Dixie Engineering Inc: Gary Wysocki – President (Consulting)
Refrigeration Design
FACILITY
Tropical Cheese Industries – Perth Amboy, NJ (1989) ---
Design/Installation of (2) Frick MCM Screw compressors (R-22) along
with (1) BAC Ice building unit and Chester-Jensen Instant Chilling
system for high volume cooling on (2) 300 Gallon Flash Vat
Pasteurizer’s (cheese cultures).
FACILITY
Drake Bakeries – Wayne, NJ (1991) --- Design/Installation addition of
(1) 1000 ton Trane Centra-VAC Centrifugal Ammonia Compressor for
the cooling of warmed chocolate which enrobed numerous snake
cake products.
Refrigeration Design(continued2)
FACILITY
Whitlock Packaging – Fort Gibson, OK (2003) --- Design & installation
of (2) Dunham-Bush Freon systems (R-22) for the production cooling
of Pepsi’s Mountain DEW Amp energy drink in order to saturate CO2
within solution. Design included all exchangers, valving, PLC logic
control, EPR and BPR components.
Refrigeration Design(continued3)
Dixie Engineering Inc (Consulting) --- Sewaren, NJ (2005-2013)
1. Jasper Products – Joplin, MO – Designed a 1650 HP FES ammonia
system for the cooling and production of Soy Proteins and Soy Milks.
Supplied mechanical and electrical scope of work, PID’s, BOM’s,
equipment rigging etc.
2. Sara Lee Inc – Robinsville, SC – Designed 800 HP FES ammonia
system and BAC tower for spiral freezing of Pie dough.
3. Water Lillie Foods – Astoria, NY – Designed PID for 130 ton Chiller
system installation for storage cooler (Trane).
Refrigeration Revamping/Modifications
McCain-Ellios Foods – Lodi, NJ (1994)--- Added WONDERWARE Control
system platform (HMI)(In-Touch) to existing 1300 HP Mycom
Ammonia screw compressor system. Changed out numerous level
controls to 4-20ma, changed out Mycom liquid ammonia pumps with
durable Hansen liquid supply/return pumps from intercoolers.
Installed new (BPR) valving on Surge tanks.
Refrigeration Installations
FACILITY
Krauzser’s Dairy – Edison, NJ (1984) ---- Installation of (2) Frick MRI
ammonia Piston Compressors and PID diagrams along with (2)
Chester- Jensen single stage cascade Ice Builders for chilling process
water.
Krauzser’s Dairy – Edison, NJ (1985) ---- Installation of 60 x 40’ft
concrete floor with heated glycol system. Installation of (2) Interstage
upright Frick Piston Ammonia Compressors and (1) Niagara NO-Frost
sub-zero cooling unit for Dolly Madison Ice Cream storage.
Refrigeration Installations(Continued2)
FACILITY
Pillsbury Company/Haagen Dazs – Woodbridge, NJ (1997) ----
Installation of (2) FES Ammonia Screw Booster Compressors and
related piping for (2) 80 foot Ice Cream Cooling Tunnels and APV
Votators.
OTHER:
NOTE: Engineered and maintained the largest ammonia system in
New Jersey (Haagen- Dazs facility) with 76,000lbs of Anhydrous
Ammonia. Incident Commander for the entire facility in relation to
township evacuations, and TCPA protocols.
HAZMAT/SCBA Training
Centrifugal Screw Compressor Design
Environmental Code Compliance
Member – ASHRAE/SMACNA