reporton rootcauseanalysisonvalveleakobserved …

10
REPORT ON ROOT CAUSE ANALYSIS ON VALVE LEAK OBSERVED AT LTHE HASBAH SITE Suresh J – Sr. DGM, Manufacturing. RCA REF: QM NCR IK ON 061RCA OO1

Upload: others

Post on 19-Apr-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …

REPORT ON

ROOT CAUSE ANALYSIS ON VALVE LEAK OBSERVED

AT LTHE HASBAH SITE

Suresh J – Sr. DGM, Manufacturing.

RCA REF: QM NCR IK ON 061�RCA OO1

Page 2: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
Page 3: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
Page 4: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …

2.1 Verifications at L&T Valves Factory:

Page 5: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …

2.2 Correction:

Page 6: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
Page 7: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …
Page 8: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …

Why?

Why?

Why?

Page 9: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …

Why?

Why?

Why?

Page 10: REPORTON ROOTCAUSEANALYSISONVALVELEAKOBSERVED …