COMPANY INTRODUCTIONDESIGN & PROJECT MANAGEMENT SERVICES
AUTOMOTIVE
![Page 2: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/2.jpg)
OVERVIEW
![Page 3: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/3.jpg)
ISG & Realys CompaniesISG is an international construction services company delivering fit out, construction and a range of specialist services.
The provision of consistent delivery across geographies makes ISG the partner of choice for multi-national and local organizations building, refurbishing or fitting out their spaces. ISG is also focused on the communities where we work – employing local people and building networks of local suppliers.
![Page 4: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/4.jpg)
ISG & Realys CompaniesRealys Group was founded in 2005 in Shanghai as AOS China. Originally the company was a subsidiary of AOS Group (France) providing real estate related services; design, architecture and construction and project management services.
In 2008, AOS China and Middle East became independent of AOS Group (France) and in 2011 was acquired by ISG.
Realys is today ISG’s brand for the delivery of all non-contracting services in Asia Pacific; Architecture, Interior Design, Consulting, Project and Construction Management.
![Page 5: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/5.jpg)
Realys Group Services
![Page 6: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/6.jpg)
Case StudiesAUTOMOTIVE 4S RETAIL
DESIGN AND PROJECT MANAGEMENT
![Page 7: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/7.jpg)
PORSCHE PAN-CHINA (23 No.)
1. Porsche Taizhou 3,000 sqm
2. Porsche Hangzhou 6,450 sqm
3. Porsche Tangshan 7,800 sqm
4. Porsche Beijing V 8,000 sqm
5. Porsche Nanchang 8,000 sqm
6. Porsche Foshan Nanhai 10,800 sqm
7. Porsche Shaoxing 10,120 sqm
8. Porsche Changzhou 16,000 sqm
9. Porsche Urumqi 5,230 sqm
10. Porsche Ningbo II 8,000 sqm
11. Porsche Suzhou 4,700 sqm
12. Porsche Changchun 3,500 sqm
13. Porsche Lanzhou 1,360 sqm
14. Porsche Shanghai II 6,000 sqm
LIVE PROJECTS (JAN 2012)
1. Porsche Shenzhen II 7,800 sqm
2. Porsche Shanghai IV 22,400 sqm
3. Porsche Jiaxing 1,750 sqm
4. Porsche Luoyang 1,360 sqm
5. Porsche Suzhou B&P 1,750 sqm
6. Porsche Nantong 7,800 sqm
7. Porsche Foshan Shunde 7,500 sqm
8. Porsche Jinan 7,800 sqm
9. Porsche Weifang 8,000 sqm
![Page 8: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/8.jpg)
Asia Pacific
Gulf
Europe
Project:Shanghai Flagship 4S
Services:Design Project ManagementConstruction Management
Location: Shanghai, China
Gross surface area:6,000 sqm
Working Period:Sep 2008 to Apr 2010.
PORSCHE SHANGHAI: HQ + FLAGSHIP 4S
![Page 9: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/9.jpg)
PORSCHE CENTRE TAIZHOU
Project: Porsche Centre Taizhou
Services:Design
Location: Taizhou, China
Gross surface area:3,000 sqm
.
![Page 10: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/10.jpg)
PORSCHE CENTRE HANGZHOU BINJIANG
Project:
Porsche Centre Hangzhou Binjiang
Services:Design
Location: Hangzhou, China
Gross surface area:6,450 sqm
![Page 11: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/11.jpg)
PORSCHE CENTRE TANGSHAN
Project:Porsche Centre Tangshan
Services:Design
Location: Tangshan, China
Gross surface area:7,840 sqm
![Page 12: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/12.jpg)
PORSCHE CENTRE BEIJING V
Project:Porsche Centre Beijing V
Services:
DesignProject ManagementConstruction Management
Location: Beijing, China
Gross surface area:8,400 sqm
![Page 13: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/13.jpg)
PORSCHE CENTRE NANCHANG
Project:Porsche Centre Nanchang
Services:Design
Location: Nanchang, China
Gross surface area:8,000 sqm
![Page 14: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/14.jpg)
PORSCHE CENTRE FOSHAN NANHAI
Project:Porsche Centre Foshan Nanhai
Services:Design
Location: Nanhai, China
Gross surface area:10,850 sqm
![Page 15: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/15.jpg)
PORSCHE CENTRE SHAOXING
Project:Porsche Centre Shaoxing
Services:
DesignProject ManagementConstruction Management
Location: Shaoxing, China
Gross surface area:10,120 sqm
![Page 16: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/16.jpg)
PORSCHE CENTRE CHANGZHOU
Project:Porsche Centre Changzhou
Services:Design
Location: Changzhou, China
Gross surface area:16,000 sqm
![Page 17: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/17.jpg)
PORSCHE CENTRE URUMQI
Project:Porsche Centre Urumqi
Services:Design
Location: Urumqi, China
Gross surface area:5,230 sqm
![Page 18: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/18.jpg)
PORSCHE CENTRE NINGBO II
Project:Porsche Centre Ningbo II
Services:
DesignProject ManagementConstruction Management
Location: Ningbo, China
Gross surface area:8,000 sqm
![Page 19: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/19.jpg)
PORSCHE CENTRE CHANGCHUN
Project:Porsche Centre Changchun
Services:Project Management
Location: Changchun, China
Gross surface area:3,500 sqm
![Page 20: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/20.jpg)
PORSCHE CENTRE SUZHOU
Project:Porsche Centre Suzhou
Services:
DesignProject ManagementConstruction Management
Location: Suzhou, China
Gross surface area:4,700 sqm
![Page 21: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/21.jpg)
WHS - PORSCHE LANZHOU
Project:WHS - Lanzhou
Services:
DesignProject ManagementConstruction Management
Location: Lanzhou, China
Gross surface WHS area:1,360 sqm
![Page 22: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/22.jpg)
Case StudiesLIVE PROJECTS
![Page 23: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/23.jpg)
PORSCHE CENTRE SHENZEN II
Project:Porsche Centre Shenzen II
Services:Design
Location: Shenzen, China
Gross surface area:7,800 sqm
![Page 24: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/24.jpg)
PORSCHE CENTRE JIAXING
Project:Porsche Centre Centre Jiaxing
Services:Design
Location: Jiaxing, China
Gross surface area:1,750 sqm
![Page 25: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/25.jpg)
PORSCHE CENTRE SUZHOU B&P
Project:Porsche Centre Suzhou B&P
Services:Design
Location: Suzhou, China
Gross surface area:1,750 sqm
![Page 26: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/26.jpg)
PORSCHE CENTRE SHANGHAI IV
Project:Porsche Centre Shanghai IV
Services:Design
Location: Shanghai, China
Gross surface area:22,400 sqm
![Page 27: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/27.jpg)
WHS - PORSCHE LUOYANG
WHS - Project:Porsche WHS Luoyang
Services:
EngineeringDesignAuthority ApprovalsProject ManagementConstruction Management
Location: Luoyang, China
Gross surface area:1,360 sqm
![Page 28: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/28.jpg)
PORSCHE CENTRE FOSHAN SHUNDE
Project:Porsche Centre Foshan Shunde
Services:Design
Location: Foshan, China
Gross surface area:7,500 sqm
![Page 29: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/29.jpg)
PORSCHE CENTRE WEIFANG
Project:Porsche Centre Weifang
Services:Design Management
Location: Weifang, China
Gross surface area:8.000 sqm
![Page 30: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/30.jpg)
PORSCHE CENTRE NANTONG
Project:Porsche Centre Nantong
Services:Project ManagementConstruction Management
Location: Nantong, China
Gross surface area:7,800 sqm
![Page 31: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/31.jpg)
PORSCHE CENTRE JINAN
Project:Porsche Centre Jinan
Services:Project Management
Location: Jinan, China
Gross surface area:7,800 sqm
![Page 32: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/32.jpg)
PORSCHE CHINA: “CATEGORY 1”
CATEGORY 1
Services:New Standard Design
Location: Pan-China Projects
Gross surface area:3,600 sqm
![Page 33: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/33.jpg)
PORSCHE CHINA: “CATEGORY 3”
CATEGORY 3
Services:New Standard Design
Location: Pan-China Projects
Gross surface area:12,600 sqm
![Page 34: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/34.jpg)
Project:Asia HQ, R&D Centre
ServicesProgram, Site SelectionProject Management
Location:Shanghai
Area50,000 sqm
Working Period:On hold
PSA PEUGOT CITROEN, ASIA PACIFIC HQ & R&D Centre
![Page 35: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/35.jpg)
Project :Design ManagementProject Management
Location: Suzhou, China
Gross surface area:8,000 sqm
VW 4S SUZHOU
![Page 36: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/36.jpg)
Project:Office Expansion
Location:Shanghai
Services: Project Management
Gross surface area: 2,000 sqm
Duration:14 weeks
JAGUAR LAND ROVER, SHANGHAI
![Page 37: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/37.jpg)
Project:Citroen Experience Centre
Location:Shanghai
Services: Concept Design
Gross surface area: 600 sqm
Duration:Ongoing
CITROEN EXPERIENCE CENTRE
![Page 38: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/38.jpg)
CASE STUDIESRETAIL
![Page 39: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/39.jpg)
Project:Beijing Flagship Store
Locations:Sanlitun, The Village & Joy City
Services: Management Contractor
Gross surface area: 1,500 sqm1,600 sqm
Duration:120 days / 7 months
APPLE BEIJING (2 STORES)
![Page 40: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/40.jpg)
Project: 12th Maison Store
Location: Marina Bay, Singapore
Services: Fit-OutLighting DesignProject Management
Gross surface area: 1,500 sqm
Duration: 9 months
LOUIS VUITTON SINGAPORE
![Page 41: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/41.jpg)
Project:Flagship Store
Location:Shanghai
Services: Construction Management
Gross surface area: 800 sqm
Duration:14 weeks
NOKIA SHANGHAI
![Page 42: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/42.jpg)
CASE STUDIESSPECIAL PROJECTS
![Page 43: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/43.jpg)
Project :Nation Pavilion – World EXPO
Location:Shanghai
Services: Project & Construction Management
Gross surface area: 7,000 sqm
Duration:17 mths (construction 10 mths)
EXPO 2010 - KINGDOM OF SAUDI ARABIA
![Page 44: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/44.jpg)
Project :Construction for EXPO 2010
Services: Project ManagementDesignFit out works
Gross surface area: 5,500 sqm
Working Period:April 2009 - April 2010
EXPO 2010 – BELGIUM & EUROPEAN PAVILIION
![Page 45: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/45.jpg)
CASE STUDIESMANUFACTURING AND R&D CENTRES
![Page 46: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/46.jpg)
AIR LIQUIDE SHANGHAI R&D
Project: R&D Centre and Offices
Services:Site SelectionDesignCost Estimation
Location: Shanghai, China
Gross surface area: Phase 1: 12.000 sqm Phase 2: 8.000 sqm
![Page 47: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/47.jpg)
Asia Pacific
Gulf
Europe
SEMATIC WORKSHOPS CHANGSHU
Project:Office, Workshops and Support Facilities
Services: Owner Rep Design, Project Management Construction Management
Location:Changshu, China
Area: 20.000 sqm
Working Period:Feb 2011~ Apr 2012
![Page 48: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/48.jpg)
Asia Pacific
Gulf
Europe
BOSTIK (TOTAL GP) SHANGHAI R&D
Project: R&D Centre and Offices
Services:DesignPM & CM under discussion
Location: Shanghai, China
Gross surface area: B I: 3.600 sqmB II: 4.000 sqm
![Page 49: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/49.jpg)
Asia Pacific
Gulf
Europe
AREVA SHANGHAI
Project :T & C China Technology Center (CTC)
Services: Full Design services
Location: Caohejing Pujiang Hi-tech Park
Gross Floor area:35,000 sqm
![Page 50: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/50.jpg)
SAINT GOBAIN SHANGHAI R&D
Project:R&D Center and Office
Services:Procurement Construction Management
Location:Minhang, Shanghai
Gross surface area: 5,300 sqm
Working period: Feb 2006 to June 2007.
![Page 51: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/51.jpg)
ARKEMA KOALA
Project:Arkema Koala
Services: Full Design servicesProject ManagementConstruction Management
Location:Changshu, China
Gross Floor area:2000 sqm
![Page 52: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/52.jpg)
ARKEMA CRDC & AFC
Project:Arkema CRDC + AFC
Services: Full Design servicesProject ManagementConstruction Management
Location: Changshu, China
Gross Floor area:CRDC : 10,200 sqm AFC : 1,500 sqm
Working period: Ongoing
![Page 53: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/53.jpg)
Project: R&D Center
Services:Design, Engineering, Procurement Construction Management.
Location: Xinzhuang, Shanghai
Gross Floor area: 4,000 sqm
Working period: July 2007 to June 2008.
RHODIA BAMBOO I SHANGHAI R&D
![Page 54: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/54.jpg)
RHODIA BAMBOO IV SHANGHAI R&D
Project: R&D and Offices
Services:Design, PM & CM under discussion
Location: Xinzhuang, Shanghai
Gross surface area: 4.200sqm
![Page 55: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/55.jpg)
Asia Pacific
Gulf
Europe
EDEN FACTORY
Project: Eden Chocolate Office + Workshop located in Suzhou Industrial Park
Services:• Procurement • Construction Management.
Location: Suzhou Industrial Park, Jiangsu, China
Gross Floor area: 15.000 Sqm
Working period: From Aug 2008 to June 2009.
![Page 56: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/56.jpg)
Project:Manufacturing and Campus
Services:Design
Location: Jiashan, China
Gross surface area:120.000 sqm
Working Period: February 2007 to November 2008
CHINA FLOORS SHANGHAI MANUFACTURING
![Page 57: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/57.jpg)
CASE STUDIESOFFICE
![Page 58: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/58.jpg)
Project:China HQ Consolidation
Location:Shanghai
Services: Tenant RepresentationDesignContractingMove management.Change management
Gross surface area: 4,500 sqm
KRAFT CHINA HQ SHANGHAI
![Page 59: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/59.jpg)
SODEXO OFFICE SHANGHAI & BEIJING
Project:Shanghai & Beijing Office
Location:HQ Relocation, Shanghai and Beijing
Services:
Tenant RepresentationDesignContractingMove Management
References;
Christophe Solas, President
![Page 60: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/60.jpg)
LPA SHANGHAI
Project:Office
Location:Shanghai
Services:DesignPMConstruction
Reference:Paul-Emmanuel Benachi
![Page 61: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/61.jpg)
PALM SHANGHAI
Project:Office
Location:Caohejing Hi-Tech Park, Shanghai
Service:
DesignPMContracting
Duration:Jul 2006 – Jan 2007
Reference:Mr. Ray Allison
![Page 62: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/62.jpg)
Project:Office Relocation
Location:One Raffles Quay, Singapore
Services: Project Management
Gross surface area: 3,500 SQM
Duration:20 weeks
LEED Platinum
BLOOMBERG, SINGAPORE
![Page 63: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/63.jpg)
NATEXIS BANQUES POPULAIRES SHANGHAI
ProjectHQ Office
Location:Luijiazui, Shanghai
Services: Tenant RepresentationContracting
Gross floor area:600 sqm
Duration:May 2006 – Sep 2006
Reference:Herve Housse
![Page 64: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/64.jpg)
OUR CLIENTSSUMMARY
![Page 65: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/65.jpg)
Our Experience – Automotive
![Page 66: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/66.jpg)
Our Experience – Retail
![Page 67: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/67.jpg)
Our Experience – R&D
![Page 68: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/68.jpg)
Our Experience – Office
![Page 69: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/69.jpg)
SERVICES & PROCESS
![Page 70: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/70.jpg)
What We Do
Site SelectionSchematic DesignSite AnalysisCost Estimation
DesignEngineeringSustainable Dev.Construction MgmtProcurement Mgmt
Project ManagementConcept DesignBasic DesignDetailed DesignFit Out
![Page 71: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/71.jpg)
• One Point of Contact• In-depth Knowledge across Entire Process • Consistency in Delivering Multiple Solutions• Complete Programme Management• Proven Track Record• Outline Concept to Completion• Developed Partnerships
Realys Turnkey Solution
Why work with a Turnkey Solution
![Page 72: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/72.jpg)
Project Phases
Project Establishment Phase
1
• POR (Plan of Requirements)• Site Selection• Land Use Right• Project Proposal• Due Diligence• Soil Investigation
![Page 73: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/73.jpg)
Project Phases
Project Establishment Phase
Project Design& Pre-ConstructionApproval Phase
1 2
• Project approval• Project registration with construction committee• Concept design• Preliminary design• Detailed design• Construction permit
![Page 74: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/74.jpg)
Project Phases
Project Establishment Phase
Project Design& Pre-ConstructionApproval Phase
ConstructionPhase
1 2 3
• Registration with all related authorities• Temporary utilities and site temporary facilities• Construction management (Quality, cost, schedules)
![Page 75: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/75.jpg)
Project Phases
Project Establishment Phase
Project Design& Pre-ConstructionApproval Phase
ConstructionPhase
Project Final AcceptancePhase
1 2 3 4
• All related acceptance certificates• Documentation submission for filing• As-built drawings
![Page 76: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/76.jpg)
Best Practice
Quality• Quality is at the heart of our business and
philosophy
• Best Practice Manual with ISO certified processes followed on all projects
• Database of Preferred Trade Contractors
![Page 77: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/77.jpg)
Quality
Best Practice
Health & Safety• Site specific H&S plan for each project
• H&S performance reported every year
• Our H&S system complies with all current legislation
![Page 78: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/78.jpg)
Industry Sectors
Best Practice
Sustainability
• Member of the USGBC
• LEED certified projects delivered throughout Asia
• Global Sustainability Policy in place
Health & Safety
Quality
![Page 79: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/79.jpg)
What makes us different
Extensive International network
Experienced international team
High CRM level with clients
Multi-disciplinary skills base
Commitment and pro-activeness
ISO processes in all offices
Health & Safety – Zero tolerance
Sustainable and green solutions
Experience in wide range of sectors
End-to-End solutions
European quality for local costs
Listed on London Stock Exchange
![Page 80: Realys auto general 16 may2012](https://reader036.vdocuments.site/reader036/viewer/2022081404/5596db981a28abd56a8b46dd/html5/thumbnails/80.jpg)
Contact: Michael Duffy
Director Consulting, South East Asia
[email protected]: +65 98369794
www.realys.com
www.realysgroup.com