North Carolina Department of Transportation
2015
STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION
2016-2025 JUNE 2015
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPBA - National Highway Performance Program (Bonus Allocation)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersS - StateS (M) - State Match
HFB - Highway Fund Bridge Replacement Program STP - Surface Transportation ProgramHP - Federal-Aid High Priority STPDA - Surface Transportation Program - Direct AttributableHRRR - High Risk Rural Roads STPOFF -Surface Transportation Program (Off System Bridge)HSIP - Highway Safety Improvement Program STPON - Surface Transportation Program Bridge (On System Bridge)L - Local T - State Highway Trust Funds PE - Preliminary Engineering
RG - Right of Way (GARVEE)
STATE TRANSPORTATION IMPROVEMENT PROGRAM
NHP - National Highway Performance Program
Work Type (Activity) box
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
DP - Discretionary or DemonstrationCMAQ - Congestion Mitigation
ER - Emergency Relief Funds
BOND (R) - Revenue Bond
project until completion.
APD - Appalachian Development
FUNDING CATEGORY (1)
SW - StatewideTRN -Transition Project
BA - Bonus AllocationDIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
NEW ROUTE or City
WORK TYPE (ACTIVITY)
I-40 TO NC 3
Phases of implementation:ESTIMATED COST
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
break.
work description.
Preliminary Engineering, Right of Way, Utility, Mitigation
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
and Construction cost estimates by funding category in current dollars. Cost may include one or more
for an explanation of funding categories
Preliminary engineering,Right of Way, Mitigation,
One or two letter
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
SW
FY 2023 FY 2024FY 2022
5000BNHP
C10000 C
9000
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000
FY 2021
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
DEVELOPMENTAL PROGRAM
FY 2016 FY 2019 FY 2020
B
FY 2025
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN. 700
FY 2017
MWIDEN TO A FOUR-LANE FACILITY
A
C 5000 BC B
20000CRC 5000
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
COMMITMENTSFUTUREUtilities or Construction.
(3) WORK TYPE (ACTIVITY)
CB
or activity beginning in the initial scheduled year. For other work types
A - Acquisition
indicates (Cash-Flow Funding) with proposed work type
(Estimates are in thousand ofdollars.)
funding types. Multi-year funding of a project segment
or activities see
FY 2018
C
SW
NHP
4000
used for each project phase.
FUNDING SOURCE (2)
UM
1500
A
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
Various - multiple routes
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
HIGHWAY PROGRAM
INTERSTATE PROJECTSFS-1512A
SCHEDULED FOR FEASIBILITY STUDY
US 321 (EXIT 123) TO I-77 (EXIT 152). WIDEN ROADWAY.
29.0CATAWBAIREDELL
I-40
I-5804 2500SR 1639 (MEACHAM ROAD) TO 0.3 MILE EAST OF US 21. PAVEMENT REHABILITATION.
3.0SW
NHPIM 2500C IREDELL I-40
I-3819 315359 138383
GARVEE BOND FUNDING $10 MILLION; CONSTRUCTION - PAYBACK FY 2012 - FY 2023
STATESVILLE, MODIFICATION OF I-40/I-77 INTERCHANGE AREA.
NHP CG 1097 A CG 1097 A CG 1097 A CG 1097 A CG 1097 A 1097CG A1097CG A1097CG A NHP 100R B NHP 168100C B
IREDELL I-40/I-77
A INITIAL I-40/I-77 INTERCHANGE IMPROVEMENTS - UNDER CONSTRUCTIONTRNB FINAL I-40/I-77 INTERCHANGE IMPROVEMENTS
I-5805 6400SR 2167 (WARD ROAD) TO DAVIE COUNTY LINE. PAVEMENT REHABILITATION.
4.0SW
NHPIM 6400C IREDELL I-40
I-5772 102501.4 MILES EAST OF I-77 TO SR 2167 (WARD ROAD). PAVEMENT REHABILITATION.
4.6SW
NHPIM 10250C IREDELL I-40
I-5003 38988 30340
COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019
EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.
27.0
TRN
NHP CG 2162 CG 2162 CG 2162 CG 2162 BURKECATAWBAIREDELL
I-40
FS-1512B I-77/SR 1302 (CORNELIUS ROAD). CONVERT GRADE SEPARATION TO INTERCHANGE.
IREDELL I-77
I-5717 11850 750
COORDINATE WITH PROJECT R-2307
NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.
SW
NHP R 900 NHP 5100C5100C
IREDELL I-77
I-5768 8900SOUTH CAROLINA LINE TO SR 1577 (WEST TYVOLA ROAD). PAVEMENT REHABILITATION.
4.8SW
NHPIM C 4450 C 4450 MECKLENBURG I-77
I-5825 5800SR 1577 (TYVOLA ROAD) TO I-277 IN CHARLOTTE. PAVEMENT REHABILITATION.
4.7SW
NHPIM C 5800 MECKLENBURG I-77 / US 21
I-5773 41002 MILES NORTH OF SR 1001 (OSWALT AMITY ROAD) TO 0.3 MILE NORTH OF SR 2321 (EAST BROAD STREET). PAVEMENT REHABILITATION.
5.5SW
NHPIM C 4100 IREDELL I-77
Page 1 of 29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE
Wednesday, June 03, 2015
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025
HIGHWAY PROGRAM
INTERSTATE PROJECTSI-5813 19000.3 MILE NORTH OF SR 2321 (EAST BROAD
STREET) TO SR 1892 (JENNINGS ROAD). PAVEMENT REHABILITATION.
5.2SW
NHPIM C 1900 IREDELL I-77
I-5405 737285 660285
UNDER CONSTRUCTION - INCLUDES FUNDING FOR I-3311 C AND I-4750 AA
I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.
17.0 NHPBA R 3000 A NHPBA C 12333 A C 12334 A C 12333 A NHPBA R 3000 B NHPBA C 11333 B C 11334 B C 11333 B
IREDELLMECKLENBURG
I-77
A I-77/LAKEVIEW ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE.EXB I-77/HAMBRIGHT ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE.EX
I-5715 18050 500NC 73 INTERCHANGE. UPGRADE EXISTING INTERCHANGE TO SPLIT DIAMOND CONFIGURATION.SW
NHP R 1550 NHP 16000C
MECKLENBURG I-77
I-3311 152434 105334
PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-3311 C INCLUDED IN I-5405
I-277 (BROOKSHIRE FREEWAY) IN CHARLOTTE TO SR 5544 (WEST CATAWBA AVENUE - EXIT 28). ADDITIONAL LANES.
17.4 NHP 100R B NHP 47000C B
MECKLENBURG I-77
A I-85 TO NORTH OF I-485 (CHARLOTTE OUTER LOOP) - COMPLETEAA NC 73 (SAM FURR ROAD), WEST OF I-77 TO EAST OF I-77; SR 2136 (GILEAD ROAD), WEST OF I-77 TO EAST OF I-77 - COMPLETEB I-485 (CHARLOTTE OUTER LOOP) TO SR 5544 (WEST CATAWBA AVENUE) EXIT 28.C I-277 TO NORTH OF I-85. CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HOT LANES. I-277 (BROOKSHIRE
FREEWAY), I-77 TO NORTH BREVARD STREET. CONSTRUCT HOT LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405D I-485 (CHARLOTTE OUTER LOOP) TO SR 2136 (GILEAD ROAD) - COMPLETEE NORTH OF I-277/NC 16 (BROOKSHIRE FREEWAY) TO NORTH OF I-85. WORK TO BE ACCOMPLISHED IN I-3311 C.
I-5718 1219300I-485 (EXIT 1) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.
9.6 NHP 48600R A R 48600 A R 48600 ANHP