Date: 11/11/2017 Report on One Day Industrial Visit at Kolaghat Thermal Power Plant Station (KTPS), WBPDCL Organised by Department of ECE NSHM Knowledge Campus, Durgapur Date: On 6 th November 2017 Venue: KTPS, Purba Medinipur, West Bengal

Upload: others

Post on 30-Mar-2020

139 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Date: 11/11/2017

Report on

One Day Industrial Visit at Kolaghat Thermal

Power Plant Station (KTPS), WBPDCL

Organised by

Department of ECE

NSHM Knowledge Campus, Durgapur

Date: On 6th

November 2017

Venue: KTPS, Purba Medinipur, West Bengal

Page 2: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Objective:

1. To enhance the knowledge of students about thermal power plant of KTPS,

WBPDCL

2. To Observe the different section of the power plant and understanding the basic

working principle.

3. To know working role of a person in industry.

Division of the students: 2nd year (3rdsem 20 nos.) and 3rd year( 5thsem 15 nos.) students

of ECE

Total Number of students: 35

Name of the Faculties:

1) Prof. Anu Samanta (Co-ordinator)

2) Prof. Jesmin Zakaria (Team member)

3) Prof. Madhu Sudan Das (Team Member)

Event Description:

An Industrial visit to “Kolaghat Thermal Power Plant Station

(KTPS),WBPDCL, Purba Medinipur, West Bengal” was organized by

the Electronics and Communication Department of NSHM Knowledge

Campus, Durgapur on Monday, 06th November 2016 comprising 35 nos. of

ECE students (both 2nd

. and 3rd

yr.) and 3 faculties. Kolaghat Thermal Power

Station involves a total installed capacity of 1260 MW. There are Bakreshwar

Thermal Power Plant having capacity of 1050MW, & Sagardighi Thermal

Power Project having capacity of 600MW, Bandel Thermal Power Plant and

Santaldihi Thermal Power Plant undertaken by WBP DCL.

Page 3: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

On 6th

November 2017 early in the morning at 5 am faculties reached at

college campus and students reported at 5.20am. Then at 5.30 am we started

journey by bus and we reached Shaktigarh halt stoppage at 7 am where

students’ took their breakfast and then again bus started at 7.30am. At 10.15 am

we reached at KTPS Thermal Power Plant. After completed some formalities

and submitting official documents in the Admin Block we entered inside the

power plant which is subdivided into two section one is generation section from

where power is generated and another one distribution section from where

power is distributed. We first visited the mechanical operation/thermal power

generation/GM Building in the 1st. session which was from 11am to 1.30pm.

and interacted with the Technical coordinator persons. The Technical

coordinator divided our students into two subgroups of 2nd

year and 3rd

year

along with event coordinator Mr. Saptarshi Hazra and Mr. Sanjeev Chakraborty.

The Technical coordinators of KTPS conducted very informative session for the

students and also he explained the function of each section/system from where

power is generated. He also guided the students and showed all the section and

the importance in the current work of KTPS. Finally the session was concluded

with question-answer/doubt/query clearance session. Many of the students

asked different questions to the Technical Head on current demanding

technologies, market scenarios etc. and he cleared all the doubts and myths

which were in students mind about the power plant.

After completed the 1st session we went for the lunch at 2:00 p.m. to

Hotel Park Point in Mecheda and then again we returned back and started 2nd

session which was from 3pm. to 5pm. at ECR (Electrical Control Room) block

of KTPS. In ECR block there is a control room from where generated power is

controlled. The technical coordinator again explained how to power is

distributed and transmitted to all over west Bengal and other area in India.

After that theoretical session they took students in the field area to show the

Page 4: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

transmission line area from where power is transmitted through Feeder. The

technical coordinator explained everything and again there is a question- answer

session. The students were satisfied after the session. The visit came to an end at

5.30 p.m. Finally, we left the KTPS premises at 5.30 p.m. It was an informative,

interesting and a successful visit. As students of ECE, they understand a live

importance of a power plant like KTPS we express our thanks and gratitude to

the Technical Head, General Manager and all team members of KTPS who

spent their valuable time for us directly and indirectly. We also thank to our

respected Director and HOD who motivate us to arrange such an informative

program. Lately we request you to arrange more industrial visit in the future for

the students which will be beneficial for the students to train them towards

Core/Technical/Industry sector.

Photo Gallery:

Pic.1 At the Starting of the journey at 5.30am from college campus

Page 5: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.2: Reached at KTPS

Pic.4 : KTPS cooling tower

Page 6: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.5: View of the Chimneys of KTPS

Page 7: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.6: ECE team along with Technical coordinator and Event

Instructor of KTPS

Page 8: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.7: Students entering the Power plant

Page 9: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.8: question-answer session with students and technical

coordinator

Pic.9 : Inside the Power plant

Page 10: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.10: Outside view of the Turbine of Unit 1 of Mechanical

Operation Building

Page 11: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.11: Sample view of Turbine

Page 12: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.12: Interactive session with students about generation

Pic.13: Inside Power Plant

Page 13: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.14: Students observing the Power Plant

Page 14: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.15: Lunch time get together

Pic.3 : In front of the ECR building after completion of visit

Page 15: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.16: End of the 2nd

session.

Pic.17 : Before leaving KTPS

Page 16: Report on One Day Industrial Visit at Kolaghat Thermal Power …nfet.nshm.com/.../11/Report-on-Industry-visit-at-KTPS.pdf · 2017-11-29 · An Industrial visit to “Kolaghat Thermal

Pic.18: Dinner time after reaching Durgapur

Pic.19: End of the journey