Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Upload: rodney-webster

Post on 18-Jan-2018

219 views

Category:

Documents


0 download

DESCRIPTION

Bid Tool Overview Redispatch Bid Content Generator Day and Hour ending Quantity (MW) available within 10 min. Price per MWh Increase (INC) and/or Decrease (DEC)

TRANSCRIPT

Page 1: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Reliability Redispatch Pilot Presentation for NIPPC

June 13, 2007

Term of Pilot 6/26/07 through 9/30/07

Page 2: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Project Status Software Development complete Hardware environments configured and

operational Dispatch and scheduling procedure

changes documented Dispatch, scheduling and bidder training

underway Pilot agreement nearing completion

Page 3: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Bid Tool Overview Redispatch Bid Content

• Generator• Day and Hour ending• Quantity (MW) available within 10 min.• Price per MWh• Increase (INC) and/or Decrease (DEC)

Page 4: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Bid Validation Rules

• INC Only Bid

• DEC Only Bid

• INC and DEC Bid

• Neither – Zero Bid

• INC Bid includes INC MW & INC Price

• DEC Bid includes DEC MW & DEC Price

Bid Data

Page 5: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Bid Validation Rules

• Whole # > Zero

• Not exceeding Generator’s established Maximum INC/DEC MW amount.

• Not less than Generator’s established Minimum INC/DEC MW amount.

Megawatts

Page 6: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Bid Validation Rules

• Positive U.S. currency value per MWh

• Not exceeding established Maximum INC/DEC Bid Price Limit. ($400)

• Not less than established Minimum INC/DEC Bid Price Limit. ($0)

Price

Page 7: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Submitting a Bid

• Submitted or changed up to20 minutes prior to flow hour.

• No further into the futurethan 5 days. (Day +5)

Page 8: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Bid Tool Demonstration

Page 9: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Calculate Redispatch

Background

Page 10: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Simplified RRP Map

Page 11: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Introduction

• A generator’s impact on a flowgate is measured by its Power Transfer Distribution Factor or PTDF.

• PTDF is also known as Path Utilization Factor (PUF) and Transmission Loading Relief (TLR).

Page 12: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Introduction cont.

• The PTDF is the ratio impact to the loading on a specific flowgate based on an increase (INC) at the generator and a like decrease (DEC) at a reference bus (Grand Coulee for our studies).

• A positive PTDF will increase the loading.

• A negative PTDF will decrease the loading and provide relief.

Page 13: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Reference BusPUFs are zero

Generators

South of

Allston

North of

Hanford

North of

John Day

Paul-Allsto

n

CAR Carmen -0.173 -0.563 -0.819 -0.204

CHJ Chief Joseph 0.010 -0.005 -0.007 0.012

CHP Chehalis 0.249 -0.250 -0.748 0.389

CNT Centralia 0.231 -0.232 -0.749 0.352

GCL Grand Coulee 0.000 0.000 0.000 0.000

HPP Hermiston -0.091 -0.547 -0.714 -0.125

JDA John Day -0.127 -0.611 -0.834 -0.156

LAN Lancaster -0.018 -0.186 -0.006 -0.024

TDA The Dalles -0.135 -0.580 -0.808 -0.169

zBON Bonneville -0.136 -0.454 -0.734 -0.254

zFRD Fredrickson 0.084 -0.074 -0.147 0.087

zGEC Goldendale -0.125 -0.572 -0.786 -0.159

zHMJ HM Jackson 0.044 -0.028 -0.022 0.052

zKBC Kimberly Clark 0.044 -0.028 -0.022 0.052

zKFG Klamath Falls Gen -0.147 -0.589 -0.828 -0.176

zLVF Longview Fiber 0.072 -0.059 -0.091 0.070

zMCN McNary -0.091 -0.547 -0.714 -0.125

Flowgates

Flowgates and PTDFs/PUFs

Page 14: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Redispatch• To relieve the loading on the path, we find the pairs of

generators that will provide relief.• We look for combinations of INC generator and DEC

generators with a combined PTDF that is negative.• The combined PTDF is the INC PTDF – DEC PTDF.• Numbers closer to -1.0 are more effective.

DEC CNT CHP CHJ GCL

INC P-A 0.352 0.389 0.012 0.000

CAR -0.204 -0.556 -0.593 -0.216 -0.204

GCL 0.000 -0.352 -0.389 -0.012 0.000

JDA -0.156 -0.508 -0.545 -0.168 -0.156

TDA -0.169 -0.521 -0.558 -0.181 -0.169

+ -

Page 15: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Single Redispatch Pair

Redispatch: 35 MW

JDA-CNT

Impact: 35*-0.508=-17.8 MW

Page 16: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Redispatch Solution

• To get more relief, redispatch more pairs of generators.

• Since a single generator could be involved in multiple pairs, the amounts are summed and each generator is called once.

Page 17: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

Calculate Redispatch

35-MW Paul-Allston Example

Page 18: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example

Required Relief = 35Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW Redispatch Contact

CAR $80.00 $20.00 40 40 0 0 40 40 EWEB DispatcherCHJ $80.00 $20.00 100 100 0 0 100 100 BPAP Hydro DeskCHP $80.00 $20.00 30 30 0 0 30 30 CHP Plant OperatorCNT $80.00 $20.00 75 75 0 0 75 75 CNT Plant OperatorGCL $80.00 $20.00 200 200 0 0 200 200 BPAP Hydro DeskHPP $80.00 $20.00 25 25 0 0 25 25 HPP Plant OperatorJDA $80.00 $20.00 45 45 0 0 45 45 BPAP Hydro DeskLAN $80.00 $20.00 75 75 0 0 75 75 Avista Energy DispTDA $80.00 $20.00 30 30 0 0 30 30 BPAP Hydro Desk… … … … … … … … … …

Page 19: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example1. Add the first bid pair to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DEC INCPTDF

DECPTDF

PAIRPTDF INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MW Potential

ReliefCAR CHP -0.2043 0.3885 -0.5928 $80.00 $20.00 $60.00 $101.21 40 30 30 17.7TDA CHP -0.1719 0.3885 -0.5604 $80.00 $20.00 $60.00 $107.06 30 30 30 16.8CAR CNT -0.2043 0.3514 -0.5557 $80.00 $20.00 $60.00 $107.97 40 75 40 22.2… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 17.7 Cumulative Relief: 17.7

EWEB Dispatcher DispatcherCAR 30 This bid Price: $1,800 ($60 x 30 MW) Cumulative Price: $1,800CHP Plant Operator CHP 30 Number of Calls: 2

Page 20: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example2. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW Redispatch Contact

CAR $80.00 $20.00 40 40 30 0 10 40 EWEB DispatcherCHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant Operator

3. Re-calculate the Bid Stack

Page 21: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example4. Add the next bid pair to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIR

PTDF INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

ReliefCAR CNT -0.2043 0.3514 -0.5557 $80.00 $20.00 $60.00 $107.97 10 75 10 5.5TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 75 30 15.6… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 5.5 Cumulative Relief: 23.2

EWEB Dispatcher CAR 30 This bid Price: $600 ($60 x 10 MW) Cumulative Price: $2,40010 Number of Calls: 3

CHP Plant Operator CHP 30CNT Plant Operator CNT 10

Page 22: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example5. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $ INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW Redispatch Contact

CAR $80.00 $20.00 40 40 40 0 0 40 EWEB DispatcherCHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant OperatorCNT $80.00 $20.00 75 75 0 10 75 65 CNT Plant Operator

6. Re-calculate the Bid Stack

Page 23: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example7. The next bid pair provides more relief than needed to meet the Required ReliefRequired Relief = 35 Cumulative Relief (23.2) + this bid Relief (15.6) = 38.8 3.8 MW too much relief

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MW

PotentialRelief

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.6JDA CNT -0.1567 0.3514 -0.5081 $80.00 $20.00 $60.00 $118.08 45 65 45 22.8… … … … … … … … … … … … …

8. Calculate the MW to use from the last bid so that the exact Required Relief is metRelief Needed = Required Relief - Cumulative Relief

Required Relief (35) - Cumulative Relief (23.2) = 11.6 Relief Needed11.8

9. Calculate MW to Use from this bidMW to Use = Relief Needed / (Pair PTDF x -1), rounded up

Relief Needed (11.8) / (Pair PTDF(-.05233 x -1) = 22.549, rounded up to 23

Page 24: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example10. Recalculate the Potential Relief for the final bid

Potential Relief = MW to Use x (Pair PTDF x -1), truncated to 1 decimal placeMW to Use (23) x Pair PTDF (-0.5233 x -1) = 12.0

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIRPTDF INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MW

PotentialRelief

TDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.623 12.0

11. Recalculate the price for the adjusted bidBid Price = Pair Price x Potential Relief

Pair Price ($60) x Potential Relief (23) = $1,380

Page 25: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example12. Add the last bid, with the adjusted Potential Relief, MW to Use, Pair Price to the Suggestion List and update the Cumulative Relief, Cumulative Price and # of Calls

Bid Stack

INC DECINC

PTDFDEC

PTDFPAIR

PTDF INC $ DEC $ PAIR $ EFF $ INC MW DEC MW PAIR MWPotential

ReliefTDA CNT -0.1719 0.3514 -0.5233 $80.00 $20.00 $60.00 $114.65 30 65 30 15.6

23 12.0JDA CNT -0.1567 0.3514 -0.5081 $80.00 $20.00 $60.00 $118.08 45 65 45 22.8… … … … … … … … … … … … …

Suggestion List

Redispatch Contact GeneratorINCMW

DECMW This bid Relief: 12.0 Cumulative Relief: 35.2

EWEB Dispatcher CAR 30 This bid Price: $1,380 ($60 x 23 MW) Cumulative Price: $3,78010 Number of Calls: 4

CHP Plant Operator CHP 30CNT Plant Operator CNT 10

23BPAP Hydro Desk TDA 23

Page 26: Reliability Redispatch Pilot Presentation for NIPPC June 13, 2007 Term of Pilot 6/26/07 through 9/30/07

35-MW Paul-Allston Example13. Update both bids of the pair to reflect the MW used

Bids

Generator INC $ DEC $ INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW Redispatch Contact

CNT $80.00 $20.00 75 75 0 33 75 42 CNT Plant OperatorTDA $80.00 $20.00 30 30 23 0 7 30 BPAP Hydro Desk

14. The final set of Bids that were used will look like this:

Bids

Generator INC $ DEC $ INC MW

DEC MW

Used INC MW

Used DEC MW

AvailableINC MW

AvailableDEC MW Redispatch Contact

CAR $80.00 $20.00 40 40 40 0 0 40 EWEB DispatcherCHP $80.00 $20.00 30 30 0 30 30 0 CHP Plant OperatorCNT $80.00 $20.00 75 75 0 33 75 42 CNT Plant OperatorTDA $80.00 $20.00 30 30 23 0 7 30 BPAP Hydro Desk

15. The final Call List will show the total that each generator needs to INC or DEC, like this:

Call List

Redispatch Contact Generator Request

EWEB Dispatcher CAR - Carmen Smith 40CHP Plant Operator CHP - Chehalis -30CNT Plant Operator CNT - Centralia -33BPAP Hydro Desk TDA - The Dalles 23