24 th Statewide Conference on Local Bridges October 24 th , 2018 Replacement of the Bailey Avenue Bridges over Cazenovia Creek & Buffalo River 1 NYSDOT PIN: 5756.34 BIN’S: 2028320 & 2028330 Presented by: Andrew L. Odien, P.E.

Upload: others

Post on 04-Apr-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

24th Statewide Conference on

Local Bridges

October 24th, 2018

Replacement of the Bailey Avenue Bridges

over Cazenovia Creek & Buffalo River

1

NYSDOT PIN: 5756.34

BIN’S: 2028320 & 2028330

Presented by:

Andrew L. Odien, P.E.

Page 2: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

• Site History & Project Background

• Project Goals

• Design Challenges

• Construction Challenges

• Learning Assessment

• Acknowledgements2

Outline:

Page 3: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Project Location:

3

Page 4: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Existing Conditions – Cazenovia Creek Bridge:

4

100’

150’ Channel Elevation Looking West

Page 5: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Existing Conditions – Buffalo River Bridge:

5

190’

230’ ChannelElevation Looking West

Page 6: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Channel Constrictions & Ice Jamming:

6Incoming Ice

LooingEast fromCazenoviaCreek Bridge

Page 7: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Channel Constrictions & Ice Jamming:

7Cazenovia Creek Bridge Buffalo River Bridge

Page 8: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

8

Existing Highway Geometry:

• Broken-back curves

• Curves with radii smaller than accepted minimum

• High accident rates

Existing Radii = 250’

Existing Radius = 230’

Existing Bailey Avenue Alignment

Page 9: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

• Replace existing structurally deficient bridges.

• Lessen channel constrictions to improve hydraulic

openings & reduce ice jamming.

• Improve highway geometrics by eliminating broken back

curves and increasing curve radii.

• Maintain two-way, four lane traffic on high volume

commuter route.

Project Goals:

9

Page 10: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

10

Preliminary Alignments:

Page 11: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

11

Proposed Cazenovia

Creek Bridge:

• Single span rigid frame

• Incorporated alignment

curvature

• Existing South & North

abutments to be

removed

Page 12: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

12

Proposed Buffalo

River Bridge:

• Single Span

Simply Supported

Girders

• Existing south

abutment to be

removed.

• Existing north

abutment to

remain.

Page 13: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

13

Proposed

Bridge Sections:

• 9 composite

plate girders

spaced at 8’-8”

• Cross frame type

diaphragms used

• Public & private

utilities carried

Page 14: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

14

Alignment Impacts on Cazenovia Creek Bridge:

• Bridge profile

tangent

• Partial horizontal

curvature on

bridge

• Roadway

curvature +

tangent framing

= vertical curve

camber

Page 15: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

15

Impacts to Adjacent Parkland:

Land Provided To Erie County

Original Park Foot PrintNew Peninsula Park Foot Print

Page 16: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

• 8’x8’ Concrete Box

• Realignment

impractical

16

• Replace with new

precast box culvert,

built through new

Buffalo River Bridge

North Abutment &

Steel Sheeting

Conflict With

Combined

Sewer Outfall

Page 17: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

17

Incorporation of Outfall in North Abutment:

Existing Proposed

Page 18: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Excavation Protection & Shoring:

18Cazenovia Creek Bridge South Abutment

Page 19: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

19

Excavation Protection & Shoring:

Buffalo River Bridge

North Abutment

Page 20: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Substructure Design – Cazenovia Creek Bridge:

20

Page 21: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

21

Foundation Design – Buffalo River Bridge Pile Plans:

North Abutment - 85 H-Piles

New Piles Placed to Avoid Existing Outfall Structure Timber Piles

Page 22: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Bidding & Award:

• Advertisement: Early Spring 2016

• 4 Bidders

• Bid Opening Held: April 19, 2016

• Low Bid: $ 18,888,887.50 ($1.3M under EE, $1.1M

under Median Bid)

• Contractor: Union Concrete and Construction

Corporation

• NTP: August 2016

22

Page 23: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Field Changes:

23

NYSDOT STEEL BRIDGE RAILING

(FOUR RAIL)

TEXAS AESTHETIC

CONCRETE BRIDGE BARRIER

• Change affected controlling member (Fascia Girder)

• Lightweight Concrete Substituted

• Steel Bridge Railing to Texas Aesthetic Concrete Bridge Barrier.

85 LB/FT 510 LB/FT

500% RailingSDL Increase

Page 24: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Field Changes:

24

• Shoring Design Changes – Buffalo River North Abutment• Soil Anchors Changed to Rock Anchors to Quantity

Contract Detail Field Change

Tied-back Sheeting Wall

Page 25: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Soldier Pile Wall At Outfall

Field Changes:

25

• Shoring Design Changes – Buffalo River North Abutment• Tied-back Soldier Pile Wall Around Outfall Changed to Braced Sheeting

Contract Detail Field Change

Page 26: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Dewatering:

26

• Constant

battle at all

excavations

• Worst at

Buffalo River

North

Abutment

Page 27: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Winter Concreting:

27

Page 28: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Erection:

28

• Heavy girders picks + long stick lengths = 2 cranes + mid-air splices• Buffalo River Girders = 229.5’ long x 165,000 LB (total wt.)

• Buffalo River “A” Girders = 134.5’ long x 95,000 LB (segment)

Page 29: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Erection:

29

• Bracing of the first girder installed at the Buffalo River bridge.

Bracing was attached to existing adjacent bridge.

Page 30: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Demolition:

30

• Demolition of the existing bridges presented their own

challenges due to the enormous weight of the existing

built-up, riveted girders.• Cazenovia Creek Bridge Existing Girders = 72 Tons

• Buffalo River Bridge Span 1 Girders = 45 Tons

• Demolition of the Buffalo River bridge was further

complicated by the presence of a counterweight that

had the potential to rotate.• Buffalo River Span 2 Girders = 48 Tons

Page 31: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Demolition – Cazenovia Creek Bridge Girders:

31

Page 32: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Demolition – Buffalo River Bridge Bascule Girder:

32

Counter-weight

Page 33: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Demolition – Buffalo River Bridge Bascule Girder:

33

Page 34: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Demolition – Buffalo River Bridge Bascule Girder:

34

Page 35: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Finished Bridges:

35

Page 36: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Finished Bridges:

36

Page 37: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Finished Bridges:

37

Page 38: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Finished Bridges:

38

Page 39: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Acknowledgements:

Michael Finn – City Engineer - City of Buffalo

Seyed Ghasemi – Project Manager - City of Buffalo

Union Concrete Construction Corporation

Art Salvati – Resident Engineer - CHA

Bernard Rias – Office Engineer - CHA

Frank DelSignore – CHA Project Manager

Garret Hoffmann – CHA, Structures

Dory Marsh – CHA, Highway

39

Page 40: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Learning Assessment:

• What was one of the project goals?• Replace existing bridges, improve hydraulic openings,

improve highway geometrics, maintain traffic during construction

• What type of structure was the Proposed Cazenovia Creek Bridge?• Rigid Frame (Tall Integral Abutments)

• What was the percentage railing dead load increase due to the field change from Steel 4-Rail to Texas Aesthetic Concrete Bridge Barrier?• 500% 40

Page 41: Replacement of the Bailey Avenue Bridges over Cazenovia ... · • Demolition of the existing bridges presented their own challenges due to the enormous weight of the existing built-up,

Questions and Answers

41