RE-USE STUDY for the FORMER CARNEGIE LIBRARY BUILDING
PREPARED BY
WITH
20 MAY 2010
I A M S C O N S U L T I N G , L L CS O T A C O N S T R U C T I O N S E R V I C E S , I N C
W A T S O N E N G I N E E R S
FOR
AND
blank
MEP FEASIBILITY REPORT
124567
1718202224272930343740
INTRODUCTION
HISTORY
THE NEW HAZLETT THEATER
THE CHARM BRACELET PROJECT
LIBRARY RELOCATION
EXISTING CONDITIONS
CODE REVIEW
GROUND FLOOR PROGRAM
FIRST FLOOR PROGRAM
SECOND FLOOR PROGRAM
OVERVIEW
IMMEDIATE PROJECTS
SHORT TERM PROJECTS
LONG TERM PROJECTS
CONCLUSION & NEXT STEPS
CODE REVIEW
CONTENTSRE-USE STUDY
for the FORMER CARNEGIE LIBRARY BUILDING
PROJECT COMMITTEE
Sara Radelet, Executive Director, The New Hazlett Theater
Tom Sokolowski, The Andy Warhol Museum; the Board of the New Hazlett Theater
Chris Siefert, Deputy Director, Children’s Museum of Pittsburgh
Andrew Dash, Senior Planner, Department of City Planning, City of Pittsburgh
Andrea Lavin Kossis, Community Project Services Manager, Community Design Center of Pittsburgh
Ray Klimko, Facilities Management, City of Pittsburgh
Ron Graziano, Director of Facilities Development, Carnegie Library of Pittsburgh
Dave Bjornson, Technical Director, The New Hazlett Theater
Melinda Pietrusza, Project Coordinator, The New Hazlett Theater
LOYSEN + KREUTHMEIER ARCHITECTSKaren Loysen, principal
Peter Kreuthmeier, principal
Dave Green
Sallyann Kluz
Jennifer McCarthy-Lovell
This project was supported by the generous contributions of the Community Design Center of
Pittsburgh, Design Fund.
BACKGROUND
ANALYSIS
RECOMMENDATIONS
BUILDING PROGRAM
SUPPLEMENTAL DOCUMENTS
APPENDIX
THE RE-ENVISIONED LIBRARY:
PROGRAMMING GOALS
blank
1LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BACKGRO
UN
D
In 2009, after the permanent relocation of the Carnegie
Library of Pittsburgh - Allegheny branch facility and the
announcement that the remaining library functions would
be relocated by the end of 2010, it became clear to the
New Hazlett Theater (NHT) and the City of Pittsburgh
that the lack of occupancy of the former library would be
detrimental for the remaining tenants as well as for the
City. The City expressed interest in partnering with the NHT
to develop a plan for adaptive reuse of the full building,
including the addition of new tenants. With that in mind, the
NHT, in partnership with the Community Design Center of
Pittsburgh (CDCP) developed a Request for Proposals to seek
an architect to study the former library building, review its
mechanical and structural systems and explore multi-tenant
use options. Loysen + Kreuthmeier Architects was retained in
December 2009 to complete this study.
Key stakeholders - representatives from the City and
neighborhood cultural institutions - formed a Project
Committee for the study. All are looking for the successful
and sustainable reuse of the building. Representing these
stakeholders are:
Department of City Planning: Andrew Dash, Senior Planner
Community Design Center of Pittsburgh: Andrea Lavin
Kossis, Community Project Services Manager
City of Pittsburgh: Ray Klimko, Facilities Management
Carnegie Library of Pittsburgh: Ron Graziano, Director of
Facilities Development
The Andy Warhol Museum (also, representing the Board of
Directors of the NHT): Tom Sokolowski
Children’s Museum of Pittsburgh: Chris Siefert, Deputy
Director
The New Hazlett Theater: Sara Radelet, Executive Director
The New Hazlett Theater: Dave Bjornson, Technical Director
The New Hazlett Theater: Melinda Pietrusza, Project
Coordinator
The Project Committee met regularly with the consultant
team and shared their vision for the building. The Project
Committee hosted a series of three community meetings to
gather input to the project and to invite the public to share
their vision for the re-use of the building.
This report is divided into the following components:
• Background, including a brief Building History and
background on the key stakeholders involved in the
building;
• Analysis, including existing Conditions and overviews
of the Mechanical Equipment Report and Building Code
Review (provided as appendices to this report);
• Program, including Goals for the Re-Envisioned Library
and a fl oor-by-fl oor review of the proposed program;
• Building Improvement Recommendations, including
those for Immediate, Short Term, and Long Term
Implementation; and
• A summary of Conceptual Cost Estimates for Building
Improvements is provided as a separate document.
INTRODUCTION: PARTNERSHIP TO STUDY REUSE OF THE FORMER LIBRARY.
2FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
ORIGINALCARNEGIE
MUSIC HALL
ORIGINALCARNEGIE
FREE LIBRARY
1914ADDITION
AB
C
D
E F
G
H
I
J
00 8 16 24 32 FT
K
L
Key Plan : Original LibraryA LobbyB Delivery RoomC South Reading RoomD Trustee’s RoomE WorkroomF StacksG Librarian Offi cesH StacksI Expanded Stacks (1914)J Reading Room (1914)K Light WellL Theater Back-of-House
above left: View of the Carnegie Free Library at the corner of Federal Street and East Ohio Street
right: Footprint of the original Library, including 1914 addition
HISTORY OF THE CARNEGIE FREE LIBRARY BUILDING.
Originally known as the Carnegie Free Library and
Carnegie Music Hall, this historic building complex is
located at what was the heart of Allegheny City. The
building complex was designed by architects Smithmeyer
and Pelz, who were also responsible for the Jeff erson
Building of the Library of Congress in Washington, D.C.
Andrew Carnegie fi nanced the construction of the
library and gave the facility and the adjacent music hall
to Allegheny City with the stipulation that the local
government be responsible for funding the facility,
including its operations and upkeep. Dedicated on
February 20, 1890, the Carnegie Free Library of Allegheny
became the fi rst publicly-funded Carnegie Library in
America.
Typical of libraries of its era, the Carnegie Free Library was
originally designed as a series of grand public Reading
Rooms with closed Book Stacks that were accessible
only to library staff . Each Reading Room had its own
Circulation Desk and staff . On the First Floor, the Library
was entered from Federal Street (now pedestrian only).
Visitors entered through the main Lobby, which featured
a grand marble staircase to the Second Floor, then on to
the entrances of both the Library and the Trustees’ Room,
which was located in the base of the Clock Tower.
The Ground Floor spaces were organized around the
Delivery Room, with the closed Book Stacks located to
BACKGRO
UN
D
3LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BACKGRO
UN
D
top: View of the original Second Floor Reading Roommiddle: The Second Floor of the 1914 Additionbottom: View of the expanded Second Floor Reading Room, circa 1914
the north and a public Reading Room to the south (later
becoming the Children’s Reading Room). The Delivery
Room featured a large carved wood fi replace, above
which hung a portrait of the library’s benefactor, Andrew
Carnegie. Librarian’s offi ces fl anked the fi replace. The
skylight was comprised of metal scrollwork supporting
simple glass lites. The upper walls of the Delivery Room
featured plaster relief decoration that highlighted the
names of prominent American authors, including those
of Nathaniel Hawthorne, Washington Irving, Henry
Wadsworth Longfellow, Ralph Waldo Emerson, Benjamin
Franklin, and Harriet Beecher Stowe. Structural book
stacks were located behind the fi rst fl oor circulation
desk, adjacent to the light well between the Library and
Theater. Additional stacks were located along the western
side of the building. In 1914, renovations reconfi gured
the marble staircase and added a new centralized
circulation desk in the Lobby, combining the services that
had previously been provided on multiple fl oors. Also,
to the north, an addition expanded the First Floor stack
areas and added a new public stack and reading room
with mezzanine.
On the Second Floor, the Library was organized around its
Reading Room, which featured an elaborate stained glass
skylight. Structural book stacks were located to the east
of the Reading Room, adjacent to the light well. Similar
to the First Floor, as part of the 1914 renovation, a new
public stack and reading space, including mezzanine, was
added to the north side of the building. From the Second
Floor lobby, a broad stair led up to a Lecture Hall and then
on to the Clock Tower.
After the annexation of Allegheny City by the City of
Pittsburgh in 1907, the Carnegie Free Library of Allegheny
remained separate from Carnegie Library of Pittsburgh
for some time. It was not until 1956 that the library
became part of the larger Carnegie Library of Pittsburgh
system, while building ownership remained with the
City of Pittsburgh. The urban fabric around the Library
building was signifi cantly altered during the 1960’s urban
redevelopment, with the closing of Federal and East Ohio
Streets to make a pedestrian mall and sunken plaza. The
library building and theater were extensively renovated in
the early 1970’s, which included the removal of much of
the historic fabric of the library and music hall, including
the original marble staircase, the fi replace, stained glass
skylights, the theater’s pipe organ, and wood and plaster
moldings throughout. Based on reports of the building
condition prior to the renovations, it is likely that these
elements had deteriorated signifi cantly with time, and
that costs associated with restoration would have been
prohibitive. Two new elevators were installed at this
time, a new enclosed stair tower was constructed on the
northern face of the building, and the interior footprint
of the Clock Tower was adapted to serve as an additional
stair tower to meet egress requirements. One area of
structural stacks, adjacent to the central light well, was
removed and replaced with a permanent structural
fl oor, signifi cantly increasing the size of the Second Floor
Mezzanine. Also at this time, a portion of the Ground
Floor of the building was renovated to become a Senior
Center, operated by the City of Pittsburgh’s Citiparks
program.
As library use patterns changed over the years and the
facility operated as a branch of the CLP system, the public
functions of the library were concentrated to the fi rst
fl oor of the building. The Second Floor of the building
was used primarily as the Allegheny Depository for the
CLP’s Iron and Glass and Pennsylvania Collections. The
Carnegie Library of Pittsburgh – Allegheny Regional
continued to operate in the building until April 2006,
when a lightning strike toppled a portion of the stone
clock tower, sending massive stone blocks crashing
through the facility’s mechanical equipment and the
ceiling of the original Lecture Hall. Damage was extensive
and the library was forced to close to the public.
above: The original Marble Stair, circa 1890middle right: The original Delivery Room, circa 1890far right : Structural Stacks, circa 1890
4FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
BACKGRO
UN
D
Renovated as part of the 1970’s project, the Carnegie Music
Hall was rededicated the Theodore Hazlett Theater in the
1980’s and served as the home to the Pittsburgh Public
Theater (PPT) until the late 1990’s, when PPT relocated to
downtown Pittsburgh. The theater was operated as a rental
venue for several years by the City of Pittsburgh, but theater
supporters and members of the community realized that the
operation of a theater was outside the scope of the City. A
new non-profi t entity was formed to lead the redevelopment
of the theater, and in 2006, the newly rehabilitated
performance space was rededicated as the New Hazlett
Theater (NHT).
The NHT is a non-profi t organization founded with a mission
to cultivate the arts and provide a venue for world class
and neighborhood cultural events. The theater supports
live theatrical productions, dance performances, and music
events for both touring and local companies. With seating
for audiences of 300 – 500, the Theater provides a signifi cant
addition to the Northside’s cultural district, which includes
the Children’s Museum, the Andy Warhol Museum, and the
Mattress Factory, among others.
THE NEW HAZLETT THEATER. The New Hazlett Theater hosts a wide range of productions throughout the course of the year.
top: Pittsburgh Musical Theater’s production of “Jesus Christ Superstar”middle: The Last Poetsbottom: Pittsburgh International Festival of Firsts
photo credits: The New Hazlett Theater
5LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BACKGRO
UN
D
Begun in 2006 as a way address the problem of community
fracture on the Northside, the Charm Bracelet Project
has developed into a network of cultural, educational,
and recreational organizations transforming traditional
understandings of how institutions make community
impact. From their “Statement of Purpose” , the group works
collectively to foster a vibrant, attractive and accessible
Northside that is unifi ed by visible, lasting connections
between organizations and amenities. Participating
organizations include: the Children’s Museum of Pittsburgh;
the Andy Warhol Museum; the New Hazlett Theater;
Carnegie Library of Pittsburgh; The Mattress Factory; Artists
Image Resource (AIR); the National Aviary; Allegheny
Commons Initiative; Carnegie Science Center; City of
Asylum; Manchester Craftsman’s Guild; The Pittsburgh
Project; Northside Leadership Conference; Photo Antiquities
Museum; Saturday Light Brigade; Sarah Heinz House;
Venture Outdoors and others.
The Charm Bracelet Project has initiated a number of
activities within the Northside. Among these activities
have been the development of a microgrant program to
support “creative, imaginative and collaborative projects
that positively impact the Northside and advance the
goals of the Charm Bracelet Project.” Projects funded to
date include: public art; mentoring for young women at
local schools; outdoor activities, such as kayaking on Lake
Elizabeth and guided bike tours; writing clubs; and a variety
of educational workshops, classes and activities to engage
residents in the fabric of the Northside communities. In
addition to these initiatives, many of the partners are
engaged in larger projects. Among these projects are plans
for the Revitalization of Allegheny Public Square, the public
park space immediately adjacent to the former Carnegie
Free Library, New Hazlett Theater, and Children’s Museum
buildings. This project is being led by the Children’s Museum.
It is the energy of the collaborative spirit of the Charm
Bracelet Project that lead to interest in the building project
for the former Carnegie Library.
THE CHARM BRACELET PROJECT.
Programs sponsored by the Charm Bracelet Project include:
top left: “Chalk Shoes”, public art by Julia Mandlemiddle left: Design for Federal Street Underpass by Paula Scherbottom left: “Where is Allegheny City?” neighborhood treasure hunt
top middle : Community Art Lab participantsbottom middle : kayaking on Lake Elizabeth
photo credits: The Charm Bracelet Project
below: The Charm Bracelet Project Partners
6FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
BACKGRO
UN
D
Faced with extensive repairs due to a lightning strike in
2006, as well as an aging facility that no longer met the
needs of a modern library, Carnegie Library of Pittsburgh
made the decision to construct a new branch library
two blocks north of the original facility. Since the branch
relocation and repair of the lightning-caused damage,
the former library building has continued to serve as the
Allegheny Depository. Carnegie Library of Pittsburgh’s
lease for the building will expire at the end of 2010, at
which time the Library will have completed the relocation
of the collections housed there.
LIBRARY RELOCATION.
top: Stone from the Clock Tower crashed through the Library roof with the lightning strike, destroying the Library’s two pri-
mary HVAC units and causing signifi cant roof damagebottom : Partial interior damage from the lightning strike
Water damage on the interior of the building occurs primarily at corners where fl ashing and gutter systems have deteriorated with age. The exterior turret is located at the construction joint between the original Library building and the 1914 addition.
The 1970’s renovation added the North Stair Tower to provide a second means of egress from the First and Second Floors and their mezzanines.
The 1970’s windows have begun to fail in many locations; a lack of thermal break in the system allows condensation to occur in the walls, damaging intetior fi nishes.
7LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
This robust, granite-clad building remains the sturdy edifi ce
it was when originally dedicated in 1890. The 1914 addition,
which runs the length of the building along its north side,
is barely discernible from the original structure. The original
construction, typical for its day, uses heavy masonry bearing
walls with vaulted masonry fl oors and concrete topping
slabs. At clear-spanned rooms, steel beams support the
vaulted masonry fl oors. Steel trusses support the roof,
with cross purlins serving to brace the trusses and enable
hanging of the slate roof shingles. Gutters and downspouts
are copper and appear to have been repaired/replaced in
the 1970’s renovation. The roof has been well maintained
over the years and is currently in good condition, with a few
exceptions at fl ashing and scupper conditions. Generally, all
of this original exterior construction is in excellent condition.
In the 1970’s renovation, original wood windows were
removed. Some of the windows were replaced with
aluminum, single-glazed units. These windows are the
source of numerous leaks and condensation-based damage
throughout. Other existing openings were infi lled with metal
studs and a cement stucco fi nish.
One of the most signifi cant issues with the building exterior
is insuffi cient storm water management, particularly in the
central light well. Here, rain leaders from large upper roofs
deposit rainwater onto the lower roof. There are insuffi cient
roof drains to handle this amount of water and no overfl ow
mechanism in the event that the drain is clogged.
Around the building, there are other water infi ltration issues
requiring attention. On the east side of the building, the
1970’s theater terrace has water infi ltration problems, which
render the rooms below the terrace unusable. At the north
side of the building, where fi nish grade is precisely at the
window sill level, there is water infi ltration at the sills, which
is damaging interior fi nishes.
The former Carnegie Free Library building is an historic
landmark, designated by the City of Pittsburgh in 1974.
As such, any exterior modifi cation to the building that can
be seen from a public right-of-way will require approval
by the City of Pittsburgh’s Historic Review Commission
(HRC), including demolition, window replacement, new
construction, and additions. The HRC does not review
building interiors or the use of the property.
EXISTING CONDITIONS : EXTERIOR OF THE BUILDING.
View of the roof over the Second Floor Reading Room; the slate roof is generally in good condition for its age, but is diffi cult to maintain and repair due to its steep slope and lack of access.
View of the roof at the bottom of the Light Well, located between the Theater and the Library. Note the windows that have been infi lled over the years. Due to a lack of drainage, the Light Well fi lls with water during severe rains, causing fl ooding in the adja-
cent First Floor and the Ground Floor rooms below.
left: The elegant entrance to the former Library does not provide an acces-sible approach to the building.
above: The entrance to the Ground Floor Senior Center also serves as the
accessible entrance to the former Library building
8FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
AN
ALYSIS The former Library building underwent
an extensive renovation in the early 1970’s. These renovations included the removal of many of the interior historic details, which had deteriorated over 80 years of public wear and tear. With the exception of the Ground Floor, the main spaces of the Library were maintained, although their character was heavily altered. There have been minimal updates to the Library building since the 1970’s.
INTERIOR EXISTING CONDITIONS
View down the main corridor of the existing Senior Center (C); smaller meeting rooms (D) are defi ned by glass partitions
View of a perimeter room in the Senior Center (E); high windows at the perimeter let in daylight
The shared Mechanical Room (L) in the Ground Floor serves both the Library and Theater buildingsView of the Theater’s west corridor (P); the stone foundation wall on the left is part of the fi re separation between the Library and Theater
The former Staff Room in the Library (F)
In the former Staff Lounge in the Library (F)
9LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
The Ground Floor of the former Library building is currently
occupied by a combination of the Citipark’s Senior Center,
an offi ce suite/recording studio for the New Hazlett Theater,
shared Mechanical Rooms, and staff lounge and storage
spaces that formerly served the Library. As the basement
for the building, it is characterized by heavy masonry walls
and arched arcades supporting the structural above. The
ceilings are comprised of shallow barrel vaults, supported
by small steel members. The Ground Floor extends about 5
feet above grade for the most part, allowing it to have high
windows in the perimeter spaces on the south, west and
north faces of the building. The overall plan consists of mid-
sized spaces that are connected through the arched arcades
of the foundation. Unlike the First and Second Floors of the
former Library, the layout of the Ground Floor permits it to
be readily arranged around circulation corridors that can
provide access to diff erent spaces without having to pass
through other rooms.
The Ground Floor provides the only accessible route (A)
into the Library building, by way of a ramp constructed
in the 1970’s renovation. From this ramp, one enters the
Senior Center and then proceeds to the Main Elevator (B)
to get to the First and Second Floors. Due to the current
confi guration, the Main Elevator is not accessible when the
Senior Center is closed.
In the Senior Center, the fl oor had been excavated in the
1970’s in order to install new ductwork below the fl oor, and
quarry tile installed as the fi nished fl oor. Rooms (D) were
created within the Senior Center with sliding glass partitions
and gypsum studwall construction. A portion of the Senior
Center extends below the Theater. Windows are located
along the southern wall of perimeter rooms, with additional
rooms located to the interior of the footprint.
The Library portion of the Ground Floor includes the former
Staff Lounge (F) at the west wall, and interior storage spaces
(G). At the northwest corner of the building, Structural
Stacks (H) extend up into the First Floor. The Circulation and
Plumbing Core (I) houses a small elevator.
Although it is part of the Theater, a Recording Studio (J)
is currently located in the Library building’s footprint.
There does not appear to be a completed fi re separation
between the Theater and the former Library in this area, or
at all locations where the Senior Center extends below the
Theater.
A shared Loading Dock (M) is located on the northern face of
the building and is heavily utilized by the Theater.
A shared Pump Room (K) houses the entry for the steam
and chilled water system and is maintained primarily by the
City. Equipment in the Mechanical Room (L) serves all three
tenant spaces and is maintained by the City.
GROUND FLOOR.
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
00 5 10 15 20 FT
Key Plan : Ground Floor
Senior Center
New Hazlett Theater
Former Library
A Accessible EntranceB ElevatorC Senior Center CorridorD Senior Center Meeting RoomE Senior Center Perimeter RoomF Staff LoungeG Collection StorageH Structural StacksI Circulation & Plumbing CoreJ Recording StudioK Pump RoomL Mechanical RoomM Loading DockN North Stair TowerP Theater Corridor
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
A
B D
F G
H
I
J
K
L
MN
E E
D D
CP
10FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
AN
ALYSIS
The First Floor Lobby (C) The former Delivery Room (D)
View of the former Children’s Reading Room (F) View of the former East Stacks (H)
First Floor North Reading Room (K) Details of the Structural Stacks (J)
11LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
On the First Floor, the original marble staircase was removed
in the 1970’s in order to install a public Main Elevator (B)
that serves the Ground Floor, First Floor, and Second Floor.
Quarry tile was installed over the original fl ooring, the
ceiling lowered to accommodate ductwork, and the original
columns were furred out. Suspended fl uorescent light
fi xtures were installed. A new metal stair was installed in the
base of the Clock Tower (E), where the former Trustee’s Room
had been located. This stair (referred to as the Orange Stair
due to its color), connects the First Floor to the Second Floor
and Lecture Hall. Windows installed in the 1970’s renovation
have deteriorated and plaster damage, due to water
infi ltration at the windows and roof fl ashing, is signifi cant
along the front (west) wall of the Lobby (C). Many of the
1970’s windows along the front façade have cracked or been
damaged over time.
The former Delivery Room (D) was renovated to retain the
skylight, although the lower layer of decorative glass that
originally fi ltered the light was removed and the original wire
glass of the upper skylight is exposed. Due to cracks from
age and deterioration, the majority of the glass needs to be
replaced. It appears from the 1970’s renovation construction
drawings that some of the original detailing of the room
may still be in place, although concealed by the furred out
walls and columns. The original fi replace was dismantled
and toilet rooms (G) installed in the former Librarian Offi ce
locations. The toilet rooms are not compliant with current
ADA code requirements and the Library has reported that
there are on-going maintenance issues with them. The east
wall of the Toilet Rooms abuts the Theater’s Lobby. It appears
that there was originally a connection to the Theater in this
location.
The Children’s Reading Room (F) retains some of the original
detailing at the ceiling, which was not impacted by the
1970’s renovation. The lower walls were furred out and fabric
panels extend from the fl oor to approximately seven feet
above the fl oor. An original opening in the east wall of the
room was infi lled in order to create a First Floor separation
between the Library and the Theater. A door in this wall
currently connects the former Library to the Theater’s Lobby
via a narrow corridor.
The original East Stacks (H) of the Library open onto a light
well (M) that is located between the Library and the Theater.
The Library and Theater have both reported signifi cant
water issues with the Light Well due to the lack of suffi cient
roof drains; in severe weather, water quickly builds up and
overwhelms the drains. Storms in 2009 resulted in over 3 feet
of water up against the windows, causing interior fl ooding
both in the First Floor and the Ground Floor when water
went over the height of exhaust vents from the Mechanical
Equipment Room below.
The North Reading Room (K) retains much of its original
detailing, although the wood has been coated with a
textured plaster or paint. The First Floor Mezzanine (N) is
currently inaccessible to persons with mobility disabilities,
and has a low ceiling height.
Along the interior of the front of the Library (west wall), the
original Structural Stacks (J) remain. This includes wood
and cast iron stacks dating from the original construction
of 1890, as well as cast iron and glass stacks from the 1914
expansion. In the northwest corner, the iron and glass stacks
begin in the Ground Floor below and extend up three levels
to the First Floor Mezzanine. The Structural Stacks do not
meet ADA requirements and are only accessed from the First
Floor Mezzanine.
Carpet was installed throughout the main public and staff
spaces of the First Floor with the exception of the Lobby and
Structural Stacks. It appears that a new subfl oor coating was
installed over the existing fl ooring throughout and carpet
installed on top of that coating. Remnants of the original
mosaic fl oor may remain in the former Delivery Room and
other spaces.
FIRST FLOOR.
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
First Floor First Floor Mezzanine
Key Plan : First Floor
New Hazlett Theater
Former Library
A Main Entrance (not accessible)B ElevatorC LobbyD Former Delivery RoomE Orange StairF Former Children’s RoomG Toilet RoomsH Former East StacksI Offi cesJ Structural StacksK North Reading RoomL Plumbing & Circulation CoreM Light Well (Exterior)N First Floor MezzanineP North Stair Tower
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
A
B
CD
E
F
G
H
I
J
J
J
K
L
M
J
J
J
N
L
P P
12FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
AN
ALYSIS
Existing Second Floor Elevator Lobby (B)
Existing Second Floor Lecture Hall (J)
Second Floor Northeast Reading Room as seen from Mezzanine (N)Second Floor Reading Room (D)
View of the Second Floor Northwest Reading Room (F) as seen from the Mezzanine
Second Floor Northeast Reading Room (G)
View of the Stack Room (I), located directly above the Theater’s backstage
View of the Second Floor Stacks (E) looking towards the Light Well (M)
Looking toward the Orange Stair (K) in the Second Floor Lobby (A)
13LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
The Second Floor can be accessed either by the Orange Stair
(K) or the Main Elevator (B). The elevator opens into a Second
Floor Lobby (A) which was where the original marble stair
formerly ended. Men’s and Women’s toilet rooms (C) are
located off the Lobby, but do not meet ADA requirements.
The Lobby opens into the Second Floor Reading Room (D).
In this room, the original upper skylight remains, but the
decorative stained glass of the lower layer was removed.
Similar to the First Floor skylight, the glass in this structure
is cracked and shows signs of leaks. A large bulkhead
was constructed in the center of the skylight below the
roof ridge to run ductwork through the space from the
Mechanical Attic. Windows in this room show similar signs
of deterioration as on the First Floor. Interior windows that
originally provided ventilation between this room and the
East Stacks have been infi lled.
The Northwest Reading Room (F) includes the construction
joint between the original building and the 1914 addition. At
this joint, there is water-related damage due to ice and snow
build up at the exterior fl ashing. This will need additional
investigation in order to verify the condition of the steel
supporting the roof. The columns and plaster detailing
of the original construction have either been removed or
covered over in both of these rooms.
In addition to the expansion of the Northwest Reading
Room, the 1914 addition included adding a new Northeast
Reading Room (G). The Northeast Reading Room includes a
Second Floor Mezzanine (N). This Mezzanine is not accessible
to persons with mobility disabilities, but has a standard fl oor
to ceiling height. In addition, the Second Floor Mezzanine
includes a room adjacent to the Light Well (M) that was
formerly comprised of structural stacks. The Reading Room
and the Mezzanine that encircles it still retains much of the
original detailing, although it is fairly simple in nature and
has been painted over.
To the east of the Northeast Reading Room, there is a tall
Stack Room (I) that is located directly above the Backstage
area of the Theater. There is access to the Theater’s back-
of-house stair from this room. The windows and corners of
this room also show water damage from a combination of
window failure and fl ashing failure at downspout locations.
Lecture Hall
The Library’s Second Floor Lecture Hall (J) is located above
the Lobby, accessed by the Orange Stair (K). This room
includes a tiered fl oor that is lowered to the middle to
form an amphitheater-like confi guration. In the 1970’s
renovations, the ceiling was lowered and an original balcony
removed. Windows on the north and south sides of the
room were infi lled. The walls along the north side of the
room feature heavy slate chalkboards while the rest of the
room has a carpet-like wall covering. The Lecture Hall is also
connected to the Theater’s Lobby Stair (L).
SECOND FLOOR.
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
Second Floor Second Floor Mezzanine
Key Plan : Second Floor
New Hazlett Theater
Former Library
A Second Floor LobbyB ElevatorC Toilet RoomsD Second Floor Reading RoomE Second Floor StacksF Northwest Reading RoomG Northeast Reading RoomH Plumbing & Circulation CoreI Stack Room (above Theater back stage)J Lecture Hall (above Second Floor Lobby)K Orange StairL StorageM Light Well (Exterior)N Second Floor MezzanineP North Stair Tower
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: Existing Uses
A
B
C
D E
FG
H
I
J
K
M
L
H
E
N
PP
14FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
AN
ALYSIS
The 1970’s renovation included the addition of elevator
service to the former Library and new egress stairs. As
previously mentioned, the original marble stair that
connected the First and Second Floors was removed and
a new Main Elevator installed connecting these two fl oors
with the Ground Floor. In addition, a library staff -only
Service Elevator was installed to connect the Library’s
portion of the Ground Floor with the upper two fl oors as
well as their mezzanines.
In the Clock Tower, the Trustees’ Room was removed in
order to install the Orange Stair, connecting the First Floor,
Second Floor, Lecture Hall, and Mechanical Attic.
A North Stair Tower was constructed in the former alley,
which provides egress from each level of the former
Library, including the Mezzanines. Neither the Service
Elevator, the North Stair Tower, nor the Main Elevator
provide access to the Lecture Hall or the Mechanical Attic.
These spaces are accessed by the Orange Stair.
VERTICAL CIRCULATION.
The Orange Stair, connecting the First and Second Floors, Lecture Hall, and Mechanical Attic
Currently, large sections of the building are not compliant
with the requirements of the Americans with Disabilities
Act (ADA). In the former library portion of the building
there is one accessible entrance, which enters into the
Ground Floor Senior Center and thus is only available
when the Senior Center is open. This entrance is
connected to an ADA-compliant elevator which was
installed in the 1970’s renovation. This elevator has
stops at the Ground, First and Second Floors. There is
no accessible route to the Lecture Hall, the First Floor
Mezzanine or the Second Floor Mezzanine. On the
Theater side of the building, there is an accessible route to
the entry lobby. The Theater’s Ground Floor and Rehearsal
Hall cannot be accessed except by stairs.
In the Plumbing and Circulation Core, the staff -
only Service Elevator does not meet general ADA
requirements, though with some updates, it may qualify
as a “Limited Use/Limited Application” for access to
mezzanines. In addition, Toilet Rooms throughout the
former Library building do not meet ADA requirements.
As spaces are remodeled, more portions of the
building can be made to be accessible and other ANSI
117-compliant upgrades can be made. An accessible
route to the library portion of the building should be
available at all hours.
ACCESSIBILITY.
View of the accessible entrance to the Ground Floor Senior Center
Stairs to the Mezzanines are not accessible
Emergency egress from the First and Second Floors and their Mezzanines and Second is pro-
vided by the North Stair Tower
View of a typical Toilet Room in the 1970’s era Plumbing & Circulation Core
View of the Main Entrance to the former Library, which is inac-cessible to persons with mobility disabilities
Throughout the former Library, toilet rooms do not meet stan-dards for ADA requirements, and will need to be upgraded.
15LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
A review of the Mechanical Systems was performed,
including reviews of the existing HVAC, Plumbing, Electrical,
Fire Protection, and Building Services. The detailed review
is included in the MEP Feasibility Review, provided as a
supplemental document to this report.
Some of the key fi ndings of this review include:
• The building is currently fed with NRG steam and chilled
water, which refl ects a substantially higher energy cost
than on-site heating and cooling plants would refl ect.
• After the lightning strike, the two large HVAC units
located in the Mechanical Loft of the Library building
were replaced as part of the repair work. The new
units are in excellent working order and can be readiliy
adapted to new space confi gurations within the
building.
• Existing HVAC units installed in the 1970’s renovations
are at the end of their lifespan and should be replaced,
including units serving Theater, Senior Center, and
Lecture Hall spaces.
• The HVAC controls for the building are currently
controlled via older pneumatic controls, which
are failing and require a substantial amount of
maintenance.
• Bathrooms throughout the building do not meet the
requirements of ADA and will require improvement
with any major renovation to the building.
• The Library building is mostly unsprinkled, with the
exception of the 1970’s plumbing and staff elevator
core. Any major renovations will trigger a requirement
for expansion of sprinkler systems to the other portions
of the building.
• The Electrical system is generally in good working
order, including the emergency power and lighting
systems. However, new space confi gurations and
tenant occupancies will likely require modifi cation to
distribution and confi gurations.
• The existing Fire Alarm system is not code compliant.
A major renovation will require that the system be
upgraded.
MECHANICAL SYSTEMS - EXISTING SYSTEMS.The Mechanical Attic is located at the top of the Orange
Stair. The Attic houses the two recently replaced HVAC
units that serve the Library. There is also ladder access into
the Clock Tower, where a third HVAC unit that serves the
Lecture Hall is located.
A narrow wrought iron stair leads up to the top of the
Tower, which stills houses the original clock and bell
mechanisms, although they are no longer operational.
MECHANICAL ATTIC.
View of the Mechanical Attic and the recently replaced HVAC units that replaced those damaged by the lightning strike. This equipment should provide adequate fl exibility and service for a variety of tenant options.
The former Library’s Fire Alarm system is antiquated and needs to be replaced.
The Clock Tower and equipment housed there is accessed from a ladder in the Mechanical Loft.
16FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
COD
E REVIEW
17LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
AN
ALYSIS
The Building Code Review, located in Appendix A of this
document, was completed using the 2009 International
Building Code (IBC) and the amendments to the 2006 IBC,
adopted by the City of Pittsburgh with an eff ective date
of January 1, 2010. The Chapter 34 Review (located in
Appendix A) is an evaluation of buildings’ safety features,
intended to permit the reuse of existing structures. The
Chapter 34 Summary establishes a matrix of compliance
alternatives that can be implemented in order for buildings
to meet the code’s safety standards.
With its recent renovations in 2006, the New Hazlett portion
of the building has obtained Occupancy Permits for its
current use and construction. On the Library’s side, no
Occupancy Permit exists, although signifi cant renovations
were completed in 1972.
Built as a library in 1890 and continuing as such until the
present, the Library is a legitimate use within its building.
Today’s classifi cation of a library use is A.3, Assembly. The
Senior Center on the Ground Floor, which is separated from
the First Floor by the 2-hour jack arch fl oor construction,
is also an A.3 use classifi cation. In the New Hazlett’s
occupancy permits and code review, the construction type
is listed as IIIB, so this is also applied to the Library portion
of the building. Type III construction is that in which the
exterior walls are of non-combustible materials and the
interior building elements are of any material permitted by
the IBC (2009 International Building Code, Chapter 6). The
designation refers to an unprotected structural frame.
Generally, the masonry bearing-wall structure, with jack-arch
fl oor framing, and roof framing 20’ above the Second Floor,
meets fi re protection requirements for IIIB.
The approach of this review was to assess “As Is” conditions
with regard to Chapter 34 of the 2009 IBC (now identical
to Chapter 13 of the International Existing Building Code -
IEBC) and determine measures that can be taken to meet
mandatory standards for compliance. The “As Is” evaluation is
made with a strict eye. The existing building is evaluated in a
number of Safety Parameters, with Safety Scores developed
in the following categories: Fire Safety (FS), Means of Egress
(ME), and General Safety (GS). The Actual Score, which totals
these categories across all the Safety Parameters, indicates
the existing degree of compliance of the building in each
Safety Score, which can then be evaluated against the
building’s Mandatory Score under the 2009 IBC.
At fi rst glance, compliance for the former Library building
appears insurmountable with Safety Score deviations
ranging from 27.7 to 32.5 points. In fact, the defi ciencies
are few and there are a number of readily accomplished
corrections which change the Safety Scores substantially.
In the Chapter 34 Review, potential Corrective Measures
are indicated and new Safety Scores for compliance are
calculated based on those measures.
For example, the building scores -5 for Vertical Openings in
the “As Is” tally, although the only violation is the absence
of doors on the Orange Stair. Adding these doors changes
the score from -5 to +5. Likewise, there are minor, readily
rectifi ed instances where Tenant Separations are missing.
Highlighted are selected modifi cations that can meet the
mandatory minimum score.
The recommended strategy for the building overall is to
make application for an A.3 Occupancy Permit when the
fi rst renovation project becomes a reality. At that time,
application would be made both for the new use portion
and for the former Library use in the remainder, using
compliance with Chapter 34 as the basis for the Occupancy
Permit.
BUILDING CODE OVERVIEW.
18FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
Catalyzed by the Charm Bracelet Project and the energy
of the arts and community organizations in the Northside
neighborhoods, the Project Committee collaborated to
explore a programmatic focus for the adaptive reuse of the
former Carnegie Free Library building. After evaluating the
character and quality of the spaces of the former Library, the
Project Committee notes that the building is an appropriate
home for two to three signifi cant anchor tenants. In
addition, there are opportunities within the building for the
New Hazlett Theater to expand its program and increase its
capacity.
The new anchoring tenants would share circulation through
the original Lobby spaces of the building and would be
provided with emergency egress from the North Stair
Tower. On the First Floor, the North Reading Room, East
Stack Room, Structural Stacks, and Offi ces would provide
approximately 7200 square feet of tenant space, with an
additional 1350 square feet provided by the Mezzanine. On
the opposite side of the Lobby, the Children’s Reading Room
could be adapted to function as a black-box performance
space connected to the New Hazlett Theater. The Main
Lobby would function as a shared circulation space, and
could house a gallery or public access coff ee shop. On the
Second Floor, the Second Floor Reading Room, Second
Floor North Reading Room, and the Stacks would provide
an anchoring tenant with up to 8200 square feet, with an
additional 2400 square feet provided on the Second Floor
Mezzanine level.
Possibilities for the types of tenants and uses are varied, with
key criteria for their evaluation as follows:
1. Identify a landmark entity to occupy the building
that is refl ective of the cultural and historical
signifi cance of the historic Library Building. As one
of the major landmarks of both Allegheny City and the
Carnegie Library system, the former Library building
embodies signifi cant symbolism within the greater
Pittsburgh community. Anchoring tenants (or the
building management entity), should be ones which
are refl ective of this import and maintain a visible role
within the community at large.
2. Maintain a level of public access to the former
Library that is refl ective of the original role of the
building within the community. Public access to the
former Library can be achieved through development
of the tenant mix, and by developing the First Floor
Lobby and Delivery Room as shared circulation space
that can be accessed by the public. This area of the First
Floor may be opened to the public on a limited basis,
such as when public events are being held, or may be
developed as regularly used community space, with
such functions as wifi -access, coff ee shop, or gallery
space, depending upon the overall occupancy of the
building.
3. Identify potential uses that will enhance the role
of the former Library as a public resource. Such
tenants may include groups that provide classes and
workshops, including dance, yoga, theater, visual
arts, digital media, and others. By partnering with the
Charm Bracelet Project partners and supporting the
space needs of these existing organizations and other
projects sponsored by the Charm Bracelet Project, the
former Library can reinforce its role as a cultural anchor
within the community. On a larger scale, opportunities
such as a non-traditional school could establish a new
community for the building and the Northside as a
whole.
4. On the First Floor, one option is to look for
tenant opportunities that make use of the
VISION FOR THE ADAPTIVE RE-USE OF THE FORMER CARNEGIE FREE LIBRARY.
BUILD
ING
PROG
RAM
19LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BUILD
ING
PROG
RAM
Structural Stacks while supporting the desire for
a signifi cant publicly-oriented use. Should the
Structural Stacks stay in place, their best use would be
to support an archive or other use that has extensive
storage requirements, but can also take advantage of
the public nature of the First Floor spaces. One concept
that has been discussed is the idea of an Arts Archive,
which could both provide archival functions and
public access to documentation, including historical
footage, recordings and objects. Such a use could
include collections from the Andy Warhol Museum and
other Pittsburgh-based arts organizations, as well as
documentation of local performances by national and
international artists. Alternate archival use strategies
should also be explored.
5. Should the reuse of the Structural Stacks on the
First Floor prove to be unfeasible, look at alternate
space confi gurations and tenant mixes that are
supportive of both community access to the former
Library and the other tenant uses. Potential use
options may include: an additional small Performance
Venue, including back stage space; additional rehearsal
studios available for rental; or a signifi cant single tenant
presence, such as open offi ce space for a landmark
tenant.
6. On the Second Floor, identify potential tenants
who can take advantage of the character and
organization of the interior spaces of the building,
while continuing to enhance the creative nature
of the tenant mix. Such tenants may include: dance or
theater companies; a multi-media company; a collective
of smaller non-profi t and for-profi t organizations, such
as Charm Bracelet Project partners, arts groups, graphic
design fi rms, lighting designers, costume designers,
or other businesses where an open plan environment
supports the nature of the work.
7. Support the current occupancy of the building
by the New Hazlett Theater by identifying
opportunities to enhance and expand the New
Hazlett Theater’s existing programming and
mission. The New Hazlett Theater is regularly booked
to capacity, and could easily expand its programming
to support a new 80 seat venue, as well as a supportive
Studio that can be rented to dance and theater groups.
Such uses would further expand the public character
of the facility, and would enhance the existing suite of
performance related spaces.
8. Identify needs for shared facilities within the
greater Pittsburgh community that could be
accommodated within the building to develop a
lending library of spaces. Multiple organizations,
including both for-profi t and non-profi t, have expressed
interest in being able to rent classroom and other
spaces in conjunction with the Theater. In addition,
the New Hazlett Theater has been approached by
conference organizers who are interested in hosting
small to mid-sized events in the facility. The creation
of four to fi ve meeting/classroom spaces, used in
combination with the ability to host large presentations
in the Main Theater, would support this rental scenario
and would enhance the facility’s fi nancial feasibility.
These classroom/meeting room spaces could also be
used to support programming by Citiparks, community
organizations, and any new tenants in the building.
Additional types of spaces, such as community kitchens
that can be rented for cooking classes or small scale
commercial food production, should also be considered
in the overall planning of the facility.
9. Support the new mix of uses by enhancing the
existing Recording Studio and making it an
attractive resource for potential tenants and short-
term users. By relocating and expanding the capacity
of the Recording Studio, supportive documentation
could be provided for performances, rehearsals, and
events located throughout the building. Theater,
studio, and meeting spaces throughout the building
would be wired to accommodate video and audio
feeds to the Recording Studio, allowing high-quality
documentation to be produced in-house. This would
be an attractive off ering for conferences, theater
groups, musicians, and others, and can provide an
additional revenue stream for the Theater and its
partners.
10. Provide and enhance spaces to support the
Citiparks programs, including the Senior Center
and Roving Art Cart. The creation of new offi ce and
storage space, along with a shop for building props,
could allow the consolidation of several existing
Citiparks’ facilities that currently serve the Roving Art
Cart. Citiparks’ classes and its other activities could
make use of shared meeting spaces and studios
throughout the building, and additional synergies
could be developed with the Senior Center.
11. Create a building management mechanism that
provides the required support and upkeep of the
facility, while allowing the building’s tenants
to focus on their organizational missions. The
reuse of the former Library will require a dedicated
management apparatus that will be charged with
fund-raising for building upgrades, marketing of tenant
spaces, and responding to the day to day operational
requirements of a facility of this scale. This task will
also include working with the City of Pittsburgh to
develop a long-term lease agreement and strategy for
overall building improvements. In order to achieve the
Re-Envisioned Library, it will be necessary to have a
dedicated individual or team to manage the project. At
this time, the New Hazlett Theater, Children’s Museum
of Pittsburgh, and Andy Warhol Museum have agreed
to study this mechanism further.
12. Explore opportunities to develop long-term energy
strategies that take advantage of emerging green
technologies. The existing Library and Theater
facilities have high energy costs which may be reduced
through the introduction of heat recovery and
geothermal technologies. A move to sustainable green
energy will benefi t the marketing of the facility to new
tenants and will dramatically reduce the operational
costs of the building, while having a positive impact on
the environment overall.
What follows is a fl oor-by-fl oor summary of how these
programmatic recommendations can be incorporated into
the building.
One face of the Clock Tower continued to keep time up until the lightning strike.
bottom: A view of “The Reader”, a portion of the Colonel Anderson memo-rial located across from the Entrance to the former Library.
The memorial is dedicated to the man who inspired Andrew Carnegie to begin the Carnegie Library system.
20FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
BUILD
ING
PROG
RAM
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
A
B
C
D D D
D D
E
F F
G
H
K
K
J
I
L
Ground FloorN
M
M
P
GROUND FLOOR PROGRAM
21LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BUILD
ING
PROG
RAM
The proposed organization for the Ground Floor is
structured around several goals:
• Provide a welcoming accessible entrance that provides
full access to the Main Elevator and the upper fl oors of
the building.
• Provide “addresses” for Ground Floor tenants that will
enhance the usefulness of the spaces.
• Provide formal separation of the Theater and former
Library buildings in order to address building code and
mechanical issues.
CIRCULATION.In order to provide an accessible entry route and access to
the elevator for all of the tenants in the former library spaces,
it is recommended that a new public Elevator Lobby (B) be
created on the Ground Floor. In addition, a new corridor (M)
would connect this Lobby to the Loading Dock (I) at the rear
of the building. New addresses for the Ground Floor tenants
can be created along this new corridor.
SENIOR CENTER & CITPARKS.With the vacancy created by the Library, the Ground Floor
may be able to provide a new home for the Citiparks Roving
Art Cart program, including offi ce, workshop, and storage
space. With access to the Loading Dock available through
the proposed circulation plan, regularly occupied spaces
(such as offi ce and workshop - F) may be located along the
windowed perimeter, while storage for tents, supplies and
other equipment (G) would be provided on the interior of
the fl oor plan. In addition, should the structural stacks in the
north-west corner of the former Library remain in place, they
could provide additional storage shelving for related art
supplies and materials.
To meet code requirements for occupancy, a 2-hour
separation is required between diff erent uses. On the
Ground Floor, a solution to this could be to devote the entire
west side of the building to joint use by the City’s Senior
Center and Citiparks Roving Art Cart program. It could be
possible to more eff ectively use the Ground Floor spaces,
with children’s activities being scheduled at times when the
Senior Center is not open or for specifi c joint senior/junior
programs to be created.
RECORDING STUDIO.It is proposed that the Recording Studios be relocated to
renovated space directly below the NHT lobby (H). This
location will assist to consolidate NHT related uses within
the Theater’s footprint. The Recording Studio will be in
close proximity to the rehearsal and theater spaces, where
the majority of recording will take place. In addition, an
existing exterior door on the east face of the building will
provide direct access to the space for tenants and clients.
The Recording Studio would be directly connected to the
theater’s basement and internal vertical circulation. The
scale of the existing rooms in this area of the Ground Floor,
as well as its isolation from other uses and massive masonry
wall construction, lends itself to developing a series of
isolation studios for recording.
CONFERENCE & MEETING ROOMS.In the event of a relocation of the Senior Center, the existing
rooms on the Ground Floor may be adapted to provide a
variety of meeting/multi-purpose room sizes, ranging from
400 to 650 square feet (D). These spaces would be used
to support break-out sessions and small meetings for a
conference and could also be used for other rentals, such as
classes and workshops.
BUILDING SUPPORT SPACES.In addition to the new tenant spaces, recommended
reconfi guration of the Ground Floor will provide the
opportunity to create centrally located toilet facilities (E) to
support new uses throughout the building. These facilities
will be fully accessible and will replace the non-accessible
toilet rooms currently located on the First Floor, adjacent to
the Lobby.
The existing Ground Floor Pump and Mechanical Rooms (K)
will be reused for new equipment. Additional storage for
building services, such as snow removal equipment, trash
and recycling storage, and grounds-keeping supplies, will be
provided on the Ground Floor (P).
Key Plan : Ground Floor
Horizontal Circulation
Vertical Circulation
Ground Floor Tenant 1
Ground Floor Tenant 2
Recording Studio
A Accessible EntranceB New Elevator LobbyC New StairD Classroom / Meeting RoomE Toilet RoomsF Perimeter Offi ces or WorkshopG Interior Workshop or StorageH Relocated Recording StudioI Loading DockJ New ElevatorK Mechanical RoomsL Plumbing & Circulation CoreM New CorridorN North Stair TowerP Building Storage
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
22FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
BUILD
ING
PROG
RAM
First Floor Mezzanine : with Structural StacksSingle Tenant Scenario
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
A B
F
C
D
J
E
G
H
G
G
K
I
H
M
H
L
N N
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
H
H
G
First Floor : with Structural StacksSingle Tenant Scenario
First Floor Mezzanine : without Structural StacksTwo Tenant Scenario
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options
A B
F
C
D
J
E
Q
P
P
C
K
I
Q
M
L
N N
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options
G
First Floor : without Structural StacksTwo Tenant Scenario
RR
R
S
S
R
S
S
FIRST FLOOR PROGRAM
23LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BUILD
ING
PROG
RAM
NEW HAZLETT THEATER EXPANSION OF PROGRAMS. The New Hazlett Theater has expressed interest in expanding their programs to include a new 80 seat black-box theater (E). A theater space of this scale could be readily located in the former Children’s Reading Room and be served by the New Hazlett’s lobby spaces (K). Patrons of the new theater space would enter from the New Hazlett’s lobby through a newly created corridor (L). A new wall and entrance to the 80-seat theater would be constructed between the Children’s Reading Room and the original Delivery Room. In the future, if the option to provide a new elevator (M) is pursued, the existing Men’s Toilet would be reconfi gured to serve as a new offi ce (D) for the Theater, with the original windows to the light well reopened.
FIRST FLOOR CIRCULATION.In the re-envisioned space, the original Library Lobby (B) and former Delivery Room (now designated “Lobby / Open Gallery”, C) will serve as primary public circulation into the building. On this level, access to the ADA elevator is provided, and new addresses are created for First Floor tenants and the new 80-seat performance space (E) in the former Children’s Reading Room. The Lobby and Open Galleries will serve as common building space. The existing New Hazlett Theater lobby (K) will be connected to the Delivery Room via a new corridor (L) and fi re door, located at the existing library Women’s Room. This will allow operation of the new performance venue by the New Hazlett and give access to the theater’s existing toilet rooms (N) and other services that currently serve theater patrons.
The First Floor Mezzanine will be included in the First Floor Tenant space and will be accessed from that space via its existing stair and secondary elevator. If required, a lift may be installed to provide complete accessibility to the First Floor Mezzanine. Both the First Floor and First Floor Mezzanine will continue to be served by the existing North Stair Tower (S).
The scale of the new Lobbies and Galleries may provide an opportunity for use for community events and meetings, as well as pre-function space for performance events. It might include coff ee cart and lounge furnishings or remain open as gallery space. It is further recommended that interior restoration and preservation eff orts be focused on these two areas. If historic fabric remains here, it may present an opportunity to restore a portion of the public space to refl ect its original grandeur.
Due to the nature of the former Library spaces and the lack of corridors between the rooms, circulation from tenant spaces will be created through galleries and lobbies (C). In a multi-tenant scenario (as illustrated in the plans labeled “Without Structural Stacks”, this organization will create the required two means of egress for each tenant.
STACKS OR NO STACKS.As discussed under Existing Conditions, the book stacks located on the west side of the First Floor are Structural Stacks (H) with fl oors integral to the system. Should a user be identifi ed which requires storage, such as an archive function, the shelving could remain in place. However, should the shelving not be required, the shelving (or portion of the shelving) may be dismantled to create 1-1/2 story spaces appropriate for studios, rehearsal halls or open offi ce. Of further note, if the structural shelving system in the northwest corner were dismantled, it would require the addition of a new fl oor structure between the Ground Floor and First Floor, as the structural stacks extend into the Ground Floor.
TENANT OPTIONS.As indicated previously, the confi guration of the former Library spaces presents a challenge to the creation of multiple tenant addresses; in order to accommodate multiple tenants, large portions of the fl oor plan are needed to provide circulation and address egress requirements. In order to maximize the rentable square footage of the First Floor, it would be most desirable to identify one anchoring tenant to occupy the spaces to the north of the Lobby. Should one tenant not prove feasible, it would be possible to create two smaller tenant space with access through connected galleries (C).
The proportion and connection of the spaces lend themselves to the creation of open plan offi ces, studios, and rehearsal halls. The opportunity exists for these to be occupied by private tenants or to create studios that can be rented by a variety of organizations. In addition, should the desire for additional performance space arise, a second black-box theater or fl ex performance space could be created (Q). The confi guration of this space would allow a back stage and storage area to be developed as well.
One programmatic idea that was discussed by the Project Committee is the creation of an Arts Archive, with the purpose of housing documentation from artists and organizations throughout Western Pennsylvania. Such an archive would also provide opportunities for the public to interact with the archival materials. The concept of
developing an Arts Archive in the former Carnegie Free Library building is compelling in many ways. To begin with, the Archive mission is similar to that of the original library - to provide free public access to information. Further, creating an Arts Archive would ensure continuing public use of a facility that was given to the people of Allegheny City over 100 years ago. The original spaces of the fi rst fl oor – reading rooms, stack rooms and offi ces – translate well into a plan for an archive that might include materials storage, gallery display space, individual and small group viewing rooms, access to digital materials via computer stations, and administrative offi ces. In order to develop this idea further and review its feasibility, the concept will require a champion to lead the way working with local institutions, such as the Carnegie Museums, and to identify potential funding for both the exploratory and implementation phases.
The Plumbing and Circulation Core (R) will require reconfi guration in order to create accessible toilet rooms to serve the tenant spaces. Additional toilet facilities would be located on the Ground Floor and Second Floor.
Key Plan : First Floor & First Floor Mezzanine
Horizontal Circulation
Vertical Circulation
Theater Use
First Floor Tenant 1
First Floor Tenant 2
A Main EntranceB LobbyC Lobby / Open GalleryD Offi ce (NHT)E New Performance SpaceF Orange Stair (Existing)G Open Offi ce or GalleryH Structural StacksI Light WellJ Theater (Existing)K Theater LobbyL New CorridorM New ElevatorN Theater Toilet RoomsP Studio or Open Offi ceQ Performance, Flex or Open Offi ce SpaceR Plumbing & Circulation CoreS North Stair Tower
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
24FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
BUILD
ING
PROG
RAM
Second Floor Mezzanine
STOR. STOR.
00 5 10 15 20 FT
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
AB
C
E
E
C
I
GF
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
C
Second Floor
CC
D
I
H
J
K
K
SECOND FLOOR PROGRAM
25LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
BUILD
ING
PROG
RAM
The proposed Second Floor is organized to provide an opportunity for a large tenant occupancy that could be comprised of a single organization or a collaboration between smaller groups sharing resources. It is highly desirable to maintain and enhance the grand scale of the original Reading Room spaces, which provide opportunities for collaborative uses, including studios and open offi ces.
TENANT OPTIONS.The Second Floor tenant space represents over 12,000 square feet of space, much of which is sky-lit double-height space. Due to the sequential confi guration of the space and egress requirements, it will be necessary for this space to be occupied by a single tenant. Such a tenant could be a single organization, or could be a collaboration of smaller groups sharing resources such as offi ces, meeting rooms, and business support services.
There are multiple opportunities for the types of the tenants appropriate to this space. Within the arts community, occupancy could include a dance or theater company or multi-media production company that could make use of the ample ceiling space for lighting, settings, and other rigging. The lower-ceiling spaces of the mezzanine can be utilized for more intimate offi ce and support spaces. The space could be used by a collaboration of more than one organization, with space for studios and shared offi ce resources, and might also include offi ce space for other collaborators, such as lighting and costuming artists and designers.
Alternatively, an offi ce use that is supported by an open plan work environment would be an appropriate fi t for the space. This might include a variety of businesses that would complement the overall tenant mix of the building.
LECTURE HALL REUSE.The plan for the re-envisioned space includes the reuse of the existing Lecture Hall as a Studio (E) for the New Hazlett Theater and that would be available for rental. With the addition of a simple sprung fl oor in lieu of the existing tiered fl oor, the size of this space lends itself well to a variety types of classes, including dance and yoga. Future renovation plans should consider restoring the windows and the vaulted ceiling of the room in order to introduce light and air.
SECOND FLOOR CIRCULATION.As discussed previously, the sequential confi guration of spaces on the Second Floor and the egress confi guration requires that the majority of the fl oor plan be occupied by a
single tenant. The Second Floor will continue to be served by the primary ADA elevator and the existing Orange Stair (J). A common Lobby (A) on the Second Floor will have an address to Second Floor tenant space and renovated toilet rooms (B). The Second Floor Mezzanine will be accessed from the existing stairs and Limited Use elevator (I) that are internal to the Second Floor tenant space. Both the Second Floor and Second Floor Mezzanine will continue to be served by the existing North Stair Tower (K).
In order to provide full accessibility to the both the existing Rehearsal Studio (F) and the new Studio (E) located in the former Lecture Hall, it recommended that a new elevator (G) be installed in the stack currently occupied by the New Hazlett Theater’s offi ces and coat room. In addition, a new stair from the Rehearsal Hall will be required to meet IBC 2009. In the short term, however, access to the new Studio may be provided by the installation of a stair-mounted lift on the Orange Stair, providing access from the Second Floor elevator lobby (A).
Key Plan : First Floor & First Floor Mezzanine
Horizontal Circulation
Vertical Circulation
Theater Use
Second Floor Tenant 1
A Elevator LobbyB Toilet RoomsC Open Offi ce or GalleryD Offi ce or Additional Theater BackstageE New Studio (NHT)F Existing Rehearsal Studio (NHT)G New ElevatorH Offi ce or MeetingI Plumbing & Circulation CoreJ Orange StairK North Stair Tower
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
NEW HAZLETT THEATER/ ALLEGHENY LIBRARY BUILDING USE STUDY: New Use Options WITH STACKS
26FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
27LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
RECOM
MEN
DATIO
NS
Following are recommendations for work related to preserving the historic
Carnegie Free Library building, located at Allegheny Center in Pittsburgh’s
historic Northside. This document is intended to serve as an appendix to the
full Re-Use Study for the Former Carnegie Library Building, and should be
consulted in conjunction with that document, which includes Background,
Existing Conditions Analysis, and Programmatic Recommendations.
Recommended building improvements are divided into “Immediate”, “Short
Term” and “Long Term” categories. This phasing is anticipated to meet
available resources and mesh with ongoing programming eff orts. Immediate
measures are those that can and should be done this summer. Short Term
projects are those currently under consideration for implementation
following December 2010, when Carnegie Library of Pittsburgh leaves
the building, although replacement of air handling equipment could be
completed sooner. The Long Term category involves improvements both to
the building envelope and interior, related to preservation, long term goals of
sustainability and creation of a dynamic, enduring, Northside amenity.
The cost estimates presented here are refl ective of assumptions made
regarding the preliminary programming and occupancy of the former Library
building. It is recommended that additional cost estimates be prepared
at diff erent stages in the design process in order to refl ect changes made
to both the program and the additional detail that will be available to an
estimator as the design progresses.
OVERVIEW.
FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
RECOM
MEN
DATIO
NS
28
29LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
RECOM
MEN
DATIO
NS
IMMEDIATE PROJECTS.
Remedial actions listed in this category are intended
to correct dire current problems, the results of water
infi ltration and rampant utility costs. In regard to water
infi ltration, these steps are essential to preventing further
interior damage and should be completed prior to the
Library’s repair of interior plaster. Recognizing the limited
budget for this work, only minimum required scopes are
listed. In regard to mechanical system controls, the new
controls should be implemented as soon as possible
to reduce logistical and cost problems with the current
systems.
Presently, the building’s air handlers are controlled
with older pneumatic controls, which are failing and
are requiring a substantial amount of maintenance. It
is recommended that a new digital control system be
provided for the building. This will reduce operating
cost through better time scheduling of the building;
reduce operating cost through better control of night
setback temperatures; provide better visibility from
a maintenance perspective; and will enable trending
capabilities to review and learn how the users are using
the building to allow for adjustment in systems to better
serve occupants.
Specifi c scopes of work include:
Water Infi ltration
• Add roof drains to central light well roof and add
interior rain leaders, or directly boot downspouts to
drains
• Repair fl ashing and scuppers at northwest corners
• Point stone at lintels where interior water damage is
evident
• Caulk windows
Mechanical System Controls
• Provide new digital controls for all air handling units
View of the Light Well roof; new roof drains are required to prevent further fl ooding
Interior damage caused by failing fl ashings and scuppers
Interior damage caused by failing windows and the lack of thermal break in the system
30FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
RECOM
MEN
DATIO
NS
00 5 10 15 20 FT
A
B
D
C
Short Term Projects : Ground Floor
E
31LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
RECOM
MEN
DATIO
NS
SHORT TERM PROJECTS.1. CHAPTER 34 COMPLIANCEThe Chapter 34 Compliance improvements are those
which are required for code compliance under IBC
Chapter 34 Compliance Alternatives for existing
buildings (reference the Chapter 34 tallies “As Is” and “For
Compliance” included in the Appendices). At such time
as any new projects and/or change of occupancy occur
within the former library space, an application would
be made for the entire building to obtain an Occupancy
Permit. This will set the stage for smaller portions of
the building to be upgraded as individual projects. This
strategy, as well as the Code Review and Chapter 34 Tally
have been reviewed by and are on fi le with the Bureau of
Building Inspection.
In the Chapter 34 tally, not all, but rather selected
remediation will meet the minimum standards. Readily
accomplished steps follow.
Chapter 34 Improvements
• Complete the 2 hour separation between Library
and Theater where it is not intact:
Between the Recording Studio and adjacent corridor
At Corridor 125, between the Theater & Library
• Make sure tenant separations are complete at the
Senior Center
• Compartmentalize the library side of the building
into fi re areas less than 7,500 square feet
• Install 1 ½ hour doors on the orange stair
• Provide recall in the main elevator and make
signage updates in the elevators
• Test/Repair/Replace existing duct smoke detectors
To create an accessible route into to the former library
side of the building:
• Provide a public-access elevator lobby on the
Ground Floor
2. REPLACE NEW HAZLETT THEATER AIR HANDLERSAHU-6 and AHU-7 , which serve the Hazlett Theater, were
installed in the early 1970’s and are well past the end of
its useful life. Due to their age, these units should be
replaced.
3. CITIPARKS REMODELING ON GROUND FLOORAmong the fi rst projects discussed for the former Library
building is the expansion of Citiparks’ facilities on the
Ground Floor. At this time, the program for the Citiparks’
facilities has not been discussed in detail; additional
programming for this space will be required. However, in
order to develop some preliminary budget numbers for
the project, initial assumptions about the scope of work
were made.
Ground Floor Improvements
• Relocate the existing Recording Studio to the
Ground Floor of the Theater building, below the
Theater lobby
• Interior remodeling for former Library Ground Floor
for Citiparks Roving Art Cart and Senior Center
• Complete tenant separation between Ground Floor
of former Library and Ground Floor of Theater
The Orange Stair will require new fi re doors to be installed at the First Floor.
A view down the corridor in the Ground Floor of the Theater. The stone foundation wall on the left is the line of fi re separa-
tion between the Theater and the Library.
Key Plans : Short Term Projects
Horizontal Circulation
Vertical Circulation
Citiparks
New Hazlett Theater
A Accessible EntranceB Elevator LobbyC Plumbing & Circulation CoreD North Stair TowerE Loading Dock
32FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
RECOM
MEN
DATIO
NS
00 5 10 15 20 FT
A
B
C
D
E
F
B
CH
G
Short Term Projects : First Floor
Short Term Projects : Second Floor
33LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
RECOM
MEN
DATIO
NS
Short term tenant improvements will include plans for the reuse of the former Children’s Room and
Lecture Hall for performance and studio space
4. EXPAND NEW HAZLETT THEATER INTO CHILDREN’S READING ROOM & LECTURE HALL
Among the fi rst projects that have been discussed are the
expansion of the New Hazlett Theater into the Children’s
Reading Room and Lecture Hall. The scope being studied
for NHT includes creating a new opening from the
Theater Lobby to the Library Lobby and remodeling the
Children’s Reading Room into an 80-seat performance
space. Above, the Lecture Hall would be remodeled to
become a fl at-fl oor studio, for dance or other classes.
The approach recommended for this NHT remodeling
project is to create these new spaces with minimal
expense yet enable their occupancy. Infrastructure,
lighting, acoustic and code issues will be addressed.
Appropriate performance fl oors will be installed. Neither
historic remodeling of the Lobby, nor the Lecture Hall
ceiling, is not included in the scope listed below.
New Performance Space
• Demolish existing library toilet room to create a
new opening between Hazlett and Library lobbies.
Provide 1 1/2 hour doors.
• Provide new acoustic infi ll and doors at the three
entry bays to the Children’s Reading Room
• Remove existing lights and install new house lights
• Install circuits for and hang new lighting grid
(fi xtures by NHT)
• Install performance fl oor
• Paint
• Provide an allowance for fi t-out and for curtains to
cover existing walls
Lecture Hall
• Demo existing stepped fl oor.
• Install new raised fl oor with performance fl ooring
• Install wheelchair lift on existing orange stair
• Paint
• Provide an allowance for fi t-out and for curtains to
cover existing walls
Key Plans : Short Term Projects
Horizontal Circulation
Vertical Circulation
Citiparks
New Hazlett Theater
A Main EntranceB Elevator LobbyC Orange StairD Lobby / GalleryE New Performance Space (NHT)F New CorridorG Lecture Hall / New Rehearsal Studio (NHT)H Existing Rehearsal Studio (NHT)
Library Lobby
• Clean-up, cosmetic improvements
Mechanical-Electrical-Plumbing Systems (MEP)
• Replace existing Lecture Hall air handler with new
unit to serve both Lecture Hall and Performance
Space. New ductwork for both spaces to be located
in the raised fl oor in the Lecture Hall.
• New electric panel and circuits to serve both rooms
• Improve electrical distribution within both rooms,
enable musical performances
• Link spaces to Recording Studios
• Install sprinklers in fi rst (in raised fl oor) and second
fl oor ceilings (in dropped ceiling)
34FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
RECOM
MEN
DATIO
NS
35LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
RECOM
MEN
DATIO
NS
LONG TERM PROJECTS.
The long term vision for the re-use of the former Carnegie
Library building will continue to evolve as potential uses
and tenants are explored. These uses will be evaluated
through the lens of the twelve goals for the Building
Program, described on pages 18 and 19 of this document,
and the fi nal tenant mix will determine many of the long
term improvements that will be required. In addition to
these tenant improvements, there are a number of long
term projects that will need to be undertaken in order to
preserve this historic landmark.
First, and perhaps foremost on this list, the remaining
water infi ltration issues must be corrected. And in order
to create a sustainable, effi ciently-operated building, the
building’s envelope and central mechanical systems must
be improved.
Improvement of the building envelope to meet modern
standards for energy use, combined with a long term
strategy for mechanical systems are, ultimately, strategies
for preserving resources as well as expenses – a new
paradigm for City-owned buildings. To improve the
building envelope, window replacement and insulation
for walls and ceilings are the largest components. Several
safety-related upgrades should also be considered. To
improve central mechanical equipment, geothermal
wells are proposed for heating and cooling, along with
replacement of ineffi cient air handling units. These can
work with existing piping and ductwork. Other central
mechanical systems will need to be improved as well.
• Insulate exterior walls, R19 minimum
• Insulate ceilings, R30 minimum
• Replace windows with thermally broken frames,
insulated glass
• Return windows to the Lecture Hall
• Remodel the Orange Stair to go to the Ground Floor,
create a proper exit directly to grade
• Enclose elevator lobbies
• Add elevator Phase I and II recall, upgrade to new
construction standards
• Improve trunk electrical distribution/panels
• Replace out-dated air handling units
• Install a central heat-recovery cooling tower
• Drill geothermal wells
• Reglaze existing skylights
• Install new elevator to Rehearsal and Lecture Hall
Remaining water infi ltration issues include those at the
East Entry terrace. This deterioration has been ongoing
for many years, rendering the rooms below hazardous. To
fi x this, the terrace requires signifi cant work. In addition,
proactive measures need to be taken at the northwest
corner of the building, where existing grading causes
water to enter Ground Floor windows.
• Rebuild and waterproof the East Entrance Terrace
• Install trench drains at the north and northwest
foundation walls
Long term tenant improvements will need to be
established once the program, building management
and funding are fi nalized. The overall scope of this work
will include all of the restoration and remodeling to suit
tenant layouts, as well as branch infrastructure, such as
duct-work, sprinklers where required, plumbing, electrical
and tele/data wiring. To meet accessibility requirements,
ADA-compliant toilets will be required throughout, while
Mezzanines may need to be made accessible, depending
on the occupancy strategy.
Without specifi c program requirements established
for the First and Second Floor tenant spaces, the scope
of work and its associated costs are based on per
square foot cost assumptions. These costs will need to
be evaluated in greater detail with potential tenants
and in conjunction with Building and Plumbing Code
requirements that may be triggered by their occupancy.
It has been noted that a working clock tower signifi es that
the building is alive and vibrant. If a donor could be found,
repair and maintenance of the tower would serve as a
symbol of community revitalization and growth throughout
Pittsburgh and the region as a whole.
AND SOMEDAY...
36FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
RECOM
MEN
DATIO
NS
37LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS
CONSULTING, LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
CON
CLUSIO
N &
NEXT STEPS
CONCLUSION & NEXT STEPS.
The former Carnegie Free Library building is a powerful
symbol of community spirit and the enduring role that
the Carnegie name has played in shaping the Pittsburgh
region. The building and the story of the Carnegie Library
has long been an emblem of public-private cooperation,
as well as the ability of private enterprise to strengthen
communities and have positive impacts on the lives
of the citizens. Today, the opportunity to continue to
reinvent the building in the tradition of this legacy
presents itself. The vision for the reinvented Library is one
that brings together public activities, private enterprise,
and creates a dynamic space that can serve as a model for
the sustainable reuse of such historic structures.
Embarking on the next steps towards realizing the vision
for the reinvented Library, two parallel action plans will
be developed: one to address the Immediate and Short
Term Improvements, and one to address the overall
Vision for the former Library and the required Long Term
Improvements.
The fi rst step of realizing the overall Vision for the Library
will be to identify an appropriate steward for the building.
The New Hazlett Theater, Children’s Museum and Andy
Warhol Museum will work together to establish a
management entity for the former library. It is envisioned
that this management entity will solicit funding for
building improvements, seek appropriate tenants, and
provide ongoing stewardship. A leasing agreement with
the City of Pittsburgh will need to be established which
clearly defi nes the roles of the City and the management
entity within the former Library, as well as each agency’s
limits of authority. The management entity will be
charged with developing an implementation plan
for the required capital investments into the building
(as identifi ed in the Long Term Improvements), and
developing a marketing strategy to bring new tenants to
the facility.
Parallel with the development of the management
entity, work must begin on the Immediate and Short
Term Improvements. The Immediate Improvements
will provide stop-gap measures to reduce any further
deterioration of the facility and to reduce the overall
energy consumption. Both components are critical for
maintaining the viability of existing uses within the
building.
Within the Short Term Improvements, which includes the
Chapter 34 Compliance Measures, Replacing Theater Air
Handlers, Citiparks Remodeling on the Ground Floor, and
Expansion of the New Hazlett Theater into the Children’s
Reading Room and the Lecture Hall, planning, design,
and engineering should be undertaken in order begin to
develop complete design and construction documents
and identify sources for required funds to complete
these projects. Further consultation with Citiparks related
to their space planning requirements will also need to
be undertaken, and schematic layouts for the Ground
Floor Citiparks uses and relocated Recording Studio will
be developed. Design documents for the expansion of
the NHT into the Children’s Room and Lecture Hall will
be required and will need approval by the Bureau of
Building Inspection prior to the start of any associated
construction.
Fulfi llment of the vision for the reinvented Library will be
a multi-phase process, and will be an on-going process
throughout the life of the building. By creating an
alliance of community stakeholders, private enterprise,
and creative thinkers to follow through on this vision,
the partnership for the reinvented Library will benefi t
from the diff erent interests, talent, and expertise that
participant brings to the project. Together, this alliance
will be instrumental in fulfi lling the vision of a truly
sustainable enterprise in the heart of the Northside
communities.
38FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
39
APPEN
DICES
LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS CONSULTING,
LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
APPENDICES.
40FORMER
CARNEGIE LIBRARY
BUILDING RE-USE
STUDY
APPEN
DIX A
: COD
E REVIEW
303 Use Classification A.3
III B
503 Allowable Stories 2
Existing Stories 2
Allowable Building Height 55'
Existing Building Height 55' (grade to average ht. of rooof, clock tower not included)
503 Allowable Building Area/Fl 9,500 s.f.
506.2 Adjusted Allowable Area/Fl IF = 75% 16,625 s.f. (includes the theater)
Actual Area, First Floor 22,800 s.f. (includes the theater)
505 Mezzanines, Area Calcs Equipment Platform 1,000 s.f.
2M Open Mezz Area = 2,500 s.f. 21%
2 Second Floor Area = 12,100 s.f.
1M Open Mezz Area = 4,200 s.f. 33%
1 First Floor Area = 12,600 s.f.
G Ground Floor = 12,960 s.f.
508 Mixed Use Library A.3, Theater A.1 Separation provided: 2 hr
508.25 Incidental Occupancies: Mechanical No gas-fired equip
601 Construction Type IIIB
Structural Frame 0 (at steel beams and columns)
Bearing Walls Exterior 2 (Distance > 30')
Interior 0 (masonry bearing)
Non-Bearing Walls Exterior 0
Interior 0
Floor Construction 0 (steel beam, masonry jack arch, concrete topping)
Roof 0 (roof members are 20' +/- above 2nd floor)
Secondary Members 0 (roof members are 20' +/- above 2nd floor)
705.8 Exterior Wall Opening Limits NP/NS Fire Separation >30 No Limit
706 Fire Walls 2 HR (library and theater separates uses)
708 Shaft Enclosures 1 HR (Connecting < 4 stories)
708.14 Elevator Lobby Enclosure N/A (Connecting 3 levels)
717 Concealed Spaces Sleepers most likely still present. Also, existing raised floor framing at Lecture Hall is wood.
Exits Corridors Rooms
803.9 Finishes A.3 Class A A C
903 Automatic Sprinkler Systems Current None provided (Required throughout, due to area and occupancy count)
905 Standpipe Systems Height Provided ( Class III required if top floor > 30' above fire dept access)
Occ Load n/a (Class I required if occupancy > 1000)
Area/A Area/FE Travel
906 Portable Extinguishers Hazard Ordinary 1,500 s.f. 11,250 s.f. 75'
907 Fire Alarm A.3 Provided Manual alarm w/occupant notification
n/a Manual alarm w/occupant voice/alarm communications if occ >1000
None Exist Visible alarms required if uprading or altering
911 Fire Command Center None Exists
912 Fire Department Connection Provided
Reading Stacks Lecture Inst Stor Mech Total
/50 /100 /7 /100 /300 /300 /Fl
1004 Occupant Load EP 1,000 s.f. 3 3
2M 2,500 s.f. 25 25
2 12,100 s.f. 26 52 237 9 324
1M 4,200 s.f. 14 9 23
1 12,600 s.f. 126 16 13 154
G 12,960 s.f. 75 18 5 98
Total Occ Capacity
1005 Egress Width Provided 1 1 @10' 1 @ 3' 1 @ 3' 16 960
G 1 @ 3' 1 @ 3' 1 @ 3' 9 540
Stairway Widths North (serves 1, 1M. 2, 2M) 54" 180
Tower (serves 2) 54" 180 237/2 = 118 + 88/2 = 44
South (serves Lecture Hall)) 42" 140 237/2 = 118 + Rehearsal
1006 Egress Illumination Provided
1007 Accessible Means of Egress 1 1 Accessible (thru NHT) (1007.8 no two-way at elevator, 1007.9 signage not compliant)
G 1 Accessible (one thru Citiparks) (1007.9 signage not compliant)
1011 Exit Signs Lighted signs provided
1014 Exit Access A Travel, w/o Sprinkler 200' (Max existing travel is 138', from 1M Collection Storage)
1018 Corridors A Rating, w/o Sprinkler 1 (Currently no corridors exist)
1103 Accessibility Major segments of the building are currently not accessible.
3000 Elevators 1 existing ADA-compliant (no recall provided)
1 existing "Limited Use/Limited Application" elevator in the staff area
3400 Existing Building, National Historic Landmark
CODE ANALYSIS.
41
APPEN
DIX A
: COD
E REVIEW
LOYSEN +
KREUTHMEIER
ARCHITECTS
with
IAMS CONSULTING,
LLC
SOTA
CONSTRUCTION
SERVICES, LLC
and
WATSON
ENGINEERING
Existing occupancy: A.3 Proposed occupancy: A.3
Year building was constructed: 1890 Number of stories: 2 Height in feet: 55'
Type of Construction: III B Area per floor: = 22,800 s.f. (Library + Theater)
Percentage of open perimeter increase: 75%
Completely suppressed: No Corridor wall rating: N/A
Compartmentation: No Required door closers: Yes
Fire-resistance of vertical opening enclosures: 2hr (except at Orange Stair)
Type of HVAC system: Forced air Serving number of floors: One
Automatic fire detection: Yes Type and location: Duct detectors
Smoke control: No Type:
Adequate exit routes: Yes Dead ends: No
Maximum exit access travel distance: 138' Elevator controls: No
Means of egress emergency lighting: Yes Mixed Occupancies: Yes
AS IS FOR COMPLIANCE
Safety Parameters FS ME GS FS ME GS
3412.6.1 Building Height 0 0 0 0 0 0
3412.6.2 Building Area -5.1 -5.1 -5.1 -5.1 -5.1 -5.1
3412.6.3 Compartmentation 0 0 0 10 10 10 (add doors to compartmentalize, max. area 7500 s.f.)
3412.6.4 Tenant Separations -3 -3 -3 4 4 4 (make sure tenant separations are intact throughout)
3412.6.5 Corridor Walls 0 0 0 0 0 0
3412.6.6 Vertical Openings -5 -5 -5 5 5 5 (enclose the orange stair)
3412.6.7 HVAC Systems 5 5 5 5 5 5 (serves one floor)
3412.6.8 Automatic Fire Detection -10 -10 -10 0 0 0 (test, meet IMC)
3412.6.9 Fire Alarm System -5 -5 -5 -5 -5 -5
3412.6.10 Smoke Control 0 0 0 0
3412.6.11 Means of Egress 2 2 2 2
3412.6.12 Dead Ends 2 2 2 2
3412.6.13 Maximum Exit Access Travel 6.2 6.2 6.2 6.2
3412.6.14 Elevator Control 0 0 2 2 (to score 2.0, add Phase I & II recall, meet new code)
3412.6.15 Means of Egress Lighting 4 4 4 4 4 4
3412.6.16 Mixed Occupancies 0 0 0 5 5 5 (make sure use separations are intact throughout)
3412.6.17 Automatic Sprinklers -6 -6 -6 -6 -6 -6
3412.6.18 Standpipes 4 4 4 4
3412.6.19 Incidental Accessory Occupancy 0 0 0 0 0 0
Actual Score -21.1 -14.9 -10.9 20.9 29.1 33.1
Mandatory Score 18 29 29 18 29 29
CHAPTER 34 REVIEW SUMMARY.
As discussed previously in the Building Code Overview,
the Chapter 34 Review looks at the application of the
Existing Building regulations to the former Library
building and identifi ed measures that can be undertaken
to bring it into compliance with those requirements.
The Chapter 34 Review consists of two parts: the “As Is”
review of the building and the ‘For Compliance” review of
measures that can be undertaken. The existing building
is evaluated in a number of Safety Parameters (listed
along the left side of the chart), with Safety Scores (listed
along the top of the chart) identifi ed in the following
categories:
• Fire Safety (FS)
• Means of Egress (ME)
• General Safety (GS)
The Actual Score (totalled at the bottom of the chart)
indicates the existing and proposed degrees of
compliance of the building within each Safety Score. The
Actual Score is compared to the Mandatory Score in order
to determine the deviation and help to identify potential
corrective measures that can be undertaken to bring the
building into compliance.
As indicated previously in the Report, compliance for the
former Library building appears insurmountable at fi rst
glance. However, on further examination, the defi ciencies
are few and there are a number of readily accomplished
corrections which change the Safety Scores substantially.
These corrective measures are indicated in the last
column of the chart and their impact is calculated under
the “For Compliance” section of the chart.
OVERVIEW.