Our Ref: 14S1076000 Your Ref: STH04/00227 28 March 2014 Roads & Maritime Services – Southern Region Level 4, Southern Regional Office 90 Crown Street WOLLONGONG NSW 2500 Attention: Mr. Daniel Talevski Dear Daniel RE: MACQUARIEDALE ROAD, APPIN – PLANNING PROPOSAL RESPONSE TO RMS INFORMATION REQUEST Further to the email from Gerry Beasley (dated 10 March) the following sets out a response to the remaining information requests set out in the RMS letter (dated 21 February 2014) pursuant to the proposed Planning Proposal at Macquariedale Road in Appin. The RMS information request has been reproduced in bold, with a response to each item provided hereafter. “RMS notes the provided treatment at the junction of Appin Road and Macquariedale Road. RMS requires the developer to consider and address the traffic implications associated with vehicles turning right exiting and entering the shopping complex onto Appin Road from both existing accesses. A concept plan to support the proposed arrangements on Appin Road, at and in the vicinity of, Macquariedale Road needs to be provided. This plan needs to include identification of pedestrian and public transport infrastructure.” A concept layout plan (GTA Drawing No. 14S1076000-01-01 to 04-P3) was prepared by GTA and submitted to RMS on 6 March 2014. This plan is included as Attachment 1, along with the associated swept path analysis undertaken to inform the design, illustrating the following: a 12.5m HRV vehicle can undertake each available turning movement at the intersection a 99 th percentile car turning right from the shopping centre onto Appin Road eastbound and westbound 99 th percentile cars can pass another 99 th percentile car ‘propped’ to turn right from Macquariedale Road into the shopping centre. “RMS requires traffic analysis of Appin Road and King Street West temporary intersection identifying appropriate upgrades/treatments to cater for development traffic. A concept plan to support the proposed arrangements on Appin Road at, and in the vicinity of, Macquariedale Road needs to be provided.” The temporary King Street West approach will provide vehicle access for approximately 20 medium density dwellings. Applying the RMS Guidelines traffic generation rate (0.71-0.78 GTA Letter 2012

Upload: others

Post on 19-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Our Ref: 14S1076000

Your Ref: STH04/00227

28 March 2014

Roads & Maritime Services – Southern Region

Level 4, Southern Regional Office

90 Crown Street

WOLLONGONG NSW 2500

Attention: Mr. Daniel Talevski

Dear Daniel

RE: MACQUARIEDALE ROAD, APPIN – PLANNING PROPOSAL

RESPONSE TO RMS INFORMATION REQUEST

Further to the email from Gerry Beasley (dated 10 March) the following sets out a response to the

remaining information requests set out in the RMS letter (dated 21 February 2014) pursuant to the

proposed Planning Proposal at Macquariedale Road in Appin.

The RMS information request has been reproduced in bold, with a response to each item

provided hereafter.

“RMS notes the provided treatment at the junction of Appin Road and Macquariedale Road. RMS

requires the developer to consider and address the traffic implications associated with vehicles

turning right exiting and entering the shopping complex onto Appin Road from both existing

accesses. A concept plan to support the proposed arrangements on Appin Road, at and in the

vicinity of, Macquariedale Road needs to be provided. This plan needs to include identification

of pedestrian and public transport infrastructure.”

A concept layout plan (GTA Drawing No. 14S1076000-01-01 to 04-P3) was prepared by GTA and

submitted to RMS on 6 March 2014. This plan is included as Attachment 1, along with the

associated swept path analysis undertaken to inform the design, illustrating the following:

a 12.5m HRV vehicle can undertake each available turning movement at the

intersection

a 99th percentile car turning right from the shopping centre onto Appin Road

eastbound and westbound 99th percentile cars can pass another 99th percentile car

‘propped’ to turn right from Macquariedale Road into the shopping centre.

“RMS requires traffic analysis of Appin Road and King Street West temporary intersection

identifying appropriate upgrades/treatments to cater for development traffic. A concept plan to

support the proposed arrangements on Appin Road at, and in the vicinity of, Macquariedale

Road needs to be provided.”

The temporary King Street West approach will provide vehicle access for approximately 20

medium density dwellings. Applying the RMS Guidelines traffic generation rate (0.71-0.78

GTA

Le

tte

r 2012

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 2 of 9

movements per dwelling) indicates a peak hour traffic generation of 16 movements. This level of

additional traffic activity could be accommodated by single approach and departure lanes on

King Street West with no formal turn facilities on Appin Road.

By comparison, King Street East currently carries up to 27 vehicle movements in a peak hour and

is configured with single approach and departure lanes with no formal turn facilities provided on

Appin Road and was observed to operate well during peak periods.

A SIDRA INTERSECTION assessment indicates that the intersection would be expected to operate

with a satisfactory level of service. The full results are included as Attachment 4.

A concept layout plan of the proposed Appin Road/ King Street intersection is included as

Attachment 2 (GTA Drawing No. 14S1076000-02-01-P2).

“RMS details of the road reserve width proposed to allow for a future 4-way connection at Appin

Road and Church Street. A concept design is required to determine suitability of the proposed

road reserve.”

No changes to the Appin Road / Church Street intersection are proposed as part of this Planning

Proposal. A future western connection to the existing configuration could be provided as part of

any future rezoning to the south of the site.

The future control and layout of this intersection would be determined as part of any future

Planning Proposal for the lands to the south of the site and as such, has not been determined at

this stage.

Notwithstanding, an indicative concept sketch (GTA Drawing No. 14S1076000-02-02-P2) has been

prepared to illustrate that a new western approach to the existing intersection could be

provided, albeit slightly off-centre from the Church Street approach. The western approach

would be accommodated within the subject site lands (including those to the south). The full

frontage of the subject site at Church Street would form part of the future road reserve, with the

majority of the intersection at Appin road located on the land to the south.

“RMS notes the traffic analysis does not consider the intersection of Appin Road and the access to

the future ‘North Appin’ subdivision. This has been proposed to cater for part of the traffic

generation from the northern subdivision. RMS requires the ‘North Appin’ subdivision connection

to Appin Road be analysed with the traffic generation from the proposed northern subdivision to

determine the suitability of the existing junction.”

The MWT Report ‘Residential Development at Appin’ dated August 2006 assessed the transport

impact of the future ‘North Appin’ subdivision. In regards to the future operation of the site

access to Appin Road, the report stated the following:

“SIDRA analysis was conducted to examine operation of the proposed access intersection under

the forecast traffic flows. The analysis was done for a notional future year of 2016 for which long

term traffic growth on Appin Road was assumed.

The analysis found that the access intersection would operate satisfactorily at Level of Service A

during both morning and evening peak periods. This means that it would have a significant

amount of spare capacity.”

Application of the RMS traffic generation rates to the approximate 42 lots accessed via the

‘North Appin’ subdivision indicates that the site would generate an additional 33 peak hour

movements to the intersection. An updated SIDRA INTERSECTION assessment of the intersection

to Appin Road indicates that it is expected to continue to operate at a Level of Service A during

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 3 of 9

the morning and evening peak hours. As such, the proposed site access roundabout to Appin

Road will satisfactorily accommodate the additional traffic generated by the site.

The results of the updated SIDRA INTERSECTION assessment are included as Attachment C.

I trust the above satisfactorily responds to RMS queries raised. Naturally, should you have any

questions or require any further information, please do not hesitate to contact me in our Sydney

office on (02) 8448 1800.

Yours sincerely

GTA CONSULTANTS

Brett Maynard

Director

encl.

Attachment 1: Appin Road/ Macquariedale Road Concept Layout - GTA Drawing No. 14S1076000-01-01-04-P3

Attachment 2: Appin Road/ King Street Concept Layout - GTA Drawing No. 14S1076000-02-01-P2

Attachment 3: Appin Road/ Church Street Concept Layout - GTA Drawing No. 14S1076000-03-01-P2

Attachment 4: SIDRA Intersection Results

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 4 of 9

Attachment 1

Appin Road/ Macquariedale Road Concept Layout

KEEP

CLEAR

DATE:

DRAWING NO.

1:500@A3

SCALE:

SHEET:

OF

APPROVED:

0 10

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

26/03/2014

AT

3:1

5:3

3 P

M14S1076000-0

1-P

3.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

04

26.03.2014

BDM

ENDEAVOUR APPIN PLANNING

01

MA

CQ

UA

RIE

DA

LE

RO

AD

APPIN

ROAD

KIN

G

ST

RE

ET

5 15

NOTES:

FOR A 12.5m LARGE RIGID VEHICLE

ADJUST KERBS AS REQUIRED TO ALLOW

E1

E3

E5

E5

E5

E5

C1

TB

TB1

14S1076000-01-01-P3

PRELIMINARY PLAN

WITHOUT NOTIFICATION

ONLY SUBJECT TO CHANGE

FOR DISCUSSION PURPOSES

BEWARE OF UNDERGROUND SERVICES

GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

APPROXIMATE ONLY AND THEIR EXACT POSITION

THE LOCATIONS OF UNDERGROUND SERVICES ARE

WARNING

E5

E5

E5

15.0

38.0

11.3

TURN LA

NE

TAPER

R1-2A

3.9

1.7

4.2

4.0

3.0

3.0

2.5

4.1

TURN EXIT FROM CAR PARK

MAINTAIN EXISTING RIGHT

APPIN ROAD / MACQUARIEDALE ROAD, APPIN

RIGHT TURN AUXILIARY LANE (CONCEPT LAYOUT)

DETAIL DESIGN

EXTENT TO BE CONFIRMED DURING

SERVICES MAY REQUIRE RELOCATION.

PAVEMENT WIDENING AS REQUIRED

CURRENT STANDARD

LINEMARKING AND UPDATE TO

RELOCATE SCHOOL SPEED ZONE

STANDARDS AND GUIDELINES

CIVIL WORKS AND LINEMARKING ARE TO BE IN ACCORDANCE WITH RMS3.

ALL EXISTING LINEMARKING IS TO BE REMOVED2.

DESIGN CATERS FOR ALL VEHICLES UP TO 12.5m LARGE RIGID VEHICLES1.

KEEP

CLEARB99 6.3

mR

GTA

B99 6.3m

R

GTA

B99 6.3

mR

GTA

B99 6.3

mR

GTA

B99 6.3

mR

GTA

B99 6.

3mR

GTA

B99 6.3m

R

GTA

DATE:

DRAWING NO.

1:500@A3

SCALE:

SHEET:

OF

APPROVED:

0 10

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

26/03/2014

AT

3:1

5:3

5 P

M14S1076000-0

1-P

3.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

04

26.03.2014

BDM

ENDEAVOUR APPIN PLANNING

02

MA

CQ

UA

RIE

DA

LE

RO

AD

APPIN

ROAD

KIN

G

ST

RE

ET

5 15

NOTES:

14S1076000-01-02-P3

PRELIMINARY PLAN

WITHOUT NOTIFICATION

ONLY SUBJECT TO CHANGE

FOR DISCUSSION PURPOSES

BEWARE OF UNDERGROUND SERVICES

GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

APPROXIMATE ONLY AND THEIR EXACT POSITION

THE LOCATIONS OF UNDERGROUND SERVICES ARE

WARNING

APPIN ROAD / MACQUARIEDALE ROAD, APPIN

STANDARDS AND GUIDELINES

CIVIL WORKS AND LINEMARKING ARE TO BE IN ACCORDANCE WITH RMS3.

ALL EXISTING LINEMARKING IS TO BE REMOVED2.

DESIGN CATERS FOR ALL VEHICLES UP TO 12.5m LARGE RIGID VEHICLES1.

SWEPT PATH ASSESSMENT - B99 CAR

SWEPT PATH KEY

FROM VEHICLE BODY300mm CLEARANCE

VEHICLE BODY PATH

VEHICLE TYRE PATH

VEHICLE CENTRE LINE

ASSUMED SPEED 15km/h

Lock to Lock Time

Width

Track

:

:

:

metresB99 6.3mR

6.0

1.77

1.94

3.050.95

5.20

Steering Angle 34.0:

SU TR

UCK

AUSTROA

DS 2006 (AU)

SU TRUCK

AUSTROADS

2006 (A

U)

SU TRUCK

AUSTROADS

2006 (AU)

SU TR

UCK

AUSTROA

DS 2006 (AU)

KEEP

CLEAR

DATE:

DRAWING NO.

1:500@A3

SCALE:

SHEET:

OF

APPROVED:

0 10

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

26/03/2014

AT

3:1

5:3

7 P

M14S1076000-0

1-P

3.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

04

26.03.2014

BDM

ENDEAVOUR APPIN PLANNING

03

MA

CQ

UA

RIE

DA

LE

RO

AD

APPIN

ROAD

KIN

G

ST

RE

ET

5 15

NOTES:

14S1076000-01-03-P3

PRELIMINARY PLAN

WITHOUT NOTIFICATION

ONLY SUBJECT TO CHANGE

FOR DISCUSSION PURPOSES

BEWARE OF UNDERGROUND SERVICES

GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

APPROXIMATE ONLY AND THEIR EXACT POSITION

THE LOCATIONS OF UNDERGROUND SERVICES ARE

WARNING

APPIN ROAD / MACQUARIEDALE ROAD, APPIN

STANDARDS AND GUIDELINES

CIVIL WORKS AND LINEMARKING ARE TO BE IN ACCORDANCE WITH RMS3.

ALL EXISTING LINEMARKING IS TO BE REMOVED2.

DESIGN CATERS FOR ALL VEHICLES UP TO 12.5m LARGE RIGID VEHICLES1.

SWEPT PATH KEY

FROM VEHICLE BODY300mm CLEARANCE

VEHICLE BODY PATH

VEHICLE TYRE PATH

VEHICLE CENTRE LINE

ASSUMED SPEED 15km/h

Width

Lock to Lock Time

Track

Steering Angle

2.20

:

:

:

6.0

2.50

2.50

36.6:

6.85

metres

12.50

SU TRUCK

SWEPT PATH ASSESSMENT - 12.5m LRV

SU TR

UCK

AUSTROADS 2006 (A

U)

SU TRUCK

AUSTROADS

2006 (A

U)

SU TRUCK

AUSTROADS

2006 (

AU)

SU TR

UCK

AUSTROA

DS 2006 (AU)

KEEP

CLEAR

DATE:

DRAWING NO.

1:500@A3

SCALE:

SHEET:

OF

APPROVED:

0 10

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

26/03/2014

AT

3:1

5:3

8 P

M14S1076000-0

1-P

3.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

04

26.03.2014

BDM

ENDEAVOUR APPIN PLANNING

04

MA

CQ

UA

RIE

DA

LE

RO

AD

APPIN

ROAD

KIN

G

ST

RE

ET

5 15

NOTES:

14S1076000-01-04-P3

PRELIMINARY PLAN

WITHOUT NOTIFICATION

ONLY SUBJECT TO CHANGE

FOR DISCUSSION PURPOSES

BEWARE OF UNDERGROUND SERVICES

GIVEN THAT ALL EXISTING SERVICES ARE SHOWN.

SHOULD BE PROVEN ON SITE. NO GUARANTEE IS

APPROXIMATE ONLY AND THEIR EXACT POSITION

THE LOCATIONS OF UNDERGROUND SERVICES ARE

WARNING

APPIN ROAD / MACQUARIEDALE ROAD, APPIN

STANDARDS AND GUIDELINES

CIVIL WORKS AND LINEMARKING ARE TO BE IN ACCORDANCE WITH RMS3.

ALL EXISTING LINEMARKING IS TO BE REMOVED2.

DESIGN CATERS FOR ALL VEHICLES UP TO 12.5m LARGE RIGID VEHICLES1.

SWEPT PATH KEY

FROM VEHICLE BODY300mm CLEARANCE

VEHICLE BODY PATH

VEHICLE TYRE PATH

VEHICLE CENTRE LINE

ASSUMED SPEED 15km/h

Width

Lock to Lock Time

Track

Steering Angle

2.20

:

:

:

6.0

2.50

2.50

36.6:

6.85

metres

12.50

SU TRUCK

SWEPT PATH ASSESSMENT - 12.5m LRV

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 5 of 9

Attachment 2

Appin Road/ King Street Concept Layout

DATE:

DRAWING NO.

1:400@A3

SCALE:

SHEET:

OF

APPROVED:

0 8

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

27/03/2014

AT

4:0

9:1

5 P

M14S1076000-0

2-P

2.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

02

27.03.2014

BDM 14S1076000-02-01-P2

ENDEAVOUR APPIN PLANNING

01

AP

PIN

RO

AD

KING

STREET

KING STREET WEST

4 12

APPIN ROAD / KING STREET WEST, APPIN

DRAFT CONCEPT LAYOUT

INTO PROPOSED ROAD NETWORK

ROAD TO BE INCORPORATED

8.5

2.3

DESIGN

CONFIRMED DURING DETAIL

RELOCATION. EXTENT TO BE

POWER POLE MAY REQUIRE

DESIGN

CONFIRMED DURING DETAIL

RELOCATION. EXTENT TO BE

POWER POLE REQUIRES

R1-

2A

CUL-DE-SAC TREATMENT

INDICATIVE FUTURE

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 6 of 9

Attachment 3

Appin Road/ Church Street Concept Layout

DATE:

DRAWING NO.

1:400@A3

SCALE:

SHEET:

OF

APPROVED:

0 8

nsultantscowww.gta.com.au

GTA

PLO

TTE

D B

Y :

rebecca.fletc

her

ON

27/03/2014

AT

4:0

9:1

6 P

M14S1076000-0

2-P

2.d

gn

Adelaide 08 8334 3600

Canberra 02 6263 9400

Brisbane 07 3113 5000

Sydney 02 8448 1800

Melbourne 03 9851 9600

02

27.03.2014

BDM 14S1076000-02-02-P2

ENDEAVOUR APPIN PLANNING

02

AP

PIN

RO

AD

STREET

4 12

CHURCH

APPIN ROAD / CHURCH STREET, APPIN

R12

R6

1.5

5.0

12.0

FOR DEVELOPMENT ACCESS

INDICATIVE FUTURE FOURTH LEG

INTEGRATED WITH TRAFFIC SIGNALS

FOOTPRINT SLIP LANE TO BE

POTENTIAL FOR REDUCED

APPROACH MAY BE REQUIRED

REALIGNMENT OF CHURCH STREET

REQUIRED

SINGALISED INTERSECTION

SUBJECT TO BROADER ROAD NETWORK

LANE ARRANGEMENTS AND CAPACITY

NOTE:

DRAFT INDICATIVE CONCEPT LAYOUT

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 7 of 9

Attachment 4

SIDRA INTERSECTION Results

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 8 of 9

Appin Road/ ‘North Appin’ Subdivision Access

AM Peak Hour

PM Peak Hour

140328ltr-14S1076000 Endeavour Appin RMS Responses.docx 9 of 9

Appin Road/ King Street (temp access)

AM Peak Hour

PM Peak Hour