May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management Division 345 Courtland Street, N.E. Atlanta, GA 30365 Subject: Notification - Completion of Construction Activities; Golden Strip Septic Tank (GSST) Site; Simpsonville, South Carolina Dear Mr. Zeller: This letter is intended to officially notify the US EPA and SC DHEC that Construction Activities for the GSST Site Remedial Action have now been completed. The Pre-Final Inspection was conducted on April 25,1996, as part of the Monthly Progress Meeting. The Attendance Sheet and Final Construction Punchlist are enclosed for your review. Heritage Environmental Services demobilized from the site on April 26,1996, and the seeding and fertilizing activities were completed on May 8,1996. Analytical results from soil samples collected from the backhoe trench near the "grassy knoll" show no indications of site constituents of concern above Remedial Action Target Concentrations (RATCs). These data are attached for your review. All indications, at this point, are that no further action will be required in this regard. Preparation of the Remedial Action Report is underway and scheduled to be submitted for GSTG review by May 31,1996. The final "as-built" record drawings will be included as a part of this submittal. We anticipate submission of the Remedial Action Report by June 15,1996. If you have any questions or comments regarding the Final Punchlist, the upcoming schedule of activities, or any other items of concern, please contact either myself or Steve Webb at your earliest convenience. Very truly yours, RMT, Inc. C. MarkShoaf, P.E. Construction Manager cc: Golden Strip Task Group Distribution Richard Haynes - SC DHEC Steve Webb, Bill Stephens - RMT File 673.41 (c) RMT, INC.-GREENVILLE, SC 100 VERDAE BOULEVARD 29607-3825 INC - P.O. Boxl6778 29606-6778 864/281-0030 864/281-0288 FAX i:\wo\6\6734112.doc/cdf%

Upload: others

Post on 06-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

May 13,1996

Mr. Craig ZellerRemedial Project ManagerUnited States Environmental Protection AgencyRegion IV - Waste Management Division345 Courtland Street, N.E.Atlanta, GA 30365

Subject: Notification - Completion of Construction Activities;Golden Strip Septic Tank (GSST) Site;Simpsonville, South Carolina

Dear Mr. Zeller:

This letter is intended to officially notify the US EPA and SC DHEC that Construction Activitiesfor the GSST Site Remedial Action have now been completed. The Pre-Final Inspection wasconducted on April 25,1996, as part of the Monthly Progress Meeting. The Attendance Sheetand Final Construction Punchlist are enclosed for your review.Heritage Environmental Services demobilized from the site on April 26,1996, and the seedingand fertilizing activities were completed on May 8,1996. Analytical results from soil samplescollected from the backhoe trench near the "grassy knoll" show no indications of siteconstituents of concern above Remedial Action Target Concentrations (RATCs). These data areattached for your review. All indications, at this point, are that no further action will berequired in this regard.Preparation of the Remedial Action Report is underway and scheduled to be submitted forGSTG review by May 31,1996. The final "as-built" record drawings will be included as a partof this submittal. We anticipate submission of the Remedial Action Report by June 15,1996.

If you have any questions or comments regarding the Final Punchlist, the upcoming scheduleof activities, or any other items of concern, please contact either myself or Steve Webb at yourearliest convenience.

Very truly yours,

RMT, Inc.

C. MarkShoaf, P.E.Construction Manager

cc: Golden Strip Task Group DistributionRichard Haynes - SC DHECSteve Webb, Bill Stephens - RMTFile 673.41 (c)

RMT, INC.-GREENVILLE, SC100 VERDAE BOULEVARD 29607-3825

INC- P.O. B o x l 6 7 7 8 29606-6778864/281-0030 864/281-0288 FAX

i:\wo\6\6734112.doc/cdf%

Page 2: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

ATTENDANCE SHEET FOR MONTHLYPROGRESS MEETING

Golden Strip Septic Tank SiteRemedial ActionSimpsonville, SC

April 25, 1996 at 10:00 a.m.

Name (Please Print) Signature Representing Phone # Fax #

<~ 1 i 1 i ' t l

?** -

~-?.-; -^/7z

2/4 ^?-

C:\DATA\MARKS\\VP\GSSTMTGl W

Page 3: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Final Construction PunchlistGolden Strip Septic Tank SiteSimpsonville, South Carolina

Paeel of2ITEM ACTION

1 Landfill Cardboard rolls and wood stakes to rolloff. HES CompleteTwo metal posts near gates to rolloff. HES CompleteChain link fence roll and barbed wire near gates to rolloff. HES CompleteTwo metal posts near southeast corner of landfill to rolloff. HES Complete

101112

TruckTurnaround

Remove pallet, pipe, and valve to Storage Trailer. HES CompleteGrade soil over rock at entrance. HES CompleteRemove metal gate and wood posts in entrance to TTA. HES CompleteRemove two piles of orange construction fence. HES CompleteRemove Fire Hose to Storage Trailer. HES CompleteGrade wooded area. Push wood to edge of clearing. HES CompleteRemove metal posts. HES CompleteRemove fallen tree to woods. HES Complete

13 Swale Remove old silt fence and replace with new silt fence. HES Complete14151617181920

Detention Pond Remove silt fence. HES CompleteGrade the back slopes Evans CompletePlace soil around head wall. HES CompletePlace riprap around head wall. HES CompletePlace stone on pipe. HES CompletePlace soil and stone on berm where pipe runs through berm. HES CompleteSpread #57 stone. HES Complete

212223

Abandoned Drum Remove orange construction fence and post. HES CompleteRemove bucket and stakes RMT CompleteMove tree to allow access to monitoring well. HES Complete

I :\wp\6\67341 pl.doc/cdf96

Page 4: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Final Construction PunchlistGolden Strip Septic Tank SiteSimpsonville, South Carolina

Page 2 of 2IxFTEM:;::

2425262728293031323334353637

38

£M;;-:̂Abandoned Drum(Continued)Frac Tank

General

'^•^^^•± . : . . , .. DESCRIPTION • • ; -^^. ; ..; ̂ /M^Remove 4x4 wood post.Remove metal post.Remove limb across fence at the gate.Remove silt fence.Move extra plumbing supplies to HES supply trailer.Regrade area.Repair the fence and its barbed wire.Place large rocks into hole and regrade.Chunk of concrete near the entrance to rolloff.Seeding activitiesTest trenches.Sample results from the trenches near "Grassy Knoll"..Disposition of the trench material.Delivery of "As-Builts"

Establish Vegetative Cover

ACTIONHESHESHESHESHESHESHESHESHES

EvansHESRMTRMTHES/RMT

Evans/RMT

: ;;;;;:;;STATUS:::; ::•::••CompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteCompleteComplete

-. -/^\ ///si^^^-^:^^_^/'e&tf-fooj^p&tt&Ltt.

— ̂-••••>j®'

~A\~**$

\vatftett,rfjptr£)0*{fopfrQa/*&#-&&[fASffc&H{jS&^^^H.Vjej^&vf4^£&4

.^'/V(f u

^.'^/•i-T#v^,^(¥-,i--']

i:\wp\6\67341pl.dotfcdf96

Page 5: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madisor Office & Laboratory802 Doming WayMadison. WI 53717608-827-5501 • Fax: 608 827-55031-888 5 EN'CHEM

KNT CHKM

Corporate Office & Laboratory1 795 Indus t r i a l DriveGrrcn Bay. \V] 54302

414-469-2436 • Fax 4 l~4-469-8K271 - 8 0 0 - 7 - E N C H f C M

PROJECT NAME: GSSTPROJECT NO: 00673.50WORK ORDER NO: 9777

REPORT DATE:05/07/96PAGE NO: 1

SAMPLE NO.

9777-0019777-0029777-0039777-004

STATION ID

70002700037000470005

COLL. DATE

04/25/9604/25/9604/25/9604/25/96

SAMPLE NO. STATION ID COLL. DATE

I certify that the data contained in this Final Report has been generated and reviewed inaccordance with approved methods and Laboratory Standard Operating Procedure. Exceptions,if any, are discussed in the accompanying sample narrative. Release of this Final Report isauthorized by Laboratory management, as is verified by the following signature.

proval Signature Date

Lab Cert. #: WI DNR 113138520, MN DNR 055-999-107, SC DHEC 83001, TN DOH 02916

Page 6: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Dcminfi WayMadison. WI 5371760S 827-550) • Fax: 60s 827-5503l-888-5-E\THEM

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50WI DNR LAB ID: 113138520

EIST CHEMI N O

PAGE: 1

REPORT DATE:METHOD: 8060

Corporate Office & Laboratory1 795 I n d u s t r i a l DriveGrt-cn Bay. WI 54302

414-469-243(5 • Fax: 4 l '4 -469 88271 - 8 0 0 - 7 - E N C H K M

of 1

05/08/96

SEMIVOLATILE ORGANICS ANALYSIS REPORT

ANALYTE: bis(2-Ethylhexyl)phthalate

RESULT

SAMPLESTATION IDCOLLECTION DATEEXTRACTION DATEANALYTICAL DATE

9777-0017000204/25/9604/29/96'05/02/96

<1000

EQL CODE UNITS

1000 ug/kg dry wt

SAMPLESTATION IDCOLLECTION DATEEXTRACTION DATEANALYTICAL DATE

9777-0027000304/25/9604/29/960.5/02/96

<1100 1100 ug/kg dry wt.

SAMPLESTATION IDCOLLECTION DATEEXTRACTION DATEANALYTICAL DATE

9777-0037000404/25/9604/29/9605/02/96

<100 100 ug/kg dry wt.

SAMPLESTATION IDCOLLECTION DATEEXTRACTION DATEANALYTICAL DATE

9777-0047000504/25/9604/29/9605/02/96

<1200 1200 ug/kg dry wt.

Page 7: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Ueminc WayMadison. WI 53717608-827-5501 • Fax: 608-827-55031-888-5-ENCHEM

CHKM

Corporate Office & Laboratory1 795 I n d u s t r i a l DriveGreen Bay. \VI 54302

414 469 2436 • Fax: 4 I 4 -469-8K271-800 7- E N C H K M

PROJECT NAME: GSSTPROJECT NO: 00673.50WORK ORDER NO: 9777

REPORT DATE:05/09/96PAGE NO: 1

SAMPLE NO.

9777-0019777-0029777-0039777-0049777-005

STATION ID

70002700037000470005TRIP BLANK

COLL. DATE

04/25/9604/25/9604/25/9604/25/9604/25/96

SAMPLE NO. STATION ID COLL. DATE

I certify that the data contained in this Final Report has been generated and reviewed inaccordance with approved methods and Laboratory Standard Operating Procedure. Exceptions,if any, are discussed in the accompanying sample narrative. Release of this Final Report isauthorized by Laboratory management, as is verified by the following signature.

Signature Date

Lab Cert. #: WI DNR 113138520, MN DNR 055-999-107, SC DHEC 83001, TN DOH 02916

Page 8: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Demin^ WayMadison. WI 53717608-827-5501 • Fax: 608 827-55031-888-5-KNCHEM

Corporate Office & Laboratory1795 I n d u s t r i a l DriveGreen Hay. WI 54302

414-469-243(5 • Fax 4 14-469-88271-800 7- K N C H K M

PAGE:

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-001STATION ID: 70002WI DNR LAB ID: 113138520

REPORT DATE: 05/09/96COLLECTION DATE: 04/25/96ANALYSIS DATE: 04/30/96METHOD: 8260

VOLATILE ORGANICS ANALYSIS REPORT

COMPOUND

Methylene chlorideAcetone1,2-Dichloroethene, total2-Butanone1,1,1-TrichloroethaneTetrachloroetheneTolueneChlorobenzeneEthylbenzeneStyreneXylene, total

RESULT EQL

6.1126.16.16.16.16.16.16.16.16.1

CODE

QB(32)

UNITS

ug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kg

ug/kg

dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.

Page 9: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Deminu WayMadison. \VI 53717608-827-5501 • Fax: 608 827-55031-888-5-ENCHEM

EN CHEM

Corporate Office & Laboratory1 795 I n d u s t r i a l DriveGreen Bay. \VI 54302

4 14-469-2436 • Fax: 4 l~4-469-88271 - 8 0 0 - 7 - E N C H E M

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-002STATION ID: 70003WI DNR LAB ID: 113138520

REPORT DATE: 05/09/96COLLECTION DATE: 04/25/96ANALYSIS DATE: 04/30/96METHOD: 8260

VOLATILE ORGANICS ANALYSIS REPORT

COMPOUND

Methylene chlorideAcetone1,2-Dichloroethene, total2-Butanone1,1,1-TrichloroethaneTetrachloroetheneTolueneChlorobenzeneEthylbenzeneStyreneXylene, total

RESULT

<6.63

<6.6<6.6<6.6<6.6<6.6<6.6<6.6<6.6<6.6

EQL

6.6136.66.66.66.66.66.66.66.66.6

CODE

QB(35)

UNITS

ug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kg

dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt,dry wt.

Page 10: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Dcming WayMadison. \VI 53717608-827-5501 • Fax. 608-827-55031-888-5-ENCHEM I N C-.

PAGE: 1

Corporate Office & Laboratory1 795 Industrial DriveGreen Bay. Wl 54302

414 469 2436 • Fax: 4 U-469-88271 -800-7- E N C H E M

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-003STATION ID: 70004WI DNR LAB ID: 113138520

REPORT DATE: 05/09/96COLLECTION DATE: 04/25/96ANALYSIS DATE: 04/30/96METHOD: 8260

VOLATILE ORGANICS ANALYSIS REPORT

COMPOUND

Methylene chlorideAcetone1,2-Dichloroethene, total2-Butanone1,1,1-TrichloroethaneTetrachloroetheneTolueneChlorobenzeneEthylbenzeneStyreneXylene, total

RESULT EQL

6.2126.26.26.26.26.26.26.26.26.2

CODE

QB(33)

UNITS

ug/kgug/kgug/kgugAg"gAgug/kgug/kgug/kgugAgug/kg

dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.

Page 11: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Deminfi Wax-Madison. \V1 5371 7608-827-5501 • Fax: 60S 827-55031-888 -5-ENCHEM

Corporate Office & Laboratory1795 Industr ia l DriveGreen Bay. W! 54302

414-469-2436 • Fax: 4 M-469-88271-800-7-ENCHEM

PAGE:

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-004STATION ID: 70005WI DNR LAB ID: 113138520

REPORT DATE: 05/09/96COLLECTION DATE: 04/25/96ANALYSIS DATE: 05/07/96METHOD: 8260

VOLATILE ORGANICS ANALYSIS REPORT

COMPOUND

Methylene chlorideAcetone1,2-Dichloroethene, total2-Butanone1,1,1-TrichloroethaneTetrachloroetheneTolueneChlorobenzeneEthylbenzeneStyreneXylene, total

RESULT

<7.06

<7.0<7.0<7.0<7.0<7.0<7.0<7.0<7.0<7.0

EQL

7.014

CODE

QB(5)

UNITS

ug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kgug/kg

7.0

dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.

Page 12: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 beming WayMadison. \VI 53717608-827-5501 • Fax: 608-827-55031-888 5 ENCHEM

KIV ,-CHKM] X C.

PAGE:

Corporate Office & Laboratory1 795 I n d u s t r i a l DriveGreen Bay. \VI 54302

414 469-2436- Fax: 414-469-88271 - 8 0 0 - 7 - E N C I I E M

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-005STATION ID: TRIP BLANKWI DNR LAB ID: 113138520

REPORT DATE: 05/09/96COLLECTION DATE: 04/25/96ANALYSIS DATE: 04/30/96METHOD: 8260

VOLATILE ORGANICS ANALYSIS REPORT

COMPOUND

Methylene chlorideAcetone1,2-Dichloroethene, total2-Butanone1,1,1-TrichloroethaneTetrachloroetheneToluf neChloiobenzeneEthylbenzeneStyreneXylen-3, total

RESULT

<5.04

<5.0<5.0<5.0<5.0<5.0<5.0<5.0<5.0<5.0

EQL

5.010

5.05.05.05.05.0

CODE

QB(27)

UNITS

Page 13: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Doming WayMadison. \VI 53717608-827-5501 • Fax: 608-827-55031-888-5-ENCHEM

KN CHKM

Corporate Office & Laboratory1795 Indus t r i a l DriveGreen Bay. \V1 54302

414-469-2436 • Fax: 4M-469 8S271-800 -7- E N C H E M

Organic GC/MS Data Qualifier Sheet

B(n)

D

E

Anatyte is present in the method blank. If the processes that were applied to thesample were applied to the method blank, the value of the anatyte in the method blankwould likely be 'rf.

Anatyte value from diluted analysis,

Anatyte concentration exceeds calibration range (see Sample Narrative).

H(n)

J

K

N

NR

Q

U

Anatysis performed "n1 days past holding time.

Estimated concentration to tentatively identified compounds (TICs).

Concentration may be elevated due to the presence of an unrequested anatyte (seeSample Narrative).

Presumptive evidence of a compound based on mass spectral library search.

Not required.

Qualitative mass spectral evidence of analyte present: concentration is less than thereporting limit.

Analyte undetected.

W Sample received with headspace.

Effective 08/28/95

Page 14: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Derninu WayMadison. \V1 53717608 827-5501 • Fax: 608-827 55031-888-5-ENCHEM

CHKM

Corporate Office & Laboratory1795 I n d u s t r i a l DriveGreen Hay. Wl 54302

414 469-2436 • Fax: 4 f 4 469-88271-800-7- E N O H E M

SAMPLE NARRATIVEVOLATILE ORGANIC ANALYSIS

PROJECT NAME:PROJECT NUMBER:WORKORDER NUMBER:DATE:

GSST673.50977705/07/96

Sample number 9777-004 (70005) was initially analyzed on 04/30/96. Itwas repeated on 05/07/96. Both analyses failed the internal standard* areacriteria. The second analysis was reported.

Internal standards added to every standard, blank, matrix spike andduplicate, and sample at a known concentration, prior to analysis. Internalstandards are used as the basis for quantitation of the target compounds.

Page 15: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Deinina WayMadison. WI 53717608-827-5501 • Fax: 608-827-55031 -888-5- E N C H E M

KIST CHKM

Corporate Office & Laboratory1 795 l i K l u s i n a l DriveGn-cn Bay \\'l 54302

4 1 - 4 - 4 6 < l 2436 • Fax: 4 H - 4 6 ! ) 88271-80(1 7 E N ' C H K M

PROJECT NAME: GSSTPROJECT NO: 00673.50WORK ORDER NO: 9777

REPORT DATE:05/14/96PAGE NO: 1

SAMPLE NO. STATION ID

9777-0019777-0029777-0039777-004

70002700037000470005

COLL. DATE

04/25/9604/25/9604/25/9604/25/96

SAMPLE NO. STATION ID COLL. DATE

I certify that the data contained in this Final Report has been generated and reviewed inaccordance with approved methods and Laboratory Standard Operating Procedure. Exceptions,if any, are discussed in the accompanying sample narrative. Release of this Final Report isauthorized by Laboratory management, as is verified by the following signature.

4Wroyal SignatureN-

Date

Lab Cert. #: WI DNR 113138520, MN DNR 055-999-107, SC DHEC 83001, TN DOH 02916

Page 16: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Doming Wax-Madison. \VI 53717608-827-5501 - Fax: 608-827-55031-888-5-ENCHEM

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-001STATION ID: 70002WI DNR LAB ID: 113138520

EN OHKM] X C"

PAGE: 1

Corporate Office & Laboratory1 795 I n d u s l r i a l DriveGreen E3ay. \VI 54302

414-469 243(i • Fax: 4 M-469-88271 - 8 0 0 - 7 - E N C H E M

REPORT DATE: 05/14/96COLLECTION DATE: 04/25/96MATRIX TYPE: SOIL

COMPOUND

AntimonyArsenicCadmiumChromiumCopperLeadMercuryNickelZinc

Cyanide, totalSolids, total

INORGANIC ANALYSIS REPORT

RESULT EQL CODE

0.61 P0.610.611.22.40.360.12 *2.42.4

UNITS

mg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wtmg/kg dry wt

< 3.082.2

3.0 mg/kg dry wt.

Page 17: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Dcminfi WayMadison. WI 53717608-827-5501 • Fax: 608-827-55031-888-5-ENCHEM

Corporate Office & Laboratory1795 I n d u s t r i a l DriveGreen Hay. WI 54302

-469 2436 • Fax. -U4-469 8K27] - 8 0 0 - 7 - E N C H I - ; M

PAGE:

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-003STATION ID: 70004WI DNR LAB ID: 113138520

REPORT DATE: 05/14/96COLLECTION DATE: 04/25/96MATRIX TYPE: SOIL

INORGANIC ANALYSIS REPORT

COMPOUND

AntimonyArsenicCadmiumChromiumCopperLeadMercuryNickelZinc

Cyanide, totalSolids, total

RESULT

1.32.92.84437230.297.392

< 3.180.5

EQL

0.620.620.621.22.50.370.122.52.5

3.1

CODE UNITS

mg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kg

dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.dry wt.

mg/kg dry wt.

Page 18: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Dt-minc WayMadison. \VI 53717608-827 5501 • Fax: 608-827 55031-888-5-ENCHEM

CHKMI NT.

PAGE: 1

Corporate Office & Laboratory1 795 Industrial DriveGreen Hay. \VI 5-4302

4 1 4 - 4 6 M - 2 4 3 6 • Fax: 414 -469 88271-SOO 7 - E N ' C H F M

PROJECT NAME: GSSTPROJECT NUMBER: 00673.50LAB SAMPLE NUMBER: 9777-004STATION ID: 70005WI DNR LAB ID: 113138520

REPORT DATE: 05/14/96COLLECTION DATE: 04/25/96MATRIX TYPE: SOIL

INORGANIC ANALYSIS REPORT

COMPOUND

AntimonyArsenicCadmiumChromiumCopperLeadMercuryNickelZinc

Cyanide, totalSolids, total

RESULT

0.973.44.0180200572.17.8130

< 3.570.6

EQL

0.710.710.711.42.80.420.142.82.8

3.5

CODE UNITS

mg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kgmg/kg

dry wt.dry wt.dry wt.dry wt,dry wt.dry wt.dry wt.dry wt.dry wt.

mg/kg dry wt.

Page 19: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Madison Office & Laboratory802 Doming WayMadison. WI 5371760S 827 5501 • Fax: 608-827-55031-888-5 EXCHEM

EN"

Corporate Office & Laboratory1795 I n d u s t r i a l DriveGreen Bay. \VI 54302

414 469 2436 • Fax: 4 14 469 88271 - 8 0 0 - 7 - E N C H E M

Inorganic Data Qualifier Sheet

Digested spike recovery fails accuracy criteria; post-digestion spike recoveryaccepted.

Duplicate analyses not within control limits.

Page 20: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

CHAIN OF CUSTODY RECORDLABORATORIES

744 Heartland Trail, P.O. Box 8923 • Madison, Wl 53708-8923 • Phone (608) 831-4444 • FAX (608) 831-7530

N2 065065

Project No. Project/Client:

Project Manager/Contact Person:

Lab No. Yr.Date Time Sample Station ID

_ o3 O£ o

xtr

PRESERVED CODES

A - NONE

B - HNOa

C - H2S04

D-NaOHE -HCIF - METHANOLG-

1QQ03leant

\JOY. ^ <W4l/r

^f 0

SPECIAL INSTRUCTIONS

SAMPLER Relinquished by (Sig.) HAZARDS ASSOCIATEDWITH SAMPLES

I I Flammable

I 1 Corrosive

II Highly Toxic

D Olhcr (list)

Custod/Sealv7 Present/A6€ent\ Intact/Not Intact Seal #'s

Turn Around (circle one) Normal

___________—————————

(For Lab Use Only)

Receipt Temp:

Temp Blaok Y _>J

Receipt pH

(Wet/Metals)

-268 (FW!6/95) WHITE - LABORATORY COPY Yfl I OW nrponr A nnrnn.v

Page 21: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Golden Strip Septic TankRemedial ActionSimpsonville, SC

Construction Punch List

LandfillItem Description

1 Cardboard rolls and wood stakes to rolloff.

2 Two metal post near gates to rolloflf

3 Chain link fence roll near gates to rolloff.

4 Two metal posts near southeast corner of land fill to rolloff

Entrance to Truck Turnaround AreaItem Description

5 Remove pallet, pipe and valve

6 Grade soil over rock at entrance

7 Remove metal gate and wood posts in entrance to TTA.

Truck Turnaround AreaItem Description

8 Remove two piles of orange construction fence.

9 Remove Fire Hose

10 Grade wooded area. Push wood to edge of clearing.

11 Remove metal posts.

12 Remove fallen tree to woods.

SwaleItem Description

13 Remove old silt fence and replace with new silt fence.

Detention PondItem Description

14 Remove silt fence

15 Grade the back slopes.

16 Place soil around head wall

Action

HES

HES

HES

HES

Action

HES

HES

HES

Action

HES

HES

HES

HES

HES

Action

HES

Action

HES

Evans

HES

Status

Complete

Complete

Complete

Status

Complete

Complete

Complete

Status

Complete

Complete

Complete

Complete

Status

Complete

Status

Complete

Comple

Page 22: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

Detention PondItem Description

17 Place Rip Rap around head wall

18 Place stone on pipe.

19 Place soil and stone on berm where pipe runs through berm.

20 Spread #57 stone.

Abandoned Drum AreaItem Description

21 Remove orange construction fence and post

Abandoned Drum Area (access road)Item Description

22 Move tree to allow access to monitoring well

23 Remove 4x4 wood post

24 Remove metal post

Frac Tank AreaItem Description

25 Remove limb across fence at the gate

26 Remove silt fence

27 Move extra plumbing supplies to HES supply trailer

28 Regrade area

29 Repair the fence and its barbed wire

30 Place large rocks into hole and regrade

Other areasItem Description

31 Chunk of concrete near the entrance to rolloff

32 Seeding activities

33 Test Trenches

34 Samples results from the trenches

35 Disposition of the trench material

Action

HES

HES

HES

HES

Action

HES

Action

HES

HES

HES

Action

HES

HES

HES

HES

HES

HES

Action

HES

Evans

HES

RMT

RMT

Status

Complete

Complete

Complete

Complete

Status

Complete

Status

Complete

Complete

Complete

Status

Complete

Complete

Complete

Complete

Status

Page 23: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

UNITED STATES ENVIRONMENTAL PROTECTION AGENCYREGION 4

ATLANTA FEDERAL CENTER100 ALABAMA STREET, S.W.

ATLANTA, GEORGIA 30303-3104

October 2, 1996

4WD-NSMB

Mr. Steve W. Webb, P.E., Ph.D.Project ManagerRMT, Inc.lOOVerdaeBlvd.Greenville, SC 29606

SUBJ: Transmittal of Final Close-Out Report; Golden Strip Septic Tank NPL Site, Simpsonville,South Carolina.

Dear Mr. Webb:

On behalf of U.S. EPA - Region IV, it is with great pleasure that I forward the FinalClose-Out Report for the Golden Strip Septic Tank (GSST) NPL Site near Simpsonville, SouthCarolina. The Final Clotfe-Out Report (FCOR) was approved by Mr. A. Stanley Meiburg, DeputyRegional Administrator, during a briefing on September 30, 1996. Approval of the FCORdocuments Site Completion at the GSST NPL Site. A letter from the South Carolina Departmentof Health and Environmental Control (SCDHEC) which provides concurrence with EPA'sdecision in this regard, is also enclosed for your information and files.

EPA-Region IV will now initiate the process to delete the GSST Site from the NationalPriorities List. This includes the following activities:

• Obtain State concurrence to delete the site from NPL, compilation of the deletion docket,and preparation of the Notice of Intent to Delete (NOID) for EPA Headquarters' reviewand Regional Administrator approval; •

• Publication of the NOID in the Federal Register and a notice in a local newspaper ofgeneral distribution, which initiates the 30-day public comment period;

• Preparation of a responsiveness summary, if necessary; and

• Publication of the Notice of Deletion in the Federal Register.

I plan to begin working on the above activities in the near future, and expect to formallydelete the GSST Site from the NPL by Spring 1997.

RecycledTlecyclable • Printed with Vegetable OH Based Inks on 100% Recycled Paper (40% Poslconsumer)

Page 24: Remedial Project Manager United States Environmental ...May 13,1996 Mr. Craig Zeller Remedial Project Manager United States Environmental Protection Agency Region IV - Waste Management

EPA appreciates RMT's technical competence, innovation and overall attention to detailthat was demonstrated consistently throughout the RI/FS and RD/RA process at the GSST Site.You and your colleagues at RMT played a vital role in building the trust of EPA and SCDHECwhich resulted in the establishment of a successful working relationship between all involvedentities. Moreover, the cooperative nature and commitment of the Golden Strip Task Group(GSTG) facilitated the achievement of the project objectives.

Our collective efforts should now be directed toward returning the GSST Site to futureuses that will benefit the surrounding community. EPA acknowledges the rather sensitive issuessurrounding property acquisition from the Rice family. Current EPA initiatives such asBrownfields do not provide funding for real estate transfers or acquisitions. However, EPAremains committed to providing other assistance, as identified, to RMT and the GSTG to ensurethat this property is returned to future beneficial use. Please contact me at (404) 562-8799 if Ican be of further assistance. I look forward to working with the RMT professionals on otherprojects in the Southeastern Region.

Sincerely,

Craig ZellerRemedial Project Manager

Enclosure

cc. Richard Haynes, SCDHEC