  • North Carolina Department of Transportation

    2015

    STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

    CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

    2016-2025 JUNE 2015

  • COUNTY

    FUTURE YEARS

    F

    NHPB - National Highway Performance Program (Bridge)NHPBA - National Highway Performance Program (Bonus Allocation)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersS - StateS (M) - State Match

    HFB - Highway Fund Bridge Replacement Program STP - Surface Transportation ProgramHP - Federal-Aid High Priority STPDA - Surface Transportation Program - Direct AttributableHRRR - High Risk Rural Roads STPOFF -Surface Transportation Program (Off System Bridge)HSIP - Highway Safety Improvement Program STPON - Surface Transportation Program Bridge (On System Bridge)L - Local T - State Highway Trust Funds PE - Preliminary Engineering

    RG - Right of Way (GARVEE)

    STATE TRANSPORTATION IMPROVEMENT PROGRAM

    NHP - National Highway Performance Program

    Work Type (Activity) box

    F - Feasibility StudyCG - Construction (GARVEE)C - Construction

    G - Grading and Structures

    R - Right of Way

    (2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

    DP - Discretionary or DemonstrationCMAQ - Congestion Mitigation

    ER - Emergency Relief Funds

    BOND (R) - Revenue Bond

    project until completion.

    APD - Appalachian Development

    FUNDING CATEGORY (1)

    SW - StatewideTRN -Transition Project

    BA - Bonus AllocationDIV - DivisionEX - Exempt

    REG - RegionalHF - State Dollars (Non-STI)

    NEW ROUTE or City

    WORK TYPE (ACTIVITY)

    I-40 TO NC 3

    Phases of implementation:ESTIMATED COST

    (1) FUNDING CATEGORY

    PROJECT BREAKS

    designation for project

    LOCATION / DESCRIPTION

    SR - Secondary Road

    IDENTIFICATION NUMBER Assigned to each project at conception and remains with

    break.

    work description.

    Preliminary Engineering, Right of Way, Utility, Mitigation

    See Highway Funding Key

    any project breaks.Category for the project andIdentifies the "STI" Funding

    and Construction cost estimates by funding category in current dollars. Cost may include one or more

    for an explanation of funding categories

    Preliminary engineering,Right of Way, Mitigation,

    One or two letter

    NHPNHP

    LOCATION / DESCRIPTION NHP

    NHP

    SW

    FY 2023 FY 2024FY 2022

    5000BNHP

    C10000 C

    9000

    TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

    U 5000

    FY 2021

    TOTAL PROJECT

    COST (THOU)

    NHPNHP

    FUN

    DS

    A

    PRIOR YEARS COST

    (THOU)

    DEVELOPMENTAL PROGRAM

    FY 2016 FY 2019 FY 2020

    B

    FY 2025

    NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN. 700

    FY 2017

    MWIDEN TO A FOUR-LANE FACILITY

    A

    C 5000 BC B

    20000CRC 5000

    HIGHWAY PROGRAM

    UNFUNDED

    NC 3 TO SR 1003SR 1003 TO NC 96

    ASW

    UNFUNDED

    COMMITMENTSFUTUREUtilities or Construction.

    (3) WORK TYPE (ACTIVITY)

    CB

    or activity beginning in the initial scheduled year. For other work types

    A - Acquisition

    indicates (Cash-Flow Funding) with proposed work type

    (Estimates are in thousand ofdollars.)

    funding types. Multi-year funding of a project segment

    or activities see

    FY 2018

    C

    SW

    NHP

    4000

    used for each project phase.

    FUNDING SOURCE (2)

    UM

    1500

    A

    US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

    Project termini and a general

    SW

    Various - multiple routes

    WAKE

    NUMBERLENGTH (MILES)

    DIVISION 00

    R-0000

    IDROUTE/CITY

    S - StructureU - Utilities

    I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

  • CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

    ROUTE/CITYCOUNTYID

    LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

    PRIORYEARSCOST

    TOTALPROJCOST

    LENGTH

    TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

    FUNDS FY 2016

    UNFUNDED

    FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

    STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

    FY 2021 FY 2022 FY 2023 FY 2024 FY 2025

    HIGHWAY PROGRAM

    INTERSTATE PROJECTSFS-1512A

    SCHEDULED FOR FEASIBILITY STUDY

    US 321 (EXIT 123) TO I-77 (EXIT 152). WIDEN ROADWAY.

    29.0CATAWBAIREDELL

    I-40

    I-5804 2500SR 1639 (MEACHAM ROAD) TO 0.3 MILE EAST OF US 21. PAVEMENT REHABILITATION.

    3.0SW

    NHPIM 2500C IREDELL I-40

    I-3819 315359 138383

    GARVEE BOND FUNDING $10 MILLION; CONSTRUCTION - PAYBACK FY 2012 - FY 2023

    STATESVILLE, MODIFICATION OF I-40/I-77 INTERCHANGE AREA.

    NHP CG 1097 A CG 1097 A CG 1097 A CG 1097 A CG 1097 A 1097CG A1097CG A1097CG A NHP 100R B NHP 168100C B

    IREDELL I-40/I-77

    A INITIAL I-40/I-77 INTERCHANGE IMPROVEMENTS - UNDER CONSTRUCTIONTRNB FINAL I-40/I-77 INTERCHANGE IMPROVEMENTS

    I-5805 6400SR 2167 (WARD ROAD) TO DAVIE COUNTY LINE. PAVEMENT REHABILITATION.

    4.0SW

    NHPIM 6400C IREDELL I-40

    I-5772 102501.4 MILES EAST OF I-77 TO SR 2167 (WARD ROAD). PAVEMENT REHABILITATION.

    4.6SW

    NHPIM 10250C IREDELL I-40

    I-5003 38988 30340

    COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019

    EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.

    27.0

    TRN

    NHP CG 2162 CG 2162 CG 2162 CG 2162 BURKECATAWBAIREDELL

    I-40

    FS-1512B I-77/SR 1302 (CORNELIUS ROAD). CONVERT GRADE SEPARATION TO INTERCHANGE.

    IREDELL I-77

    I-5717 11850 750

    COORDINATE WITH PROJECT R-2307

    NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.

    SW

    NHP R 900 NHP 5100C5100C

    IREDELL I-77

    I-5768 8900SOUTH CAROLINA LINE TO SR 1577 (WEST TYVOLA ROAD). PAVEMENT REHABILITATION.

    4.8SW

    NHPIM C 4450 C 4450 MECKLENBURG I-77

    I-5825 5800SR 1577 (TYVOLA ROAD) TO I-277 IN CHARLOTTE. PAVEMENT REHABILITATION.

    4.7SW

    NHPIM C 5800 MECKLENBURG I-77 / US 21

    I-5773 41002 MILES NORTH OF SR 1001 (OSWALT AMITY ROAD) TO 0.3 MILE NORTH OF SR 2321 (EAST BROAD STREET). PAVEMENT REHABILITATION.

    5.5SW

    NHPIM C 4100 IREDELL I-77

    Page 1 of 29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

    Wednesday, June 03, 2015

    DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

  • CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

    ROUTE/CITYCOUNTYID

    LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

    PRIORYEARSCOST

    TOTALPROJCOST

    LENGTH

    TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

    FUNDS FY 2016

    UNFUNDED

    FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

    STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

    FY 2021 FY 2022 FY 2023 FY 2024 FY 2025

    HIGHWAY PROGRAM

    INTERSTATE PROJECTSI-5813 19000.3 MILE NORTH OF SR 2321 (EAST BROAD

    STREET) TO SR 1892 (JENNINGS ROAD). PAVEMENT REHABILITATION.

    5.2SW

    NHPIM C 1900 IREDELL I-77

    I-5405 737285 660285

    UNDER CONSTRUCTION - INCLUDES FUNDING FOR I-3311 C AND I-4750 AA

    I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.

    17.0 NHPBA R 3000 A NHPBA C 12333 A C 12334 A C 12333 A NHPBA R 3000 B NHPBA C 11333 B C 11334 B C 11333 B

    IREDELLMECKLENBURG

    I-77

    A I-77/LAKEVIEW ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE.EXB I-77/HAMBRIGHT ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE.EX

    I-5715 18050 500NC 73 INTERCHANGE. UPGRADE EXISTING INTERCHANGE TO SPLIT DIAMOND CONFIGURATION.SW

    NHP R 1550 NHP 16000C

    MECKLENBURG I-77

    I-3311 152434 105334

    PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-3311 C INCLUDED IN I-5405

    I-277 (BROOKSHIRE FREEWAY) IN CHARLOTTE TO SR 5544 (WEST CATAWBA AVENUE - EXIT 28). ADDITIONAL LANES.

    17.4 NHP 100R B NHP 47000C B

    MECKLENBURG I-77

    A I-85 TO NORTH OF I-485 (CHARLOTTE OUTER LOOP) - COMPLETEAA NC 73 (SAM FURR ROAD), WEST OF I-77 TO EAST OF I-77; SR 2136 (GILEAD ROAD), WEST OF I-77 TO EAST OF I-77 - COMPLETEB I-485 (CHARLOTTE OUTER LOOP) TO SR 5544 (WEST CATAWBA AVENUE) EXIT 28.C I-277 TO NORTH OF I-85. CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HOT LANES. I-277 (BROOKSHIRE

    FREEWAY), I-77 TO NORTH BREVARD STREET. CONSTRUCT HOT LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405D I-485 (CHARLOTTE OUTER LOOP) TO SR 2136 (GILEAD ROAD) - COMPLETEE NORTH OF I-277/NC 16 (BROOKSHIRE FREEWAY) TO NORTH OF I-85. WORK TO BE ACCOMPLISHED IN I-3311 C.

    I-5718 1219300I-485 (EXIT 1) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.

    9.6 NHP 48600R A R 48600 A R 48600 ANHP