Page 1: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Rehabilitation of the Anthony Wayne Suspension Bridge

Ohio Transportation Engineering ConferenceOctober 27, 2015

David Geckle, P.E., Project EngineerOhio Department of Transportation – District Two

Bernie Goetz, P.E., Project ManagerE.S. Wagner Co.

Page 2: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Anthony Wayne Bridge2

Page 3: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

History

• The bridge was originally constructed between 1929 and 1931.

• Spans the navigable Maumee River.• Bridge rehabilitation projects in 1961 and

1996.• Only remaining suspension bridge in ODOT’s

inventory.

3

Page 4: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Anthony Wayne Bridge Statistics

• Overall bridge length = 3,218 FT• Tower height = 215 FT• Bridge Types and Spans:

• 3 Suspension spans (1 Mainspan, 2 backspans)• 1,252 FT in total length

• 2 Deck Truss Approach Spans• Each 203 FT in length

• 5 Twin Girder Approach Spans• Lengths range from 69 FT to 165 FT

• 9 Multi-Girder Approach Spans• Lengths range from 20 FT to 45 FT

4

Page 5: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Rehabilitation Details

• Complete redeck• Structural Steel Repairs

• Suspension Span Superstructure• Towers• Approach Span Superstructure

• Replacement of Single Span Under Truss Sections with Two Span Plate Girder Superstructure

• Substructure Concrete Patching

5

Page 6: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Existing Truss Span6

Page 7: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Project Details

• Contract awarded to E.S. Wagner Co. for $28,694,796.

• Allowed for a 19 Month complete closure of the bridge

• Could not impede shipping traffic

7

Page 8: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation

• Work completed symmetrically about the transverse and longitudinal centerline of the suspension span.

8

Page 9: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation9

• No work platforms could extend more than 6” below low steel within shipping channel• No interference with shipping traffic

Page 10: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation

Page 11: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation

Page 12: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Deck Edge

• Main stiffening girder tied to suspension span deck with shear bolts.• First known occurrence in the

World.• Cathodic Protection (Galvanic

Zinc Anodes) incorporated into deck edge design.

• Galvanized Reinforcing Steel.

12

Page 13: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation

• Placement of Lightweight Concrete for all components on suspension span.

13

Page 14: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation

• Replaced existing finger joints at the Towers with modular expansion joints.

14

Page 15: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Main Cable Hold-Down Retrofit15

Page 16: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

16

Main Cable Hold-Down Retrofit

Page 17: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Suspension Span Rehabilation17

Page 18: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans

• Remove existing single span truss and replace with two span plate girder superstructure.• Avoid main suspension cable during demolition &

erection

18

Page 19: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans19

Page 20: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans20

Page 21: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans21

Page 22: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans22

Page 23: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans23

Page 24: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans24

Page 25: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans25

Page 26: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Truss Spans26

Page 27: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Tower Structural Steel Repairs27

Page 28: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Approach Span Structural Steel Repairs28

Page 29: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

29

Approach Span Structural Steel Repairs

Page 30: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Concrete Patching30

Page 31: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Handrail and Post Refurbishment31

Page 32: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Future Toledo Metropark32

• Project incorporated the beginnings of a future 30 acre Toledo Metropark• Bioswale lined with Berea Sandstone• Trench drains for bridge drainage

Page 33: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Statistics33

• Total of 10,750 CY of Concrete• 2,560 CY Lightweight Concrete• 750 CY of Substructure Concrete Patching

• 1.5 Million pounds of Epoxy Coated Reinforcing Steel

• 205,000 pounds of Galvanized Reinforcing Steel

• 1.1 Million pounds of New Structural Steel• 48,000 New Structural Steel Bolts

• 25,000 Rivets Removed

Page 34: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Future Work – Painting & Lighting34

Page 35: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Future Work - Dehumidification35

Page 36: Rehabilitation of the Anthony Wayne Suspension Bridge...Rehabilitation of the Anthony Wayne Suspension Bridge Ohio Transportation Engineering Conference October 27, 2015 David Geckle,

Anthony Wayne Bridge36