Total Project Snapshot Report2013 Legislature TPS Report 60796v1
$500,000
Approved
Agency: Commerce, Community and Economic DevelopmentGrants to Municipalities (AS 37.05.315)
Federal Tax ID: 92-0038816Grant Recipient: Juneau
Project Title: Project Type: Remodel, Reconstruction and Upgrades
Juneau - Phase III Don Statter Harbor New Haul OutFacility
State Funding Requested: $2,100,000 House District: Juneau Areawide (31-32)Future Funding May Be Requested
Brief Project Description:Construction/Rebuild of new boat haul out facility at Don Statter Harbor
Funding Plan: Total Project Cost: $2,100,000 Funding Already Secured: ($0)FY2014 State Funding Request: ($2,100,000)Project Deficit: $0 Funding Details:
no other funding is currently secured for this project
Detailed Project Description and Justification:The Don Statter Harbor in Auke Bay, serving the 16,000 residents of the Mendenhall Valley, hundreds of visiting harborpatrons and all of Juneau, is one of SE Alaska's most desirable summer harbor facilities. This popularity often results insevere congestion when mariners compete for limited and inefficient services currently available to the boating public. CBJDocks and Harbor have established a Statter Harbor Master Plan to alleviate many of the problem areas plaguing theexisting facility. The vision, through a sequence of four construction phases, is to separate user groups into functionallocations for efficacy of harbor operations.
Phase III of the Master Plan would include the Statter Harbor Boat Haul Out Rebuild and Repair. Docks & Harbors hasprioritized a full-service boatyard as a necessity to meet the demands of the boating public and a boat haul-out is critical tothat vision. By maintaining and improving a boatyard service, mariners are provided a safety net to ensure a repair facility isavailable to meet the northern boating needs in SE Alaska. This $2.1M project would replace the existing haul-out (travellift) owned by CBJ, which is leased to the commercial boatyard, for lifting vessels out of the water for maintenance andstorage. A new float would be constructed, in the approximate position of the existing launch ramp, and the recentlyacquired self-propelled hydraulic boat lift would be employed when it's services are needed.
Project Timeline:Fall,winter 2013
Entity Responsible for the Ongoing Operation and Maintenance of this Project:CBJ
For use by Co-chair Staff Only:
Page 1
Contact Name: Terry HarveyContact Number: 465 3744
2:01 PM 5/9/2013
Total Project Snapshot Report2013 Legislature TPS Report 60796v1
Grant Recipient Contact Information:Name: Kim KieferTitle: City ManagerAddress: 155 S. Seward
Juneau, Alaska 99801Phone Number: 586-5240Email: [email protected]
Has this project been through a public review process at the local level and is it a community priority? X Yes No
For use by Co-chair Staff Only:
Page 2
Contact Name: Terry HarveyContact Number: 465 3744
2:01 PM 5/9/2013
-110
-105
-9
5
-9
0
-8
5
-8
0
-7
0
-6
5
-6
0
-5
5
-4
5
-4
0
-3
5
-3
0
-2
0
-15
-1
0
-5
5
10
15
20
30
35
40
45
-110
-105
-105
-95
-95
-90
-90
-85
-85
-80
-80
-70-65
-60-55
-45-40
-35
-30
-20 -15
-15
-10
-10
- 5
- 5
5
5
5
10
10
10
1015
15
15
15
101520
20
20
20
101520
30
30
30
35
35
40
40
40
45
45
45
-1
00
-7
5
-5
0
-2
5 0
25
-100
-100
-75
-50
-25
0
0
0
25
25
25
25
25
oo
o
oo
oo
oo
o
o
oo
o
o
oo
o
o
o o
o
o
o
o
o
o oo
o
o
o o
o
o
oo
o
o
OS
T
T
PO
ST
PO
ST
BACKLOOP ROAD
GL
AC
IER
HW
Y
-15 MLLW DREDGE BASIN
COMMERCIAL BOATHAULOUT,KAYAK RAMP &BOARDING FLOAT
COMMERCIAL LOADINGFLOAT
DEHARTSMOORAGE FLOATREPLACEMENT
BOATYARD
BOAT LAUNCH RAMP
& BOARDING FLOAT
BAY CREEKMEANDERS
VEHICLEPARKING
BU
S T
UR
NA
RO
UN
D
RESTROOM, KIOSK,ADF&G CREEL COUNT,TRASH RECEPTACLES
TRAILERPARKING
EEL GRASS
24' x 100'
FUEL FLOAT
32' FINGER
FLOATS
42' FINGER FLOATS
VIEWING PLATFORM
SEAWALK
MSE RETAININGWALL
VEGETATIONBUFFER
MAKE R
EADY AREA
TIE
DO
WN
AR
EA
MHW = +14.8 FT EL.
HTL = +20.3 FT EL.
BU
S P
AR
KIN
G
))
SECURITY FENCING
PARKING SUMMARY
TRAILER PARKING 100
84VEHICLE PARKING
4BUS PARKING
DOCKS & HARBOR DEPARTMENT
CITY/BOROUGH OF JUNEAU
ALASKA'S CAPITAL CITY
ENGINEERS, INCSCALE IN FEET
0 60 120 FT312/15/10 3082015
BI
PND
CRS
CRS
AFOT
AT
E
THS 49
CE-8845
Charles R. Somerville
S
A
KN
A
R
GI
ET
SE
OROISSEF AN
DP
E
L
L
RE
ENI
G
E
R