reception building operating procedure

1
De-packaging unit ` Sealed trailer Quick Mix Underground slurry store Fast opening/closing roller doors Inside the reception building Reception Building Deliveries arrive at site and are weighed at the weighbridge. Weighbridge A delivery approaches the fast opening/ closing roller doors of the reception building. Delivery vehicle drives into the reception building and the roller doors close automatically behind it. Roller doors open automatically, and biofilter extraction doubles in power to create a negative pressure inside the shed, drawing outside air into the shed. Food waste is emptied into the import bunker. Food waste is transferred into the de-packaging unit via a combination of walking floors and augers to obtain a clean feedstock. Grass/maize is either unloaded in the reception hall for immediate use, otherwise it is emptied into a clamp in the feed store. Solid crops are mixed with slurries to obtain a feedstock of the correct consistency. Slurries are unloaded directly into the sealed underground slurry tank via a filling cone. All the different feedstocks are piped into the food buffer tank. Here they are blended together to obtain the perfect nutritional composition required by the micro- organisms to breakdown the organic material and create biogas. Food waste ...to the Anaerobic Digester (AD)... Operating Procedure Building Plan

Upload: cres-biogas

Post on 29-Mar-2016

220 views

Category:

Documents


0 download

DESCRIPTION

Describes the operationing procedure used within the Reception building, and during the receiving of feedstocks

TRANSCRIPT

Page 1: Reception Building Operating Procedure

De-packaging unit

`

Sealed trailer

Quick Mix

Underground slurry

store

Fast opening/closing roller

doors

Inside the reception building

Reception Building

Deliveries arrive at

site and are weighed

at the weighbridge.

Weighbridge

A delivery approaches

the fast opening/

closing roller doors of

the reception building.

Delivery vehicle

drives into the

reception building

and the roller doors

close automatically

behind it.

Roller doors open automatically, and

biofilter extraction doubles in power to

create a negative pressure inside the

shed, drawing outside air into the shed.

Food waste is emptied

into the import bunker.

Food waste is

transferred into the

de-packaging unit via

a combination of

walking floors and

augers to obtain a

clean feedstock.

Grass/maize is either

unloaded in the

reception hall for

immediate use,

otherwise it is emptied

into a clamp in the feed

store.

Solid crops are

mixed with slurries to

obtain a feedstock of

the correct

consistency.

Slurries are

unloaded directly

into the sealed

underground slurry

tank via a filling

cone.

All the different feedstocks are

piped into the food buffer tank.

Here they are blended together to

obtain the perfect nutritional

composition required by the micro-

organisms to breakdown the

organic material and create

biogas.

Food waste

...to the Anaerobic

Digester (AD)...

Operating Procedure

Building Plan