rebo terminal,
TRANSCRIPT
REBO terminal, the ideal hub for offshore wind & heavy lift activities in the North Sea
www.reboostende.bewww.portofoostende.be
2015
-11
32
shaREhOldERsgOal
publicprivate
shaRE hOldERs
REnEwaBlE EnERgy BasE OOstEndE
15%15%
15%
15%
40%
13% of the gross final consumption of energyshould come for renewable energy(compared to 1990)
share of renewable energy in 2012 was (barely)
6.8% 2020climatetargets
BElgIan EnERgy taRgEts 2020
The Rebo terminal is the perfect offshore terminal for: handling, lifting, storage, assembling and transportation of offshore components.
REBO aims at specialized project developers, manufacturers and contractors in the offshore energy sector.
The wind farms in the North Sea make an important contribution to achieving the Belgian renewable energy targets. The various offshore wind farms (once fully operational) have an installed capacity of some 2,245 MW and an annual electricity output of 7,700,000 MWH.
This is equivalent to:- 9% of total electricity consumption in Belgium (8085 TWh)- 46% of Belgian households
The construction of an average offshore wind project (300 MW) creates during the development and construction phase, approximately 1400 direct jobs and a similar number of indirect jobs.
The exploitation phase creates an average of at least 100 new jobs per wind farm.
This means that the realization of the total offshore wind potential in Belgium creates 20,000 jobs during the development and construction phase and 800 new local permanent jobs in the operation phase.
Northwind
© N
orth
win
d
Invest in existing and new port infrastructures to service offshore wind activities.
Exploitation of a 15 ha offshore terminal.
1
2
easy access | priority for offshore installation vessels | no locks | loading & unloading | storage area | O&M facilities
Mul
titec
hCM
I
o�ce
FalckFabricom
pontoon
Mul
titec
h
grin
d bed
H
20T/m²
Alstom
Parkwind
Senv
ion
GeoSea
ReboB
Flansea
C-Power
crew changes& refueling
SCIENCE PARK
PLASSENDALE 1
E40 - Brussels
VLOTDOK
VISSERIJDOK
ZEEWEZENDOK
HALVE MAAN
HAVENGEUL
Greenbridge incubation centre
sani
tary
co
mpl
exMHI Vestas
29 KM
OOSTENDE
ZEEBRUGGE
8
7
6a
6b 5
4
3
2
2
1
connection to Oostende
connection to Zeebrugge
Stevin connection operational in 2018
54
Halve maan- site prepared for offshore wind works- surface: 5 ha- quay length: 100 m- quay capacity: 10 T/m²- draught: -8 TAW
Zeewezendok- site prepared for offshore wind works- surface: 10-15 ha- quay length: 700 m- quay capacity: 4 T/m² to 20 T/m²- draught: - 8m TAW
Vlotdok- site prepared for berthing & refueling- length: 800 m berthing places
Visserijdok- surface: 7 ha
assembly & storage area with direct access to open sea offices & storageassembly & storage area behind the locks
source: La Tene maps
OffshORE wInd faRms In thE nORth sEa BElgIan OffshORE wInd faRms
REBO offers ... > 90 hectares on 5 sites (Zeewezendok, Halve Maan, Visserijdok, Vlotdok, Plassendale) > 800 m adapted heavy quay capacity 4 - 20 T/m² > prepared surfaces over 10 T/m² for storage of foundations, nacelles, hubs, towers and blades
EnERgy PORt OOstEndE ... > is a versatile short sea port situated in the busiest maritme area and accommodates roro, bulk and project cargo > has a strategic focus on REnEwaBlE EnERgy and gives PRIORIty to offshore wind vessels > airport on 2 km - no aircraft restrictions - direct connection to highway - railway to terminal - waterway connection with innerland
wInd faRm CaPaCIty InstallEd # tURBInEs COnnECtIOn
1 Norther 350 MW
2 C-Power 325 MW 325 MW 6 x 5 MW Senvion
48 x 6.15 MW Senvion
Oostende
3 Rentel 288 MW
4 Northwind 216 MW 216 MW 72 x 3 MW MHI Vestas Zeebrugge
5 Seastar 246 MW
6a Belwind I 171 MW 171 MW 55 x 3 MW MHI Vestas
1 x 6 MW Alstom
Zeebrugge
6b Nobelwind 165 MW 50 x 3.3 MW MHI Vestas Zeebrugge
7 Northwestern 2 224 MW
8 Mermaid 266 MW
tOtal 2245 mw 712 mw 182 turbines operational
blades coming in by road, going out by sea
250 km
is a good location for wind farms in the North Sea in a 250 km radius
wind farm operational
wind farm ongoing
wind farm in preparation
76
> quay length: 800 meters> 15 Ha of terminal surfaces (with heavy lift capacity)> warehouse space of 50 000 - 80 000 m2
> 90 ha open storage for breakbulk activities (inner & outer port)
> berth for installation vessels and jack up facilities > mobilization or demobilization of vessels/ barges
> 51°14’ N - 2° 56’ E> draught: -8.4 LAT meters> harbour width: 270 meters> no locks, no bridges> priority for installation vessels> steaming time to open sea 10 minutes
maRItImE aCCEss PORt Of OOstEndE InfRastRUCtURE REBO
270 m
150 m
300 m
reinforced seabed
reinforced quay
up to 20 T/m2
arrival of blades
jacked up - distance to quay - 0 m
preassembly of the rotor
floating - distance to quay - 0 m
installation of the blades
arrival of tower elements
arrival of turbine arrival of nacelles & hubs
hEavy lIftIng OPERatIOnsEasy aCCEss
© R
ober
t Piro
tte
© R
ober
t Piro
tte
© A
lstom
© R
ober
t Piro
tte
98
503
502
602
603
604
605
501
FUTURE
FUTURE
FUTURE
FUTURE
INSTALLATION AREA
priority for offshore installation vessels | no locks | 20 ha installation & storage area with direct access to open sea offices & storage | dedicated O&M | pontoons with utilities | on site safety training center |technical suppliers
O&M AREA
1110
InstallatIOn O&m
Goliath & Neptune
Neptune & Bold Tern
NeptuneBold Tern
4 POntOOns wIth UtIlItIEs & CRanEs fOR sERvICE vEssElsPRIORIty fOR InstallatIOn vEssEls
1312
OffICEs & stORagE aREa sERvICEs
On sItE safEty tRaInIng CEntERIn thE nEaR fUtURE
along the quay: MHI Vestas - Alstom - Parkwind - GeoSea
direct acces to the quay: Falck Safety Services – Cofely direct acces to the quay: Senvion – OWA – Technum – Flidar – eCoast – eBo
welding, painting & sandblasting
> a dedicated team to help project developers and suppliers > technical support services: welding, construction, surface treatment, diving works, offfshore transport & crew, laundry service for offshore suits .... more details on www.multitech-oostende.be
> covered and open storage possibilities for project management and O&M> sanitary complex for installation offshore workers up to 100 people> fully equiped offices
scaffolding
© F
alck
Saf
ety
Serv
ices
© F
alck
Saf
ety
Serv
ices
REBO business center
1514
© B
elw
ind
REfEREnCEs REfEREnCEs
C-Power I - project management + installation (2008) + O&M
Northwind cable - storage of spare the cable (2013)
Belwind - Alstom Haliade 150 6 MW installation (2013) + O&M
Belwind & Northwind - project management (2014) + O&M
C-Power II & III - project management + installation (2012 - 2013) + O&M
© A
lstom
© A
lstom
© A
lstom
© C
-Pow
er, p
hoto
grap
her T
om D
haen
ens
© C
-Pow
er, p
hoto
grap
her T
om D
haen
ens
© C
-Pow
er
© C
-Pow
er©
C-P
ower
© C
-Pow
er©
Kev
in M
olle
t
© R
ober
t Piro
tte©
Nor
thw
ind
© N
orth
win
d
RENEWABLE ENERGy COMPANIES PRESENT IN OOSTENDE
www.reboostende.bewww.portofoostende.be
REBO nv | Slijkensesteenweg 2 | BE 8400 Oostende | +32 59 34 07 11 | Emmanuël Timmermans | [email protected]
sEE yOU sOOn!