the quality systems. My principal challenge in this company was to maintain properly molds with a lot kind of surface finishes. Most of the molds was for television (fronts, panel and backs) the biggest was 45 tons with mold master hot runner and some valve gates.

Accomplishments:

Reduce scrap levels to 3% , from 16%

Reduce the changeover to only 45 minutes from 6 hours. (SMED technical)

Maintain molds properly with only 2 technicians by shift.

DELPHI MTC 4/2000 to 12/2005

Tooling Engineer, Tool room supervisor Cd. Juarez. Responsible of: Supervised mold makers and tool designers, designed and fabricated new plastic injection molds for automotive sensor’s most of them are over mold, bought any necessary tools and items to use in a mold construction, generated any program for the machining centers, WEDM, and any CNC machine that we need to use for a mold fabrication, with unigraphics cam. develop a SLS way to make rapid prototype injection molds,Standardized all plastic injection molds using Master unit dies (MUD) Accomplishments:

Made a new mold every 4 weeks

Made a proper team to made mold in home

Used Unigraphicscam to programming al CNC equipment from my computer.

Design mold with solid edge, and unigraphics mold wizard.

Learn and develop stereo lithography process with steel for prototype molds.

Work properly with many people for other countries.

Page 4: Resume 2013

PlasticosSotec/ Proctor Silex9/1992 to 2/2000

Juarez Tooling General Supervisor responsible of: Maintained in proper conditions all stamping dies, plastic injection molds, thermo set injection molds, and aluminum injection over molds. Made all change of engineering request in the plant. Make all repairs of any damage tool, sometimes I used external machine shops Maintained proper inventory of many specialized parts for stamping dies and injection molds. Supervised all tool room personnel about 24 mold makers and two designers Maintained thetool room jobs schedule. Bought all tool room consumables, specialized tools accessories or parts Maintained all tool room equipment. Design and fabricate any tool that plant needs to improve his production or his safety. Implement maintenance programs for stamping dies and injection molds Training all involved people in plastic molds maintenance, repair methods and fabrication. Made spare part and completemolds in house.Coordinate all tool room jobs in four shifts. Designed and built any fixture for secondary operations needed to make in the plastic parts, Repaired and maintained ultrasonic and compression plastic welding machines Repaired and maintenance of casting aluminum dies, and refurbish his surface finish. Accomplishments:

Design and fabricate many mold during normal working time

Always launch new products on time.

Hire all tool room personal

Reduced the expenseson external machine shops in more of 2000 usd by year.

General Instruments 1984 /1990

Page 5: Resume 2013

Mold Maker Responsible of:

Designed and fabricated plastic injection molds, some molds were made for some different colors. Some of they was used a pure form molds andover mold, and some was molded in a double cannon machine. They was used for IBM key board and night vision switches Designed and fabricated some single kinds of stamping dies. Bought any tool, equipment or component that I need it to repair the molds from production. Followed all jobs schedule that the supervisor gave to me. Make any repair that the molds needed where were running. Accomplishments:

Design and built many mold in Master unit dies

Learn to use mechanical design (Autocad.13)

Learn to use EDM sinker

Learn over mold technologies Great experience in machining, design and implementation of maintenance plans Tools validation, troubleshooting and technicians supervising.