REALISING PRIORITIES IN REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT IN BULGARIA IN BULGARIA Ivaylo Moskovski Deputy Minister Republic of Bulgaria Ministry of Transport, Information Technology and Communications 17 November 2010 Vienna, Austria

Upload: others

Post on 21-Mar-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

REALISING PRIORITIES IN REALISING PRIORITIES IN

INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT

IN BULGARIAIN BULGARIA

Ivaylo MoskovskiDeputy Minister

Republic of BulgariaMinistry of Transport,

Information Technology and Communications

17 November 2010Vienna, Austria

Page 2: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

ContentsContents

� Building upon the favorable geographic position of the country

� European Structural and Cohesion Funds –main sources of infrastructure financing

� Major road and rail transport infrastructure projects in Bulgaria

� Alternative sources for financing – PPP schemes in transport infrastructure development

Page 3: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Geographical Location of BulgariaGeographical Location of Bulgaria

The location of Bulgaria: a very important

competitive advantage

Page 4: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE DEVELOPMENT

IN BULGARIAIN BULGARIA

Page 5: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Strategic Framework for Strategic Framework for Infrastructure PlanningInfrastructure Planning

� Strategy for Development of the Transport Infrastructure of the Republic of Bulgaria until 2015 – approved by the Council of Ministers in 2006

� Budget of the Strategy – € 4 712 M

� Operational Programme on Transport 2007-2013 – officially signed on 27 November 2007 in Brussels

� Budget of the Programme – € 2 003 M

� General Transport Master Plan for Bulgaria

� Strategy for Development of the Transport Infrastructure of the Republic of Bulgaria through the Concession Schemes

� National Programme for Development of the Public Ports –draft

Page 6: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

ISPA INFRASTRUCTURE PROJECTS ISPA INFRASTRUCTURE PROJECTS

IN BULGARIAIN BULGARIA

Page 7: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

ISPA Projects LocationISPA Projects Location

Sofia

Plovdiv

Ruse

Burgas

Reconstruction and electrification of Plovdiv – Svilengrad railway line

Vidin

Black Sea

The Danube River

Varna

New bridge over the Danube River at Vidin – Calafat

Daskalovo

Construction of Lyulin Motorway –Sofia ring road – Road junction

Daskalovo

Svilengrad

Page 8: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Plovdiv Plovdiv –– Svilengrad Railway LineSvilengrad Railway Line

� The Project includes electrification and upgrading (incl. partial doubling) of approx. 151 km line for 160 km/h � Phase 1 Krumovo – Parvomai� Phase 2 Parvomai – Svilengrad

� Budget� € 153 M – EU ISPA grant� € 150 M – EIB Loan� € 37 M – Bulgarian State Budget

contribution

� The completion of the entire Project is planned for 2012

� Status – under implementation

Page 9: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Vidin Vidin –– Calafat Danube BridgeCalafat Danube Bridge

� The Project includes� Design and construction of a combined (road and rail) bridge

• 4 road lanes and a single track railway line• Bicycle lane

� Construction of the adjoining road and rail infrastructure• New rail freight yard and 7 km new railway line• Reconstruction of the existing passenger station• Construction of 4 new two level road junctions

� The Project budget for the Bulgarian side –€ 226 M� The completion of the entire Project is planned for 2012� Status – under implementation

Page 10: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

INFRASTRUCTURE PROJECTS UNDER INFRASTRUCTURE PROJECTS UNDER THE OPERATIONAL PROGRAMME ON THE OPERATIONAL PROGRAMME ON

TRANSPORT 2007 TRANSPORT 2007 –– 20132013

Page 11: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Operational Operational ProgrammeProgramme on Transport on Transport Priority AxesPriority Axes

№ Priority AxesIndicative

Budget (€ mln.)

1Development of railway infrastructure along the major national and Pan-European transport axes

580.00

2Development of road infrastructure along the major national and Pan-European transport axes

989.59

3Improvement of intermodality for passengers and freights

211.09

4Improvement of the maritime and inland-waterway navigation

156.85

Page 12: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Railway InfrastructureRailway Infrastructure

Total length of the railway lines in Bulgaria – 5 923 km

Page 13: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Svilengrad Svilengrad –– Turkish Border Turkish Border Railway LineRailway Line

� Total indicative budget –€ 43.9 Mof which:� € 29.8 M under OP

Transport� Construction and

electrification of 19 km new railway section for speed of 160 km/h

� Signed contract for the project implementation –25.05.2009

� Status – under implementation

Sofia

Burgas

Plovdiv

VarnaRuse

Svilengrad

Bulgarian – Turkish border

Page 14: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

ModernisationModernisation of Sofia of Sofia –– Plovdiv Plovdiv Railway LineRailway Line

� Total indicative budget –€ 362.8 M

� The Project is divided into 3 railway sections:� Sofia – Elin Pelin� Elin Pelin – Septemvri� Plovdiv – Septemvri

� Elin Pelin – Plovdiv railway section will be implemented under the 2014 – 2020 programming period

� Status – forthcoming tender procedures for Plovdiv –Septemvri railway section construction

Sofia

Burgas

Plovdiv

Varna

Ruse

Page 15: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

� Total budget–€ 187.3 M

� Length – 292 km� The Project includes 3

railway sections, divided into 2 lots:� Lot 1: Mihaylovo –

Kaloyanovets and Tserkovski – Karnobat

� Lot 2: Druzhba – Burgas

� Status – tender procedures for construction and supervision

Renewal of Railway Sections along Renewal of Railway Sections along Plovdiv Plovdiv –– Burgas Railway LineBurgas Railway Line

Sofia

BurgasPlovdiv

Karnobat

Mihaylovo

Druzhba

TserkovskiKaloyanovets

Ruse

Page 16: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Other Railway ProjectsOther Railway Projects

� Design of Vidin – Sofia railway line

� Modernisation of Trans-European railway network in Bulgaria: Sofia – Dragoman railway line

� Modernisation of Trans-European railway network in Bulgaria: Sofia – Pernik – Radomir railway line

� Modernisation of Radomir –Gyueshevo railway line

Page 17: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Road InfrastructureRoad InfrastructureTotal length of national roads – 19 436 kmDensity of national roads – 0.18 km/km²

Motorways – 418 kmI Class roads – 2975 km

II Class roads – 4027 kmIII Class roads – 11748 km

Page 18: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Construction of Construction of TrakiaTrakia MotorwayMotorway� Total indicative budget –€ 362.6 M

� 357.7 M under OP Transport� Total length – 115.18 km divided into 3 lots� Lot 2: Stara Zagora – Nova Zagora –

31.800 km� Budget –€ 70.5 M� Start of construction – 09 June 2010� Construction time – 25 months� End of construction – June 2012

� Lot 3: Nova Zagora – Yambol – 34.300 km� Budget – € 65 M� Start of construction – 02 August 2010 � Construction time – 25 months� End of construction – August 2012

� Lot 4: Yambol – Karnobat – 49.080 km� Budget –€ 107 M� Start of construction – 03 September 2010� Construction time – 28 months� End of construction – December 2012

� Status – under implementation

Sofia

Burgas

Plovdiv

StaraZagora

NovaZagora

Yambol

Karnobat

Ruse

Page 19: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Construction of Struma MotorwayConstruction of Struma Motorway� Total length of the road section –132 km

divided into 4 lots:� Lot 1: Dolna Dikania – Dupnitsa� Lot 2: Dupnitsa – Blagoevgrad� Lot 4: Sandanski – Kulata� Total length of Lot 1, Lot 2 and Lot 4 –

65.78 km � Tentative cost –€ 250 M� Lot 3: Blagoevgrad – Sandanski –

construction in the next programming period 2014 – 2020

� Design Lot 3 –2011� Forthcoming tender procedures for

construction and supervision of Lot 1 and Lot 4

� Start of construction� Lot 1 –July 2011� Lot 4 –September 2011

� Construction time –23/22 months� End of construction –May/June 2013

Sofia

BurgasPlovdivDupnitsa

Varna

Ruse

Blagoevgrad

Sandanski

Kulata

Page 20: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Sofia Ring Road Sofia Ring Road –– Yana Road JunctionYana Road Junction� Hemus Motorway:

Sofia Ring Road – Yana Road Junction section

� Length –8.5 km� Tentative costs –€ 32 M� Announcement –November

2010� Start of construction –May

2011� Construction time –20

months� End of construction –

December 2012

Sofia

Burgas

Elin Pelin

Yana Road Junction

Varna

Ruse

Page 21: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Other Road Infrastructure ProjectsOther Road Infrastructure Projects

� Construction of Maritza Motorway

� Road I-5 Kardzhali – Podkova

� Modernisation of Road section I-1 (E-79) Vratsa – Botevgrad

� Road E-79 Vidin – Montana (Dimovo – Bela – Ruzhentsi)

� Status – under implementation

Page 22: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

Operational Programme TransportOperational Programme Transport2014 2014 -- 20202020

OPT – 2007-2013 PROGRAMME PERIOD

OPT – 2014-2020 PROGRAMME PERIOD

22

Page 23: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

Projects in Operational Projects in Operational ProgrammeProgrammeTransport 2014 Transport 2014 -- 20202020

� Struma Motorway Lot 3 67,5 km 350 M Euro� Black sea Motorway 100 km 350 M Euro� Sofia – Kalotina (BG – SRB) 50 km 150 M Euro� Sofia – Gyueshevo (BG – MC) 85 km 260 M Euro� Tunnel Shipka Pass 3,2 km 100 M Euro � Sofia Transit Road – West tangent 8,5 km 80 M Euro

– North tangent 16,5 km 150 M Euro� Hemus Motorway 280 km 1.350 M Euro

∑ 2.790 M Euro

MTITC – REPUBLIC OF BULGARIA

Page 24: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

� National and foreign investors are welcome in the process of implementing transport infrastructure concessions

� The MTITC policy foresees the involvement of the private sector into the modernisation and maintenance of transport infrastructure

� The Strategy for Development of the Transport Infrastructure of the Republic of Bulgaria through the Concession Schemeswas elaborated at the beginning of 2010� Main objective – to outline the mid-term perspectives for development of

ports, airports and railway stations through the concession mechanisms

� Public-private partnership in Bulgaria � Port and airport infrastructure – 10 successfully signed concession

contracts� Reconstruction and modernisation of the rail infrastructure – 3

planned concession procedures at elaboration stage

Alternative Sources for FinancingAlternative Sources for FinancingAlternative Sources for Financing

Page 25: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Danube River

SofiaBlack Sea

Burgas

Varna

Ruse

Plovdiv

Gorna Oryahovitsa

Main Railway StationsMain Railway Stations

Future concession

Poduyane

Railway stations

Page 26: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

Possibilities for Railway Possibilities for Railway Stations ConcessionStations Concession

� Sofia Central Railway Station

� Poduyane Railway Station in Sofia

� Plovdiv Central Railway Station

Page 27: REALISING PRIORITIES IN INFRASTRUCTURE DEVELOPMENT IN … · 2010. 12. 16. · Ivaylo Moskovski Deputy Minister tel. +359 2 9409 409, fax +359 2 9409 827 e-mail: imoskovski@mtitc.government.bg

MTITC – REPUBLIC OF BULGARIA

THANK YOU FOR YOUR ATTENTION!THANK YOU FOR YOUR ATTENTION!

Ivaylo MoskovskiDeputy Minister

tel. +359 2 9409 409, fax +359 2 9409 827e-mail: [email protected]

www.mtitc.government.bg

17 November 2010 Vienna, Austria