Report run on: March 20, 2012 10:45 AM
RECAPP Facility Evaluation Report
Cardinal Newman Elementary / Junior High SchoolB2568ACalgary
Calgary RCSSD #1
Report run on: March 20, 2012 10:45 AM Page 2 of 49
B2568ABuilding Id:
Cardinal Newman ElementarBuilding Name:
CalgaryLocation:16201 Mckenzie Lake BoulevAddress:
6,922.20Gross Area (sq. m): $16,360,000Replacement Cost:1991Construction Year:
Evaluation Date: August 29 2011
Quinn Young Architects Ltd.Evaluation Company:
Erik HeckEvaluator Name:
The original 4,356 s.m. K - 9 School was constructed in 1991 with a capacity of approximately 300 students. Anaddition of approximately 1,344 s.m. Consisting of a gymnasium, 7 classrooms and a science room along withwashrooms and custodial areas was completed in 1999 bringing the total area to approximately 5,700 s.m. Addingapproximately 200 students to the capacity of the base building bringing the capacity of the main school building at thattime was approximately 500 students. Through the years 16 portables have been added, bringing the total capacity to900 students.
General Summary:
Structural Summary:Concrete slab on grade (150mm to 200mm) Concrete piles and grade beams with wood stud or 190 block exterior wallsand interior block walls supporting wood trusses. The gymnasium is concrete piles and grade beams with 290 block wallswood trusses. The mechanical mezzanine is a concrete slab supported by concrete beams. Overall the structure is in acceptablecondition.
Envelope Summary:Exterior is is primarily brick veneer with metal fascias around the clerestory windows. The appear to be in goodcondition with no apparent problems The roof is mostly clay tile with veral gutters around the outside. There are also low slope portions that are SBSroofing. Staff has indicated that there have been ongoing problems with roof leaks. Overall the envelope is inacceptable condition.
Interior Summary:The building interior is a combination of drywall and concrete block walls. Ceilings are primarily acoustic tile in asuspended t-bar grid system with some acoustic panels, textured drywall and painted drywall. There is a large crack in the mortar joint in one wall of mechanical room 201, the door closer on the musicalinstrument storage has been disconnected and there is staining on some of the ceiling tiles possibly due to roof leaks.Overall the interior is in acceptable condition.
Mechanical Summary:Following site services are provided: 150 mm diameter sanitary sewer gravity drain, 300 diameter storm sewer from roof and area drain by gravity to cityservice, 150 diameter water service and pressure gas service. Plumbing fixtures, water supply, and drainage system inside building are in good condition. Hot water heating system consists of boilers and pumps which supply heat to perimeter radiation, fan coil units andreheat coils. Four air handling units inside building provide ventilation for entire school. Air condition units are recommended forcomputer rooms. The systems are in acceptable condition.
Electrical Summary:The primary service is 120/208V, 3 phase, 4 wire which is fed underground from an utility supplied transformer.Distribution panels in the building are mainly full. Lighting is T-12 florescent fixtures throughout the school with metalhalide fixture in the gym. There are HID light fixtures at the external exit doors and for the parking lot. There is Cat 5data communication cabling throughout. The school has a Nortel telephone system and a Dukane PA system. TheFire alarm system is a Edwards system and is tested yearly.
7.05%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $1,153,700
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Report run on: March 20, 2012 10:45 AM Page 3 of 49
Overall, the electrical systems are in acceptable condition.
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: March 20, 2012 10:45 AM Page 4 of 49
A1020 Special Foundations* - 1991
A1020 Special Foundations* - 1999
A1030 Slab on Grade* - 1991
A1030 Slab on Grade* 1999
B1010.02 Structural Interior Walls Supporting Floors (or Roof)*
B1010.05 Mezzanine Construction*
B1010.09 Floor Construction Fireproofing*
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1991
1999
1991
1999
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
JAN-07
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S1 STRUCTURAL
Concrete grade beams and piles.
Concrete grade beams and piles.
A combination of 150mm, 200mm and 225mm structural concrete slab on grade.
175mm concrete slab on grade.
Concrete block load bearing walls supporting the mechanical mezzanine.
Reinforced concrete slab on concrete beams forming mechanical mezzanine.
Concrete slab at mechanical mezzanine.
Report run on: March 20, 2012 10:45 AM Page 5 of 49
B1010.10 Floor Construction Firestopping*
B1020.01 Roof Structural Frame*
B1020.02 Structural Interior Walls Supporting Roofs*
B1020.04 Canopies*
B1020.06 Roof Construction Fireproofing*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
JAN-07
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Fire dampers and firestopping at floor penetrations.
Both the original 1991 building and 1999 addition have wood roof trusses.
Concrete block load bearing walls in both the original 1991 building and 1999 addition.
Concrete beams and wood framed canopies at vestibule 193 and corridor 185. Concrete beam and block framed towercanopy structure at main entrance.
2 layers 13 mm type x gypsum board at ceiling.
Report run on: March 20, 2012 10:45 AM Page 6 of 49
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.06.03 Metal Siding**
B2010.01.09 Expansion Control: Ext. Wall*
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
0
40
0
20
Design Life
Design Life
Design Life
Design Life
JAN-07
MAR-12
JAN-07
MAR-12
Updated
Updated
Updated
Updated
Replace Metal Siding (10 m2)
Replace Joint Sealers (945 m)
Lifecycle Replacement
Lifecycle Replacement
2031
2015
$3,000
$28,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S2 ENVELOPE
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Brick veneer exterior cladding on both the original 1991 building and 1999 addition.
Metal siding on clerestory projection at administration.
Control joints in exterior brick faces and window/wall transitions in both the original 1991 building and 1999 addition.
Exterior caulking/sealant around windows and joints in both the original 1991 building and 1999 addition.
Report run on: March 20, 2012 10:45 AM Page 7 of 49
B2010.01.13 Paints (& Stains): Ext. Wall**
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.02.05 Wood Framing: Ext. Wall Const.*
B2010.03 Exterior Wall Vapour Retarders, Air Barriers, and Insulation*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1999
1991
1991
1991
Installed
Installed
Installed
Installed
15
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-12
JAN-07
JAN-07
MAR-12
Updated
Updated
Updated
Updated
Repaint Grade Beam (40 m2)
Lifecycle Replacement 2015 $1,000 Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Type Year Cost Priority
Updated: MAR-12
Painted exposed concrete grade beam at 1999 addition.
Some concrete block exterior walls in both the original 1991 building and 1999 addition.
38x140 wood stud framing in both the original 1991 building and 1999 addition.
Vapour barrier and batt or rigid insulation in both the original 1991 building and the 1999 expansion.
Report run on: March 20, 2012 10:45 AM Page 8 of 49
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1991 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1991
1991
1991
Installed
Installed
Installed
0
0
40
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Repair exterior louvers
Replace Aluminum Windows (153 m2)
Repair
Lifecycle Replacement
2013
2031
$1,500
$125,000
Low
Unassigned
Louvers facing the play area are dented and the finish isdamaged
Concern:
Fix damaged louvers and refinish.Recommendation:
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Prefinished metal wall vents, louvers and screens.
Prefinished metal soffits on both the original 1991 building and 1999 addition.
Brown prefinished aluminum window frames, sealed units glazing with lower vented windows c/w bug screens.
Consequences of Deferral:Increased cost of maintenance.
Report run on: March 20, 2012 10:45 AM Page 9 of 49
B2020.01.01.02 Aluminum Windows (Glass & Frame)** - 1999 Section
B2030.01.02 Steel-Framed Storefronts: Doors**
B2030.01.11 Metal Entrance Door** - 1991 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1999
1991
1991
Installed
Installed
Installed
40
30
0
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Aluminum Windows (45 m2)
Replace Steel-Framed Storefront Doors (2)
Replace Metal Entrance Doors (8)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2039
2021
2021
$36,000
$4,600
$8,000
Unassigned
Unassigned
Unassigned
Hollow metal doors in pressed steel storefront.Concern:
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Brown prefinished aluminum window frames, sealed units glazing with lower vented windows c/w bug screens.
Hollow metal doors in pressed steel frames c/w glazed lites and glazed transom.
Hollow metal doors in pressed steel frames c/w glazed lites.
Report run on: March 20, 2012 10:45 AM Page 10 of 49
B2030.01.11 Metal Entrance Door** - 1999 Section
B2030.02 Exterior Utility Doors** - 1991 Section
B2030.02 Exterior Utility Doors** - 1999 Section
B3010.01 Deck Vapour Retarder and Insulation* - 1991 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1999
1991
1999
1991
Installed
Installed
Installed
Installed
0
40
40
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Metal Entrance Doors (3)
Replace Exterior Utility Doors (2)
Replace Exterior Utility Doors (5)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2029
2031
2039
$3,000
$1,600
$4,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Hollow metal doors in pressed steel frames c/w glazed lites.
Hollow metal doors in pressed steel frames.
Hollow metal doors in pressed steel frames.
Poly vapour barrier and RSI 7 batt insulation.
Report run on: March 20, 2012 10:45 AM Page 11 of 49
B3010.01 Deck Vapour Retarder and Insulation* - 1999 Section
B3010.02.02 Roofing Tiles** - 1991 Section
B3010.02.02 Roofing Tiles** - 1999 Section
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1991 Section
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
1999
1991
1999
1991
Installed
Installed
Installed
Installed
0
30
30
25
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Concrete Roofing Tiles (3960 m2)
Replace Concrete Roofing Tiles (1350 m2)
Replace SBS and Veral Roofing (380 m2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2021
2029
2016
$750,000
$260,000
$65,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Poly vapour barrier and RSI 7 loose fill insulation.
Concrete roofing tiles.
Concrete roofing tiles.
SBS roofing in various areas. Veral gutters around the building perimeter.
Report run on: March 20, 2012 10:45 AM Page 12 of 49
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)** - 1999 Section
B3010.08 Flashing and Sheet Metal
B3020.02 Other Roofing Openings (Hatch, Vent, etc)*
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
1999
1991
1991
Installed
Installed
Installed
25
0
0
Design Life
Design Life
Design Life
MAR-12
MAR-12
JAN-07
Updated
Updated
Updated
Replace Veral Roofing (130 m2)
Repair Flashings
Lifecycle Replacement
Repair
2024
2012
$22,000
$1,000
Unassigned
Low
Parapet cap flashings at northeast side of school and wallcounter flashing at northwest upper gym wall are pulling awayfrom building.
Concern:
Repair or replace defective sections of flashing.Recommendation:
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Veral gutters around the building perimeter.
Prefinished metal parapet cap flashings and wall counter flashings.
2 Metal access hatches. Low profile roof vents.
Consequences of Deferral:Potential for water infiltration into building envelope anddamage to building interior.
Report run on: March 20, 2012 10:45 AM Page 13 of 49
C1010.01 Interior Fixed Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.04 Interior Balustrades and Screens, Interior Railings*
C1010.05 Interior Windows*
C1010.07 Interior Partition Firestopping*
C1010.08 Other Partitions*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
0
30
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JAN-07
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace Operable Wall (25 m2)
Lifecycle Replacement 2021 $28,000 Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S3 INTERIOR
Event:
Type Year Cost Priority
Updated: MAR-12
A combination of painted concrete block and drywall partitions in both the original 1991 building and 1999 addition.
Folding operable wall in ancillary gymnasium.
Pipe handrails and guards in the mechanical mezzanines and stairs in both the original 1991 building and 1999 addition.
Glazing in pressed steel frame between the home economics/industrial arts and offices.
Building is broken into fire compartments with 2 hour fire walls. Ducts through appear to be dampered. Penetrations aresealed.
Glass block walls at main office, library, and computer room.
Report run on: March 20, 2012 10:45 AM Page 14 of 49
C1020.01 Interior Swinging Doors (& Hardware)*
C1020.03 Interior Fire Doors*
C1020.05 Interior Large Doors*
C1030.01 Visual Display Boards** - 1991 Section
C1030.01 Visual Display Boards** - 1999 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1999
Installed
Installed
Installed
Installed
Installed
0
0
0
20
20
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace Visual Display Boards (215)
Replace Visual Display Boards (85)
Lifecycle Replacement
Lifecycle Replacement
2015
2019
$150,000
$70,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Stained birch solid core doors and painted metal doors with and without sidelights in pressed steel frames throughout.
1 1-2 hour hollow metal doors and frames at firewalls. 3/4 hour rated metal doors in pressed steel frames at storage rooms and custodial rooms.
Stainless steel rolling shutter door at main office.
Chalkboards (30), tackboards (160) and whiteboards (25) throughout.
Chalkboards (5), tackboards (60) and whiteboards (20) throughout.
Report run on: March 20, 2012 10:45 AM Page 15 of 49
C1030.02 Fabricated Compartments (Toilets/Showers)** - 1991 Section
C1030.02 Fabricated Compartments (Toilets/Showers)** - 1999 Section
C1030.05 Wall and Corner Guards*
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1999
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
30
30
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
JAN-07
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace Washroom Partitions (32)
Replace Washroom Partitions (4)
Lifecycle Replacement
Lifecycle Replacement
2021
2029
$37,000
$5,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Painted metal washroom partitions.
Painted metal washroom partitions.
Stainless steel and plastic corner guards.
Handrails in link to portables on the south side of the building.
Lamacoid signage fastened to top of door frames in both 1991 building and 1999 addition.
Report run on: March 20, 2012 10:45 AM Page 16 of 49
C1030.10 Lockers**
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.08 Stair Railings and Balustrades*
C2020.10 Stair Painting*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1999
Installed
Installed
Installed
Installed
Installed
Installed
30
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
JAN-07
JAN-07
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Replace Lockers (470)
Lifecycle Replacement 2021 $225,000 Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Type Year Cost Priority
Updated: MAR-12
Prefinished full height 305 mm metal lockers in corridors 185, 186, 187 and 188 and in phys ed. office. 6-tier metal lockers in change rooms.
Metal and wood storage shelving in storage rooms.
Wall mounted soap dispensers, paper towel dispensers, napkin disposals, mirrors, metal trash receptacle, partitionmounted toilet paper dispensers in washrooms.
Steel channel stringers, metal pan treads and risers with concrete topping to mechanical mezzanines.
Hollow metal pipe rails and guard rails at mechanical mezzanines.
Painted concrete stair treads.
Report run on: March 20, 2012 10:45 AM Page 17 of 49
C2020.11 Other Stair Finishes*
C2030 Interior Ramps*
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment**
C3010.11 Interior Wall Painting*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1999
1991
1991
1999
Installed
Installed
Installed
Installed
Installed
0
100
40
20
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace Tile Wall Finishes (85 m2)
ReplaceAcoustical Wall Treatments (65 m2)
Lifecycle Replacement
Lifecycle Replacement
2031
2015
$21,000
$15,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Exposed concrete topping stair treads.
Ramp constructed with wood joists, plywood subfloor, antislip sheet vinyl flooring and pipe rail handrails in link toportables off corridor 196.
80 x 80 tile at drinking fountains in corridors, at urinals in boys washrooms and change room, in shower in the PE office,at the showers in the change rooms, and at the slop sinks in the janitors rooms.
Acoustic concrete block on upper gym walls (not part of replacement pricing). Wood acoustic walls (45 m2) and acoustic wall panels (20 m2) in music room.
Painted concrete block and gypsum board walls throughout.
Report run on: March 20, 2012 10:45 AM Page 18 of 49
C3020.01.02 Painted Concrete Floor Finishes*
C3020.02 Tile Floor Finishes**
C3020.04 Wood Flooring**
C3020.07 Resilient Flooring** - 1991 Section
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
2001
1991
1991
1991
Installed
Installed
Installed
Installed
0
50
30
20
Design Life
Design Life
Design Life
Design Life
JAN-07
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Tile Floor Finishes (350 m2)
Replace Wood Flooring (550 m2)
Replace Resilient Flooring (2325 m2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2041
2021
2015
$56,000
$135,000
$185,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Painted concrete floors in mechanical mezzanine, industrial arts area, gymnasium storage rooms and weight/storageroom.
80x80 ceramic tile in shower areas. 200x200 ceramic tile flooring in washrooms change rooms, vestibules 193 and 100, at entry doors in corridors 185, 187and 196.
Sprung maple wood floor in gymnasium (495 m2). Parquet flooring in woodworking (55 m2).
Sheet vinyl flooring (2185 m2) in corridors, kitchen, infirmary, staff room, classrooms, science storage, home economics,and ancillary lunchroom. VCT (140 m2) in janitor rooms and most storage areas.
Report run on: March 20, 2012 10:45 AM Page 19 of 49
C3020.07 Resilient Flooring** - 1999 Section
C3020.07 Resilient Flooring** - 2011 Section
C3020.08 Carpet Flooring** - 1991 Section
4 - Acceptable
6 - Excellent
4 - Acceptable
Rating
Rating
Rating
1999
2011
1991
Installed
Installed
Installed
20
20
15
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Resilient Flooring (1090 m2)
Replace Resilient Flooring (44 m2)
Replace Carpet (250 m2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2019
2031
2015
$95,000
$4,000
$17,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Synthetic pulastic flooring (255 m2) in auxiliary gymnasium. Sheet vinyl flooring (250 m2) in corridors, science room, and link to portables off corridor 196. VCT (585 m2) in janitor room, storage areas, most classrooms, and washroom.
Sheet vinyl flooring in ECS 117.
Carpet flooring in the administration areas and music room.
Report run on: March 20, 2012 10:45 AM Page 20 of 49
C3020.08 Carpet Flooring** - 2011 Section
C3020.11 Floor Painting*
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1991 Section
C3030.06 Acoustic Ceiling Treatment (Susp. T-Bar)** - 1999 Section
6 - Excellent
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
2011
2006
1991
1999
Installed
Installed
Installed
Installed
15
0
25
25
Design Life
Design Life
Design Life
Design Life
MAR-12
JAN-07
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace Carpet (260 m2)
Replace Acoustic Ceiling Tiles (2780 m2)
Replace Acoustic Ceiling Tiles (820 m2)
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2026
2016
2024
$18,000
$125,000
$36,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Carpet tile in library, counseling rooms and ECS 117.
Painted court marking in gymnasium.
T-bar ceilings in classrooms, corridors and office/administration area.
Report run on: March 20, 2012 10:45 AM Page 21 of 49
C3030.07 Interior Ceiling Painting*
C3030.09 Other Ceiling Finishes*
4 - Acceptable
4 - Acceptable
Rating
Rating
1991
1991
Installed
Installed
0
0
Design Life
Design Life
MAR-12
JAN-07
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Painted drywall ceilings in storage rooms, change rooms and washrooms. Painted concrete ceiling in gymnasiumstorage.
Acoustic ceiling panels in gymnasium. Textured ceiling in corridors, administration area and music room
Report run on: March 20, 2012 10:45 AM Page 22 of 49
D2010.04 Sinks** - 1991
D2010.04 Sinks** - 1999
D2010.05 Showers**
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
1991
1999
1991
Installed
Installed
Installed
30
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 31 Sinks - 1991
Replace 2 Sinks - 1999
Replace 15 Showers
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2021
2029
2021
$44,000
$3,000
$15,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S4 MECHANICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
There are 10 S.S. Double bowl one with clay trap and one with garborator, 20 S.S. Bar sinks four with acid traps withglass mason jars, 10 hand sinks and 1 S.S. Single bowl sink and 2 trough sinks with TMV at taps. One sink has beenremoved from ECS room due to water damage from negligence.
There are 2 single bowl stainless steel sinks installed in the 1999 building renovation.
There are 15 Symmons Hydra-pipe stainless steel shower systems for each tiled shower cubical and gang shower with aSymmons thermostatic mixing valve and cabinet located near the gang showers.
Report run on: March 20, 2012 10:45 AM Page 23 of 49
D2010.08 Drinking Fountains/Coolers** - 1991
D2010.08 Drinking Fountains/Coolers** - 1999
D2010.09 Other Plumbing Fixtures*
D2010.09 Other Plumbing Fixtures* - 1991
D2010.09 Other Plumbing Fixtures* - 1999
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1991
1999
1991
1991
1999
Installed
Installed
Installed
Installed
Installed
35
35
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 4 Drinking Fountains / Coolers
Replace 1 Drinking Fountain/Cooler
Lifecycle Replacement
Lifecycle Replacement
2026
2034
$5,000
$1,500
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
There are 4 non refrigerated vitreous china wall hung drinking fountain installed in corridor.
There is 1 Elkay refrigerated drinking fountain installed in the corridor 1999 renovation.
There are 2 emergency eye wash units. One is in the industrial arts shop and the other is in the prep room #167.
There are 2 Mifab 24x36 acrylic floor mounted mop sinks in this building.
There is a Mifab 24x24 acrylic mop sink installed in the 1999 renovation.
Report run on: March 20, 2012 10:45 AM Page 24 of 49
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1991
D2010.10 Washroom Fixtures (WC, Lav, Urnl)** - 1999
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.02 Valves: Domestic Water**
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1999
1991
1991
Installed
Installed
Installed
Installed
35
35
0
40
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 68 Washroom Fixtures (WC, Lav, Urnl)
Replace 7 Washroom Fixtures (WC, Lav, Urnl)
Replace 90 Valves: Domestic Water
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2026
2034
2031
$96,000
$10,000
$40,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
There are 24 floor mounted water closets with flush valves and tanks, 15 wall mounted gang urinals with tanks and 29steel and enamel drop in lavatory sinks.
There are 4 floor mounted water closets with flush valves and 3 steel enamel drop in lavatory sinks installed in the 1999renovation.
There is copper pipes and tubes installed for the domestic water systems in this building.
There are ball valves and gate valves used in domestic water lines in this building.
Report run on: March 20, 2012 10:45 AM Page 25 of 49
D2020.01.03 Piping Specialties (Backflow Preventers)**
D2020.02.02 Plumbing Pumps: Domestic Water**
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation: Domestic*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
20
20
20
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 3 Piping Specialties (Backflow Preventors)
Replace 1 Plumbing Pumps: Domestic Water
Replace 2 Domestic Water Heaters
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
$6,000
$2,000
$12,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
There are 3 back flow preventors installed in this building. Two are installed in the in coming water service room. One isa 2" for the potable water system and the other is a 2" for the irrigation system. The third is a 3/4" for the make up water inthe mechanical room.
There is an inline domestic hot water recirculation pump installed on domestic hot water recirculation line.
There are 2 Jetglass M-1-82U-250 225MBH gas fired domestic hot water tanks with a 82 gallons storage in the ceilingspace of the mechanical room.
The domestic cold, hot and recirculation water along with the hot water supply and return lines are all insulated in thisbuilding.
Report run on: March 20, 2012 10:45 AM Page 26 of 49
D2030.01 Waste and Vent Piping*
D2030.02.04 Floor Drains*
D2030.03 Waste Piping Equipment*
D2040.01 Rain Water Drainage Piping Systems*
D2040.02.04 Roof Drains*
D3010.02 Gas Supply Systems*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
There is copper and cast iron waste and vent pipes in this building.
There are floor drains in various areas throughout the building.
There are 4 acid traps, 1 garborator and 1 clay trap attached to specialty sinks in this building.
The rain water drainage piping system is internal to the building and connects to the municipal storm water system. Thepiping is generally cast iron and original to the building construction.
There are cast iron drains installed around perimeter of roof area.
There is a medium pressure gas service run from meter room to mechanical room. There is a pressure regulator installedto reduce gas pressure to low pressure for boilers and heaters. It is noted that this gas meter configuration should berelocated to the outside of the building to ensure access for service by ATCO gas.
Report run on: March 20, 2012 10:45 AM Page 27 of 49
D3020.02.01 Heating Boilers and Accessories: H.W.**
D3020.02.02 Chimneys (& Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
1991
1991
1991
Installed
Installed
Installed
35
35
0
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 3 Heating Boilers and Accessories: H.W.
Replace 15m Chimneys (&Comb. Air): H.W. Boiler
Lifecycle Replacement
Lifecycle Replacement
2026
2026
$20,500
$191,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
There are 3 Super Hot gas fired atmospheric boilers Model AAE-1320 at 132MBH with an expansion tank, circulationpumps and heat exchanger. One boiler was replaced in 2000.
The chimney for the boilers and hot water tanks are insulated with metal cladding. The combustion air is insulated andhas a skirt at floor level.
There is a chemical pot feeder with a side stream filter and site glass provided for hot water boiler system. A Mixing andfill tank are provided for the glycol solution heating system.
Report run on: March 20, 2012 10:45 AM Page 28 of 49
D3040.01.01 Air Handling Units: Air Distribution** - 1991
D3040.01.01 Air Handling Units: Air Distribution** - 1999
D3040.01.02 Fans: Air Distribution (Remote from AHU)* - 1991
D3040.01.02 Fans: Air Distribution (Remote from AHU)* - 1999
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
1991
1999
1991
1999
Installed
Installed
Installed
Installed
30
30
0
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 2 Air Handling Units: Air Distribution
Replace 2 Air Handling Units: Air Distribution
Lifecycle Replacement
Lifecycle Replacement
2021
2029
$234,000
$232,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Air handling units provided are as follows: 1 air handling unit No. 1 - Haakon 490, supply 30,000 CFM. The unit is c/w supply fan, glycol preheat coil, humidifier withMunter media, filter section, and mixing damper section. 1 air handing unit No. 2 - Haakon unit to handle 6000 CFM. The unit is c/w supply fan, preheat glycol solution coil, Munterhumidifier section,filter section and mixing damper section.
Air handling units provided are as follows: 1 air handling unit No. 3 - Haakon model 3687 CFM capacity using 2 H.P. Motor. Unit c/w supply fan, glycol preheat coilsection, Munter humidifier section, filter section and mixing dampers. This unit was installed with the 1999 renovation. 1 air handling unit No. 4 - Engineered Air LM-8 with capacity of 8200 CFM. The unit is c/w supply fan Munter humidifiersection, preheat glycol coil section, filter section and mixing dampers. This unit was installed with the 1999 renovation.
There are 9 ceiling circulation fans located in the gym and music room for general air circulation in these spaces.
There are 2 ceiling circulation fans located in the new gym for general air circulation. Which was part of the 1999renovation.
Report run on: March 20, 2012 10:45 AM Page 29 of 49
D3040.01.03 Air Cleaning Devices: Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.07 Air Outlets & Inlets: Air Distribution*
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1999
1991
Installed
Installed
Installed
Installed
Installed
0
0
0
40
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 4 Hot Water Distribution Pumps
Replace 7 Fans: Exhaust
Lifecycle Replacement
Lifecycle Replacement
2039
2021
$460,000
$22,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
There is a air purifier suspended from ceiling of wood workshop, this electronic air cleaner is installed to remove dirt andfume particles.
There is low pressure supply air sheet metal distributed from air handlers to ceiling and side wall diffuser in this building.
There are ceiling diffusers that are installed in classrooms and the general office space. High side wall registers areinstalled in some special areas.
There are 2 vertical in-line 5HP. Armstrong pumps to circulate heating hot water to perimeter radiation, fan coil units andheat exchanger and 2 vertical in-line 4HP. Armstrong pumps to circulate heating glycol solution from heat exchanger topreheat coils in air handling units.
There are 3 in-line exhaust fans provided in ceiling space to provide exhaust air for the wash rooms and shower rooms.The shop and art rooms has 2 fan for the fume hoods and there are 2 in-line exhaust fans in the shop for acid cabinets. Shop welding fumes hoods and spray booths exhausted.
Report run on: March 20, 2012 10:45 AM Page 30 of 49
D3040.04.02 Air Cleaning Devices: Exhaust*
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3040.05 Heat Exchangers**
D3050.02 Air Coils**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
0
0
0
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Replace 1 Heat Exchanger
Replacement 9 Air Coils
Lifecycle Replacement
Lifecycle Replacement
2021
2021
$6,000
$4,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
There is a Murphy Dust Collector MKAW-400 with 10HP. Motor located in the wood working shop. Ducting from the unit isprovided to dust inlet hoods at various wood working equipment.
Exhaust ducts are provided from exhaust grilles and hoods to in-line exhaust fan which is ducted to the outside. Relief airis provided through ductwork and weather hoods located on roof.
Wash rooms & shower room grilles are located at ceiling. Exhaust from the shop areas are exhausted through fabricatedexhaust hood.
There is a shell and tube heat exchanger used to heat glycol solution for the preheat coils in air handling units.
There are reheat coils installed in some branch of ductwork for internal zone temperature control.
Report run on: March 20, 2012 10:45 AM Page 31 of 49
D3050.03 Humidifiers**
D3050.05.02 Fan Coil Units** - 1991
D3050.05.02 Fan Coil Units** - 1999
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
1991
1991
1999
Installed
Installed
Installed
25
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 2 Humidifiers
Replace 7 Fan Coil Units
Replace 3 Fan Coil Units
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2016
2021
2029
$1,700
$25,000
$11,000
Unassigned
Unassigned
Unassigned
There are 2 fan coil units recessed low in walls and 1mounted high on the wall located by the vestibule which waspart of the 1999 renovation.
Concern:
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
There are spray type Munter humidifiers Air Handler number 1 and Air handler number 2. The system is not currentlyused.
There are 7 Fan coil units recessed low in walls located at entrances and vestibules in this building.
Report run on: March 20, 2012 10:45 AM Page 32 of 49
D3050.05.03 Finned Tube Radiation** - 1991
D3050.05.03 Finned Tube Radiation** - 1999
D3050.05.06 Unit Heaters**
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
1991
1999
1991
Installed
Installed
Installed
40
40
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace 80m Finned Tube Radiation
Replace 30m Finned Tube Radiation
Replace 1 Unit Heater
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2031
2039
2021
$50,000
$30,000
$3,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
There are perimeter wall fin radiation with cabinets install in areas along the exterior perimeter walls and perimeter finradiation with cabinets mounted 4m high above the floor in the gym along the exterior perimeter walls.
There are perimeter wall fin radiation with cabinets install in areas along the exterior perimeter walls and perimeter finradiation with cabinets mounted 4m high above the floor in the gym along the exterior perimeter walls.
There is 1 hot water unit heaters suspended in mechanical room.
Report run on: March 20, 2012 10:45 AM Page 33 of 49
D3060.02.01 Electric and Electronic Controls**
D3060.02.02 Pneumatic Controls**
D3060.02.05 Building Systems Controls (BMCS, EMCS)**
D4030.01 Fire Extinguisher, Cabinets and Accessories* - 1991
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
2006
1991
Installed
Installed
Installed
Installed
30
40
20
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Replace 25 Electric and Electronic Controls
Replace 50 Pneumatic Controls
Replace 1 Building Systems Control
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2021
2031
2026
$7,000
$26,000
$100,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
Electric controls are provided for fan coil units, radiant fin and unit heater.
There is a duplex air compressor with dryer used to provide air for the pneumatic controls. Generally all control valvesand dampers have pneumatic controls.
There is a Building Management Control System (MBS) to schedule operation of air handlers, exhaust fan, boilers andpump.
There are 15 dry chemical 10lb. fire extinguishers installed in cabinets in corridors and on brackets in rooms.
Report run on: March 20, 2012 10:45 AM Page 34 of 49
D4030.01 Fire Extinguisher, Cabinets and Accessories* - 1999
D4090.06 Smoke Protection & Exhaust Fans** - 1991
D4090.06 Smoke Protection & Exhaust Fans** - 1999
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
1999
1991
1999
Installed
Installed
Installed
0
40
40
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replacement 8 Smoke Protection & Exhaust Fans
Replace 2 Smoke Protection & Exhaust Fans
Lifecycle Replacement
Lifecycle Replacement
2031
2039
$8,000
$2,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
There are 4 dry chemical 10lb. fire extinguishers installed in cabinets in corridors and on brackets in rooms.
There are smoke detectors installed in supply and return ducts of air handlers.
Report run on: March 20, 2012 10:45 AM Page 35 of 49
D5010.03 Main Electrical Switchboards (Main Distribution)**
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.01 Switchboards, Panelboards, and (Motor) Control Centers**
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
1991
1991
1991
Installed
Installed
Installed
40
30
30
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Main Electrical Switchboards (MainDistribution) one only
Replace 14 Electrical Branch Circuit Panelboards(Secondary Distribution)
Replace 1 Switchboards, Panelboards, and(Motor) Control Centers
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2031
2021
2021
$30,000
$63,000
$25,000
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S5 ELECTRICAL
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
1991 Siemens 102/208 volt, 3 phase, 4 wire, 1600 amp. Attached CDP with space for future demands.
Siemens 120/208v 42 cct panelboards are typical and are in good condition and reasonable space for more circuits.
Siemens MCC has two spaces left for additional loads. Modular starters have HOA pilot light, over load relays anddisconnect
1600Capacity Size
ampsCapacity Unit
Report run on: March 20, 2012 10:45 AM Page 36 of 49
D5010.07.02 Motor Starters and Accessories**
D5020.01 Electrical Branch Wiring*
D5020.02.01 Lighting Accessories: Interior (Lighting Controls)*
D5020.02.02.02 Interior Fluorescent Fixtures**
D5020.02.02.03 Interior Metal Halide Fixtures*
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
30
0
0
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
JAN-07
MAR-12
JAN-07
Updated
Updated
Updated
Updated
Updated
Replace Motor Starters and Accessories 16
Retrofit Light fixtures to T8 & electronic ballasts
Lifecycle Replacement
Lifecycle Replacement
2021
2015
$40,000
$200,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
The Motor starters are Siemens brand and operate various mechanical equipment, such as exhaust fans and AHUs.
Conduit and wire installation complete with flexible connections to motors and fixtures
Line voltage switching throughout, with contactors for gym lighting circuits. Three level switching in classrooms.
Typical fixtures in class rooms are 2x4, 120v, three lamp, T-12 lamps and ballasts, K12 lenses. Lamps are mixed cooland warm white . The hallways are fixtures are 2x4, two lamp, T-12, K12 lenses.
Both gymnasiums have metal halide fixtures with lamp protection.
Report run on: March 20, 2012 10:45 AM Page 37 of 49
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs*
D5020.03.01.04 Exterior H.P. Sodium Fixtures*
D5020.03.02 Lighting Accessories: Exterior (Lighting Controls)*
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
1991
1991
1991
1991
Installed
Installed
Installed
Installed
20
0
0
0
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
JAN-07
JAN-07
Updated
Updated
Updated
Updated
Replace Emergency Lighting Battery Packs 12
Replace Exit lights with LED 15
Lifecycle Replacement
Energy Efficiency Upgrade
2015
2012
$13,200
$3,300
Unassigned
Low
Exit light are incandescent fixtures.Concern:
Upgrade exit lights to LED.Recommendation:
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Two head battery pack 12v emergency lighting fixture. Battery packs and exit lights are interconnected.
Exit lights are incandescent.
Exterior lighting is HID wall packs at all exits.
Wall packs are controlled by photo-cell.
Consequences of Deferral:Higher maintenance and operational costs.
Report run on: March 20, 2012 10:45 AM Page 38 of 49
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.03 Clock and Program Systems*
D5030.04.01 Telephone Systems*
D5030.04.04 Data Systems*
4 - Acceptable
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
25
25
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
JAN-07
JAN-07
JAN-07
Updated
Updated
Updated
Updated
Updated
Replace Detection and Fire Alarm 1
Replace Intrusion Detection
Lifecycle Replacement
Lifecycle Replacement
2021
2016
$100,000
$59,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Fire alarm system is an Edwards ESA 2000, hard wired, sixteen zone being used and two spaces.
Silent Knight model 5104 system with key pad and key arm/ disarm. Regency burglary/ fire control/ communicator model4720 and Regency 64 zone expander model 4126. There are motion sensors in the school.
Master clock is integral to the public address system.
Telephone system is a Strata Vie and is working good.
Network cabling is Cat.5 with AMP patch pannels and with 3-com hubs.
Report run on: March 20, 2012 10:45 AM Page 39 of 49
D5030.05 Public Address and Music Systems**
4 - AcceptableRating
1991Installed
20Design Life
MAR-12Updated
Replace Public Address and Music Systems
Lifecycle Replacement 2015 $5,000 Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Type Year Cost Priority
Updated: MAR-12
P.A. System is a Dukane with tuner and tape player. Call/priv switches is typical in class rooms.
Report run on: March 20, 2012 10:45 AM Page 40 of 49
E1020.02 Library Equipment*
E1020.07 Laboratory Equipment*
E1090 Other Equipment - Kiln
E1090.04 Residential Equipment*
E1090.06 Darkroom Equipment*
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
1999
1991
1999
1991
1991
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Computer and book scanner.
Fume hoods, sinks, gas nozzles, sinks, eye wash, wall mounted soap dispensers and paper towel dispensers.
Kiln c/w exhaust in Industrial Arts.
Stoves, refrigerators, microwave ovens and dishwashers are installed in the Home Economics area and staff lounge. Awasher and dryer and hood fans for the stoves are installed in the Home Economics room. Refrigerators, a stove c/whoodfan, microwave and freezer are installed in the Kitchen.
Darkroom equipment installed in 2 rooms in Industrial Arts.
Report run on: March 20, 2012 10:45 AM Page 41 of 49
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02 Fixed Casework** - 1991 Section
E2010.02 Fixed Casework** - 1999 Section
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
1991
1991
1999
Installed
Installed
Installed
0
35
35
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Replace Fixed Casework (590 m)
Replace Fixed Casework (95 m)
Lifecycle Replacement
Lifecycle Replacement
2026
2034
$450,000
$75,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Main gymnasium: 2 side swing and 4 fixed basketball nets 1 scoreboard 6 climbing ropes 1 gymnasium divider curtain Auxiliary gymnasium: 4 fixed basketball nets 1 scoreboard 1 climbing frame
The classroom, office and library millwork is clear finished birch plywood with plastic laminate countertops. There arebirch and glass display cabinets at the main gathering area. Wall-mounted plastic laminate vanities in washrooms.
The classroom millwork is clear finished birch plywood with plastic laminate countertops. Wall-mounted plastic laminatevanities in washroom.
Report run on: March 20, 2012 10:45 AM Page 42 of 49
E2010.03.06 Curtains and Drapes** - 1991 Section
E2010.03.06 Curtains and Drapes** - 1999 Section
4 - Acceptable
5 - Good
Rating
Rating
1991
1999
Installed
Installed
30
30
Design Life
Design Life
MAR-12
MAR-12
Updated
Updated
Replace Curtains (153 m2)
Replace Curtains (45 m2)
Lifecycle Replacement
Lifecycle Replacement
2021
2029
$16,000
$5,000
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
MAR-12
MAR-12
Fabric curtains on classroom windows.
Report run on: March 20, 2012 10:45 AM Page 43 of 49
F1010.02.04 Portable and Mobile Buildings** - 1981 Portables
4 - AcceptableRating
1981Installed
30Design Life
MAR-12Updated
Replace Portable Building Envelope
Replace Portable Electrical Systems
Replace Portable Interior
Replace Portable Mechanical Systems
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2015
2015
2015
2015
$228,000
$45,000
$54,000
$48,000
Unassigned
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
MAR-12
2 portable classrooms (C84CS04, C81CS30) in south group of 6 portables. 1 portable classroom (C81CS64) in north group of 8 portables. Envelope: (Acceptable) Construction - Wood frame set on wood cribbing and skirted with painted plywood. Cladding - Vertical cement board siding with horizontal metal siding on top 1000. Windows - Aluminum sliders c/w sealed units and security screens. Roofing - SBS membrane Interior: (Acceptable) Flooring - Sheet vinyl Walls - Gypsum board with painted vinyl fabric c/w aluminum battens at joints. Gypsum board, painted (C84CS04). Ceiling - Gypsum board panels w/ textured spray. 610 x 1220 Acoustic tile (C84CS04). Doors - Rated hollow metal in pressed steel frames Equipment - Slate chalkboards, vinyl covered tack boards and whiteboards. Metal boot racks in corridor. Mechanical: (Acceptable) These units have corner furnaces with supply air duct work in the upper corner of the room (C84CS04, C81CS30) oralong the floor and feeding the corridor (C81CS64). The return air is on the side of the furnace closet. These units haveroof mounted supply fans with a grill mounted in the ceiling. The thermostats are all programmable. There is 1 wallmounted 5lb. ABC fire extinguisher mounted in the corridor for this group. Electrical: (Acceptable) These units have 1X4 fluorescent 2 lamp fixtures complete with local switching. Each unit has a standalone 8 circuitpanel.
Report run on: March 20, 2012 10:45 AM Page 44 of 49
F1010.02.04 Portable and Mobile Buildings** - 1989 Portable
4 - AcceptableRating
1989Installed
30Design Life
MAR-12Updated
Replace Portable Building Envelope
Replace Portable Electrical Systems
Replace Portable Interior
Replace Portable Mechanical Systems
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2019
2019
2015
2015
$76,000
$15,000
$18,000
$16,000
Unassigned
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
MAR-12
1 portable classroom (C89CS21) in south group of 6 portables. Envelope: (Acceptable) Construction - Wood frame set on wood cribbing and skirted with painted plywood. Cladding - Vertical cement board siding with horizontal metal siding on top 1000. Windows - Aluminum sliders c/w sealed units and security screens. Roofing - SBS membrane Interior: (Acceptable) Flooring - Sheet vinyl Walls - Gypsum board, painted. Ceiling - 610 x 1220 Acoustic tile. Doors - Rated hollow metal in pressed steel frames Equipment - Slate chalkboards, vinyl covered tack boards. Mechanical: (Acceptable) This unit has a corner furnace with supply air duct work in the upper corner of the room. The return air is on the side ofthe furnace closet. A roof mounted supply fan with a grill is mounted in the ceiling. The thermostat is programmable.There is 1 wall mounted 5lb. ABC fire extinguisher mounted in the corridor for this group. Electrical: (Acceptable) This unit has 1X4 fluorescent 2 lamp fixtures complete with local switching. The unit has a standalone 8 circuit panel.
Report run on: March 20, 2012 10:45 AM Page 45 of 49
F1010.02.04 Portable and Mobile Buildings** - 1992 Portables
4 - AcceptableRating
1992Installed
30Design Life
MAR-12Updated
Replace Portable Building Envelope
Replace Portable Electrical Systems
Replace Portable Interior
Replace Portable Mechanical Systems
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2022
2022
2015
2017
$456,000
$90,000
$108,000
$96,000
Unassigned
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
MAR-12
5 portable classrooms (C93CS03, C92CS16, C94CS10, C93CS05, C93CS06) in north group of 8 portables. 1 portable classroom (C93CS04) in west group of 2 portables. Envelope: (Acceptable) Construction - Wood frame set on wood cribbing and skirted with painted plywood. Cladding - Vertical cement board siding with horizontal metal siding on top 1000. Windows - Aluminum sliders c/w sealed units and security screens. Roofing - SBS membrane Interior: (Acceptable) Flooring - Sheet vinyl Walls - Gypsum board, painted. Ceiling - 610 x 1220 Acoustic tile. Doors - Rated hollow metal in pressed steel frames Equipment - Slate chalkboards, vinyl covered tack boards and white boards. Mechanical: (Acceptable) These units have a corner furnace with supply air duct work in the upper corner of the room. The return air is on the sideof the furnace closet. These units have roof mounted supply fans with a grill mounted in the ceiling. The thermostats areall programmable. There is 1 wall mounted 5lb. ABC fire extinguisher mounted in the corridor for this group. Electrical: (Acceptable) These units has 1X4 fluorescent 2 lamp fixtures complete with local switching. Each unit has a standalone 8 circuit panel.
Report run on: March 20, 2012 10:45 AM Page 46 of 49
F1010.02.04 Portable and Mobile Buildings** - 1996 Portables
5 - GoodRating
1996Installed
30Design Life
MAR-12Updated
Replace Portable Building Envelope
Replace Portable Electrical Systems
Replace Portable Interior
Replace Portable Mechanical Systems
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
Lifecycle Replacement
2026
2026
2016
2021
$456,000
$90,000
$108,000
$96,000
Unassigned
Unassigned
Unassigned
Unassigned
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Event:
Event:
Event:
Event:
Type
Type
Type
Type
Year
Year
Year
Year
Cost
Cost
Cost
Cost
Priority
Priority
Priority
Priority
Updated:
Updated:
Updated:
Updated:
MAR-12
MAR-12
MAR-12
MAR-12
3 portable classrooms (C97CS15, C97CS18, C96CS03) in south group of 6 portables. 2 portable classrooms (C96CS24, C98CS08) in north group of 8 portables. 1 portable classroom (C96CS05) in west group of 2 portables. Envelope: (Good) Construction - Wood frame set on wood cribbing and skirted with painted plywood. Cladding - Vertical cement board siding with horizontal metal siding on top 1000. Windows - Aluminum sliders c/w sealed units and security screens. Roofing - SBS membrane Interior: (Acceptable) Flooring - Sheet vinyl Walls - Gypsum board, painted. Ceiling - 610 x 1220 Acoustic tile. Doors - Rated hollow metal in pressed steel frames Equipment - Slate chalkboards, vinyl covered tack boards and white boards. Mechanical: (Acceptable) These units have a corner furnace with supply air duct work in the upper corner of the room or along the floor (C97CS18). The return air is on the side of the furnace closet. These units have roof mounted supply fans with a grill mounted in theceiling. The thermostats are all programmable. There is 1 wall mounted 5lb. ABC fire extinguisher mounted in thecorridor for this group. Electrical: (Acceptable) These units has 1X4 fluorescent 2 lamp fixtures complete with local switching. Each unit has a standalone 8 circuit panel.
Report run on: March 20, 2012 10:45 AM Page 47 of 49
F1020.02.13 Paint Booths*
4 - AcceptableRating
1991Installed
0Design Life
JAN-07Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
Paint booth in industrial arts room.
Report run on: March 20, 2012 10:45 AM Page 48 of 49
K4010.01 Barrier Free Route: Parking to Entrance*
K4010.02 Barrier Free Entrances*
K4010.03 Barrier Free Interior Circulation*
K4010.04 Barrier Free Washrooms*
K4030.01 Asbestos*
K4030.02 PCBs*
K4030.04 Mould*
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
1991
1991
1991
1991
1991
1991
1991
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
MAR-12
JAN-07
JAN-07
JAN-07
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)S8 SPECIAL ASSESSMENT
Walkway from barrier free parking stall to ramp and entry level. Ramp from bus drop-off to entry level.
Automatic door openers at main entrance.
Barrier free travel provided to all public areas.
Barrier free washrooms adjacent to main office. Additional girl's barrier free washroom in 1999 addition.
No asbestos observed or reported.
No PCBs observed or reported.
No mould observed or reported.
Report run on: March 20, 2012 10:45 AM Page 49 of 49
K4030.09 Other Hazardous Materials*
K5010.01 Site Documentation*
K5010.02 Building Documentation*
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
1991
2011
2011
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
MAR-12
MAR-12
MAR-12
Updated
Updated
Updated
Calgary - Cardinal Newman Elementary / Junior High School (B2568A)
No hazardous materials observed or reported.
Quinn Young Architects 2011 Main Building: 5700 m2 Portable Classrooms: 1222 m2 School Capacity: 900 students