Page 1: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Reliability Redispatch Pilot Presentation for NIPPC

June 13, 2007

Term of Pilot

6/26/07 through 9/30/07

Page 2: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Project Status

Software Development complete Hardware environments configured and

operational Dispatch and scheduling procedure

changes documented Dispatch, scheduling and bidder training

underway Pilot agreement nearing completion

Page 3: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Bid Tool Overview

Redispatch Bid Content• Generator

• Day and Hour ending

• Quantity (MW) available within 10 min.

• Price per MWh

• Increase (INC) and/or Decrease (DEC)

Page 4: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Bid Validation Rules

• INC Only Bid

• DEC Only Bid

• INC and DEC Bid

• Neither – Zero Bid

• INC Bid includes INC MW & INC Price

• DEC Bid includes DEC MW & DEC Price

Bid Data

Page 5: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Bid Validation Rules

• Whole # > Zero

• Not exceeding Generator’s established Maximum INC/DEC MW amount.

• Not less than Generator’s established Minimum INC/DEC MW amount.

Megawatts

Page 6: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Bid Validation Rules

• Positive U.S. currency value per MWh

• Not exceeding established Maximum INC/DEC Bid Price Limit. ($400)

• Not less than established Minimum INC/DEC Bid Price Limit. ($0)

Price

Page 7: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Submitting a Bid

• Submitted or changed up to

20 minutes prior to flow hour.

• No further into the future

than 5 days. (Day +5)

Page 8: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Bid Tool Demonstration

Page 9: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Calculate Redispatch

Background

Page 10: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Simplified RRP Map

Page 11: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Introduction

• A generator’s impact on a flowgate is measured by its Power Transfer Distribution Factor or PTDF.

• PTDF is also known as Path Utilization Factor (PUF) and Transmission Loading Relief (TLR).

Page 12: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Introduction cont.

• The PTDF is the ratio impact to the loading on a specific flowgate based on an increase (INC) at the generator and a like decrease (DEC) at a reference bus (Grand Coulee for our studies).

• A positive PTDF will increase the loading.

• A negative PTDF will decrease the loading and provide relief.

Page 13: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Reference BusPUFs are zero

Generators

South of

Allston

North of

Hanford

North of

John Day

Paul-Allsto

n

CAR Carmen -0.173 -0.563 -0.819 -0.204

CHJ Chief Joseph 0.010 -0.005 -0.007 0.012

CHP Chehalis 0.249 -0.250 -0.748 0.389

CNT Centralia 0.231 -0.232 -0.749 0.352

GCL Grand Coulee 0.000 0.000 0.000 0.000

HPP Hermiston -0.091 -0.547 -0.714 -0.125

JDA John Day -0.127 -0.611 -0.834 -0.156

LAN Lancaster -0.018 -0.186 -0.006 -0.024

TDA The Dalles -0.135 -0.580 -0.808 -0.169

zBON Bonneville -0.136 -0.454 -0.734 -0.254

zFRD Fredrickson 0.084 -0.074 -0.147 0.087

zGEC Goldendale -0.125 -0.572 -0.786 -0.159

zHMJ HM Jackson 0.044 -0.028 -0.022 0.052

zKBC Kimberly Clark 0.044 -0.028 -0.022 0.052

zKFG Klamath Falls Gen -0.147 -0.589 -0.828 -0.176

zLVF Longview Fiber 0.072 -0.059 -0.091 0.070

zMCN McNary -0.091 -0.547 -0.714 -0.125

Flowgates

Flowgates and PTDFs/PUFs

Page 14: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Redispatch

• To relieve the loading on the path, we find the pairs of generators that will provide relief.

• We look for combinations of INC generator and DEC generators with a combined PTDF that is negative.

• The combined PTDF is the INC PTDF – DEC PTDF.• Numbers closer to -1.0 are more effective.

DEC CNT CHP CHJ GCL

INC P-A 0.352 0.389 0.012 0.000

CAR -0.204 -0.556 -0.593 -0.216 -0.204

GCL 0.000 -0.352 -0.389 -0.012 0.000

JDA -0.156 -0.508 -0.545 -0.168 -0.156

TDA -0.169 -0.521 -0.558 -0.181 -0.169

+ -

Page 15: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Single Redispatch Pair

Redispatch: 35 MW

JDA-CNT

Impact: 35*-0.508=-17.8 MW

Page 16: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Redispatch Solution

• To get more relief, redispatch more pairs of generators.

• Since a single generator could be involved in multiple pairs, the amounts are summed and each generator is called once.

Page 17: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

Calculate Redispatch

35-MW Paul-Allston Example

Page 18: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example

Required Relief = 35Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW

Redispatch Contact

CAR $80.00 $20.00 40 40 0 0 40 40 EWEB Dispatcher

CHJ $80.00 $20.00 100 100 0 0 100 100 BPAP Hydro Desk

CHP $80.00 $20.00 30 30 0 0 30 30 CHP Plant Operator

CNT $80.00 $20.00 75 75 0 0 75 75 CNT Plant Operator

GCL $80.00 $20.00 200 200 0 0 200 200 BPAP Hydro Desk

HPP $80.00 $20.00 25 25 0 0 25 25 HPP Plant Operator

JDA $80.00 $20.00 45 45 0 0 45 45 BPAP Hydro Desk

LAN $80.00 $20.00 75 75 0 0 75 75 Avista Energy Disp

TDA $80.00 $20.00 30 30 0 0 30 30 BPAP Hydro Desk

… … … … … … … … … …

Page 19: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example1. Add the first bid pair to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF

INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

Relief

CAR CHP -0.2043 0.3885 -0.5928 $80.00 $20.00 $60.00 $101.21 40 30 30 17.7

TDA CHP -0.1719 0.3885 -0.5604 $80.00 $20.00 $60.00 $107.06 30 30 30 16.8

CAR CNT -0.2043 0.3514 -0.5557 $80.00 $20.00 $60.00 $107.97 40 75 40 22.2

… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 17.7 Cumulative Relief: 17.7

EWEB Dispatcher DispatcherCAR 30 This bid Price: $1,800 ($60 x 30 MW) Cumulative Price: $1,800CHP Plant Operator CHP 30 Number of Calls: 2

Page 20: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example2. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW

Redispatch Contact

CAR $80.00 $20.00 40 40 30 0 10 40 EWEB Dispatcher

CHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant Operator

3. Re-calculate the Bid Stack

Page 21: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example4. Add the next bid pair to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF

INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

Relief

CAR CNT -0.2043 0.3514 -0.5557 $80.00 $20.00 $60.00 $107.97 10 75 10 5.5

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 75 30 15.6

… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 5.5 Cumulative Relief: 23.2

EWEB Dispatcher CAR 30 This bid Price: $600 ($60 x 10 MW) Cumulative Price: $2,40010 Number of Calls: 3

CHP Plant Operator CHP 30

CNT Plant Operator CNT 10

Page 22: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example

5. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW

Redispatch Contact

CAR $80.00 $20.00 40 40 40 0 0 40 EWEB Dispatcher

CHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant Operator

CNT $80.00 $20.00 75 75 0 10 75 65 CNT Plant Operator

6. Re-calculate the Bid Stack

Page 23: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example7. The next bid pair provides more relief than needed to meet the Required ReliefRequired Relief = 35 Cumulative Relief (23.2) + this bid Relief (15.6) = 38.8 3.8 MW too much relief

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF

INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

Relief

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.6

JDA CNT -0.1567 0.3514 -0.5081 $80.00 $20.00 $60.00 $118.08 45 65 45 22.8

… … … … … … … … … … … … …

8. Calculate the MW to use from the last bid so that the exact Required Relief is metRelief Needed = Required Relief - Cumulative Relief

Required Relief (35) - Cumulative Relief (23.2) = 11.6 Relief Needed11.8

9. Calculate MW to Use from this bidMW to Use = Relief Needed / (Pair PTDF x -1), rounded up

Relief Needed (11.8) / (Pair PTDF(-.05233 x -1) = 22.549, rounded up to 23

Page 24: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example

10. Recalculate the Potential Relief for the final bidPotential Relief = MW to Use x (Pair PTDF x -1), truncated to 1 decimal place

MW to Use (23) x Pair PTDF (-0.5233 x -1) = 12.0Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF

INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

Relief

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.6

23 12.0

11. Recalculate the price for the adjusted bidBid Price = Pair Price x Potential Relief

Pair Price ($60) x Potential Relief (23) = $1,380

Page 25: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example12. Add the last bid, with the adjusted Potential Relief, MW to Use, Pair Price to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF

INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

Relief

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.6

23 12.0

JDA CNT -0.1567 0.3514 -0.5081 $80.00 $20.00 $60.00 $118.08 45 65 45 22.8

… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 12.0 Cumulative Relief: 35.2

EWEB Dispatcher CAR 30 This bid Price: $1,380 ($60 x 23 MW) Cumulative Price: $3,78010 Number of Calls: 4

CHP Plant Operator CHP 30

CNT Plant Operator CNT 10

23

BPAP Hydro Desk TDA 23

Page 26: Reliability Redispatch Pilot  Presentation for NIPPC June 13, 2007

35-MW Paul-Allston Example13. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW

Redispatch Contact

CNT $80.00 $20.00 75 75 0 33 75 42 CNT Plant Operator

TDA $80.00 $20.00 30 30 23 0 7 30 BPAP Hydro Desk

14. The final set of Bids that were used will look like this:

Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW

Redispatch Contact

CAR $80.00 $20.00 40 40 40 0 0 40 EWEB Dispatcher

CHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant Operator

CNT $80.00 $20.00 75 75 0 33 75 42 CNT Plant Operator

TDA $80.00 $20.00 30 30 23 0 7 30 BPAP Hydro Desk

15. The final Call List will show the total that each generator needs to INC or DEC, like this:

Call List

Redispatch Contact Generator Request

EWEB Dispatcher CAR - Carmen Smith 40

CHP Plant Operator CHP - Chehalis -30

CNT Plant Operator CNT - Centralia -33

BPAP Hydro Desk TDA - The Dalles 23