RESEARCH AND ANALYSIS The First Phase of our Work Wednesday, June 12, 2013 For Official Use Only 1 Craig Farrill Acting CTO FirstNet Board Member

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

RESEARCH AND ANALYSIS The First Phase of our Work

Wednesday, June 12, 2013 For Official Use Only 1

Craig Farrill Acting CTO FirstNet Board Member

Page 2: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

• Concepts and analysis, not decisions • Work we need to complete to move FirstNet forward • Analysis that can’t be completed until we get input from you • What FirstNet will be and do for you

Here’s our current thinking…

This section is about…

RESEARCH AND ANALYSIS

Wednesday, June 12, 2013 For Official Use Only 2

Page 3: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Network Analysis Areas • Architecture • Coverage and Capacity • Dynamic Priority and Control • Security • Resiliency and Reliability Radio Access Network Analysis Areas • Performance Optimization • Cell Range • Radio Planning Criteria Core Network Analysis Areas • Core Architecture and Standards • Distributed Hubs • Data Centers

RESEARCH AND ANALYSIS

Wednesday, June 12, 2013 For Official Use Only 3

FirstNet has researched many areas to get ready for state consultation.

Page 4: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

FirstNet will integrate public safety requirements and assets.

FirstNet Integrated Nationwide Network Infrastructure

Terrestrial and Satellite Mobile Operator Assets

State / Territory / Tribal / Local & Federal PS Wireless Assets

Public Safety Statement of Requirements (SOR)

Wednesday, June 12, 2013 For Official Use Only 4

FIRSTNET APPROACH

Page 5: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 5

What will FirstNet do for you?

• Video: 1-to-many • Messaging • Images • Group Text • Voice: Non-Mission Critical

• Your applications (Private, Selective sharing)

• FirstNet Applications • Syndicated Applications

• Data Storage • Recordkeeping • Search • Databases (CJIS, etc.)

• NOC Status • Activation • Product Ordering • Dynamic Priority Access

Communication Applications

Services Capabilities

FIRSTNET OFFERING

Page 6: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 6

Four fundamental building blocks that make up a network

ANATOMY OF FIRSTNET

Page 7: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 7

ANATOMY OF FIRSTNET

FirstNet: Nationwide Core and Local Radio Access Networks

STATE RAN

COVERAGE AREA Police

Fire Rescue

Mutual Aid First Responder

FIRSTNET NATIONWIDE DISTRIBUTED CORE NETWORK

Communications Applications Services

Switching Routing Scheduling

Databases/ Warehouses Security

Interfaces to Other Networks

FIRSTNET RADIO ACCESS NETWORK (RAN)

Backhaul Radio Link

Page 8: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Working with the public safety community, we will define what “public safety grade” means.

Wednesday, June 12, 2013 For Official Use Only 8

FirstNet Attribute Defining Public Safety Grade

Coverage “Where public safety needs it” (Geographic)

Reliability “You can bet your life on it”

Resiliency “Multiple back-up options”

Emergency Communications “Your trusted resource”

Group Communications “Essential to teamwork”

ANATOMY OF FIRSTNET

Page 9: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Public Safety User

COVERAGE

Wednesday, June 12, 2013 For Official Use Only 9

#1: Multiple Terrestrial Mobile Systems #3:

Deployable Systems

#2: Mobile Satellite Systems

Diverse Coverage Architecture: considering a “3-in-1” Approach: Terrestrial + Satellite + Deployable

Page 10: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Public Safety User

COVERAGE

Wednesday, June 12, 2013 For Official Use Only 10

#1: Terrestrial Mobile System #3:

Deployable Systems

#2: Mobile Satellite Systems

Diverse Coverage Architecture: considering a “3-in-1” Approach: Terrestrial + Satellite + Deployable

Page 11: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Public Safety User

COVERAGE

Wednesday, June 12, 2013 For Official Use Only 11

#3: Deployable Systems

#2: Mobile Satellite Systems

Diverse Coverage Architecture: considering a “3-in-1” Approach: Terrestrial + Satellite + Deployable

Page 12: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Public Safety User

COVERAGE

Wednesday, June 12, 2013 For Official Use Only 12

#3: Deployable Systems

#2: Mobile Satellite System

Diverse Coverage Architecture: considering a “3-in-1” Approach: Terrestrial + Satellite + Deployable

Page 13: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Public Safety User

Diverse Coverage Architecture: considering a “3-in-1” Approach: Terrestrial + Satellite + Deployable

COVERAGE

Wednesday, June 12, 2013 For Official Use Only 13

#3: Deployable Systems

Page 14: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

SKYBRIDGE BENEFITS

Wednesday, June 12, 2013 For Official Use Only 14

COVERAGE

SkyBridge: Using satellite to connect to FirstNet Core services and applications.

FIRSTNET CORE NETWORK

• A vehicle-mounted and powered FirstNet BC14 PicoCell

• Local coverage in and around vehicle

• Works wherever satellite data links can be established

• Can serve: - Rural areas - Tribal lands - Wilderness - Parks and federal lands

Page 15: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Terrain Ruggedness: a major impact on radio propagation

Wednesday, June 12, 2013 For Official Use Only 15

Terrain data for Alaska and Hawaii not immediately available

Terrain data for U.S. territories not immediately available

COVERAGE

USA: 3.8 million square miles Alaska: 18% of US land mass

Page 16: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 16

Land use is significant to coverage planning.

COVERAGE

Page 17: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Population is a starting point, but public safety events don’t always happen where people live.

Wednesday, June 12, 2013 For Official Use Only 17

Population data for U.S. territories not immediately available

Population data for Alaska and Hawaii not immediately available

COVERAGE

Population Density: 85% of US Population Lives Within 9% of Land Mass

Page 18: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

National Highway System: as Defined by the Federal Highway Administration

Wednesday, June 12, 2013 For Official Use Only 18

Highway data for U.S. territories not immediately available

COVERAGE

Our nation’s roads and highways are used extensively by first responders.

Page 19: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 19

Tribal Land

COVERAGE

FirstNet has a mandate to provide rural coverage which includes tribal lands.

Page 20: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 20

• Jurisdictional boundaries • Rural and unpaved roads • Population scarcity • Critical infrastructure • Incident data

• Natural disasters • Tribal lands • Parks and open space • Underserved areas • Utility infrastructure

FirstNet coverage considerations go far beyond those of commercial networks.

Public Safety Factors

COVERAGE

Page 21: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

RELIABILITY

Wednesday, June 12, 2013 For Official Use Only 21

Page 22: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 22

The majority of cell site outages are due to loss of power and data links.

RELIABILITY

Public safety-grade design includes: • Extended battery life • Back-up power systems • Diverse cell site links • Diverse cell site link technology (fiber, coax, microwave, telco)

Page 23: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

A redundant and diverse network is essential for reliability.

REDUNDANCY PHYSICAL Avoiding single points of failure across the network (power, backhaul, sites, coverage) OPERATIONAL • Backup equipment • Deployables • Commercial carrier

roaming/direct mode

RELIABILITY

Wednesday, June 12, 2013 For Official Use Only 23

Page 24: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wind zones will require more robust hardening...

Wednesday, June 12, 2013 For Official Use Only 24

Wind speed data for Alaska, Hawaii, and U.S. territories not immediately available

RELIABILITY

Page 25: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

…as will seismic zones. Hardening is not one size fits all.

Wednesday, June 12, 2013 For Official Use Only 25

Seismic data for U.S. territories not immediately available

RELIABILITY

Page 26: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

RESILIENCY

Wednesday, June 12, 2013 For Official Use Only 26

Page 27: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

RESILIENCY

PHYSICAL • Diverse Routing- Switching and Backhaul • Mirrored Databases • Geographically Distributed Processing OPERATIONAL • Deployables

• Cells on Wheels • Systems on Wheels

• Capacity Management/Load Shifting • Spares Management

Recovering quickly after an network incident is imperative.

RESILIENCY

Wednesday, June 12, 2013 For Official Use Only 27

Page 28: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

DEVICES

Wednesday, June 12, 2013 For Official Use Only 28

Page 29: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Wednesday, June 12, 2013 For Official Use Only 29

FirstNet devices will be designed to meet public safety requirements and support critical application and service needs.

DEVICES

An RFI was issued for devices on April 15, 2013. These are device type examples for illustration only.

Page 30: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

PROJECT PHASES

Wednesday, June 12, 2013 For Official Use Only 30

Page 31: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Deployment & Operations

Contracts & Core Network Completion

Stakeholder Decisions

Phase I Requirements Planning

Phase IV Phase II Phase III

Wednesday, June 12, 2013 For Official Use Only 31

FIRSTNET PROJECT PHASES

Page 32: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Stakeholder Decisions

SLIGP Phase 2 - Data Collection

Core and RAN specifications

Network RFPs issued

Pilot Project integration and device planning

FirstNet business model

State RAN plan build-out documents issued

Requirements Planning

Wednesday, June 12, 2013 For Official Use Only 32

Phase II Phase I

SLIGP Phase 1 – Requirements Gathering

User and Network Requirements

Network RFIs issued

BTOP Spectrum Leases

Initial design concepts documented

FIRSTNET PROJECT PHASES

Page 33: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

Deployment & Operations

Contracts & Core Network Completion

• Contracts and contractors (operating partners, core, RAN, site development, user support services)

• Core network deployment/integration • Device original equipment manufacturer (OEM)

agreements • Data center integration • Initial pilot project (BTOP) integrations

Requirements Planning

Contracts & Core Network Completion

Wednesday, June 12, 2013 For Official Use Only 33

Phase III Stakeholder Decisions

FIRSTNET PROJECT PHASES

Page 34: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

• Spectrum clearing • Network deployment • Network testing/interworking • Billing/user support services • Device testing and field deployments • Operational process trials

Requirements Planning

Contracts & Core Network Completion

Deployment & Operations

Wednesday, June 12, 2013 For Official Use Only 34

Phase IV Stakeholder Decisions

FIRSTNET PROJECT PHASES

Page 35: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

• Creating a nationwide architecture and standards with local management and adaptation.

• Optimizing the use of existing wireless facilities to reduce

network spend. • Building relationships with all 56 states and territories.

• Working together based on your requirements

• Deploying a fully-integrated public safety-grade nationwide

wireless broadband network serving first responders and public safety for decades to come.

Wednesday, June 12, 2013 For Official Use Only 35

Please join us in this mission.

FIRSTNET IS COMMITTED TO…

Page 36: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

FirstNet will build a network for millions of public safety users who need to be able to send data and talk to one another to meet their mission.

Creating FirstNet will require an unprecedented level of public-private partnership, collaboration and shared commitment to the well-being of all Americans.

Wednesday, June 12, 2013 For Official Use Only 36

Page 37: RESEARCH AND ANALYSIS · RESEARCH AND ANALYSIS . The First Phase of our Work . Wednesday, June 12, 2013 For Official Use Only 1 . Craig Farrill . Acting CTO . FirstNet Board Member

www.firstnet.gov Wednesday, June 12, 2013 For Official Use Only 37