H PTER N .

SURFACE DRAINAGE

DESCRIPTION OF ITEM NO 1: Tega formed of pacca bricks on end, laid in and over cement

sand mortar projecting to a height of not more than 6"

(150mm) top of drain along the property side where required,

laid to lines, grades, slopes and shape according to the

engineer's drawing.

a) 3" (75mm) Thick.

i) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.96 Bag 230.00 Each 220.80 

Sand 3.20 Cft 3.50 P. Cft 11.20 

Bricks 260.00 Nos 1200.00 Per 1000 Nos 312.00 

Total 544.00 

Contractor's Profit & Overheads 20 Percent 108.80 

Total 652.80 

Labour for 125 Rft

Mason 0.67 No 300.00 P. Day 201.00 

Unskilled Cooly 1.00 No 140.00 P. Day 140.00 

Bahishti 0.25 No 160.00 P. Day 40.00 

Total 381.00 

Sundries 10 Percent 38.10 

Total 419.10 

Contractor's Profit & Overheads 20 Percent 83.82 

Total 502.92 

Item Rates  

Labour Rate Per 100 Rft Rs. 402.34 Say 402.35 

Labour Rate Per Rm Rs. 13.20 Say 13.20 

Composite Rate Per 100 Rft Rs. 1055.14 Say 1,055.15 

Composite Rate Per Rm Rs. 34.61 Say 34.60 

Unit Rate (British System) per 100 Rft

Page 2: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 2/43

Item No. 1 Tega formed of pacca bricks on end, laid in and over cement

sand mortar projecting to a height of not more than 6"

(150mm) top of drain along the property side where required,

laid to lines, grades, slopes and shape according to the

engineer's drawing.

a) 3" (75mm) Thick.

ii) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.64 Bag 230.00 Each 147.20 

Sand 4.00 Cft 3.50 P. Cft 14.00 

Bricks 260.00 Nos 1200.00 Per 1000 Nos 312.00 

Total 473.20 

Contractor's Profit & Overheads 20 Percent 94.64 

Total 567.84 

Labour for 125 Rft

Mason 0.67 No 300.00 P. Day 201.00 

Unskilled Cooly 1.00 No 140.00 P. Day 140.00 

Bahishti 0.25 No 160.00 P. Day 40.00 

Total 381.00 Sundries 10 Percent 38.10 

Total 419.10 

Contractor's Profit & Overheads 20 Percent 83.82 

Total 502.92 

Item Rates

Labour Rate Per 100 Rft Rs. 402.34 Say 402.35 

Labour Rate Per Rm Rs. 13.20 Say 13.20 

Composite Rate Per 100 Rft Rs. 970.18 Say 970.20 

Composite Rate Per Rm Rs. 31.82 Say 31.80 

Unit Rate (British System) per 100 Rft

Page 2

Page 3: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 3/43

Item No. 1 Tega formed of pacca bricks on end, laid in and

over cement sand mortar projecting to a height of 

not more than 6" (150mm) top of drain along the

 property side where required, laid to lines,

grades, slopes and shape according to the

engineer's drawing.

b) 4½" (115mm) Thick.

i) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 1.30 Bag 230.00 Each 299.00 

Sand 4.70 Cft 3.50 P. Cft 16.45 

Bricks 380.00 Nos 1200.00 Per 1000 Nos 456.00 

Total 771.45 

Contractor's Profit & Overheads 20 Percent 154.29 

Total 925.74 

Labour for 125 Rft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.38 No 160.00 P. Day 60.80 

Total 570.80 Sundries 10 Percent 57.08 

Total 627.88 

Contractor's Profit & Overheads 20 Percent 125.58 

Total 753.46 

Item Rates

Labour Rate Per 100 Rft Rs. 602.76 Say 602.75 

Labour Rate Per Rm Rs. 19.77 Say 19.75 

Composite Rate Per 100 Rft Rs. 1528.50 Say 1,528.50 

Composite Rate Per Rm Rs. 50.13 Say 50.15 

Unit Rate (British System) per 100 Rft

Page 3

Page 4: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 4/43

Item No. 1 Tega formed of pacca bricks on end, laid in and

over cement sand mortar projecting to a height of 

not more than 6" (150mm) top of drain along the

 property side where required, laid to lines,

grades, slopes and shape according to the

engineer's drawing.

b) 4½" (115mm) Thick.

ii) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.83 Bag 230.00 Each 190.90 

Sand 5.20 Cft 3.50 P. Cft 18.20 

Bricks 380.00 Nos 1200.00 Per 1000 Nos 456.00 

Total 665.10 

Contractor's Profit & Overheads 20 Percent 133.02 

Total 798.12 

Labour for 125 Rft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.38 No 160.00 P. Day 60.80 

Total 570.80 Sundries 10 Percent 57.08 

Total 627.88 

Contractor's Profit & Overheads 20 Percent 125.58 

Total 753.46 

Item Rates

Labour Rate Per 100 Rft Rs. 602.76 Say 602.75 

Labour Rate Per Rm Rs. 19.77 Say 19.75 

Composite Rate Per 100 Rft Rs. 1400.88 Say 1,400.90 

Composite Rate Per Rm Rs. 45.95 Say 45.95 

Unit Rate (British System) per 100 Rft

Page 4

Page 5: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 5/43

DESCRIPTION OF ITEM NO 2: Pacca flat brick 3" (75mm) thick, laid in

reimbursement, in cement, sand mortar on sides

of drains and in other works where required. All

 joints to be completely filled and struck flush.

a) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Pacca Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 1.50 Bag 230.00 Each 345.00 

Sand 5.60 Cft 3.50 P. Cft 19.60 

Total 784.60 

Contractor's Profit & Overheads 20 Percent 156.92 

Total 941.52 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.33 No 160.00 P. Day 52.80 

Total 562.80 

Sundries 10 Percent 56.28 

Total 619.08 

Contractor's Profit & Overheads 20 Percent 123.82 

Total 742.90 

Item Rates

Labour Rate Per 100 Sft Rs. 594.32 Say 594.30 

Labour Rate Per Sqm Rs. 63.95 Say 63.95 

Composite Rate Per 100 Sft Rs. 1535.84 Say 1,535.85 

Composite Rate Per Sqm Rs. 165.26 Say 165.25 

Unit Rate (British System) per 100 Sft

Page 5

Page 6: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 6/43

Item No. 2 Pacca flat brick 3" (75mm) thick, laid in

reimbursement, in cement, sand mortar on sides

of drains and in other works where required. All

 joints to be completely filled and struck flush.

b) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 1.00 Bag 230.00 Each 230.00 

Sand 6.25 Cft 3.50 P. Cft 21.88 

Total 671.88 

Contractor's Profit & Overheads 20 Percent 134.38 

Total 806.25 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.33 No 160.00 P. Day 52.80 

Total 562.80 

Sundries 10 Percent 56.28 

Total 619.08 

Contractor's Profit & Overheads 20 Percent 123.82 

Total 742.90 

Item Rates

Labour Rate Per 100 Sft Rs. 594.32 Say 594.30 

Labour Rate Per Sqm Rs. 63.95 Say 63.95 

Composite Rate Per 100 Sft Rs. 1400.57 Say 1,400.55 

Composite Rate Per Sqm Rs. 150.70 Say 150.70 

Unit Rate (British System) per 100 Sft

Page 6

Page 7: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 7/43

Item No. 2 Pacca flat brick 3" (75mm) thick, laid in

reimbursement, in cement, sand mortar on sides

of drains and in other works where required. All

 joints to be completely filled and struck flush.

c) Ratio (1:6)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 0.86 Bag 230.00 Each 197.80 

Sand 6.40 Cft 3.50 P. Cft 22.40 

Total 640.20 

Contractor's Profit & Overheads 20 Percent 128.04 

Total 768.24 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.33 No 160.00 P. Day 52.80 

Total 562.80 

Sundries 10 Percent 56.28 

Total 619.08 

Contractor's Profit & Overheads 20 Percent 123.82 

Total 742.90 

Item Rates

Labour Rate Per 100 Sft Rs. 594.32 Say 594.30 

Labour Rate Per Sqm Rs. 63.95 Say 63.95 

Composite Rate Per 100 Sft Rs. 1362.56 Say 1,362.55 

Composite Rate Per Sqm Rs. 146.61 Say 146.60 

Unit Rate (British System) per 100 Sft

Page 7

Page 8: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 8/43

DESCRIPTION OF ITEM NO 3: Pacca brick on edge, laid in reimbursement, in

cement, sand mortar on sides of drains and in

other works where required. All joints to be

completely filled and struck flush.

a) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 2.30 Bag 230.00 Each 529.00 

Sand 8.55 Cft 3.50 P. Cft 29.93 

Total 1,188.93 

Contractor's Profit & Overheads 20 Percent 237.79 

Total 1,426.71 

Labour for 125 Sft

Mason 1.50 No 300.00 P. Day 450.00 

Unskilled Cooly 2.00 No 140.00 P. Day 280.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 810.00 

Sundries 10 Percent 81.00 

Total 891.00 

Contractor's Profit & Overheads 20 Percent 178.20 

Total 1,069.20 

Item Rates

Labour Rate Per 100 Sft Rs. 855.36 Say 855.35 

Labour Rate Per Sqm Rs. 92.04 Say 92.05 

Composite Rate Per 100 Sft Rs. 2282.07 Say 2,282.05 

Composite Rate Per Sqm Rs. 245.55 Say 245.55 

Unit Rate (British System) per 100 Sft

Page 8

Page 9: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 9/43

Item No. 3 Pacca brick on edge, laid in reimbursement, in

cement, sand mortar on sides of drains and in

other works where required. All joints to be

completely filled and struck flush.

b) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 1.50 Bag 230.00 Each 345.00 

Sand 9.50 Cft 3.50 P. Cft 33.25 

Total 1,008.25 

Contractor's Profit & Overheads 20 Percent 201.65 

Total 1,209.90 

Labour for 125 Sft

Mason 1.50 No 300.00 P. Day 450.00 

Unskilled Cooly 2.00 No 140.00 P. Day 280.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 810.00 

Sundries 10 Percent 81.00 

Total 891.00 

Contractor's Profit & Overheads 20 Percent 178.20 

Total 1,069.20 

Item Rates

Labour Rate Per 100 Sft Rs. 855.36 Say 855.35 

Labour Rate Per Sqm Rs. 92.04 Say 92.05 

Composite Rate Per 100 Sft Rs. 2065.26 Say 2,065.25 

Composite Rate Per Sqm Rs. 222.22 Say 222.20 

Unit Rate (British System) per 100 Sft

Page 9

Page 10: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 10/43

Item No. 3 Pacca brick on edge, laid in reimbursement, in

cement, sand mortar on sides of drains and in

other works where required. All joints to be

completely filled and struck flush.

c) Ratio (1:6)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 1.30 Bag 230.00 Each 299.00 

Sand 9.78 Cft 3.50 P. Cft 34.23 

Total 963.23 

Contractor's Profit & Overheads 20 Percent 192.65 

Total 1,155.88 

Labour for 125 Sft

Mason 1.50 No 300.00 P. Day 450.00 

Unskilled Cooly 2.00 No 140.00 P. Day 280.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 810.00 

Sundries 10 Percent 81.00 

Total 891.00 

Contractor's Profit & Overheads 20 Percent 178.20 

Total 1,069.20 

Item Rates

Labour Rate Per 100 Sft Rs. 855.36 Say 855.35 

Labour Rate Per Sqm Rs. 92.04 Say 92.05 

Composite Rate Per 100 Sft Rs. 2011.24 Say 2,011.25 

Composite Rate Per Sqm Rs. 216.41 Say 216.40 

Unit Rate (British System) per 100 Sft

Page 10

Page 11: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 11/43

DESCRIPTION OF ITEM NO 4: Pacca flat brick, herring bond pitching in cement,

  sand mortar laid to lines, grades, shapes and

slopes as per Engineer's Drawing.

a) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 1.50 Bag 230.00 Each 345.00 

Sand 5.60 Cft 3.50 P. Cft 19.60 

Total 784.60 

Contractor's Profit & Overheads 20 Percent 156.92 

Total 941.52 

Labour for 125 Sft

Mason 0.75 No 300.00 P. Day 225.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 515.00 

Sundries 10 Percent 51.50 

Total 566.50 

Contractor's Profit & Overheads 20 Percent 113.30 Total 679.80 

Item Rates

Labour Rate Per 100 Sft Rs. 543.84 Say 543.85 

Labour Rate Per Sqm Rs. 58.52 Say 58.50 

Composite Rate Per 100 Sft Rs. 1485.36 Say 1,485.35 

Composite Rate Per Sqm Rs. 159.82 Say 159.85 

Unit Rate (British System) per 100 Sft

Page 11

Page 12: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 12/43

Item No. 4 Pacca flat brick, herring bond pitching in cement,

sand mortar laid to lines, grades, shapes and

slopes as per Engineer's Drawing.

b) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 1.00 Bag 230.00 Each 230.00 

Sand 6.25 Cft 3.50 P. Cft 21.88 

Total 671.88 

Contractor's Profit & Overheads 20 Percent 134.38 

Total 806.25 

Labour for 125 Sft

Mason 0.75 No 300.00 P. Day 225.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 515.00 

Sundries 10 Percent 51.50 

Total 566.50 

Contractor's Profit & Overheads 20 Percent 113.30 Total 679.80 

Item Rates

Labour Rate Per 100 Sft Rs. 543.84 Say 543.85 

Labour Rate Per Sqm Rs. 58.52 Say 58.50 

Composite Rate Per 100 Sft Rs. 1350.09 Say 1,350.10 

Composite Rate Per Sqm Rs. 145.27 Say 145.25 

Unit Rate (British System) per 100 Sft

Page 12

Page 13: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 13/43

Item No. 4 Pacca flat brick, herring bond pitching in cement,

sand mortar laid to lines, grades, shapes and

slopes as per Engineer's Drawing.

c) Ratio (1:6)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 350.00 Nos 1200.00 Per 1000 Nos 420.00 

Cement 0.86 Bag 230.00 Each 197.80 

Sand 6.40 Cft 3.50 P. Cft 22.40 

Total 640.20 

Contractor's Profit & Overheads 20 Percent 128.04 

Total 768.24 

Labour for 125 Sft

Mason 0.75 No 300.00 P. Day 225.00 

Unskilled Cooly 1.50 No 140.00 P. Day 210.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 515.00 

Sundries 10 Percent 51.50 

Total 566.50 

Contractor's Profit & Overheads 20 Percent 113.30 Total 679.80 

Item Rates

Labour Rate Per 100 Sft Rs. 543.84 Say 543.85 

Labour Rate Per Sqm Rs. 58.52 Say 58.50 

Composite Rate Per 100 Sft Rs. 1312.08 Say 1,312.10 

Composite Rate Per Sqm Rs. 141.18 Say 141.20 

Unit Rate (British System) per 100 Sft

Page 13

Page 14: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 14/43

DESCRIPTION OF ITEM NO 5: Pacca brick on edge, herring bond pitching in

cement, sand mortar laid to lines, grades, shapes

and slopes as per Engineer's Drawing.

a) Ratio (1:3)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 2.30 Bag 230.00 Each 529.00 

Sand 8.55 Cft 3.50 P. Cft 29.93 

Total 1,188.93 

Contractor's Profit & Overheads 20 Percent 237.79 

Total 1,426.71 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 2.80 Nos 140.00 P. Day 392.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 772.00 

Sundries 10 Percent 77.20 

Total 849.20 

Contractor's Profit & Overheads 20 Percent 169.84 Total 1,019.04 

Item Rates

Labour Rate Per 100 Sft Rs. 815.23 Say 815.25 

Labour Rate Per Sqm Rs. 87.72 Say 87.70 

Composite Rate Per 100 Sft Rs. 2241.94 Say 2,241.95 

Composite Rate Per Sqm Rs. 241.23 Say 241.25 

Unit Rate (British System) per 100 Sft

Page 14

Page 15: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 15/43

Item No. 5 Pacca brick on edge, herring bond pitching in

cement, sand mortar laid to lines, grades, shapes

and slopes as per Engineer's Drawing.

b) Ratio (1:5)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 1.50 Bag 230.00 Each 345.00 

Sand 9.50 Cft 3.50 P. Cft 33.25 

Total 1,008.25 

Contractor's Profit & Overheads 20 Percent 201.65 

Total 1,209.90 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 2.80 Nos 140.00 P. Day 392.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 772.00 

Sundries 10 Percent 77.20 

Total 849.20 

Contractor's Profit & Overheads 20 Percent 169.84 Total 1,019.04 

Item Rates

Labour Rate Per 100 Sft Rs. 815.23 Say 815.25 

Labour Rate Per Sqm Rs. 87.72 Say 87.70 

Composite Rate Per 100 Sft Rs. 2025.13 Say 2,025.15 

Composite Rate Per Sqm Rs. 217.90 Say 217.90 

Unit Rate (British System) per 100 Sft

Page 15

Page 16: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 16/43

Item No. 5 Pacca brick on edge, herring bond pitching in

cement, sand mortar laid to lines, grades, shapes

and slopes as per Engineer's Drawing.

c) Ratio (1:6)

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Bricks 525.00 Nos 1200.00 Per 1000 Nos 630.00 

Cement 1.30 Bag 230.00 Each 299.00 

Sand 9.78 Cft 3.50 P. Cft 34.23 

Total 963.23 

Contractor's Profit & Overheads 20 Percent 192.65 

Total 1,155.88 

Labour for 125 Sft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 2.80 Nos 140.00 P. Day 392.00 

Bahishti 0.50 No 160.00 P. Day 80.00 

Total 772.00 

Sundries 10 Percent 77.20 

Total 849.20 

Contractor's Profit & Overheads 20 Percent 169.84 Total 1,019.04 

Item Rates

Labour Rate Per 100 Sft Rs. 815.23 Say 815.25 

Labour Rate Per Sqm Rs. 87.72 Say 87.70 

Composite Rate Per 100 Sft Rs. 1971.11 Say 1,971.10 

Composite Rate Per Sqm Rs. 212.09 Say 212.10 

Unit Rate (British System) per 100 Sft

Page 16

Page 17: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 17/43

DESCRIPTION OF ITEM NO 6: Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades, slopes

and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

a) Type I

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

CC 1:6:12

1x100x5/6'x1/6' 13.89 Cft

Say: 13.90 Cft

CC 1:2½:5

1x100x5/6'x11/24' 38.19 Cft

D/D 1x100x22/7x¼x¼x¼x½ 2.45 Cft

D/D 1x100x(6"+10")x½" 2.78 Cft

2 32.96 Cft

Say: 33.00 Cft

Surface Rendering

1x100x22/7x3/12' 78.57 Sft

1x100x(2"+2") 33.33 Sft

12 111.90 Sft

Say: 112 SftMaterial

Cement for.

Cement Concrete 1:6:12 0.90 Bag

Cement Concrete 1:2½:5 4.78 Bag

¼" Cement PLaster 1:1 1.03 Bag

6.71 Bag 230.00 Each 1,543.30 

Sand for.

Cement Concrete 1:6:12 6.81 Cft

Cement Concrete 1:2½:5 14.95 Cft

¼" Cement PLaster 1:1 1.29 Cft

23.05 Cft 3.50 P. Cft 80.68 

Unit Rate (British System) per Rft

Page 17

Page 18: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 18/43

a) Type I

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Brick ballast 1:6:12 13.62 Cft 5.60 P. Cft 76.27 

Bajri for 1:2½:5 29.70 Cft 18.50 P. Cft 549.45 

Total 2,249.70 

Contractor's Profit & Overheads 20 Percent 449.94 

Total 2,699.64 

Labour

Mason 1.50 No 300.00 P. Day 450.00 

Unskilled Cooly 3.00 Nos 140.00 P. Day 420.00 

Bahishti 0.75 No 160.00 P. Day 120.00 

Total 990.00 

Sundries 10 Percent 99.00 

Total 1,089.00 

Contractor's Profit & Overheads 20 Percent 217.80 

Total 1,306.80 

Item Rates

Labour Rate Per Rft Rs. 13.07 Say 13.05 

Labour Rate Per Rm Rs. 42.86 Say 42.85 

Composite Rate Per Rft Rs. 40.06 Say 40.05 

Composite Rate Per Rm Rs. 131.41 Say 131.40 

Unit Rate (British System) per Rft

Page 18

Page 19: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 19/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

b) Type II

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

CC 1:6:12

1x100x(1'-2½"+1'-8½")x7¼" 88.10 Cft

2

Deduction.

1x100x(8"+11½")x4¼" 28.77 Cft

2

Net Total 59.33 Cft

CC 1:2½:51x100x(11½"+8")x4¼" 28.77 Cft

2

1x100x(1-8½")x4" 56.94 Cft

Total 85.71 Cft

Deduction.

1x100x0.82 8.20 Cft

1x100(7 3/8"+10") 2 1/8" 17.34 Cft

2

1x100(10"+1"-8½")x0.87 4.21 Cft

2 Total 29.75 Cft

85.71 - 29.75 Net Total 55.96 Cft

Surface Rendering

With Cement Sand Mortar1:1of¼" thick 220.00 Sft

Material

Cement for.

Cement Concrete 1:6:12 3.84 Bags

Cement Concrete 1:2½:5 5.62 Bags

¼" Cement PLaster 1:1 2.27 Bags

11.73 Bags 230.00 Each 2,697.90 Sand for.

Cement Concrete 1:6:12 28.86 Cft

Cement Concrete 1:2½:5 17.54 Cft

¼" Cement PLaster 1:1 2.86 Cft

49.26 Cft 3.50 P. Cft 172.41 

Unit Rate (British System) per Rft

Page 19

Page 20: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 20/43

b) Type II

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Brick ballast for 1:6:12 57.70 Cft 5.60 P. Cft 323.12 

Bajri for 1:2½:5 35.10 Cft 18.50 P. Cft 649.35 

Total 3,842.78 Contractor's Profit & Overheads 20 Percent 768.56 

Total 4,611.34 

Labour

Mason 3.00 Nos 300.00 P. Day 900.00 

Unskilled Cooly 6.00 Nos 140.00 P. Day 840.00 

Bahishti 1.50 No 160.00 P. Day 240.00 

Total 1,980.00 

Sundries 10 Percent 198.00 

Total 2,178.00 

Contractor's Profit & Overheads 20 Percent 435.60 

Total 2,613.60 

Item Rates

Labour Rate Per Rft Rs. 26.14 Say 26.15 

Labour Rate Per Rm Rs. 85.73 Say 85.75 

Composite Rate Per Rft Rs. 72.25 Say 72.25 

Composite Rate Per Rm Rs. 236.98 Say 237.00 

Unit Rate (British System) per Rft

Page 20

Page 21: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 21/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

c) Type III

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-3 5/8"+1'-11") 117.33 Cft

2

2'x100'x4½"x1½" 9.38 Cft

Total 126.71 Cft

Deduction.1x100x(8"+1'-½"

)x5¾" 40.93 Cft

2

Net Total 85.78 Cft

CC 1:2½:5

1x100(8"+1'-2") 5¾" 43.92 Cft

2

1x100x1'-11"x4" 63.89 Cft

Total 107.81 Cft

Deduction.

1x100x.082 8.20 Cft

1x100(7-3/8"+1'-½")6" 41.40 Cft

2

1x100(1'-½"+1'-11")x¾" 9.24 Cft

2

Total 58.84 Cft

107.81 - 58.84 Net Total 48.97 Cft

Surface Rendering.

Surface Area.

1x9.4'x100 78.33 Sft

12

2x6½"x100 108.33 Sft

12

Unit Rate (British System) per Rft

Page 21

Page 22: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 22/43

c) Type III

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

2x5¼"x100 87.50 Sft

12

274.16 Sft

Material Required. Say: 274.20 Sft

Cement for.

Cement Concrete 1:6:12 5.57 Bags

Cement Concrete 1:2½:5 7.10 Bags

Cement for Surface rendering 2.52 Bags

15.19 Bags

Say 15.00 230.00 Each 3,450.00 

Sand for.

Sand for 1:6:12 40.00 Cft

Sand for 1:2½:5 22.00 Cft

Sand for Surface rendering 3.00 Cft

65.00 Cft 3.50 P. Cft 227.50 

Brick ballast for 1:6:12 84.00 Cft 5.60 P. Cft 470.40 

Bajri for 1:2½:5 44.07 Cft 18.50 P. Cft 815.30 

Total 4,963.20 

Contractor's Profit & Overheads 20 Percent 992.64 

Total 5,955.83 

Labour

Mason 2.75 Nos 300.00 P. Day 825.00 

Unskilled Cooly 10.00 Nos 140.00 P. Day 1,400.00 

Bahishti 1.30 Nos 160.00 P. Day 208.00 

Total 2,433.00 

Sundries 10 Percent 243.30 

Total 2,676.30 

Contractor's Profit & Overheads 20 Percent 535.26 

Total 3,211.56 

Item Rates

Labour Rate Per Rft Rs. 32.12 Say 32.10 

Labour Rate Per Rm Rs. 105.34 Say 105.35 

Composite Rate Per Rft Rs. 91.67 Say 91.65 

Composite Rate Per Rm Rs. 300.69 Say 300.70 

Unit Rate (British System) per Rft

Page 23: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 23/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

d) Type IV

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-3 ¾"+2'-1½")x11½" 164.73 Cft

2

2x100x4½"x1½" 9.38 Cft

Total 174.11 Cft

Deduction.

1x100x(8"+1-3½")x8½" 69.35 Cft

2

Net Total 104.76 Cft

CC 1:2½:5

1x100(8"+1'-4¼") 8½" 71.60 Cft

2

1x100x2'-1¼"x4" 70.14 Cft

Total 141.74 Cft

Deduction.1x100x0.082 8.20 Cft

1x100(7'-3/8"+1'-2¾")x8¾" 67.20 Cft

2

1x100(1'-2¾"+2'-1¼")x¾" 10.42 Cft

2

Total 85.82 Cft

141.74 - 85.82 Net Total 55.92 Cft

Surface Rendering.

1x9.4/1x100 78.33 Sft

122x5¼x100 87.50 Sft

12

2x9½x100 158.33 Sft

12 324.16 Sft

Say: 324.16 Sft

Unit Rate (British System) per Rft

Page 23

Page 24: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 24/43

d) Type IV

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material Required.

Cement for.

Cement for 1:6:12 6.81 Bags

Cement for 1:2½:5 8.11 Bags

Cement for Surface rendering 2.98 Bags

17.90 Bags 230.00 Each 4,117.00 

Sand for.

Sand for 1:6:12 51.33 Cft

Sand for 1:2½:5 25.33 Cft

Sand for Surface rendering 3.73 Cft

80.39 Cft 3.50 P. Cft 281.37 

Brick ballast for 1:6:12 102.66 Cft 5.60 P. Cft 574.90 

Stone Bajri for 1:2½:5 50.33 Cft 18.50 P. Cft 931.11 

Total 5,904.37 

Contractor's Profit & Overheads 20 Percent 1,180.87 

Total 7,085.24 

Labour

Mason 3.25 Nos 300.00 P. Day 975.00 

Unskilled Cooly 11.83 Nos 140.00 P. Day 1,656.20 

Bahishti 1.67 Nos 160.00 P. Day 267.20 

Total 2,898.40 

Sundries 10 Percent 289.84 Total 3,188.24 

Contractor's Profit & Overheads 20 Percent 637.65 

Total 3,825.89 

Item Rates

Labour Rate Per Rft Rs. 38.26 Say 38.25 

Labour Rate Per Rm Rs. 125.49 Say 125.50 

Composite Rate Per Rft Rs. 109.11 Say 109.10 

Composite Rate Per Rm Rs. 357.88 Say 357.90 

Unit Rate (British System) per Rft

Page 24

Page 25: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 25/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

e) Type V

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-7"+2'-3¾")x10½" 170.44 Cft

2

2x100x(6½"x4½")5½" 44.01 Cft

2Total 214.45 Cft

Deduction.

1x100x(8"+1'-2¾")x7½" 59.24 Cft

2

Net Total 155.21 Cft

CC 1:2½:5

1x100(8"+1'-6¾")x1'-1" 120.75 Cft

2

1x100x2'-3¾"x4" 77.08 CftTotal 197.83 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7-3/8"+1'-5¼")x11¾" 100.48 Cft

2

1x100(1-5¼"+2'-3¾")x¾" 11.72 Cft

2

Total 120.40 Cft

197.83 - 120.40 Net Total 77.43 Cft

Surface Rendering with 1:1 C/S.

Mortor ¼" thick.

1x9.4"x100 78.33 Sft

12

Unit Rate (British System) per Rft

Page 25

Page 26: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 26/43

e) Type V

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

2x5¼"x100 87.50 Sft

12

2x1'-1"x100 216.66 Sft

Total 382.49 SftMaterial Required. Say: 382.50 Sft

Cement for.

Cement for 1:6:12 9.96 Bags

Cement for 1:2½:5 11.22 Bags

Cement for Surface rendering 3.52 Bags

24.70 Bags 230.00 Each 5,681.00 

Sand for.

Sand for 1:6:12 75.00 Cft

Sand for 1:2½:5 35.00 Cft

Sand for Surface rendering 4.40 Cft

114.40 Cft 3.50 P. Cft 400.40 

Brick ballast for 1:6:12 150.15 Cft 5.60 P. Cft 840.84 

Stone Bajri for 1:2½:5 69.70 Cft 18.50 P. Cft 1,289.45 

Total 8,211.69 

Contractor's Profit & Overheads 20 Percent 1,642.34 

Total 9,854.03 

Labour

Mason 4.00 Nos 300.00 P. Day 1,200.00 

Unskilled Cooly 16.00 Nos 140.00 P. Day 2,240.00 Bahishti 2.20 No 160.00 P. Day 352.00 

Total 3,792.00 

Sundries 10 Percent 379.20 

Total 4,171.20 

Contractor's Profit & Overheads 20 Percent 834.24 

Total 5,005.44 

Item Rates

Labour Rate Per Rft Rs. 50.05 Say 50.05 Labour Rate Per Rm Rs. 164.18 Say 164.20 

Composite Rate Per Rft Rs. 148.59 Say 148.60 

Composite Rate Per Rm Rs. 487.39 Say 487.40 

Unit Rate (British System) per Rft

Page 27: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 27/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

f) Type VI

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-7"+2'-6½")x1-1½" 230.25 Cft

2

2x100x(6½"x4½")5½" 42.01 Cft

2

Total 272.26 CftDeduction.

1x100x(8"+1-5 1/8")x10½" 91.58 Cft

2

Net Total 180.68 Cft

CC 1:2½:5

1x100(8"+1'-9 1/8")x1'-4" 161.81 Cft

2

1x100x2'-6-1/8"x4" 83.68 Cft

Total 245.49 Cft

Deduction.1x100(7'-3/8"+1'-7 5/8")x1'-2¾" 138.28 Cft

2

1x100(1'-7 5/8"+2'-6 1/8")x0.75" 12.96 Cft

2

1x100x0.082 8.20 Cft

Total 159.44 Cft

245.49 - 159.44 Net Total 86.05 Cft

Surface Rendering.

1x9.4x100 78.33 Sft

122x5¼"x100 87.50 Sft

12

2x1'-4/12"x100 266.66 Sft

Total 432.49 Sft

Say: 432.50 Sft

Unit Rate (British System) per Rft

Page 27

Page 28: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 28/43

f) Type VI

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material Required.

Cement for.

Cement for 1:6:12 11.74 Bags

Cement for 1:2½:5 12.48 BagsCement for Surface rendering 3.98 Bags

28.20 Bags 230.00 Each 6,486.00 

Sand for.

Sand for 1:6:12 88.53 Cft

Sand for 1:2½:5 38.98 Cft

Sand for Surface rendering 4.97 Cft

132.48 Cft 3.50 P. Cft 463.68 

Brick ballast for 1:6:12 177.07 Cft 5.60 P. Cft 991.59 

Stone Bajri for 1:2½:5 77.45 Cft 18.50 P. Cft 1,432.83 

Total 9,374.10 Contractor's Profit & Overheads 20 Percent 1,874.82 

Total 11,248.92 

Labour

Mason 4.55 Nos 300.00 P. Day 1,365.00 

Unskilled Cooly 18.50 Nos 140.00 P. Day 2,590.00 

Bahishti 2.50 Nos 160.00 P. Day 400.00 

Total 4,355.00 

Sundries 10 Percent 435.50 

Total 4,790.50 

Contractor's Profit & Overheads 20 Percent 958.10 

Total 5,748.60 

Item Rates

Labour Rate Per Rft Rs. 57.49 Say 57.50 

Labour Rate Per Rm Rs. 188.55 Say 188.55 

Composite Rate Per Rft Rs. 169.98 Say 170.00 

Composite Rate Per Rm Rs. 557.52 Say 557.50 

Unit Rate (British System) per Rft

Page 28

Page 29: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 29/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

g) Type VII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-7"+2'-8½")x1-4 3/8" 292.82 Cft

2

2x100x(6½"x4½")5¼" 40.10 Cft

2Total 332.92 Cft

Deduction.

1x100x(8"+9'-7½")1'-1 3/8" 127.71 Cft

2

Net Total 205.21 Cft

CC 1:2½:5

1x100(8"+1'-11½")1'-6.5/8" 203.71 Cft

2

1x100x2'-8½"x4" 90.28 CftTotal 293.99 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7 3/9"+1'-10")1'-5½" 178.52 Cft

2

1x100(1'-10"+2'-8½")x7/8" 16.56 Cft

2

Total 203.28 Cft

293.99 - 203.28 Net Total 90.71 Cft

Surface Rendering with 1:1 CS mortor.

1x9.4x100 78.33 Sft

12

Unit Rate (British System) per Rft

Page 29

Page 30: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 30/43

g) Type VII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

2x5¼"x100 87.50 Sft

12

2x1'-7/12"x100 316.66 Sft

482.49 Sft

Material Required. Say: 482.50 Sft

Cement for.

Cement for 1:6:12 13.34 Bags

Cement for 1:2½:5 13.15 Bags

Cement for Surface rendering 4.44 Bags

30.93 Bags 230.00 Each 7,113.90 

Sand for.

Sand for 1:6:12 100.55 Cft

Sand for 1:2½:5 41.09 Cft

Sand for Surface rendering 5.55 Cft147.19 Cft 3.50 P. Cft 515.16 

Brick ballast for 1:6:12 201.00 Cft 6.50 P. Cft 1,306.50 

Stone Bajri for 1:2½:5 81.64 Cft 18.50 P. Cft 1,510.34 

Total 10,445.90 

Contractor's Profit & Overheads 20 Percent 2,089.18 

Total 12,535.08 

Labour

Mason 5.04 Nos 300.00 P. Day 1,512.00 Unskilled Cooly 20.50 Nos 140.00 P. Day 2,870.00 

Bahishti 2.78 Nos 160.00 P. Day 444.80 

Total 4,826.80 

Sundries 10 Percent 482.68 

Total 5,309.48 

Contractor's Profit & Overheads 20 Percent 1,061.90 

Total 6,371.38 

Item Rates

Labour Rate Per Rft Rs. 63.71 Say 63.70 

Labour Rate Per Rm Rs. 208.98 Say 209.00 

Composite Rate Per Rft Rs. 189.06 Say 189.05 

Composite Rate Per Rm Rs. 620.13 Say 620.15 

Unit Rate (British System) per Rft

Page 31: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 31/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

h) Type VIII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-7"+2'-10 7/8")1' 7" 355.43 Cft

2x100x(6½"+4½")5¼" 40.10 Cft

2

Total 395.53 Cft

Deduction.

1x100x(8"+1'-9 7/8")1'-4" 165.97 Cft

2

Net Total 229.56 Cft

CC 1:2½:5

1x100(8"+2-1 7/8")1'-9¼" 249.95 Cft

2

1x100(2'-10 7/8")4" 96.88 Cft

Total 346.83 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7 3/8"+2'-3/8")1'-8¼" 223.42 Cft

2

1x100(2'-3/8"+2'-10 7/8")x¾" 15.43 Cft

2

Total 247.05 Cft

346.83 - 247.05 Net Total 99.78 Cft

Surface Rendering with 1:1 CS mortor.

1x9.4/x100 78.33 Sft

12

Unit Rate (British System) per Rft

Page 31

Page 32: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 32/43

h) Type VIII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

2x5¼"x100 87.50 Sft

12

2x1'-10.1/12"x100 375.00 Sft

540.83 Sft

Material Required. Say : 540.85 Sft

Cement for.

Cement for 1:6:12 14.92 Bags

Cement for 1:2½:5 14.50 Bags

Cement for Surface rendering 4.98 Bags

34.40 Bags 230.00 Each 7,912.00 

Sand for.

Sand for 1:6:12 112.48 Cft

Sand for 1:2½:5 45.30 Cft

Sand for Surface rendering 6.22 Cft

164.00 Cft 3.50 P. Cft 574.00 

Brick ballast for 1:6:12 250.00 Cft 5.60 P. Cft 1,400.00 

Stone Bajri for 1:2½:5 90.00 Cft 18.50 P. Cft 1,665.00 

Total 11,551.00 

Contractor's Profit & Overheads 20 Percent 2,310.20 

Total 13,861.20 

Labour

Mason 5.63 Nos 300.00 P. Day 1,689.00 Unskilled Cooly 22.90 Nos 140.00 P. Day 3,206.00 

Bahishti 3.10 Nos 160.00 P. Day 496.00 

Total 5,391.00 

Sundries 10 Percent 539.10 

Total 5,930.10 

Contractor's Profit & Overheads 20 Percent 1,186.02 

Total 7,116.12 

Item Rates

Labour Rate Per Rft Rs. 71.16 Say 71.15 

Labour Rate Per Rm Rs. 233.41 Say 233.40 

Composite Rate Per Rft Rs. 209.77 Say 209.75 

Composite Rate Per Rm Rs. 688.06 Say 688.05 

Unit Rate (British System) per Rft

Page 33: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 33/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

i) Type IX

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-10 3/8"+3'-3¼")x1'-8" 427.99 Cft

2

2x100x(7"+4½")9¼" 80.30 Cft

2Total 508.29 Cft

Deduction.

1x100x(9 3/8"+1'-11¼")x1'-4" 181.22 Cft

2

Net Total 327.07 Cft

CC 1:2½:5

1x100(9 3/8"+2'-6¼")x2'-1¼" 347.45 Cft

2

1x100(3'-3¼")4½" 122.66 Cft

Total 470.11 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7 3/8"+2'-11/2")x2'-¼" 278.41 Cft

2

1x100(2'-2¾"+3'-3¼")x¾" 17.19 Cft

2

Total 303.80 Cft

470.11 - 303.80 Net Total 166.31 Cft

Surface Rendering with (1:) C/S Mortar.1x9.4/x100 78.33 Sft

12

2x6¼x100 104.17 Sft

12

Unit Rate (British System) per Rft

Page 33

Page 34: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 34/43

i) Type IX

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

2x1'-10.1/12"x100 375.00 Sft

557.50 Sft

Material Required.

Cement for.Cement for 1:6:12 21.26 Bags

Cement for 1:2½:5 24.11 Bags

Cement for Surface rendering 5.13 Bags

50.50 Bags 230.00 Each 11,615.00 

Sand for.

Sand for 1:6:12 160.26 Cft

Sand for 1:2½:5 75.34 Cft

Sand for Surface rendering 6.41 Cft

242.01 Cft 3.50 P. Cft 847.04 

Brick ballast for 1:6:12 320.53 Cft 5.60 P. Cft 1,794.97 

Stone Bajri for 1:2½:5 149.68 Cft 18.50 P. Cft 2,769.08 

Total 17,026.08 

Contractor's Profit & Overheads 20 Percent 3,405.22 

Total 20,431.30 

Labour

Mason 6.66 Nos 300.00 P. Day 1,998.00 

Unskilled Cooly 31.91 Nos 140.00 P. Day 4,467.40 

Bahishti 4.03 Nos 160.00 P. Day 644.80 

Total 7,110.20 

Sundries 10 Percent 711.02 

Total 7,821.22 

Contractor's Profit & Overheads 20 Percent 1,564.24 

Total 9,385.46 

Item Rates

Labour Rate Per Rft Rs. 93.85 Say 93.85 

Labour Rate Per Rm Rs. 307.84 Say 307.85 

Composite Rate Per Rft Rs. 298.17 Say 298.15 

Composite Rate Per Rm Rs. 977.99 Say 978.00 

Unit Rate (British System) per Rft

Page 35: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 35/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

 j) Type X

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-10¾"+3'-5¾")x1'-10½" 503.91 Cft

2

2x100x(8"+4½")9½" 82.47 Cft2

Total 586.38 Cft

Deduction.

1x100x(9½"+2'-1¾")1'-6½" 226.43 Cft

2

Net Total 359.95 Cft

CC 1:2½:5

1x100(9½"+2'-8¾")2'-4" 410.76 Cft

21x100x3'-5¾"4½" 130.47 Cft

Total 541.23 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7' 3/8"+2'-5¼")2'-2¼" 333.86 Cft

1x100(2'-5¼"+3'-5¾"

)x¾" 18.43 Cft

2

Total 360.49 Cft

541.23 - 360.49 Net Total 180.74 Cft

Surface Rendering with (1:1) Cement

Sand Mortar. 620.00 Sft

Unit Rate (British System) per Rft

Page 35

Page 36: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 36/43

 j) Type X

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material Required.

Cement for.

Cement for 1:6:12 23.40 Bags

Cement for 1:2½:5 26.20 BagsCement for Surface rendering 5.70 Bags

55.30 Bags 230.00 Each 12,719.00 

Sand for.

Sand for 1:6:12 176.37 Cft

Sand for 1:2½:5 81.85 Cft

Sand for Surface rendering 7.13 Cft

265.35 Cft 3.50 P. Cft 928.73 

Brick ballast for 1:6:12 352.75 Cft 5.60 P. Cft 1,975.40 

Stone Bajri for 1:2½:5 162.61 Cft 18.50 P. Cft 3,008.29 

Total 18,631.41 Contractor's Profit & Overheads 20 Percent 3,726.28 

Total 22,357.69 

Labour

Mason 7.35 Nos 300.00 P. Day 2,205.00 

Unskilled Cooly 35.00 Nos 140.00 P. Day 4,900.00 

Bahishti 4.43 Nos 160.00 P. Day 708.80 

Total 7,813.80 

Sundries 10 Percent 781.38 Total 8,595.18 

Contractor's Profit & Overheads 20 Percent 1,719.04 

Total 10,314.22 

Item Rates

Labour Rate Per Rft Rs. 103.14 Say 103.15 

Labour Rate Per Rm Rs. 338.31 Say 338.30 

Composite Rate Per Rft Rs. 326.72 Say 326.70 

Composite Rate Per Rm Rs. 1071.64 Say 1,071.65 

Unit Rate (British System) per Rft

Page 36

Page 37: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 37/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

k) Type XI

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-10¾"+3'-8¼")x2'-1 3/8" 599.05 Cft

2

2x100x(8"+4½")9½" 82.47 Cft2

Total 681.52 Cft

Deduction.

1x100x(9½"+2'-4¼")1'-9¾" 285.09 Cft

2

Net Total 396.43 Cft

CC 1:2½:5

1x100(9½"+2'-11¾")2'-7¼" 490.99 Cft

1x100x3'-8¼"x4½" 138.28 Cft

Total 629.27 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7' 3/8"+2'-7¾")2'-5½" 400.71 Cft

2

1x100(2'-7¾"+3'-8¼")x¾" 19.79 Cft

2

Total 428.70 Cft

629.27 - 428.70 Net Total 200.57 Cft

Surface Rendering with (1:1) Cement

Sand Mortar. 711.70 Sft

Unit Rate (British System) per Rft

Page 37

Page 38: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 38/43

k) Type XI

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material Required.

Cement for.

Cement for 1:6:12 25.77 Bags

Cement for 1:2½:5 29.08 BagsCement for Surface rendering 6.55 Bags

61.40 Bags 230.00 Each 14,122.00 

Sand for.

Sand for 1:6:12 194.25 Cft

Sand for 1:2½:5 91.12 Cft

Sand for Surface rendering 8.18 Cft

293.55 Cft 3.50 P. Cft 1,027.43 

Brick ballast for 1:6:12 388.50 Cft 5.60 P. Cft 2,175.60 

Stone Bajri for 1:2½:5 180.51 Cft 18.50 P. Cft 3,339.44 

Total 20,664.46 Contractor's Profit & Overheads 20 Percent 4,132.89 

Total 24,797.35 

Labour

Mason 8.34 Nos 300.00 P. Day 2,502.00 

Unskilled Cooly 38.94 Nos 140.00 P. Day 5,451.60 

Bahishti 4.96 Nos 160.00 P. Day 793.60 

Total 8,747.20 

Sundries 10 Percent 874.72 

Total 9,621.92 

Contractor's Profit & Overheads 20 Percent 1,924.38 

Total 11,546.30 

Item Rates

Labour Rate Per Rft Rs. 115.46 Say 115.45 

Labour Rate Per Rm Rs. 378.72 Say 378.70 

Composite Rate Per Rft Rs. 363.44 Say 363.45 

Composite Rate Per Rm Rs. 1192.07 Say 1,192.05 

Unit Rate (British System) per Rft

Page 39: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 39/43

Item No. 6 Constructing Punjab standard drains of cement

concrete 1:2½:5 with cement concrete bedding

ratio 1:6:12 complete, laid to lines, grades,

slopes and shapes, rendering exposed surface of 

concrete with 1:1 cement sand mortar ¼"(6mm)

thick as per Engineers Drawing (excluding

Excavation).

l) Type XII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

CC 1:6:12

1x100(1'-10¾"+3'-10¾")x2'-4¼" 681.72 Cft

2

2x100x(8"+4½")9¾" 84.63 Cft2

Total 766.35 Cft

Deduction.

1x100x(9½"+2'-6¾")2'-¼" 338.91 Cft

2

Total 427.44 Cft

CC 1:2½:5

1x100(9½"+3'-1¾")2'-10" 557.81 Cft

1x100x3'-10¾"x4½" 146.09 CftTotal 703.90 Cft

Deduction.

1x100x0.082 8.20 Cft

1x100(7' 3/8"+2'-10¼")2'-8¼" 466.17 Cft

2

1x100(2'-10¼"+3'-10¾")x¾" 21.61 Cft

2

Total 495.98 Cft

703.90 - 495.98 Net Total 207.92 Cft

Surface Rendering with (1:1) Cement

Sand Mortar. 765.82 Sft

Unit Rate (British System) per Rft

Page 39

Page 40: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 40/43

l) Type XII

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material Required.

Cement for.

Cement for 1:6:12 27.78 Bags

Cement for 1:2½:5 30.15 BagsCement for Surface rendering 7.05 Bags

64.98 Bags 230.00 Each 14,945.40 

Sand for.

Sand for 1:6:12 209.45 Cft

Sand for 1:2½:5 94.19 Cft

Sand for Surface rendering 7.05 Cft

310.69 Cft 3.50 P. Cft 1,087.42 

Brick ballast for 1:6:12 418.90 Cft 5.60 P. Cft 2,345.84 

Stone Bajri for 1:2½:5 187.12 Cft 18.50 P. Cft 3,461.72 

Total 21,840.38 

Contractor's Profit & Overheads 20 Percent 4,368.08 

Total 26,208.45 

Labour

Mason 8.89 Nos 300.00 P. Day 2,667.00 

Cooly 41.50 Nos 140.00 P. Day 5,810.00 

Bahishti 5.30 Nos 160.00 P. Day 848.00 

Total 9,325.00 Sundries 10 Percent 932.50 

Total 10,257.50 

Contractor's Profit & Overheads 20 Percent 2,051.50 

Total 12,309.00 

Item Rates

Labour Rate Per Rft Rs. 123.09 Say 123.10 

Labour Rate Per Rm Rs. 403.74 Say 403.75 

Composite Rate Per Rft Rs. 385.17 Say 385.20 Composite Rate Per Rm Rs. 1263.37 Say 1,263.35 

Unit Rate (British System) per Rft

Page 41: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 41/43

DESCRIPTION OF ITEM NO 7: Laying RC hume pipes in positions, including

 jointing.

a) 6" to 12" (150 to 300mm) Dia.

 

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.25 Bags 230.00 Each 57.50 

Sand 1.20 Cft 3.50 P. Cft 4.20 

Total 61.70 

Contractor's Profit & Overheads 20 Percent 12.34 

Total 74.04 

Labour for 50 Lft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 4.00 Nos 140.00 P. Day 560.00 

Total 860.00 

Sundries 10 Percent 86.00 

Total 946.00 

Contractor's Profit & Overheads 20 Percent 189.20 

Total 1,135.20 

Item Rates

Labour Rate Per Rft Rs. 22.70 Say 22.70 

Labour Rate Per Rm Rs. 74.47 Say 74.45 

Composite Rate Per Rft Rs. 24.18 Say 24.20 

Composite Rate Per Rm Rs. 79.33 Say 79.35 

Unit Rate (British System) per Rft/Assumed for 40 Rft

Page 41

Page 42: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 42/43

Item No. 7 Laying RC hume pipes in positions, including

 jointing.

b) 12" to 24" (300 to 600mm) Dia.

 

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.50 Bags 230.00 Each 115.00 

Sand 2.40 Cft 3.50 P. Cft 8.40 

Total 123.40 

Contractor's Profit & Overheads 20 Percent 24.68 

Total 148.08 

Labour for 50 Lft

Mason 1.00 No 300.00 P. Day 300.00 

Unskilled Cooly 7.00 Nos 140.00 P. Day 980.00 

Total 1,280.00 

Sundries 10 Percent 128.00 

Total 1,408.00 

Contractor's Profit & Overheads 20 Percent 281.60 

Total 1,689.60 

Item Rates

Labour Rate Per Rft Rs. 33.79 Say 33.80 

Labour Rate Per Rm Rs. 110.84 Say 110.85 

Composite Rate Per Rft Rs. 36.75 Say 36.75 

Composite Rate Per Rm Rs. 120.55 Say 120.55 

Unit Rate (British System) per Rft/Assumed for 40 Rft

Page 42

Page 43: Rate analsis Chapter No. 20 (Surface Drainage)

8/9/2019 Rate analsis Chapter No. 20 (Surface Drainage)

http://slidepdf.com/reader/full/rate-analsis-chapter-no-20-surface-drainage 43/43

Item No. 7 Laying RC hume pipes in positions, including

 jointing.

c) 24" to 36" (600 to 900mm) Dia.

 

Detail

Qty Rate

Per Unit (Rs.) Amount (Rs.)

Material

Cement 0.75 Bags 230.00 Each 172.50 

Sand 3.75 Cft 3.50 P. Cft 13.13 

Total 185.63 

Contractor's Profit & Overheads 20 Percent 37.13 

Total 222.75 

Labour for 50 Lft

Mason 2.00 No 300.00 P. Day 600.00 

Unskilled Cooly 8.00 Nos 140.00 P. Day 1,120.00 

Total 1,720.00 

Sundries 10 Percent 172.00 

Total 1,892.00 

Contractor's Profit & Overheads 20 Percent 378.40 

Total 2,270.40 

Item Rates

Labour Rate Per Rft Rs. 45.41 Say 45.40 

Labour Rate Per Rm Rs. 148.94 Say 148.95 

Composite Rate Per Rft Rs. 49.86 Say 49.85 

Composite Rate Per Rm Rs. 163.55 Say 163.55 

Unit Rate (British System) per Rft/Assumed for 40 Rft