Report run on: December 14, 2006 9:29 AM
RECAPP Facility Evaluation Report
Camrose Composite High School
B2882ACamrose
Battle River Reg Div #31
Report run on: December 14, 2006 9:29 AM Page 2 of 43
B2882ABuilding Id:
Camrose Composite High ScBuilding Name:
CamroseLocation:6205 - 48 Avenue Address:
0.00Gross Area (sq. m): $29,316,951Replacement Cost:0Construction Year:
Evaluation Date: June 11 2005
Wade Engineering Ltd.Evaluation Company:
Ron ShannonEvaluator Name:
Camrose High School is located in the City of Camrose, Alberta. There are 668 students enrolled. School wasconstructed in 1964 and additions added in 1968, 89 and 92. There are a mixture of single story and 2 story sectionswith concrete vaulted barrel roofs in the 64 and 68 additions. School faces street on the east elevation with a large pavedparking lot with good access and bus lanes. During roof inspection it was noted that pigeons are nesting in air handling unit on mechanical roof area of westgymnasium. Recommend screening off this location to prevent bird nesting. Periodic water entry noted in service tunnel adjacent to gymnasium, concrete repair scheduled (negative waterproofing)further monitoring and investigation needed to determine cause and long term correction. Facility meets current accessibility requirements.
General Summary:
Structural Summary:1964 structure; below grade foundations and poured in place structural columns flooring and roof decks. Concrete slab ongrade in 1968 and 92 additions. 1989 addition has preserved wood foundation on concrete piles and grade beam. Lateradditions a mixture of concrete block and steel framing tied to existing structures. Water entry concerns noted in service tunnel through cracks in foundation wall against tie-in at gymnasium. High watertable and/or roof drainage to be investigated to determine source of moisture load. No structural concerns noted or reported. Overall condition is acceptable.
Envelope Summary:Exterior finishes mixture of masonry face brick, cementitious stucco and EIFS with acrylic finish. Control joints andperimeter sealants require replacement. Roof replacement required due to failed membrane on 1964 hallway and 2storey wing along entrance walkway. Preventive maintenance indicated for several roof areas to repair blisters andridges. There is approximately 30% of existing roof due for replacement. Exterior windows primarily commercial aluminum in acceptable condition. Remaining wood framed windows (1964) inbarrel roofs are nearing the end of their expected life. Repairs have been scheduled. Replacement can be expected inthe next 7 to 10 years. Heavy snow loading and drainage concerns from west gymnasium barrel roof to adjoining flat roof causing water entryalong construction tie-in. Further review required to determine corrective repairs. Overall condition is acceptable with some life cycle replacements needed.
Interior Summary:School has been modernized in stages with millwork and architectural fittings meeting current needs. 1964 building sections still have original flooring and windows in various locations and scheduled replacement of theseitems will be occurring over the next 3 to 10 years. Overall condition is good.
Mechanical Summary:
2.66%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $780,090
Camrose - Camrose Composite High School (B2882A)
Report run on: December 14, 2006 9:29 AM Page 3 of 43
The heating system is supply by 2 - Cleaver Brooks boilers producing hot water for heating. The heating water iscirculated by 5 pumps to perimeter radiation and air handler units. The air system is made up of 9 indoor air handlers and 5 roof top units ( Eng-Air units) which services the west gym, thegathering area, cafeteria, tech lab, & the services wing. The controls are Dimex BMCS, maintaining set points and sensing with pneumatic actuator on dampers & valves.Boiler on indoor outdoor reset. The exhaust systems separate for -- washrooms, food lab, beauty culture, automotive's, 3-kitchen systems (dishwasher,ranges, general ) & 3 dust collectors in 3 shops. Items carried from 1999 report remain : 1. roof top units still require to be refurbished (operation is trouble free) energy side the dampers and linkage requirereplacement, should have side & shafts seals and neoprene edge seals on blades. 2. still require back flow protection.
Electrical Summary:Upgrade the fire alarm system to current technology and add devices to meet code, Upgrade emergency lighting andexits lights with current technology and add units to meet codes. School has upgraded the lighting to T8 lamps. Themain distribution panel should be replaced due to age. Overall rating is acceptable.
Camrose - Camrose Composite High School (B2882A)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: December 14, 2006 9:29 AM Page 4 of 43
A1010 Standard Foundations*
A1030 Slab on Grade*
A2020 Basement Walls (& Crawl Space)*
B1010.01 Floor Structural Frame*(Building Frame)
B1010.02 Structural Interior Walls Supporting Floors*
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
100
100
100
100
100
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Water entry repair.
Repair 2006 $4,560 Medium
Moisture ingress into service tunnel from attached westgymnasium through cracks in basement wall.
Concern:
Epoxy inject large cracks and monitor for further development.Recommendation:
Camrose - Camrose Composite High School (B2882A)
S1 STRUCTURAL
Event:
Type Year Cost Priority
Updated: NOV-05
1964 - poured concrete foundation with concrete piles.
1968 - Concrete slab on grade. Courtyard addition - slab on grade with sunken concrete pit for food court.
1964 - 7 m deep under original gymnasium at northeast corner with dirt floor. Concrete mechanical service tunnel runningentire length of building. 1989 addition - preserved wood foundation on concrete piles with access hatch to service tunnel, dirt crawlspace.
1964 - Structural concrete column and floor slab. 1989 addition engineered wood floor truss.
Poured concrete and/or concrete block. Structural steel in food court.
Consequences of Deferral:Continued water entry into service tunnel.
Report run on: December 14, 2006 9:29 AM Page 5 of 43
B1010.03 Floor Decks, Slabs, and Toppings*
B1010.05 Mezzanine Construction*
B1010.07 Exterior Stairs**
B1010.10 Floor Construction Firestopping*
4 - Acceptable
4 - Acceptable
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
Rating
0
0
0
0
Installed
Installed
Installed
Installed
100
100
40
100
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Repair tread surfaces on two staircases.
Repair 2006 $1,368 High
Tread surface on steel risers severely abraded anddelaminated.
Concern:
Hammer chisel surface to remove unsound concrete andoverlay with latex modified repair cement. Apply nonskidurethane coating to protect surfaces.
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
1964 - Structural concrete slab on 2nd floor additions. Structural slab on HSS steel for grandstands and weight room ingymnasium.
Courtyard addition - structural steel with metal pan and concrete topping. Wood shop - wood post and beam joist andplywood deck. Auto shop - mechanical mezzanine - Concrete block, HSS steal beam and posts with structural slab.Drama room - Open web steel truss and steel deck with concrete topping slab.
Poured in place concrete platform and risers with attached steel risers with concrete treads.
Fireproof caulking and/or mineral wool packing.
Consequences of Deferral:Safety concern.
Report run on: December 14, 2006 9:29 AM Page 6 of 43
B1020.01 Roof Structural Frame*
4 - AcceptableRating
0Installed
100Design Life
NOV-05Updated
Camrose - Camrose Composite High School (B2882A)
1964 - Structural concrete barrel roofs and flat structural concrete roof deck, 1968 - Concrete deck on structural steel beamand posts. 1989 - Wood rafter and beams with domed cedar deck. Courtyard - Structural steel with acoustic decking andmetal roofing.
Report run on: December 14, 2006 9:29 AM Page 7 of 43
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*
B2010.01.03 Stone Assemblies: Exterior Wall Skin*
B2010.01.05 Exterior Insulation and Finish Systems (EIFS)*
B2010.01.08 Cement Plaster (Stucco): Ext. Wall*
B2010.01.09 Expansion Control: Exterior Wall Skin*
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
75
75
75
75
75
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
S2 ENVELOPE
1964 & 68 - 100 mm face brick
1992 - Stone tile finish on main entry door and adjacent wall. 1968 addition - Ceramic tile mural.
1989 Gymnasium - Acrylic stucco on EIFS assembly.
1964 - Cementitious stucco on concrete block.
Masonry control joints.
Report run on: December 14, 2006 9:29 AM Page 8 of 43
B2010.01.11 Joint Sealers (caulking): Ext. Wall**
B2010.01.13 Paints (& Stains): Exterior Wall**
B2010.02.01 Cast-in-place Concrete:Ext.Wall Const*
3 - Marginal
3 - Marginal
4 - Acceptable
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
15
15
100
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Replace deficient caulking.
Repaint target areas.
Repair
Failure Replacement
2006
2007
$17,100
$13,680
Medium
Low
Sealant detailing around windows, curtain wall, EIFS controljoints is in poor condition with splits and open joints betweenmaterials .
Weathered, stained paint finish on soffits of 1964 2 storey wingand north wing. Weathered and exposed wood on curved clearstorey windows in barrel roofs.
Concern:
Concern:
Cut out existing sealants and replace with high performanceurethane sealants (505 m).
Power wash substrate, scrap delaminated paints and apply 2coats exterior grade latex paint (300 m2)
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
DEC-06
DEC-06
Perimeter caulking on windows, doors, penetrations and junctions of dissimilar materials.
Latex paint finish on exposed concrete at barrel roofs, concrete columns, stucco finish and wood window frames.
1964 - 2 storey wing exposed foundation wall.
Consequences of Deferral:
Consequences of Deferral:
Potential water entry into underlying spaces.
Potential water damage to underlying components.
Report run on: December 14, 2006 9:29 AM Page 9 of 43
B2010.02.03 Masonry Units: Ext. Wall Const.*
B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*
B2010.06 Exterior Louvers, Grilles, and Screens*
B2010.09 Exterior Soffits*
B2020.01.01.02 Aluminum Windows (Glass & Frame)**
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
100
20
20
20
35
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Concrete block construction throughout.
1989 gymnasium - membrane air barrier and rigid insulation approximately 50 mm thick. 1964 & 68 - informationunavailable.
Mechanical vents and louvers.
Stucco soffits above main entry.
Commercial aluminum frame with dual pane sealed units.
Report run on: December 14, 2006 9:29 AM Page 10 of 43
B2020.01.01.05 Wood Windows (Glass & Frame)**
B2020.03 Glazed Curtain Wall**
B2030.01.02 Steel-Framed Storefronts**
B2030.01.06 Automatic Entrance Doors**
B2030.03 Large Exterior Special Doors*
3 - Marginal
5 - Good
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
35
35
15
30
30
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Target window repairs.
Repair 2006 $3,990 Medium
Several units noted with broken glass. Windows are nearingthe end of their expected life and consideration for replacementof the windows under the barrel roofs should be given in thenext 7 to 10 years.
Concern:
Replace broken glass.Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
1964 - Curved glazing under barrel roofs, wood frame with double pane glass.
Aluminum curtain wall assembly at main entry and courtyard addition.
Steel frame entry systems with transom, sidelights and exit doors.
Power assists with button activation.
Auto shop - Motorized 4.87 m overhead door. Wood shop - 2.43m overhead door with man door.
Consequences of Deferral:Safety concern and potential for water entry.
Report run on: December 14, 2006 9:29 AM Page 11 of 43
B2030.05 Other Exterior Doors**
B3010.01 Deck Vapor Retarder and Insulation*
4 - Acceptable
4 - Acceptable
Rating
Rating
0
0
Installed
Installed
30
50
Design Life
Design Life
NOV-05
NOV-05
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Emergency exits with panic bars throughout.
Hot mopped 1 ply vapor retarder with varying amounts of insulation on SBS and BUR roofs. Metal roof informationunavailable.
Report run on: December 14, 2006 9:29 AM Page 12 of 43
B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)**
3 - MarginalRating
0Installed
25Design Life
NOV-05Updated
Area replacement of failed roofing.
Blister repairs.
Roof replacement 1964 wing.
Failure Replacement
Preventative Maintenance
Lifecycle Replacement
2006
2006
2009
$113,998
$12,540
$279,295
High
High
Medium
1964 (hallway roof) and east wing outside of courtyard - roofhas failed, significant leaks, blisters and wet insulation notedduring inspection.
Mechanical roof against west side of courtyard metal roofblister and repairs required. 1996 - BUR roof under slopedpyramid roof on library significant blistering. 1964 2 storeywing - significant blistering, ridges and splits. All areas requiremaintenance repairs.
Roof nearing end of its effective life. Previous repairs noted andmaintenance currently required to prevent loss of roof.
Concern:
Concern:
Concern:
Remove selected roof area, upgrade insulation and install newSBS 2 ply roofing (Approx. 1200 m2).
Spud back gravel, cut and repair blisters, ridges and splits andrestore flood coat and gravel protection.
Remove and replace with sloped insulation R20 and SBSroofing (2,900 m2).
Recommendation:
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Event:
Type
Type
Type
Year
Year
Year
Cost
Cost
Cost
Priority
Priority
Priority
Updated:
Updated:
DEC-06
NOV-05
1964, 68 and courtyard addition - Asphalt and gravel BUR flat roofing.
Consequences of Deferral:
Consequences of Deferral:
Consequences of Deferral:
Increased collateral damage and costs from water entry.
Early loss of roof system.
Water entry and collateral damage.
Report run on: December 14, 2006 9:29 AM Page 13 of 43
B3010.04.04 Modified Bituminous Membrane Roofing (SBS)**
B3010.07 Sheet Metal Roofing**
3 - Marginal
5 - Good
Rating
Rating
0
0
Installed
Installed
25
40
Design Life
Design Life
NOV-05
NOV-05
Updated
Updated
Blister repairs and clean drains.
Preventative Maintenance 2006 $6,840 Low
Blistering noted in valleys in barrel roofs and plugged drains.Concern:
Repair blisters and clean drains.Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated:
Updated:
DEC-06
NOV-05
1964 barrel roofs & 1989 Gymnasium - SBS roofing with rigid insulation.
Courtyard addition, Library skylight and gymnasium roof. - Standing seam roll roofing.
Consequences of Deferral:Potential water entry and increased costs forrepairs/replacement.
Report run on: December 14, 2006 9:29 AM Page 14 of 43
B3010.08.02 Metal Gutters and Downspouts**
B3020.01 Skylights**
B3020.02 Other Roofing Openings (Hatch,Vent, etc)*
3 - Marginal
5 - Good
4 - Acceptable
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
25
20
0
Design Life
Design Life
Design Life
JUL-06
NOV-05
NOV-05
Updated
Updated
Updated
Gymnasium roof - inspections and repairs
Repair 2006 $13,579 High
Heavy snow loading, ice damming occurring along transitionbetween gymnasium barrel roof to adjacent SBS flat roof.Water entry occurring periodically in winter months. Drainageproblems and ice damming concerns on exterior wall from SBSroof scuppers to metal gutter on lower roofs.
Concern:
Investigation/inspection and repair roof stripping along the barrelroof to the adjacent flat roof section and correct drainageproblems.
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: JUL-06
Exterior wall scuppers, EPDM lined gutter from upper to lower roofing and PVC downspouts. Study recommended forcorrective repairs.
Acrylic pyramid shaped skylight over library.
Various mechanical, electrical penetrations.
Consequences of Deferral:Continued water entry and increased collateral damage.
Report run on: December 14, 2006 9:29 AM Page 15 of 43
C1010.01 Interior Fixed Partitions*
C1010.03 Interior Operable Folding Panel Partitions**
C1010.04 Interior Balustrades and Screens, Interior Railings*
C1010.05 Interior Windows*
C1010.06 Interior Glazed Partitions and Storefronts*
C1010.07 Interior Partition Firestopping*
C1020.01 Interior Swinging Doors**
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
50
30
40
40
40
50
50
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
S3 INTERIOR
Concrete/glass block and wood and/or steel frame partition walls throughout.
Folding partition in music room. Canvas ceiling mounted drape in gymnasium.
Wood and steel railings throughout.
Steel frame, single glazing, plate and safety glass in various locations.
Concrete with steel framed glazing in few locations. Sliding aluminum partition on courtyard stage.
Not available for inspection.
Solid core wood and steel doors to classrooms and shop areas.
Report run on: December 14, 2006 9:29 AM Page 16 of 43
C1020.03 Interior Fire Doors*
C1020.04 Interior Sliding and Folding Doors*
C1030.01 Visual Display Boards**
C1030.02 Fabricated Compartments(Toilets/Showers)**
C1030.06 Handrails*
C1030.08 Interior Identifying Devices*
C1030.10 Lockers**
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
50
40
10
20
50
10
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Fire doors in hallways.
Courtyard - Open coil steel security shutters.
White, chalk and tack boards throughout.
Steel toilet enclosures.
Handrail on wheelchair ramp.
Illuminated exit signs, room plates and assorted hallway signage.
Standard metal lockers, full height and stacked in hallways and change rooms.
Report run on: December 14, 2006 9:29 AM Page 17 of 43
C1030.12 Storage Shelving*
C1030.14 Toilet, Bath, and Laundry Accessories*
C2010 Stair Construction*
C2020.02 Terrazzo Stair Finishes*
C2020.05 Resilient Stair Finishes**
C2020.06 Carpet Stair Finishes**
C2020.08 Stair Railings and Balustrades*
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
20
20
100
75
20
10
50
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Wood and/or steel freestanding and mounted adjustable shelving in various locations and metal boot racks in vestibules.
Paper towel, soap, toilet paper dispensers and feminine hygiene dispensers.
Wood stairs and stringers, steel tread and stringers and poured concrete.
1964 - Stairwells in 2 storey wing.
Preformed molded rubber treads and bullnosings on concrete stairs.
Courtyard staircases.
Wall, floor and/or stringer mounted railings, primarily steel with some wood.
Report run on: December 14, 2006 9:29 AM Page 18 of 43
C3010.01 Concrete Wall Finishes*
C3010.02 Wall Paneling**
C3010.04 Gypsum Board Wall Finishes*
C3010.06 Tile Wall Finishes**
C3010.09 Acoustical Wall Treatment**
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
100
30
40
50
20
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Latex paint over concrete and block walls.
15 mm MDF wall paneling installed in hallways.
Interior latex paint.
Ceramic wall tiles in washroom,change rooms and cafeteria.
Cloth covered panels in gymnasium and drama room.
Report run on: December 14, 2006 9:29 AM Page 19 of 43
C3020.01 Concrete Floor Finishes (Paint)*
C3020.02 Tile Floor Finishes**
C3020.03 Terrazzo Floor Finishes*
2 - Poor
5 - Good
4 - Acceptable
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
75
30
70
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Repair and repaint auto shop floor. (1,092 m2)
Repair 2008 $19,950 Low
Worn traffic coating on shop floor, surface delaminations due tocorrosive action.
Concern:
Strip floor, repair delamination, fill low spots and hand trowelpolymer modified repair mortar. Etch surface and apply 2coats of urethane chemical resistant coating.
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
Protective coating on auto shop floor.
Ceramic tile in various locations.
1964 - 2 storey wing hallways.
Consequences of Deferral:Continued floor damage resulting in increase repair costs.
Report run on: December 14, 2006 9:29 AM Page 20 of 43
C3020.04 Wood Flooring**
3 - MarginalRating
0Installed
25Design Life
NOV-05Updated
Shop floor replacement. (332 m2)
Lifecycle Replacement 2009 $67,259 Low
Hardwood flooring cupping, open joints and excessive wear.Concern:
Remove existing floor and replace with new hardwood flooringand seal with urethane varnish.
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
Wood shop - Tongue and groove hardwood floor.
Consequences of Deferral:Safety concern and difficult to maintain.
Report run on: December 14, 2006 9:29 AM Page 21 of 43
C3020.07 Resilient Flooring**
C3020.08 Carpet Flooring**
C3020.09 Access Flooring**
3 - Marginal
5 - Good
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
20
10
25
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Replace linoleum floor. (295 m2)
Replace remaining flooring
Failure Replacement
Failure Replacement
2006
2008
$14,250
$74,099
Low
Low
Flooring torn and patched and no longer serviceable.
80% of floor area to be replaced. Flooring no longer serviceableand difficult to maintain.
Concern:
Concern:
Install new commercial grade sheet linoleum, 1968 wing, 2ndfloor above room 136.
Replace with new commercial grade sheet linoleum, 1964 wing, 2 storey wing (approx. 1,330 m2)
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
DEC-06
DEC-06
Sheet linoleum in various hallways and classrooms throughout.
Commercial sheet carpet primarily in courtyard and library.
Removable steel drainage grates full length of machine and auto shops.
Consequences of Deferral:
Consequences of Deferral:
Tripping hazard and increased maintenance costs.
Increased maintenance costs.
Report run on: December 14, 2006 9:29 AM Page 22 of 43
C3020.13.01 Pedestrian Traffic Coating
C3030.01 Concrete Ceiling Finishes*
C3030.04 Gypsum Board Ceiling Finishes*
C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)**
C3030.07 Interior Ceiling Painting**
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
5
100
50
25
10
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Refinish concrete floor in grandstand. (220 m2)
Preventative Maintenance 2007 $5,700 Low
Coating abraded and worn. Exposed concrete.Concern:
Prep floor and recoat with urethane traffic coating.Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
2nd floor grandstand in west gymnasium.
Latex paint. Fully adhered fibre board acoustic tiles.
Latex paint.
Classroom, hallways etc.
Latex interior paint throughout.
Consequences of Deferral:Continued wear and high repair costs.
Report run on: December 14, 2006 9:29 AM Page 23 of 43
C3030.09 Other Ceiling Finishes*
D1010.01.02 Hydraulic Passenger Elevators**
D1010.02 Lifts**
4 - Acceptable
5 - Good
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
10
30
25
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Open grid wood valance.
Handicap elevator to access 2nd floor and mezzanine in courtyard.
Hydraulic vehicle lifts in auto shop.
Report run on: December 14, 2006 9:29 AM Page 24 of 43
D2010.01 Water Closets**
D2010.02 Urinals**
D2010.03 Lavatories**
D2010.04 Sinks**
D2010.05 Showers**
D2010.08 Drinking Fountains / Coolers**
D2010.09 Other Plumbing Fixtures**
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
30
30
30
30
30
30
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
S4 MECHANICAL
wall hung c/w flush valves
wall hung c/w flush valves
porcelain wall hung & SS lavatory type c/w washer less trim
SS in coffee areas, work art/science labs
gang type around central pole divided off and curtained
std. porcelain c/w bubbler
floor mounted Fait stone molded in janitor rooms
Report run on: December 14, 2006 9:29 AM Page 25 of 43
D2020.01.01 Pipes and Tubes: Domestic Water*
D2020.01.03 Piping Specialties (Backflow Preventors)**
D2020.02.06 Domestic Water Heaters**
D2020.03 Water Supply Insulation*: Domestic
D2030.01 Waste and Vent Piping*
4 - Acceptable
3 - Marginal
6 - Excellent
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
40
30
20
30
50
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Address Cross Connection Concerns
Code Repair 2006 $6,840 Medium
Cross connection.Concern:
Install vacuum breaker on hose bibs. Installed on heatingsystem cold water make up line. Installed on non-freeze hosebibs.
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: DEC-06
Copper piping majority of distribution school.
installed on fire service off building main feed Still required on hose bibs & boiler make up feed.
2 - 80 gal (2004) Benford White commercial hot water heaters c/w circ.pump
All domestic cold, hot and re-circulation piping insulated
Above ground is cast iron or copper.
Consequences of Deferral:Potable water contamination
Report run on: December 14, 2006 9:29 AM Page 26 of 43
D2040.01 Rain Water Drainage Piping Systems*
D2040.02 Rain Water Drainage Specialties
D2040.02.04 Roof Drains**
D3010.02 Gas Supply Systems*
D3020.02.01 Heating Boilers and Accessories: H.W.**
4 - Acceptable
3 - Marginal
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
50
0
40
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
FEB-06
DEC-06
Updated
Updated
Updated
Updated
Updated
provide an alarm
Operating Efficiency Upgrade 2006 $2,280 Medium
sumps overflowConcern:
Install auto alarm systemRecommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: DEC-06
Above ground is cast iron.
Sumps east lower level manual operation (most often dry)
Roof drains installed throughout. Some to sewer other to grade.
Gas distribution piping to heating boilers, domestic hot water heaters, from the city supplier.
2- Cleaver Brooks 1964 (4185 MBH each)
Consequences of Deferral:wet areas and mold
Report run on: December 14, 2006 9:29 AM Page 27 of 43
D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler**
D3020.02.03 Water Treatment: H. W. Boiler*
D3030.06.01 Refrigeration Compressors**
D3030.06.02 Refrigerant Condensing Units**
D3030.08 Other Refrigeration Systems*
5 - Good
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
30
30
25
25
20
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
1990 combustion air and chimney
pot feeder std. maintenance program
Compressor 2nd floor fan room DX
Condensing unit on roof (no models #'s )
Shop area upper level project lab small fan coil unit c/w DX system Server room split DX
Report run on: December 14, 2006 9:29 AM Page 28 of 43
D3040.01.01 Air Handling Units: Air Distribution**
D3040.01.02 Fans: Air Distribution*
D3040.01.03 Air Cleaning Devices:Air Distribution*
D3040.01.04 Ducts: Air Distribution*
D3040.01.06 Air Terminal Units: Air Distribution**
4 - Acceptable
4 - Acceptable
4 - Acceptable
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
30
30
30
50
30
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
(Need Appendix A mechanical for units and models site personal indicate all are same no changes or up grades) AH-1 -xxxx music room 1964 AH-1A 1990 AH-2 -Eng-Air west gym 1964 AH-2A- 1990 AH-3 -xxxx business ed. 1990 AH-4 -xxxx 1990 AH-5 -xxxx 1990 AH-6 -xxxx 1964 AH-7 -xxxx 1990 AH-8 -xxxx 1964 AH-9 -xxxx 1990
as per units
50 mm throw away filters
low velocity ductwork provided to ceiling outlets c/w dampers and coil for north wing both floors along perimeter.
coils?
Report run on: December 14, 2006 9:29 AM Page 29 of 43
D3040.01.07 Air Outlets & Inlets:Air Distribution*
D3040.03.01 Hot Water Distribution Systems**
D3040.04.01 Fans: Exhaust**
D3040.04.03 Ducts: Exhaust*
D3040.04.05 Air Outlets and Inlets: Exhaust*
D3050.01.01 Computer Room Air Conditioning Units**
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
30
40
30
0
0
30
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Majority are grilles adjustable pattern supply air.
Reverse return piping system
washroom exhaust system foods lab exhaust system beauty culture exhaust system 3 dust collector system is a re-circulate c/w filter bags welding for the booths automotive's exhaust system -vehicles, wash area, general exhaust kitchen exhaust systems (3) 1- rate kitchen fan & hood, 1- rate for dishwasher condensate, 1- general area
galvanized c/w dampers kitchen exhaust has a welded duct.
majority are grilles & dampers
Server room split DX system (3 ton) condenser on roof
Report run on: December 14, 2006 9:29 AM Page 30 of 43
D3050.01.02 Packaged Rooftop Air Conditioning Units (& Heating Units)**
D3050.02 Air Coils**
D3050.05.02 Fan Coil Units**
D3050.05.03 Finned Tube Radiation**
D3050.05.06 Unit Heaters**
3 - Marginal
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
15
30
30
40
30
Design Life
Design Life
Design Life
Design Life
Design Life
DEC-06
FEB-06
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
Updated
Updated
Operating Efficiency
Operating Efficiency Upgrade 2006 $11,400 Medium
Leaky dampers and poor linkage and operatorsConcern:
refurbish the dampers and actuatorsRecommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: FEB-06
1991 - 5 roof top units Eng-Air model G60 1-gym unit 2-gathering area 3-make up air unit cafeteria 4-tech lab heating/cooling unit 5-service wing
coil & air system north wing both floors along perimeter (air handler in basement tunnel)
at entrances c/w line voltage thermostats
Perimeter rooms throughout the school - except McLeary wing only in washrooms.
at entrances c/w line voltage thermostats
Consequences of Deferral:higher operating costs
Report run on: December 14, 2006 9:29 AM Page 31 of 43
D3060.02.01 Electric and Electronic Controls**
D3060.02.02 Pneumatic Controls**
D3060.02.05 Building Systems Controls(BMCS, EMCS)**
4 - Acceptable
3 - Marginal
3 - Marginal
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
30
40
30
Design Life
Design Life
Design Life
FEB-06
FEB-06
FEB-06
Updated
Updated
Updated
pneumatic to continue to be replaced to digital
Operating Efficiency plus cost savings
Operating Efficiency Upgrade
Operating Efficiency Upgrade
2006
2006
$91,198
$182,396
Medium
Medium
better systems control.
energy cost higher - there are savings
Concern:
Concern:
complete the digital control to the end device.
full BMCS with all system on line
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
FEB-06
FEB-06
force flows line voltage stats to cycle fan coil fans at entrances.
valve and damper operators at final control point, sensors and settings by a DDC system. Units in shops areas coil & dampers off thermostat. Boiler room houses air compressor Honeywell c/w 80 gal tank.
DDC system Dimex
Consequences of Deferral:
Consequences of Deferral:
missed cost savings.
continuing higher operating costs.
Report run on: December 14, 2006 9:29 AM Page 32 of 43
D4030.01 Fire Extinguisher, Cabinets and Accessories**
D4090.02 Carbon Dioxide Fire Extinguishing Systems**
4 - Acceptable
4 - Acceptable
Rating
Rating
0
0
Installed
Installed
30
50
Design Life
Design Life
FEB-06
FEB-06
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
fire hose cabinets & extinguisher throughout.
Kitchen range hood has a fire extinguisher system
Report run on: December 14, 2006 9:29 AM Page 33 of 43
D5010.01 Main Electrical Transformers**
D5010.02 Secondary Electrical Transformers (Interior)**
D5010.03 Main Electrical Switchboards (Main Distribution)**
4 - Acceptable
5 - Good
2 - Poor
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
40
40
40
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Main distribution is obsolete replace with new.
Failure Replacement 2006 $28,499 Medium
Equipment is outdated and obsolete. Replacement breakersare not available .
Concern:
Replace with new power logic type equipment.Recommendation:
Camrose - Camrose Composite High School (B2882A)
S5 ELECTRICAL
Event:
Type Year Cost Priority
Updated: NOV-05
New in 1992 pad mounted transformer
480volt to 120/208volt
Main 800 amp disconnect replaced 2005 main distribution is 1963 PGAK equipment 277/480 volt underground 3 phase 4 wire
Consequences of Deferral:Unscheduled emergency shutdown affecting the entire school.
Report run on: December 14, 2006 9:29 AM Page 34 of 43
D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)**
D5010.07.02 Motor Starters and Accessories**
3 - Marginal
5 - Good
Rating
Rating
0
0
Installed
Installed
25
0
Design Life
Design Life
JUL-06
NOV-05
Updated
Updated
Replace all disribution equipment
Failure Replacement 2006 $45,599 Medium
Equipment has passed its operable life cycle and is no longerserviceable.
Concern:
Replace all panelsRecommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: DEC-06
Old 1963 Westinghouse panels
Motor control is by individual starters which are in good condtion.
Consequences of Deferral:Equipment failure can result in emergency shutdown ofsignificant areas within the school
Report run on: December 14, 2006 9:29 AM Page 35 of 43
D5020.01 Electrical Branch Wiring*
D5020.01.03 Wiring Devices
D5020.02.01 Lighting Accessories (Lighting Controls)*
3 - Marginal
5 - Good
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
50
0
30
Design Life
Design Life
Design Life
JUL-06
NOV-05
NOV-05
Updated
Updated
Updated
Futher study of wiring methods
Replace deficient wiring
Study
Failure Replacement
2006
2008
$6,840
$21,308
High
Medium
Condition and type of branch wiirng should be addressed
Wiring is old and type of wiring is an issue, random failures canbe expected.
Concern:
Concern:
Provide an investigation
Replace target sections of wiring as identified in study. Costsallowed with a factor of +/- 20%.
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
NOV-05
JUL-06
Wiring is old but has not been a maintenance issue
Switches and receptacle in good condition.
Line voltage switching with some relay cabinets,
Consequences of Deferral:Fire possiblity
Report run on: December 14, 2006 9:29 AM Page 36 of 43
D5020.02.02.01 Interior Incandescent Fixtures*
D5020.02.02.02 Interior Florescent Fixtures**
D5020.02.02.05 Other Interior Fixtures*
2 - Poor
5 - Good
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
30
30
0
Design Life
Design Life
Design Life
DEC-06
NOV-05
NOV-05
Updated
Updated
Updated
Energy consumption replace all incandescentfixtures
Energy Efficiency Upgrade 2006 $1,710 Medium
Energy consumptionConcern:
Replace with T8 fluorescentsRecommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
Some incandescent in janitor/mechanical room.
4 foot fluorescent surface and recessed T8 conversion is complete T5 installed in gym
Accent lighting in main gathering area uses PL lamps
Consequences of Deferral:Power consumption
Report run on: December 14, 2006 9:29 AM Page 37 of 43
D5020.02.03.02 Emergency Lighting Battery Packs**
D5020.02.03.03 Exit Signs
D5020.03.01.03 Exterior Metal Halide Fixtures*
2 - Poor
2 - Poor
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
20
0
0
Design Life
Design Life
Design Life
JUL-06
JUL-06
NOV-05
Updated
Updated
Updated
Replace with current technology
Replace Exit lighting
Lifecycle Replacement
Lifecycle Replacement
2006
2006
$15,960
$13,680
High
Medium
Old batteries typically will not provide light for the required 30minutes.
Exits are not energy efficient and some require DC power
Concern:
Concern:
Replace emergency lighting with new self test battery packs.
Replace EXIT lights with LED lights. Schedule with emergencylight replacement.
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
JUL-06
JUL-06
120 volt plug in
120 volt with dc socket
Lighting is good at entrances and high traffic areas
Consequences of Deferral:
Consequences of Deferral:
life safety
Poor egress and decreased efficiency
Report run on: December 14, 2006 9:29 AM Page 38 of 43
D5030.01 Detection and Fire Alarm**
D5030.02.02 Intrusion Detection**
D5030.02.03 Security Access**
D5030.02.04 Video Surveillance**
D5030.03 Clock and Program Systems**
3 - Marginal
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
25
25
25
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Replace with current technology
Code Upgrade 2006 $34,199 High
Old technology no strobes, lacking some detection,no smokedetectors at top of stairs.
Concern:
Replace with new addressable system with strobes and zoneisolation and add devices
Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: NOV-05
Original Edwards 6500 panel hard wired
New system motion sensors throughout
Key pad at main entrance
Cameras throughout school corridors and common areas
Class change and program function is looked after by the telephone and paging system
Consequences of Deferral:life safety - hearing impaired.
Report run on: December 14, 2006 9:29 AM Page 39 of 43
D5030.04.01 Telephone Systems**
D5030.04.02 Paging Systems*
D5030.04.03 Call Systems**
D5030.04.04 Data Systems**
D5030.06 Television Systems*
5 - Good
5 - Good
5 - Good
3 - Marginal
5 - Good
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
25
25
25
25
20
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
JUL-06
NOV-05
Updated
Updated
Updated
Updated
Updated
Replace existing cat 5 cable with cat5e cable.
Program Functional Upgrade 2006 $34,199 Medium
Current cable will not meet expected demands on band width,cat5e cable is about 60% better than cat 5.
Concern:
Replace all cat 5 cabling with cat5e or better.Recommendation:
Camrose - Camrose Composite High School (B2882A)
Event:
Type Year Cost Priority
Updated: JUL-06
Panther system
T.O.A. system
Teacher handset with dial out capablity in each classroom.
Cable is cat 5 run through ceiling space.
Coax cable thru out
Consequences of Deferral:Data transmission is much poorer with cat5 cable.
Report run on: December 14, 2006 9:29 AM Page 40 of 43
E1020.02 Library Equipment*
E1020.03 Theater and Stage Equipment*
E1020.07 Laboratory Equipment*
E1030.01 Vehicle Service Equipment*
E1090.03 Food Service Equipment*
E1090.04 Residential Equipment*
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
25
25
25
25
25
25
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
JUL-06
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
Computer/study stations, turnstile and walk thru magnetic detector/sensor.
Stage drapes with movable partition.
Gas and water distribution, fume hood and chemical storage.
Fully equipped for automotive servicing with electronic diagnostics, tire balancer, compressors and variety of specific toolsets.
Fully equipped cafeteria with SS counters and commercial equipment gas ranges and kitchen utensils. No concernsreported.
Microwaves, electric ranges, fridges, washer and dryer located in HEC room and/or staff lounge.
Report run on: December 14, 2006 9:29 AM Page 41 of 43
E1090.07 Athletic, Recreational, and Therapeutic Equipment*
E2010.02.05 Educational Facility Casework*
E2010.02.07 Kitchen Casework*
E2010.02.08 Laboratory Casework*
E2010.02.09 Library Casework*
E2010.02.99 Other Casework*
E2010.03.01 Blinds**
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
15
35
35
35
35
0
35
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Fully equipped weight room with free weights and stationary equipment, scoreboards, basketball nets and various sportsequipment.
Various floor and/or wall mounted cabinetry with laminate countertops in classrooms.
HEC - Base cabinets with laminate countertops and wall mounted cupboards. Various shelving.
Base cabinets with laminate countertops and ss basins and wall mounted glass faced cupboards.
Freestanding and wall mounted metal/wood shelving.
Glass faced display cabinets in hallways.
Vertical blinds throughout.
Report run on: December 14, 2006 9:29 AM Page 42 of 43
E2010.03.06 Curtains and Drapes**
E2020 Moveable Furnishings*
F1010.02.05 Grandstands and Bleachers**
F1020.02 Special Purpose Rooms*
F2020.01 Asbestos*
4 - Acceptable
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
35
0
50
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
Shower curtains in change rooms.
Assorted desks, chairs and tables throughout.
Wood steel bleachers in west gymnasium.
Esthetics - various styling chairs, mirrors, various styling/cutting tools and manicure/pedicure tools and supplies. Wood shop - various wood working tools and equipment. Various rooms housing electronics, modeling and other vocational interests.
No asbestos noted or reported.
Report run on: December 14, 2006 9:29 AM Page 43 of 43
K3010 Building Services
K3020 Indoor Environment
K4010.01 Barrier Free Route: Parking to Entrance
K4010.02 Barrier Free Entrances
K4010.03 Barrier Free Interior Circulation
K4010.04 Barrier Free Washrooms
4 - Acceptable
4 - Acceptable
5 - Good
5 - Good
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
JUL-06
JUL-06
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (B2882A)
S8 FUNCTIONAL ASSESSMENT
Meets accessibility requirements.
Meets accessibility requirements.
Meets accessibility requirements except access to 2nd floor of 1964 southeast wing.
Meets accessibility requirements.
Report run on: December 14, 2006 10:50 AM Page 2 of 7
S2882Building Id:
Camrose Composite High ScBuilding Name:
CamroseLocation:Address:
0.00Gross Area (sq. m): $0Replacement Cost:0Construction Year:
Evaluation Date:
Evaluation Company:
Evaluator Name:
School sits above general grade with good drainage from building. Exterior ramps and steps are provided for lowerparking lot. Newly upgraded sport track and tennis courts with composite sport surfaces. Gravel parking lot requires resurfacing, asphalt parking and driveway at adjacent to auto shop require replacement. Small wood frame storage shed on site, vinyl siding and pitched shingle roof. No services, good condition. Overall site condition is good.
General Summary:
Structural Summary:
Envelope Summary:
Interior Summary:
Mechanical Summary:
Electrical Summary:
0%5 year Facility Condition Index (FCI):
Facility Details Evaluation Details
Total Maintenance Events Next 5 years: $82,420
Camrose - Camrose Composite High School (S2882)
Condition Rating Performance1 - Critical Unsafe, high risk of injury or critical system failure.2 - Poor Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
3 - Marginal Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.4 - Acceptable Meets present requirements, minor deficiencies. Average operating/maintenance costs.
Rating Guide
5 - Good Meets all present requirements. No deficiencies.6 - Excellent As new/state of the art, meets present and foreseeable requirements.
Report run on: December 14, 2006 10:50 AM Page 3 of 7
G2010.02.02 Flexible Pavement Roadway (Asphalt)**
G2010.04 Rigid Roadway Pavement (Concrete)**
G2010.05 Roadway Curbs and Gutters*
G2010.06 Roadway Appurtenances*
4 - Acceptable
2 - Poor
4 - Acceptable
5 - Good
Rating
Rating
Rating
Rating
0
0
0
0
Installed
Installed
Installed
Installed
0
0
0
0
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Replace driveway slab adjacent to auto shop. (235m2)
Failure Replacement 2007 $18,126 Low
Delaminating, cracking and loss of surface.Concern:
Remove concrete, compact substrate and replace with asphalt.Recommendation:
Camrose - Camrose Composite High School (S2882)
S7 SITE
Event:
Type Year Cost Priority
Updated: NOV-05
Roadway from front street on south side of facility to maintenance yard.
Driveway pad adjacent to auto shop.
Poured concrete curbs. Curbs will require replacement on next asphalt replacement.
Directional and no parking signs.
Consequences of Deferral:Tripping hazard and increased maintenance costs.
Report run on: December 14, 2006 10:50 AM Page 4 of 7
G2020.02.01 Aggregate Parking Lots (Gravel)**
G2020.02.02 Flexible Paving Parking Lots(Asphalt)**
G2020.05 Parking Lot Curbs and Gutters*
3 - Marginal
3 - Marginal
5 - Good
Rating
Rating
Rating
0
0
0
Installed
Installed
Installed
0
0
0
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Resurface and regrade parking lot. (3,000 m2)
Repair and repave shop parking lot. (1,300 m2)
Repair
Repair
2006
2007
$34,199
$30,095
Medium
Low
Numerous pot holes and uneven surfaces.
Severe alligatoring, pot holing and substrate break down.
Concern:
Concern:
Reconstruct substrate, add additional surfacing, regrade andcompact.
Spot repairs and resurface with 50 mm asphalt topping. To bescheduled with drive slab replacement.
Recommendation:
Recommendation:
Camrose - Camrose Composite High School (S2882)
Event:
Event:
Type
Type
Year
Year
Cost
Cost
Priority
Priority
Updated:
Updated:
NOV-05
NOV-05
Student parking shared maintenance personal.
Staff, visitor, student and fenced auto shop parking.
Poured concrete perimeter curbs and precast curb stops.
Consequences of Deferral:
Consequences of Deferral:
Safety concerns and high maintenance costs.
High maintenance costs and snow clearing concerns.
Report run on: December 14, 2006 10:50 AM Page 5 of 7
G2020.06.01 Traffic Barriers*
G2020.06.03 Parking Lot Signs*
G2020.06.04 Pavement Markings*
G2030.02.02 Asphalt Pedestrain Pavement**
G2030.03 Pedestrian Unit Pavers**
G2030.04 Rigid Pedestrian Pavement (Concrete)**
G2030.06 Exterior Steps and Ramps*
5 - Good
5 - Good
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (S2882)
Poured concrete islands in front parking lot.
Various steel signage on steel posts.
Directional, busloading and handicap markings.
Asphalt sidewalks adjacent to field.
Unistone pavers adjacent to main sidewalk.
Poured concrete from front street to main entry. Large poured concrete slab under east wing.
Access stairs from parking lot to main enter and north exit. Access ramp to front entry doors.
Report run on: December 14, 2006 10:50 AM Page 6 of 7
G2040.02 Fences and Gates**
G2040.03 Athletic and Recreational Surfaces**
G2040.06 Exterior Signs*
G2040.08 Flagpoles*
G2050.04 Lawns and Grasses*
G2050.05 Trees, Plants and Ground Covers*
G3010.02 Site Domestic Water Distribution*
4 - Acceptable
5 - Good
5 - Good
5 - Good
5 - Good
5 - Good
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (S2882)
Frost fencing perimeter of shop and tennis courts with operable gates.
Composite running track, rubberized tennis surface and shale shot put surface.
School identification signs and field markings.
(2) metal flag poles.
Grassed landscaping and play fields.
Various trees and shrubs on site.
City service.
Report run on: December 14, 2006 10:50 AM Page 7 of 7
G3010.03 Site Fire Protection Water Distribution*
G3020.01 Sanitary Sewage Collection*
G3030.01 Storm Water Collection*
G3060.01 Gas Distribution*
G4010.01 Electrical Substations*
G4010.02 Electrical Power Distribution Lines*
G4020.01 Area Lighting*
5 - Good
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
4 - Acceptable
Rating
Rating
Rating
Rating
Rating
Rating
Rating
0
0
0
0
0
0
0
Installed
Installed
Installed
Installed
Installed
Installed
Installed
0
0
0
0
0
0
0
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
Design Life
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
NOV-05
Updated
Updated
Updated
Updated
Updated
Updated
Updated
Camrose - Camrose Composite High School (S2882)
Fire hydrants located on site.
City service.
Connected to City storm system.
City service.
Transformer on pad.
Underground service.
Overhead lighting in parking lot.