Regional Policy Workshop of Stakeholders Decentralized Wastewater Management System

in South East Asia (SEA)

© PED/IWK@03/2014

Prior to 1950-s

EVOLUTION OF SEWERAGE SYSTEMS IN MALAYSIA

2

Year

Technology

1950-s 1970-s 1980-s 1990-s 2000

Primitive / Primary Treatment Partial / Full Secondary Treatment

1960-s

Pour Flush Septic Tank

Imhoff Tank OP/AL Activated Sludge/

Biological Filters Fully Mechanised

Plant

(Address Public Health) (Address River Pollution) (Address Environment)

Future Tertiary

Treatment

Early Days in Malaya

© PED/IWK@03/2014

0

5

10

15

20

25

30

7th MP 8th MP 9th MP 10th MP

RM B

illio

n

Cumulative Developer investment

Cumulative Government investment

INVESTMENT IN SEWERAGE INFRASTRUCTURE (PAST 2 DECADES)

MP – Malaysia Plan 3

© PED/IWK@03/2014

1991 MS1228

1994 1st ed Guidelines for

Developers

1998 2nd ed Guidelines

for Developers

2009 3rd ed M’sian

Sewerage Industry Guidelines

Continuous Improvement

JOURNEY OF STANDARDISATION IN M’SIAN SEWERAGE INDUSTRY

4 ,829 STPs taken over since 1st ed. published

4

© PED/IWK@03/2014 5

CHALLENGES OF MALAYSIA SEWERAGE INDUSTRY

• Large number • Logistic • Uneconomical Planning

• Design issues • Construction quality • Various equipment Technical

Hazard & Operability issues , Non-compliance of

effluent and hazard to

public and environment.

Cost Quality Delay

© PED/IWK@03/2014 6

STANDARD STP INITIATIVES

2010

• Initiatives by Malaysia Government Task Force

2012

• Voluntary basis

• Up to 2,000PE

2013

• Voluntary basis

• Up to 5,000PE

Near Future

• Compul-sory

• Up to 5,000PE

© PED/IWK@03/2014

STANDARD STP – OPTIMISE INDUSTRIAL RESOURCES

Consistent decisions

Simplify processes

7

© PED/IWK@03/2014

SIGNIFICANCE OF STANDARDISATION

8

COMMONALITY

COMPATIBILITY

COMPETITION REFERENCE

INTERCHANGE-ABILITY

© PED/IWK@03/2014

Plants < 5000PE,

75%

Plants > 5001PE

25%

Public Mechanical Plants

STANDARD STP – IMMEDIATE FOCUS

9 0

500

1000

1500

2000

2500

3000

3500

Extended Aeration System Other Treatment Systems

Nos

TO4 80%

Non TO4

20%

STPs taken over after enforcement of Guidelines for Developers

© PED/IWK@03/2014

• Construction methodology

• Consistent quality

• Standard Operating Procedures

• Interchangeability

• Standard Specification • Typical Design

Commonality Compatibility

• Plant Arrangement

• Land Area /Dimension

• Architecture Features Planning Design

Construc- tion

Operation

5000 PE & BELOW

10

STANDARD STP – MAIN FEATURES

© PED/IWK@03/2014

2010 2 pilot projects

(Extended Aeration)

2011 3rd revision of std stp document

(EA)

2013 4th revision of

std stp document

(EA)

2013 Proposal for 1 state 1 Std STP

and development of alternative

system

2014 Implement of 1 State 1 Std

STP and rolling out of alternative

system

CONTINUOUS DEVELOPMENT OF STANDARD STP

11

Voluntary contribution and participation from stakeholders

Consultant participation

Encourage active participation from stakeholders

© PED/IWK@03/2014

TYPICAL CURRENT STPs

Standard STP – early 2010 version Standard STP – end 2010 version

Current STP VS Standard STP

12

© PED/IWK@06/2013

For further information, pls contact to : Indah Water Konsortium Sdn Bhd (Company No. : 211763-P) Level 1-4, Block J, Pusat Bandar Damansara, 50490 Kuala Lumpur, MALAYSIA Tel:+603 27801100 Fax:+603 27801101 Web page: http://www.iwk.com.my