REBO terminal, the ideal hub for offshore wind & heavy lift activities in the North Sea www.reboostende.be www.portofoostende.be 2015-11

Upload: lehanh

Post on 11-Feb-2017

252 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REBO terminal,

REBO terminal, the ideal hub for offshore wind & heavy lift activities in the North Sea

www.reboostende.bewww.portofoostende.be

2015

-11

Page 2: REBO terminal,

32

shaREhOldERsgOal

publicprivate

shaRE hOldERs

REnEwaBlE EnERgy BasE OOstEndE

15%15%

15%

15%

40%

13% of the gross final consumption of energyshould come for renewable energy(compared to 1990)

share of renewable energy in 2012 was (barely)

6.8% 2020climatetargets

BElgIan EnERgy taRgEts 2020

The Rebo terminal is the perfect offshore terminal for: handling, lifting, storage, assembling and transportation of offshore components.

REBO aims at specialized project developers, manufacturers and contractors in the offshore energy sector.

The wind farms in the North Sea make an important contribution to achieving the Belgian renewable energy targets. The various offshore wind farms (once fully operational) have an installed capacity of some 2,245 MW and an annual electricity output of 7,700,000 MWH.

This is equivalent to:- 9% of total electricity consumption in Belgium (8085 TWh)- 46% of Belgian households

The construction of an average offshore wind project (300 MW) creates during the development and construction phase, approximately 1400 direct jobs and a similar number of indirect jobs.

The exploitation phase creates an average of at least 100 new jobs per wind farm.

This means that the realization of the total offshore wind potential in Belgium creates 20,000 jobs during the development and construction phase and 800 new local permanent jobs in the operation phase.

Northwind

© N

orth

win

d

Invest in existing and new port infrastructures to service offshore wind activities.

Exploitation of a 15 ha offshore terminal.

1

2

easy access | priority for offshore installation vessels | no locks | loading & unloading | storage area | O&M facilities

Page 3: REBO terminal,

Mul

titec

hCM

I

o�ce

FalckFabricom

pontoon

Mul

titec

h

grin

d bed

H

20T/m²

Alstom

Parkwind

Senv

ion

GeoSea

ReboB

Flansea

C-Power

crew changes& refueling

SCIENCE PARK

PLASSENDALE 1

E40 - Brussels

VLOTDOK

VISSERIJDOK

ZEEWEZENDOK

HALVE MAAN

HAVENGEUL

Greenbridge incubation centre

sani

tary

co

mpl

exMHI Vestas

29 KM

OOSTENDE

ZEEBRUGGE

8

7

6a

6b 5

4

3

2

2

1

connection to Oostende

connection to Zeebrugge

Stevin connection operational in 2018

54

Halve maan- site prepared for offshore wind works- surface: 5 ha- quay length: 100 m- quay capacity: 10 T/m²- draught: -8 TAW

Zeewezendok- site prepared for offshore wind works- surface: 10-15 ha- quay length: 700 m- quay capacity: 4 T/m² to 20 T/m²- draught: - 8m TAW

Vlotdok- site prepared for berthing & refueling- length: 800 m berthing places

Visserijdok- surface: 7 ha

assembly & storage area with direct access to open sea offices & storageassembly & storage area behind the locks

source: La Tene maps

OffshORE wInd faRms In thE nORth sEa BElgIan OffshORE wInd faRms

REBO offers ... > 90 hectares on 5 sites (Zeewezendok, Halve Maan, Visserijdok, Vlotdok, Plassendale) > 800 m adapted heavy quay capacity 4 - 20 T/m² > prepared surfaces over 10 T/m² for storage of foundations, nacelles, hubs, towers and blades

EnERgy PORt OOstEndE ... > is a versatile short sea port situated in the busiest maritme area and accommodates roro, bulk and project cargo > has a strategic focus on REnEwaBlE EnERgy and gives PRIORIty to offshore wind vessels > airport on 2 km - no aircraft restrictions - direct connection to highway - railway to terminal - waterway connection with innerland

wInd faRm CaPaCIty InstallEd # tURBInEs COnnECtIOn

1 Norther 350 MW

2 C-Power 325 MW 325 MW 6 x 5 MW Senvion

48 x 6.15 MW Senvion

Oostende

3 Rentel 288 MW

4 Northwind 216 MW 216 MW 72 x 3 MW MHI Vestas Zeebrugge

5 Seastar 246 MW

6a Belwind I 171 MW 171 MW 55 x 3 MW MHI Vestas

1 x 6 MW Alstom

Zeebrugge

6b Nobelwind 165 MW 50 x 3.3 MW MHI Vestas Zeebrugge

7 Northwestern 2 224 MW

8 Mermaid 266 MW

tOtal 2245 mw 712 mw 182 turbines operational

blades coming in by road, going out by sea

250 km

is a good location for wind farms in the North Sea in a 250 km radius

wind farm operational

wind farm ongoing

wind farm in preparation

Page 4: REBO terminal,

76

> quay length: 800 meters> 15 Ha of terminal surfaces (with heavy lift capacity)> warehouse space of 50 000 - 80 000 m2

> 90 ha open storage for breakbulk activities (inner & outer port)

> berth for installation vessels and jack up facilities > mobilization or demobilization of vessels/ barges

> 51°14’ N - 2° 56’ E> draught: -8.4 LAT meters> harbour width: 270 meters> no locks, no bridges> priority for installation vessels> steaming time to open sea 10 minutes

maRItImE aCCEss PORt Of OOstEndE InfRastRUCtURE REBO

270 m

150 m

300 m

reinforced seabed

reinforced quay

up to 20 T/m2

arrival of blades

jacked up - distance to quay - 0 m

preassembly of the rotor

floating - distance to quay - 0 m

installation of the blades

arrival of tower elements

arrival of turbine arrival of nacelles & hubs

hEavy lIftIng OPERatIOnsEasy aCCEss

© R

ober

t Piro

tte

© R

ober

t Piro

tte

© A

lstom

© R

ober

t Piro

tte

Page 5: REBO terminal,

98

503

502

602

603

604

605

501

FUTURE

FUTURE

FUTURE

FUTURE

INSTALLATION AREA

priority for offshore installation vessels | no locks | 20 ha installation & storage area with direct access to open sea offices & storage | dedicated O&M | pontoons with utilities | on site safety training center |technical suppliers

O&M AREA

Page 6: REBO terminal,

1110

InstallatIOn O&m

Goliath & Neptune

Neptune & Bold Tern

NeptuneBold Tern

4 POntOOns wIth UtIlItIEs & CRanEs fOR sERvICE vEssElsPRIORIty fOR InstallatIOn vEssEls

Page 7: REBO terminal,

1312

OffICEs & stORagE aREa sERvICEs

On sItE safEty tRaInIng CEntERIn thE nEaR fUtURE

along the quay: MHI Vestas - Alstom - Parkwind - GeoSea

direct acces to the quay: Falck Safety Services – Cofely direct acces to the quay: Senvion – OWA – Technum – Flidar – eCoast – eBo

welding, painting & sandblasting

> a dedicated team to help project developers and suppliers > technical support services: welding, construction, surface treatment, diving works, offfshore transport & crew, laundry service for offshore suits .... more details on www.multitech-oostende.be

> covered and open storage possibilities for project management and O&M> sanitary complex for installation offshore workers up to 100 people> fully equiped offices

scaffolding

© F

alck

Saf

ety

Serv

ices

© F

alck

Saf

ety

Serv

ices

REBO business center

Page 8: REBO terminal,

1514

© B

elw

ind

REfEREnCEs REfEREnCEs

C-Power I - project management + installation (2008) + O&M

Northwind cable - storage of spare the cable (2013)

Belwind - Alstom Haliade 150 6 MW installation (2013) + O&M

Belwind & Northwind - project management (2014) + O&M

C-Power II & III - project management + installation (2012 - 2013) + O&M

© A

lstom

© A

lstom

© A

lstom

© C

-Pow

er, p

hoto

grap

her T

om D

haen

ens

© C

-Pow

er, p

hoto

grap

her T

om D

haen

ens

© C

-Pow

er

© C

-Pow

er©

C-P

ower

© C

-Pow

er©

Kev

in M

olle

t

© R

ober

t Piro

tte©

Nor

thw

ind

© N

orth

win

d

Page 9: REBO terminal,

RENEWABLE ENERGy COMPANIES PRESENT IN OOSTENDE

www.reboostende.bewww.portofoostende.be

REBO nv | Slijkensesteenweg 2 | BE 8400 Oostende | +32 59 34 07 11 | Emmanuël Timmermans | [email protected]

sEE yOU sOOn!