reconciling project costing to the general ledger

54
Prepared by: Session ID: Reconciling Project Costing to the General Ledger Millie Babicz Managing Director SpearMC Consulting @SpearMC Functional Reconciliation/Analysis Tips & Tricks 101270

Upload: others

Post on 10-Nov-2021

9 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Reconciling Project Costing to the General Ledger

Prepared by:

Session ID:

Reconciling Project Costing to the

General Ledger

Millie Babicz

Managing Director

SpearMC Consulting

@SpearMC

Functional Reconciliation/Analysis Tips & Tricks

101270

Page 2: Reconciling Project Costing to the General Ledger

Agenda

• About Us

• Introduction

• Reconciliation Steps

• Other Reconciliation/Analysis Tips & Tricks

22

Page 3: Reconciling Project Costing to the General Ledger

About SpearMC

Page 4: Reconciling Project Costing to the General Ledger

Your Presenter

• ERP Implementation Specialist at KPMG for 13 years before joining

SpearMC in 2007

• PeopleSoft Financials, Financial Control and Reporting Expert

• Certified PeopleSoft Financials

• 20 Years Experience in Project / Program Management

Millie Babicz, CPAManaging Director

[email protected]

866-SPEARMC x802

www.SpearMC.com

4

Page 5: Reconciling Project Costing to the General Ledger

About SpearMC

Founded in 2004, SpearMC is a technology and

professional services firm specializing in

• PeopleSoft Financials and Supply Chain Management

• PeopleSoft Human Capital Management and Payroll

• ERP Architecture and Application Development

• Project and Program Management (PMO)

• Change Management

• ERP Training

• Mobile Technology

• Maximo Enterprise Asset

• Oracle Business Intelligence

5

Page 6: Reconciling Project Costing to the General Ledger

About SpearMC

Regional offices in Chicago, Denver, Houston,

Seattle and San Francisco

• We focus on local market delivery and capability development in line with

industry focus areas unique to the regions we serve.

• Our local and well-connected network of top-tier business analysts,

technical leads, developers and project managers keep travel cost to a

minimum.

6

Page 7: Reconciling Project Costing to the General Ledger

About SpearMC

• PeopleSoft Specialization

Oracle Gold Partner Since 2008

• Applications Reseller

• Hardware Reseller

IBM Advance Business Partner

Page 8: Reconciling Project Costing to the General Ledger

Introduction

Page 9: Reconciling Project Costing to the General Ledger

Project Costing Integration

99

Page 10: Reconciling Project Costing to the General Ledger

Reconciliation Steps

Page 11: Reconciling Project Costing to the General Ledger

Reconciliation Steps

• Determine Scope

• Identify Variances at Summary Level

• Identify Cause of Variances

• Determine How to Correct Existing Errors

• Determine How to Prevent Future Errors

1111

Page 12: Reconciling Project Costing to the General Ledger

Determine Scope

Page 13: Reconciling Project Costing to the General Ledger

Determine Scope

• Identify the type of transactions that will be reconciled

o Expenses, Revenue, Transfers

• Identify the ChartFields that will be reconciled

• Identify Analysis Types for each type of transaction

o Consider creating a new Analysis Group (s) for reconciliation/reporting

1313

Page 14: Reconciling Project Costing to the General Ledger

Determine Scope

14

Budget (BUD)

Actual Cost (ACT)

GL Expense (GLE)

Indirect Cost (SFA)

Billable Amt (BIL)

Billed Amt (BLD)

Fixed Rev (FRV)

Fixed Billed (FBD)

Budget (BUD)

Actual Cost (ACT)

GL Expense (GLE)

Indirect Cost (SFA)

Billable Amt (BIL)

Billed Amt (BLD)

Fixed Rev (FRV)

Fixed Billed (FBD)

Budget (BUD)

Actual Cost (ACT)

GL Expense (GLE)

Indirect Cost (SFA)

Billable Amt (BIL)

Billed Amt (BLD)

Fixed Rev (FRV)

Fixed Billed (FBD)

Budget (BUD)

Actual Cost (ACT)

GL Expense (GLE)

Indirect Cost (SFA)

Billable Amt (BIL)

Billed Amt (BLD)

Fixed Rev (FRV)

Fixed Billed (FBD)

Projects

Activities Activities

Transactions Transactions Transactions Transactions

14

Page 15: Reconciling Project Costing to the General Ledger

Determine Scope

• Identify Project Costing field/fields to be used for determining Accounting

Period

o E.g. Accounting Dt

o Note: must easier to reconcile as of a point in time (closed period if

possible)

1515

Page 16: Reconciling Project Costing to the General Ledger

Determine Scope

16

PC/CA GL Staging Table (CA_ACCTG_LN_PC) can be used to:

• Obtain the Accounting Dt for As Incurred Revenue (as the revenue may not be recognized in the same period as the original cost

• Obtain the account for cost/revenue created in PC (Pricing)

16

Accounting Dt An Type Account GL Distrib Amount

1/15/2015 ACT 527500 I $500

1/15/2015 IND 527500 D $100

1/15/2015 BIL 527500 D $500

1/15/2015 BIL 527500 D $100

Accounting Dt An Type Account Amount

1/15/2015 IND 593110 $100

1/15/2015 IND 493999 <$100>

2/28/2015 BIL 132900 $500

2/28/2015 BIL 432034 <$500>

2/28/2015 BIL 132900 $100

2/28/2015 BIL 432034 <$100>

Proj Resource PC/CA GL Staging Table

Page 17: Reconciling Project Costing to the General Ledger

Determine Scope

17

Type 1/1 – 1/2015 2/1 – 2/28/15

Total Cost $600 $0

Total Revenue $0 $600

In this example, the PC cost and revenue would be reported as:

17

Accounting Dt An Type Account GL Distrib Amount

1/15/2015 ACT 527500 I $500

1/15/2015 IND 527500 D $100

1/15/2015 BIL 527500 D $500

1/15/2015 BIL 527500 D $100

Accounting Dt An Type Account Amount

1/15/2015 IND 593110 $100

1/15/2015 IND 493999 <$100>

2/28/2015 BIL 132900 $500

2/28/2015 BIL 432034 <$500>

2/28/2015 BIL 132900 $100

2/28/2015 BIL 432034 <$100>

Proj Resource PC/CA GL Staging Table

Page 18: Reconciling Project Costing to the General Ledger

Determine Scope

18

Accounting Date Tip: For Cost Collection from the GL, Date Type

not only can be used to filter down journal entries to bring into PC but

it also populates the Accounting Date field in PC (Proj Resource)

with the field value of the specified data type - either Journal Date or

Posted Date). Default is Posted Date.

18

Page 19: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

Page 20: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

• Build report/query to identify PC to GL variances at the ChartField string

summary

o E.g. PCBU - Project – Activity – Fund – Account

• Options:

o Query with multiple unions that reports balances in the PC and GL.

Utilize Pivot table to obtain variances

o Custom Report

o Custom View which allow you to build a query reporting variances only

o Composite Query (PeopleTools 8.54)

2020

Page 21: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

2121

Page 22: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

22

• Keep in mind that the Analysis Group set up determines how

the Amounts are brought into Proj Resource for GL

22

Page 23: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

• As of 9.2, Direct Journal transactions can be loaded to Project

Costing during the Receivables to Project Costing interface

process (PC_AR_TO_PC).

23

Page 24: Reconciling Project Costing to the General Ledger

Identify Variances at Summary Level

24

• As of 9.2, Bills that are entered directly into PeopleSoft

Billing can be loaded to Project Costing during the Billing to

Project Costing interface process (PC_BI_TO_PC)

24

Page 25: Reconciling Project Costing to the General Ledger

Cause of Variances

Page 26: Reconciling Project Costing to the General Ledger

Cause of Variance

• Build query to identify variances by Journal ID

• Three possible types of variances

1. In PC but not in GL

2. In GL but not in PC

3. In both but the amounts are different

• Start with one project and one variance.

• Research variance to determine cause.

• Once the variance is understood, create query to find error for all projects.

26

Page 27: Reconciling Project Costing to the General Ledger

Cause of Variance

27

Page 28: Reconciling Project Costing to the General Ledger

Cause of Variance

28

Page 29: Reconciling Project Costing to the General Ledger

Cause of Variance

29

Page 30: Reconciling Project Costing to the General Ledger

Cause of Variance

30

Page 31: Reconciling Project Costing to the General Ledger

Cause of Variance

• PC to GL template can be helpful to linking each variance to the variance

reason to explain all variances

• Tip: Start with the easy variances (not the largest and most complex.)

31

Page 32: Reconciling Project Costing to the General Ledger

Cause of Variance

32

Page 33: Reconciling Project Costing to the General Ledger

Correct Existing Errors

Page 34: Reconciling Project Costing to the General Ledger

Correct Existing Errors

• Correct in the source system when possible

• Easy/In progress errors:

o Process accounting or journal generate

o Post Journals

o Run or process allocation

• GL Only Entry

• PC Only Entry (Add Transaction)

• Correct Analysis Type-Account mismatch via JE

• Correct Jrnl/Accounting Date mismatch via JE

• Update customization or create new fix

o External journal updated to set PC Distrib Status to N

34

Page 35: Reconciling Project Costing to the General Ledger

Prevent Future Errors

Page 36: Reconciling Project Costing to the General Ledger

Prevent Future Errors

• Add additional checks/queries to Month End Close

• Create/update combo edits

• Update customizations

• Update batch schedule

• Change in business process

• New customizations

36

Page 37: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis Tips & Tricks

Page 38: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

• Pivot Table (Excel)

• Concatenate (Excel)

• VLOOKUP Function (Excel)

• WorkCenters (9.2)

• Reconciliation Workbench (9.1)

o Project Recon Workbench

o Contracts Reconciliation Summary

o Subsystem Reconciliation

38

Page 39: Reconciling Project Costing to the General Ledger

• Pivot table

o Very quick way to summarize and analyze data in Excel.

o Drag and drop wizard allows you to easily move between less to more

detail.

o Page fields allow you to filter summarized results to a specific value.

o Fast way to shift data presented in rows to columns.

o Fast way to shift between amounts versus count.

Other Reconciliation/Analysis

Tips & Tricks

39

Page 40: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

40

Page 41: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

41

Page 42: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

• Concatenate

o Allows you to merge one or more Excel cells or text together as one

value.

o For the PC to GL reconciliation template, concatenated the string

Project – Activity – Account – Fund as one value so that Vlookup could

be used to link each variance to the variance reasons.

4242

Page 43: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

• VLOOKUP Function

o Allows you to “search the first column of a range of cells, and then

return a value from any cell on the same row of the range.” in Excel.

o Used VLOOKUP to add or subtract each variance reason until all

variances were fully explained.

43

Page 44: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

1.) Look up this value…2.) in this Column

3.) and when

you find the

value, display

the value in

the 6th column.

44

Page 45: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

45

WorkCenters v9.2

• WC’s are central work area designed for the end user.

• The WorkCenter is intended to provide access to key

components within the Financials and Supply Chain

application

• Delivers information that a user needs to take action

on, such as exceptions, reports and queries.

45

Page 46: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

WorkCenters v9.2 My Work: Critical Exceptions/Work you need to complete

Work Area: Workspace to do your work

Links: Other links you may need to use to complete work

Other important Reports/Queries

46

Page 47: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

Reconciliation

• The Reconciliation Summary page allows you to view the results from the Reconciliation

Summary process.

• This page provides the difference between billing and revenue at the detail level as well as the

attributes that are related to retainages, withholdings, limits, and fees. The information provided

on this page enables you to determine where to complete the remaining process, or to make an

adjustment.

47

Page 48: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

Reconciliation

48

Page 49: Reconciling Project Costing to the General Ledger

Other Reconciliation/Analysis

Tips & Tricks

49

Page 50: Reconciling Project Costing to the General Ledger

Get in Touch

Millie Babicz, CPAManaging Director

[email protected]

866-SPEARMC x802

www.SpearMC.com

Page 51: Reconciling Project Costing to the General Ledger

SpearMC Online Resources

• SpearMC online Tools & Resources can be found at

www.spearmc.com

51

Page 52: Reconciling Project Costing to the General Ledger

SpearMC Presentations at Reconnect

Wednesday, July 20 @ 9:15 – 10:15 am

• Powerful PeopleSoft 9.2 Composite &

Connected Query

• Session ID: 101230

• Presented by Randy Johnson

Wednesday, July 20 @ 10:45 – 11:45 am

• How Oracle BI Publisher Serves your

PeopleSoft Reporting Needs

• Session ID: 101150

• Presented by Randy Johnson

Wednesday, July 20 @ 1:00 – 2:30 pm

• Extending PeopleSoft WorkCenters to

your Utility Supplier Partners

• Session ID: 101240

• Presented by Randy Johnson

Thursday, July 21 @ 9:15 – 10:15 am

• Reconciling Project Costing to the

General Ledger and Functional

Reconciliation/Analysis Tips & Tricks

• Session ID: 101180

• Presented by Millie Babicz

Thursday, July 21 @ 11:00 am – 12:30 pm

• Deep Dive into nVision and Query for

PeopleSoft 9.2 (Tools 8.54)

• Session ID: 101180

• Presented by Millie Babicz

52

Page 53: Reconciling Project Costing to the General Ledger

Questions?

[email protected]

Page 54: Reconciling Project Costing to the General Ledger

Session ID:

Please complete the session evaluation

101270