regional transportation discussion
DESCRIPTION
Regional Transportation Discussion. June 5, 2007. 2030 Baseline Street Network. 2030 Congestion Levels. 2030 Baseline Detail. External Traffic Percentage. Regional Map with Bridge Locations. Northern Crossing. Northern Crossing – Change in D/C. Downtown Crossing. - PowerPoint PPT PresentationTRANSCRIPT
Regional Transportation Discussion
June 5, 2007
2030 Baseline Street Network
2030 Congestion Levels
2030 Baseline Detail
External Traffic Percentage
Regional Map with Bridge Locations
Northern Crossing
Northern Crossing – Change in D/C
Downtown Crossing
Downtown Crossing – Change in D/C
Bridge Location Issues ComparisonIssue North Crossing Downtown Crossing
Access to Downtown By-passes Downtown Short Diverted Trip to Downtown
Impact to EFU land (Goal Exception)
Yes No
Environmental Impacts/Obstacles
Wetlands Sensitive Bird Rookery ____________ ____________ ____________
Bryant Park Two rivers Train trestle crossing Major power line ____________
Albany Transportation System Redundancy (security, emergency services, construction detours)
Fair Good
Bryant Park Impacts No Yes
Traffic Volume Impact to Residences
Adds traffic to residential property in Millersburg
Adds traffic to Elm St next to Monteith Historic District
I-5 to US 20 Connectivity Improvement No Change
Rail Crossing IssuesPotential need for grade
separation in MillersburgTrestle Crossing
Effect on Benton County Roads
Diverts trips from Hwy 20 to County road system
Keeps trips on Hwy 20
Transportation Capacity BenefitsIssue North Crossing Downtown Crossing
Restores capacity to Existing Bridges
Good Good (Higher)
Restores capacity to Lyon/Ellsworth Couplet
Fair Good
Benefit to US 20 west of North Albany Road
Fair Little
Benefit to North Albany Road Fair Fair
Benefit to Springhill Road Good Little
Benefit to Central Albany Area Little Fair